Multiple titles within one project for sharing to iDVD

Hello,
I have about 90 minutes of video from Christmas.
I want to create one iMovie project from this footage, but separate it into 5 different titles (within the project) each of which will have 2 or 3 chapters, so I can just share the one project with iDVD when burning to a DVD, rather than having to do 5 different projects.
Is this possible?
I've trying for most of the day to figure it out, but I can't.
Can anybody help?
Regards

There are at least two ways to do this depending on what results you want:
One way would be to create five separate iMovies; each with its respective 2-3 chapters and then import the five iMovies into iDVD.
When you import the first one into iDVD, you will see its title and the options 'Play Movie' and 'Scene Selection.'
When you import the second one, iDVD creates a title link to another submenu showing the Play Movie and Scene Selection options for the second movie; and so forth for each of the five movies.
This gives you the five titles on the main iDVD screen, and the chapter options on the submenus. With this method you would not have a "Play All" option unless you import the entire iMovie as the first movie. Then, you would have the 'Play Movie' option (which you could rename as Play All Movies) with the five separate movies as title buttons linking to each one's Play Movie and Scene Selections.
However, if you wanted all five titles and the chapter options to be on iDVD's main screen, you can do this with some copy/paste/delete manipulation of the submenus. If you wish to do this, post back for specific instructions.
Second method would be to leave your iMovie as one long iMovie and create chapter markers for each of the five titles; and markers for each of the chapters within those titles. If you label the chapter markers correctly, a viewer will easily be able to see the organization of your iMovie.
The chapters will appear on submenus...usually 4-6 chapters per submenu. I have done this with iMovies of trips where I marked the first chapter 'Italy: Rome' second 'Venice' third 'Milan' and fourth 'France: Paris' fifth 'Chartres' sixth 'Bordeaux' etc.
This option will allow the iMovie to be selected in its entirety...the Play All option...as well as begin at whatever chapter is selected. By carefully manipulating the submenus, you could easily have each of the five divisions as separate submenus.

Similar Messages

  • Multiple Assessments within one project

    Hi,
    Currently working on a project where I'd like to have 3
    assessments built in to the same project. The criteria I'd like to
    set is:
    On the first assessment, they need to pass to progress
    On the second they need to pass to progress
    On the third they get a total score and marked as compentent
    to complete.
    Is this possible?
    Cheers,
    Dean

    PR_098 - WELCOME to the all volunteer board. There is one
    cumulative score given at the end. There are not sub-scores.
    However, you might be able to say "you passed phase 1 and your
    score is 33.33% or 100% for that section. But that would be only
    one question giving you that ability. Then it would continue and
    score the next part the same way. At the end you would get the
    number of questions and the overall score. But I think you would be
    asking several questions per subsection and that would make this
    not work.
    If you were using an LMS, then you would just break this into
    courses that link to each other. A passes assessment would go to
    the end and a failed assessment would take users to the next
    learning module. At the end you would have individual scores., but
    you might be able to score a sub-module as a collective course with
    an LMS. I don't see this as a shortcoming of Captivate because it
    is not an LMS, yet it has a built-in Quiz module.
    Regarding the first post here by happystar73, that is
    possible, but the course would move on and score it at the end. I
    have designed several courses with:
    Slide 1
    Slide 2
    Slide 3
    Slide 4
    Quiz-Slide 5 - On fail go to slide 6 on pass go to slide 7.
    Slide 6 Failure - message, hints, etc then on Next> Back
    to Slide 1
    Slide 7
    Slide 8
    Quiz Slide 9 - On fail go to slide 10 on pass go to slide
    11.
    Slide 10 Failure - message, hints, etc then on Next> Back
    to Slide 7
    Slide 11 End / Score
    Notice the pattern. This is what is needed to loop-back in
    Captivate 2 (I don't have Captivate 3 due to ongoing bugs that must
    be fixed before I agree to upgrade). The loop-back that goes
    forward first is the only way that I can get multiple answer
    Multi-Choice questions to reset / clear for another try in
    Captivate 2. I usually set the maximum attempts at 10 or 20 when I
    do this (in the overall Quiz settings and in the Quiz slide
    settings and the user MUST take the Quizzes to continue).
    If you add to the above the Captivate 3 functionality for
    Quiz Pools and randomizing of answers, then you have something more
    dynamic. It still produces only one final set of results.
    The final method is to link several courses together where
    one calls another. But the scoring sould be presentation and not
    cumulative.
    More advanced users can use SCORM SCO editing tools and
    modify the behavior to allow multiple SCO's. There are tools that
    assist with this and one of the local (board) SCORM Guru's recently
    posted a website that has all of those tools.
    I think I just restated what is in many other posts on this
    site. However, Captivate is a fantastic screen capture tool for
    software simulations, demos and software proficiency assessments.
    When you are doing more of a PowerPoint and sound enabled
    presentation and need strict SCORM compliance, there are other
    options available (generally at a higher price).
    Best of luck to you on your projects.
    Joe C.

  • Moving Titles from one project to another

    I want to combine several iMovie projects into one, in order to create a single DVD via iDVD. The projects are fairly simple - no music, just video, dissolves, and some text.
    When I select all, and then copy and paste from one project to another, the titles do not transfer. The background for the titles - i.e. black spaces - do transfer, but not the text. It seems there's no simple way to move titles from one project to another. Is there a solution or workaround, or do I simply need to create new titles in my new, combined project? Thanks.

    The simplest way would be to use multiple movies in iDVD. iDVD handles multiple movies easily and will help you set up a menu if you want. Just share your movies to the Media Browser. Then open iDVD and drag them into your iDVD project from the Media Browser in iDVD.

  • Multiple plant in one project

    Dear PS gurus!
    Want to know that can we create one project having multiple plant, if yes ? how we will do costing?How to customize?
    plz let me know the concept.
    Ansar

    you can have multiple plants in one project
    there is no customising for this - the plant would be set up as part of enterpise customising
    the costing will be based on the WBS object assigned
    for eg you can have a project where some work is carried out in plant A and some work in plant B - projects can be cross plant the cost will be assigned to the WBS based on the actual postings but the WBS can have different plant assignments

  • Compiling multiple pictures within one image?

    Hi
    My wife uses her iMac for her work, and she's trying hard to compile multiple pictures within one .jpeg image. Is this possible with *iPhoto 2*, or are there any recommended (free if possible) downloads available to acheive this?
    Many thanks in advance.

    Garth
    Welcome to the Apple suer to user assistance forums
    iPhoto does not have the capability of combining photos - click here for a few that people like for image editing starting with free - or search Macupdate for others
    LN

  • Can i install itunes multiple times on one computer for multiple users?

    Can i install itunes multiple times on one computer for multiple users?

    Like most applications you only need to install it once for it to be available to all users. (That said it is possible to install an application and only make it available to the current user, but that's rarely needed.)
    tt2

  • Multiple Developers on one Project

    Hi,
    I would like to know if there is a way that multiple developers on one project can work separately and later merge work into the main project?  I am thinking about the concept concurrent development.

    Hi Oumar,
    Use the NWDI to acheive this.
    Thanks.
    Sushil

  • How can I make multiple quizzes within one Captivate project?

    Hi guys! Really liking Captivate 5.5, especially the way random question slides can lift questions out of a question pool...very elegant!
    Sadly though, I've come up against a bit of a wall. In my project, I want to have 3 separate quizzes that all use the same question pool; a 10, 30 and 50 question-long quiz. Each one needs to have its own results page.
    It's easy enough to see what I mean by looking at the screenshot below:
    The idea was to have about 105 slides in total, with slides 10 - 20 being the 10 quiz slide, 21 - 51 being the 30 question quiz and 52 - 102 being the 50 question quiz.
    There are three invisible buttons placed over those 10, 30, 50 text boxes. In the picture, the '10 question' button would jump to slide 10, the '30 question' button would jump to slide 21, and the '50 question' button would jump to slide 52, jumping the user to the start of their designated tests.
    Though I can create the 10 random question "block" easy enough, when it comes to adding the 30 question "block" it just adds the new random questions to the existing random questions. I want three separate quizzes, each with their own results screens please. (I don't want to daisy-chain to external projects, because the results of each test need to be used within the homepage.)
    It just adds them on to the existing block!! Argh!!
    Little bit ticked off with Adobe...the reason their products are so incredible is because they put no constraints on the user, and you can use their tools to create things even the developers never dreamed of. Like in Photoshop for example, I bet when the dropshadow fx was created, the developers never realised that it would be used to give a metallic 'stamped' look to text by turning it to white and applying it just inside the text.
    Captivate, though amazing most of the time, has a nasty habit of stomping on my toes. You can't set grade boundaries and have quizzes give out grades A+ to F- for example. You can only have 'pass' and 'fail', thus making it rather pointless for use in schools, contrary to how the program is advertised. Another example would be when I wanted to create a replay button. I thought that a button that jumped to the slide it was on would be a simple, no-BS replay button, but for some reason you can't make a button jump to its current slide. I downloaded a widget that worked in the end, but I wish Adobe would get off my back and let me do what I want!
    Anyway, if you could help me out here it would be grand

    I must say I have a little sympathy for the Captivate developers on this occasion.  As you say, they've created an application that does so much, that when you eventually run into a hard boundary of some kind, the effect is somewhat jarring.  However, every application, no matter how good, has limits.  I'm probably one of the worst offenders when it comes to asking the Adobe Captivate Development Team for enhancements (I think I've logged over 70 enhancement requests for Captivate 6 alone).
    In your case, you want to have three different quizzes in one project file, each with it's own separate Quiz Results page.  Lilybiri's blog explains how to set up your own faux Quiz Results pages using system variables and custom user variables, but you're going to find this to be quite a lot of trouble.  Even if YOU want to consider these as three separate quizzes, as far as Captivate is concerned they're just one big quiz with 50 questions.  So Captivate will calculate it's internal results based on a 50 question quiz, even if your users select the 10 question version.  So achieving a final Pass/Fail result is going to be problematic at best.
    As Lilybiri suggested, your better strategy would be to break this up into separate modules so that you can get your three separate quiz results (all done in standard Captivate) as well as correct results based on the actual number of questions done by the user.
    As far as grades A-F is concerned, there's nothing to stop you from using Advanced Actions and User Variables to calculate the user's score as a grade.  You need a user variable that stores the user's grade (e.g. var_Grade). And you need a fairly complex Conditional Advanced Action (e.g. caa_CalculateGrade) with several clauses each of which goes something like:
    If
    cpQuizInfoPointsscored is lesser or equal to [highest score for a particular grade]
    AND
    greater or equal to [lowest score for a particular grade]
    Actions
    Assign var_Grade with [the appropriate grade for that range of scores]
    Your conditional action will need one of these clauses for each separate grade.  Once your variable has been assigned a grade based on the user's score, you can display it in a text caption somewhere on the quiz results page or on a slide thereafter with suitable commendations/ commiserations.

  • Best way to have multiple arrangements in one project file?

    Hello everybody,
    I am trying to figure out a smart way of having multiple arrangements associated with one project. More importantly, this would allow me to have multiple arrangements associated with the same pool of audio files in one audio window -- without needing to import/export audio.
    In DP this is achieved with multiple "sequences". I am aware this feature is not in Logic. However, perhaps there is a way to achieve a similar process?
    I guess a not-so-elegant approach would be to simply save a new song; however, if I want to use new song audio files in the old song, i'd have to import the new song audio files to the old song. Not a big deal, I guess.
    Thanks,
    D
      Mac OS X (10.4.5)  

    Thanks for responding Justin & David,
    Let me to try to better explain what I am trying to achieve.
    (Currently my problem is that I am thinking in the "workflow language" of DP, trying to figure out an analogous "translation" in Logic. For those familiar with DP, I am simply wanting to create a new sequence, within the same "song" file.
    Let's say I create a bunch of audio tracks, and compile them into arrangement A. I would like to work on a new idea that may be part of the final piece; So, I would like to have a clean, new arrangement page where I can put some of the previous audio files generated & used in arrangement A, as well as make some new ones. I'll call this arrangement B. So, in other words, arrangement B is a fresh new arrangement page that uses audio files from arrangement A as well as new ones.
    If any previous/current DP users know the best way of approximating DP's use of multiple sequences, I'd love to know what you do.
    I will explain what I am able to do if I were in DP (for the sake of communicating my problem, but not intended to begin a DP vs. LP thread).
    I will use Logic terminology, but DP concept:
    In DP, one can have multiple Arrangement windows that share a pool of audio files from one Audio Window. This allows one to try different arrangements, without keeping track of new/old audio files; and without needing importing and exporting them between songs.
    I have been reading the Project Manager section in the Logic manual. (By the way, I am not seeking a DP functionality in Logic; I am seeing how one achieves a similar workflow approach in Logic.)
    I realize I cannot even explain myself well. Perhaps I should consider the concept of sub-arrangements, and master arrangement. I guess, sub-songs, and work-in-progress master song. The master songs should have all audio files, and sub-songs have whatever audio files were created while working on that particular sub-song. So, with this, whenever I want to go back to master song, I've got to import the audio files from the sub-song.
    This may make sense - & may work smoothly. I've got to try it out.
    (Btw, David, I captured a screen shot, but I don't know where/how to post it.)
    A major thanks to all who have the patience to read so many words for a one word sentence.
    Thanks,
    Danny

  • Multiple exams in one project and variable

    Hello captivators,
    How do I make a captivate project with multiple exams. And with variables (widgets) that I need in the whole project.
    In the intro of the project you can select a character. That selected person is the visual coach (different branding) for the course.
    The student needs to through an intro module, next he can choose 6 parts of the course.
    One part = intro,n * show me, n * practice me, 1 * exam.
    The student needs to follow 1 part to the end. And then return to the intro.
    1st option: one project
    I can’t seem to make multiple examns with multiple results
    2nd option: multiple CP’s
    Then I have problems with the variables that are only known in one CP (SWF)
    3th option: Aggregator
    Then I can’t make condition. And I can’t hide the captivate menu when exported. I need conditions.
    HEEEELP Please,
    Koen

    I've not tried something like this to advise on whether it's possible in Captivate natively...but you've seem to have looked at all options and not found it possible. If that's the case, then perhaps the best option is to make the 'aggregator' in Flash, where you load each related CP file as the condititions are met. It's definitely possible to do, as one of my colleagues always uses his own 'Flash Shell' for this sort of thing. Possible for you, and ok in the project constraints?
    Erik

  • Multiple Delivery from one project

    Experts we need inputs on this process,
    Presently we are trying to map the production/Assemble through Network with out PP module,
    but if we have multiple products (sections) delivery needed through one project.
    Thanks

    Hi PSR,
    Thanks for your response,
    Yes we will assign required material through BOM transfer with header (-ve) as final product,
    But requirement is to complete one product we may have 10 or more sections, so if we assemble only it will become final product in project site , now each section we need to show in SAP as deliver from project .

  • Handling Multiple DVD as one project?

    Hi all,
    I am new to Encore. I got a chance to play with Production Studio CS3 (retail) before buying, and here is what I'd like to do to test my usual workflow:
    I have approx., 6 hours of video in PP CS3 (both DV and HDV) in one project.
    I'd like to create 3 DVD-Video disks from this. Is it possible to handle more than 1 DVD in Encore Project at once?
    If not, what is the best workflow for this?
    Should I split PP project to 3 separate ones, one per DVD, before export?
    Or is it possible to export only part of PP project to Encore (say, 1 sequence)?
    How do you usually handle multi-DVD workflow?
    Thanks,
    Vlad

    Welcome to the forum.
    The answer would be the same, even with CS5.
    Now, there is a recent thread on a user with multiple Projects, that have a common structure and many common Assets. I offered a workflow, that I have used for building a "template" Project, where one just Imports the unique Assets, edits the Menus, and then Burns that segment of a series of discs. In my case, I had 17 discs, in a set, and used that for all common items.
    If I can find that thread, I will post a link to it, however, if you do not have all those common assets, it will likely not be a useful workflow for you.
    Hunt

  • How to use two different versions of the same jar within one project

    Hi everybody!
    I have a big problem while integrating different web service clients within one bigger java project. Both implemetations need some jar files to work but demand different version. So, i would like to know if there is any way to tell which implementation should use which version! Anyhow i add those jars to the classpath makes working only one or the other webservice working but never both! Any ideas somebody?
    Best regrads,
    Stefan G�tz

    Of course do have the jar files different names but the classes inside of them are the same ... means that the standard system classloader can distinguish them. When you add a jar to a classpath the name actually dosent matter.... any other ideas, please?
    PD.: i tryed to add a manifest file to the one jar which makes use of one of the dublicated jars to specify which jar to take direcly but it makes no difference since once classes loaded they cant be distinguish ....see:
    http://java.sun.com/docs/books/tutorial/ext/basics/load.html

  • Do I make multiple videos in one project or make multiple projects??

    I am going to make at least three music videos for a local band for their web site. Do I make all three in one project and can i encode them for YouTube separately or do i do all three in totally separate projects??? It seems like once i have all the footage and audio loaded in a project and do one video to upload to YouTube then to do another video i have to load all that raw footage and audio all over again for the next video and then for the third video.... seems like once all that is loaded into a project i could just separate the videos for a few seconds and do another and then another, but how then to send them to YouTube separately???
    Or if i do all three in separate projects how can i combine them into one project to export in DVD quality for the band to use for promo???

    Personally, I would break the Project into three, discrete Projects, but you do have a point about the Importing of the Assets.
    You can certainly do this with one Project, and then Export/Share segments of it with the WAB (Work Area Bar). Here is a look at the WAB from an earlier version of PrE:
    As I do not upload to YouTube, I cannot tell you if you can use the WAB, when you do the direct Export/Upload. You may have to do an Export/Share for the individual segments, and then manually Upload each. Others can shed more light on this aspect.
    Good luck,
    Hunt

  • Can multiple users share one file for iphoto

    I want to be able to have all the user profiles on our iMac access the same files for iPhoto, so when one user adds photos they are there for anyone who logs on.

    For iPhoto 09 (version 8.0.2) and later:
    What you mean by 'share'.
    If you want the other user to be able to see the pics, but not add to, change or alter your library, then enable Sharing in your iPhoto (Preferences -> Sharing), leave iPhoto running and use Fast User Switching to open the other account. In that account, enable 'Look For Shared Libraries'. Your Library will appear in the other source pane.
    Any user can drag a pic from the Shared Library to their own in the iPhoto Window.
    Remember iPhoto must be running in both accounts for this to work.
    If you want the other user to have the same access to the library as you: to be able to add, edit, organise, keyword etc.
    Quit iPhoto in both accounts. Move the Library to the Users / Shared Folder
    (You can also use an external HD set to ignore permissions, a Disk Image or even partition your Hard Disk.)
    In each account in turn: Double click on the Library to open it. (You may be asked to repair the Library Permissions.) From that point on, this will be the default library location. Both accounts will have full access to the library, in fact, both accounts will 'own' it.
    However, there is a catch with this system and it is a significant one. iPhoto is not a multi-user app., it does not have the code to negotiate two users simultaneously writing to the database, and trying will cause db corruption. So only one user at a time, and back up, back up back up.

Maybe you are looking for

  • Connection to Apple TV

    Why does my connection lose connectivity after several minutes from the computer to my Apple TV ?

  • RSPAN Between Cisco UCS and 6500

    Hi, I need to SPAN traffic comming one server inside UCS and the destination as my 6500 core. I tried to get some document to check how to configure RPSN between UCS and 6500. Please guide Thanks Nibin

  • Java FX application not loading other machine

    Hi all, I have faced the problem when run the simple jafaFx sample application The code below : <html> <head> <title>EffectsPlayground</title> </head> <body> <h1>EffectsPlayground tttt</h1> <script src="http://dl.javafx.com/dtfx.js"></script> <script

  • Vil not start (2)

    I have a big problem: my PowerBook will not boot! It shows "only" apple logo and loading icon and then nothing more happens. I tried to reboot several times but without success. What should I do to make sure that my "data" is not lost? /Tommy Update

  • DB Table construction

    Would anyone be willing to give me tips on how to best setup my tables in MyPHPAdmin? Here is the general mockup of what I am trying to accomplish http://www.yogagoyoga.com/dbformat.html At the top of each column the bold text is how I want the infor