Multiple strategy counter based
Hi guys,
once we set up a maintenance plan and schedule it....lets say we create a measuring point and had given the initial value as 5000 miles in measurement document and maintaining the same 5000 mi as start counter reading in maintenance plan...so work order shd get genrated once it reaches every 5000 miles when measurement document get updated.
but when I scheule the maintenace plan...ip10 i find some dates specified even for future also.how the dates can be in there as nobody knows when it reached 5000 miles?
even if we create thru single cycle plan...we wll give the frequncy as 5000 mi in the cycle and whn i scheule it...i am seeing some dates in the future...this is just because I maintinaed the scheduling period? normally timebased will only have the dates rite.
pls advice
regards,
vijay
Hi
The Measurement counter always run and schedule on the annual estimate, When ever you provide the annual estimate it will always schedule it for the whole year calculate the future dates on the basis of annual estimate of values.
However you can change the scheduling period from Transaction IP10> TAB Maintenance Plan Scheduling Parameters-> Call Control Parameter and here you can adjust the required time for generating call object
and similarly you can adjust the above parameters in transaction IP43 --> Maintenance Plan scheduling parameters ---> Call control parameter and schedperiod
Similar Messages
-
Hi Dear All,
as per client requirement I want to create Strategy Plan (Counter Based) in which Maint call has to due on after every
100Hr & 300Hr. for that I created Meas Counter & assigned Lower Range: 0Hr & Upper Range: 100Hr.
after assigning Maint Strategy & counter to Maint Plan, I scheduled it. Initialy no any Meas Documents created so no any
Maint call due but after 1st Overflow at 100Hrs their r number of maint calls due(near about 42 maint calls due) on same
date for both maint packages. I didn't understand that, how miant call due for 300Hr Package(even it is not overflowed)?
Could any one plz explain me in details?
afterwords i created few more meas documents upto 320Hrs which would not make any effect on next scheduled calls. The
Scheduled call Status list is same as it is after 100Hrs.
Plz let me know where I was wrong?
Thanks in Advance...
Amol.Hi Amol,
When you are maintaining a counter, you should not normally give Upper & Lower Limit.
You should Maintain Annual Estimate. What is that you have maintained in your Counter. I hope you have maintained a very low value or none.
Hence when you have created a measuring document of 100 Hrs, it has considered very short duration and calculated many calls same day.
Just Enter a Annual estimate say 8000Hrs (maximum possible practically is 8760).
Create anothert plan and just check with same measuring point after entering the annual estimate & removing limits. It should work.
MLN Prasad -
Error while creating measurment documents for a counter (counter based strategy Plan)
Dear Experts
Pl suggest the possible solution for below case
I have a counter based preventive maintenance Plan of 100km, 200km,..... with op1,op2,..... respectively.
Now I have done maintenance for 600 km and going to enter another reading in IK11.
Here, system is giving error
Counter reading in doc. 251591 larger than in subsequent doc. 251585
Message no. IR171
Diagnosis
No counter overflow reading has been defined for the measuring point, and the counter reading that you have entered is larger than the one in the subsequent measurement document.
This is not allowed, since the counter is not marked as running backwards.
System Response
Processing will not be continued.
Procedure
Check your entries and the counter data of the measuring point.
screen shot for measurement document earlier created is asHi Akhilesh
okay . I have not found any error in my last and current reading date and time
screen shot is attached again here for ur reference
now, what thing I have to checked, pl suggest. -
How to store multiple counts based on creation date
Hi,
I want to retrieve the count of number of risk for each date and render it on line graph. I am retrieving data from sharepoint list where the number of risk counts increase with its creation and decreases after it is closure which maintained in another
column. Like if a risk is created on 02/02/2015 and closes on 03/03/2015 and an another risk is created on 17/02/2015 and closes on 14/03/2015. Then the count of the risk from 02/02/2015 to 16/02/2015 is 1 and from 17/02/2015 to 03/03/2015 is 2 and
then again till 14/03/2015 is 1. I want to retrieve the count based on the dates rendered dynamically on X-axis that is from current date back to past 24 days. I tried to create two datasets with one storing the risks after being queried based on creation
date and closure date and retrieving the count from Graph Y values but it is returning me count 0.
Please help.
Thanks in advance.Hi,
I want to retrieve the count of number of risk for each date and render it on line graph. I am retrieving data from sharepoint list where the number of risk counts increase with its creation and decreases after it is closure which maintained in another
column. Like if a risk is created on 02/02/2015 and closes on 03/03/2015 and an another risk is created on 17/02/2015 and closes on 14/03/2015. Then the count of the risk from 02/02/2015 to 16/02/2015 is 1 and from 17/02/2015 to 03/03/2015 is 2 and
then again till 14/03/2015 is 1. I want to retrieve the count based on the dates rendered dynamically on X-axis that is from current date back to past 24 days. I tried to create two datasets with one storing the risks after being queried based on creation
date and closure date and retrieving the count from Graph Y values but it is returning me count 0.
Please help.
Thanks in advance. -
What is the use of OR and AND functions in counter based maint plan
Hi
I want to create a counter based maintenance plan...
I entered the measurement reading for the counter, reading is 4000 hrs
IN IP43
I created the counter plan with cycle as 6000 hrs. Once the document reaches 6000 order will be created. While creating the maintenance plan, in the maintenance schedule parameters, i check there is OR and AND functions avaliable...
I know the basic use of both the functions..
But what is the significance in the maintenance plan....
Will it give any effect, between the schedule date and measurement docu entries...
Since i need to maintain like... once the counter reaches 6000 hrs only order should be created.. it should not create once the date as been reached... since due to present condition, i am not running the DG....
Give ur inputs
- PithanHi
Thank you for your reply
As you said...
If you want order to be created only after certain Hrs to be reached to cycle value then you may opt for single cycle or strategy cycle
can u explain how to do it...
In single cycle or stratergy... if u schedule the plan itself, the dates will be populated.. it will calculate with respect to the annual reading we have entered in the measurement document...
My DG overhaul to be taken in every 6000 hrs... i create a plan... i have given the annual reading as 8000 hrs... if i schedule the plan for 5 yrs... wat will be the call objects...
Then i am running the DG for 3 hours a day... my annual running hrs will be 1000 hours.. but my order will be released since it has crossed the dates...
how to control... is it possible to do it in IP43 with multiple counter...
How to do this ?
Cna u explain
- Pithan -
Hello All
Can any one let me know how the counter based planning can be execute.
If the maintenance is required oon one equipment after 300 hrs & 1000 hrs.
I try to do this but not able to execute properly
1) create equipment
2) create 2 measuring point against the same equipment.
3) create cycle (ip11z) with same frequency.
4) create plan (ip43) and then assign the cycle set and then attach both counter to that plan.
5) after scheduling ip10 then creating measuring document
6) finally move to dead line monitoring
here at 260 hour the system is generating order but that order contain operation of both frequency (300 hrs &1000 hrs)
i also check the hierarchy, in (ip11z ) the hierarchy field is not available like as in ( ip11)
Thanks in advance
kapilHello Sandeep
Thnx for your reply but still i am in vain pl have a look elow what i did
I create strategy (E)
Scheduling indicator u2013 time
Strategy unit- H also mention call horizon, n some other parameters
In Packages
1) 288 H 300 hour 1H 1
2) 984 H 1000 hour 2H 2
hour UOM Description Short Descript Hierarchy
Then I create M-Plan via IP42 with the same strategy and attached the task-list. So there is no field to put the counter
May be I am wrong some where ,just review the same and let me know if miss some thing
Regards
Kapil -
Preventive Maintenance Order is not releasing as per scheduled Planning in Counter Based Plan
Hi Experts
In The below schenario
There is a counter based maintenance plan. of strategy 100 km,200 km,...1800 km..
Operaton1, Operation2,... Operation3... defined in maintenance package for 100 km, 200 km,.... respectively.
Now issue is that system is releasing order as per sequence of scheduled planing & not according to schedule of current counter reading of counter.
case: At 200km order 1 is released with operation1 only, logicaly system should release order with operation1, & operation2
same like that at 300 km, system has released order with op1 & op2, logicaly system should release order with operation1, & operation3 as per strategy defined in maintenance plan.
In the present condition, what we have to do to get the desired result like for next counter reading of 400 KM system should release order with op1, & op4.
Best Regards
Pravin Gautam1st order is getting generated by 100 KM. While doing Preventive Maintenance, vehicle will not have any movements so that counter reading at the completion should as same as 100 KM.
I am not clear how & why you entered 200 KM for completion of PM order.
Also, if you complete the 1st Preventive Maintenance at 200 KM, from there only system should calculate the next order. Its not Time based as this will come automatically with predefined frequency. Your plan is Performance based & system will act according to the completion of previous Preventive Maintenance.
I don't find any reason to change behavior which is correct. I am not convinced with the development which is giving wrong details to the business. -
Counter based warranty determination
Hi Experts,
My requirement is warranty should be determined when equipment reading is less than u201C10u201D and when counter reading exceeds 10 warranty should not be determined.
I have created new counter. Counter category-equipment, counter type-forward counter, counter unit-HR(hours),minimum value-1,maximum value-20,overflow value-21
I have created counter dependent warranty. Warranty type-customer warranty, warranty basis-counter dependent, counter attribute-equipment running hours, counter attribute value-10(warranty is applicable till counter value is less than 10) and counter unit-HR(hours).
Then I have assigned new counter and warranty to install base object.
*When I create service order and enter this install base object reference object, warranty(counter based) is getting determined. Then if I enter counter reading greater than u201C10u201D,still warranty is shown being determined(it should not be determined because counter reading is more than u201C10u201D
Request experts opinion on this. What settings need to be done so that counter based warranty is determined till counter value does not exceeds u201C10u201D.
Regards
NareshHi Roypurohit,
Thanks for the response,
As you said..there is no specific reason for not downloading material and serial number from ECC. We can download these combination as Installed base.
My concerns are
The installed base coming from ECC is not carrying Warranty information, and as per out client it is not impossible to assing warranty to each installed base and IOobject manually. it has to be automated.
secondly, installed based is getting created after outbound delivery in ECC and replicating to CRM. But as per client process, warranty only starts after Invoice document created in ECC system. Then how to capture invoice creation date details in warranty and how to assign it to respective installed base / IO object automatically.
In SAP CRM where can we see the downloaded Ibase and IO Objects? What is the difference between these two?
I hope you have understood the requirment. Please help me that how to resolve this issue.
Your suggestions are highly appreciated.
Regards
Raghu ram -
Crating multiple sales orders based on one inbound purchase order idoc
Hi All,
I have a requirement to create multiple sales orders based on single inbound PO idoc.Please let me know whether is it possible or not?
Regards
maheshHi Mahesh,
What is your crieteria for different SO's ?
Regards
Megha -
Performance/Counter Based Maintenance Plan
Dear All,
Please guide me the detailed process related with "Performance/Counter Based Maintenance Plan" with step wise(with Tcode) .
its urgent
Please help.
SushantHi Sushant,
as it's urgent, I simply refer to a blpg document created by Maheswaran KD:
Behavior of Performance Based Plan in SAP Plant Maintenance
Please, all credits to Maheswaran!
Regards,
P. -
Split Single IDOC into Multiple IDOC's Based on Segment Type
Hi Experts,
I have a scenario IDOC to FILE , Split Single IDOC into Multiple IDOC's based on Segment Type
Outbound:
ZIdocName
Control Record
Data Record
Segment 1
Segment 2
Segment 3
Status Record
I should get output like below
Inbound:
ZIdocName
Control Record
Data Record
Segment 1
Status Record
ZIdocName
Control Record
Data Record
Segment 2
Status Record
ZIdocName
Control Record
Data Record
Segment 3
Status Record
Please suggest me step by step process to achieve this task.
Thanks.Thanks a lot Harish for reply.
I have small doubt. According to your reply , If we have N number of segments in single IDOC with same fields in all segments then for splitting Single IDOC into Multiple IDOC's based on Segment Type we need to duplicate N number of target IDOC tree structure.
Is that possible to Split single IDOC into Multiple IDOC's based on Segment Type using only one Target IDOC structure without duplicating the Target IDOC structure tree. -
Plz explain use of MeasPoints & counters and counter based MaintenancePlan
Hi!
My dear PM Gurus
Can any body explain how to create the measuring points and counters and detailed steps
to create a counter based, performance based and condition based maintenance plans, plz.
Regards
MDSFRHi
Create the measuring point for the equipment in IK01. Before you need to create the characteristics for the measuring point in CT04.
For the Maintenance plans, pls find link below from SAP help
http://help.sap.com/saphelp_erp60_sp/helpdata/en/f9/548ab8cdeb11d1950e00a0c93029cf/frameset.htm
Sachin -
Steps to create the counter based Maintenance plan
Hi!
Can any body give "Steps to create the counter based Maintenance plan"
(Mater Data,Transactional Data and Customizing Data creation)
Regards,
MDSFRhi
please refer the following link
http://help.sap.com/saphelp_46c/helpdata/en/fe/67ef189d6f11d189b60000e829fbbd/content.htm
regards
thyagarajan -
HI Friends,
We have created a counter based startegy plan. the order should be generated at 500/1000/2000 hours.
Current counter reading is 5, still when the maintenance plan was scheduled 3 orders got generated for the same day.
Could you let me know why this happened? isithis standard system behaviour.
thnaks in advance
Warn regards
VivekHi
counter based plan count the counter on the basis of annual estimate in measuring point
and on the basis of that value only generate the order
so enter the practical value in annual estimate
keep the scheduling period small
try background scheduling
hope will be work
Jitender -
Counter based maintenance plan triggered improperly
Hi,
we have created one counter based maintenance plan with cycle unit 1000 hours offset unit 0 hours this plan was created on 21.04.2008 . But 68 orders triggered on 19.04.2011 why it was happend.
how find start of cycle reading for the Maintenance plan?
Regards
GaneshHi,
Counter based plan will work based on the Measuring point assigned to that.
In Measuring Point, you would have defined the Annual Estimate. Based on the Annual Estimate & Cycle value in Plan & Scheduling period in the plan, based on all these, call object would be generated.
Doubt in Single Cycle Performance based Plan
Regards,
Maheswaran.
Maybe you are looking for
-
Css style class can't be used in Page Fragment?
I need to use css to modify pages. When I open a page fragment and want to apply a css rule to a button, i can't find any styleClass available in popup window: Properties->Appreaance->styleClass. Does anyone have any idea?
-
Material Replication from ECC to SRM 7.0
Hi Experts, I am working on Extended classic scenario SRM 7.0 with ECC 6.0, I have created the Material Group and Master data in ECC system. While doing replication via R3AS i am getting the following error msg( I have applied Note 720819 & 330401in
-
I too upgraded to 2.2 and had many issues.. mp3's not playing... text messages acting weird... my phone screens lagging etc... I did some research on AndroidCentral.com and found out it wasn't my phone.... just some settings that needed to be changed
-
SQLLDR script to load .xls file to database.
Hello Experts, Please can anyone tell me the sqlldr script to load .xls file to the database. I am using Oracle 10g XE as the database, and want to load a .xls file to a schema using the sqlldr script. Waiting for your reply... Thanks in advance, Man
-
Can we allow autonomus pragma in stored function
Is it possible to incorporate a autonomous pragma in stored procedure?