Multiple Work Center for single internal activity ?

If more than one work center used for single internal activity how can work center be allocated  ?

Hi Yogesh,
I understand that, you have a project activity in which different groups of people are working and you want to plan costs for all these groups of employees under the same project activity.
To achieve this, create different activity elements under that activity and assign specific WCs and Work duration to all these activity elements so that system will calculate aggregated costs and scheduling dates accordingly.
Hope this helps

Similar Messages

  • Creation of multiple cost center for one emplyee

    HI All,
    I have requirement . one emplyee is working two projects so need create two cost centers for one employee.
    please tell me how create multiple cost center for one employee.
    Thanks&Regards
    ramesh

    hai.
    if he works half the time... u can give 50%.. or just get it confirmed from core team member..
    manu

  • Multiple webdynpro applications for single webdynnpro component

    I am working on a object which have multiple webdynpro applications for single webdynnpro component.How to assign a different functionality to each application bcoz when we right click on webdynnpro component and select create webdynpro applications ,it just creates a application how so we assign diff functionality to each of them .Also in the parameter tab of the webdynpro applications ,there is a diff config id mentioned for each application.what is its relavance .
    Rgds,
    Praveen

    Hi Saravanan,
    I need to modify it from the portal end, not at the application level.
    I need some configuration steps which specifies how to modify the Detail Navigation in PPM. Using SPRO we can do some configuration, i wanted to know whether its possible from portal end as well.
    Regards
    Shivas Bhan

  • Error " No working/operating time maintained in work center for scheduling"

    Hello Friends,
    When i am scheduling the planned order than in scheduling log, system throwing the error "No working/operating time maintained in work center for scheduling".
    Message no. C7014
    But in workcenter, i have attached the grouping and in interval and shift for the available capacity 1, i have maintained the shifts.
    According i can see the capacity on that workcenter in CM01.
    Same error i am getting when i am scheduling the routing and check the scheduling log.
    Regards,
    Jitendra.

    Hi
    Have u checked , to maintain the time required to perform the activity in the work-center?
    please check, i think, we have to maintain for each activity type.
    regards,
    rasika

  • To find 'Maintenance Work Center' for Equipment (without Production order)

    Hi,
    I have a Report for - 'Equipment BOM' - IB03.
    Problem: How to find the 'Maintenance work Center ' For Equipment ? (IE03--> Organization > Responsibility> Main. W.Cntr)
    [ Note: For Client -->  It's not necessary that each Equipment has Production Order, Few Equipments are taken only for Repair purpose, Equipment is there in table - EQUI,
    So - Not possible to fetch from AUFK, HIKO or any other order tables. ]

    I have a Report for - 'Equipment BOM' - IB03.
    Problem: How to find the 'Maintenance work Center ' For Equipment ? (IE03--> Organization > Responsibility> Main. W.Cntr)
    [ Note: For Client --> It's not necessary that each Equipment has Production Order, Few Equipments are taken only for Repair purpose, Equipment is there in table - EQUI,
    So - Not possible to fetch from AUFK, HIKO or any other order tables. ]
    EQUZ-GEWRK has the main work center. Pass the equipment number and valid-to date to get the main work center.
    Cheers
    Sujay

  • Tables to retrieve work center for target costs

    Dear all,
    currently i developing a report which requires me to display the work centers and their target and actual hours and costs. I tried using production order link tables but they only show work centers that are related to planned costs. May i know which tables can i refer to, in order to retrieve work centers that contribute to the target costs?
    Thanks and Regards
    YM

    I have a Report for - 'Equipment BOM' - IB03.
    Problem: How to find the 'Maintenance work Center ' For Equipment ? (IE03--> Organization > Responsibility> Main. W.Cntr)
    [ Note: For Client --> It's not necessary that each Equipment has Production Order, Few Equipments are taken only for Repair purpose, Equipment is there in table - EQUI,
    So - Not possible to fetch from AUFK, HIKO or any other order tables. ]
    EQUZ-GEWRK has the main work center. Pass the equipment number and valid-to date to get the main work center.
    Cheers
    Sujay

  • Standard Hours Required on a Work Center for a month along with CC

    HI Gurus,
    My requirement is :
    I need a report which fetches how many hours are required in a month on a particular cost center attached to work center for a plant.
    Is there any standard report to fetch this . If no how can we develop a report. Which tables we need to combine in CO and PP.

    Hi,
    Check report S_ALR_8703611.
    Regards.

  • Multiple contact persons for single vendor--LSMW

    Hi experts,
        i want to upload multiple contact persons for single vendor. using lsmw direct input method or recording method is it possible..if possible can u let me know the procedure.
    Thx in advance,
    Neelu

    Hi
    in our company v wil upload contact person details in Sales Data......
    so its not possible to upload more than one contact person for vendor....
    can u tell me wr u people wil enter the contact person details?
    Regards
    Smitha

  • Multiple storage locations for single material - ECC 6.0

    Hi
    Can anyone let me know, how one can map multiple storage loctions for single material?
    regards
    Sanjay

    hello,
    Go to SPRO --> IMG --> Materials Management --> Inventory Management and Physical Inventory --> Plant Parameters.
    Tick Create storage locations automatically. System will extend the material to the storage location maintained in the transaction.
    Nikhil

  • Multiple notification to AdminMailRecipients for single quarantined Active Sync Device

    We have Exchange 2010 SP3 RU 7 and we use Exchange active sync to access emails on mobile.
    We have default access configured as quarantined and a email get delivered to HelpDesk Team to review those quarantined device whenever a new device tries to configure emails.
    I have seen a problem that HelpDesk Team is getting multiple quarantine notification for a single device, while I don't think that device owner tried it more than once to activate. Please help me on this.  Below is the output of ActiveSyncOrganizationSetting
    [PS] C:\Windows\system32>Get-ActiveSyncOrganizationSettings | fl
    DefaultAccessLevel        : Quarantine
    UserMailInsert            : DO NOT SEND THIS MESSAGE TO HelpDesk.  YOU DO NOT NEED TO DO ANYTHING.  YOUR DEVICE WILL BE Reviewed then approved.
    AdminMailRecipients       : {[email protected]}
    OtaNotificationMailInsert :
    Name                      : Mobile Mailbox Settings
    OtherWellKnownObjects     : {}
    AdminDisplayName          :
    ExchangeVersion           : 0.10 (14.0.100.0)
    DistinguishedName         : CN=Mobile Mailbox Settings,CN=OrganizationName,CN=Microsoft Exchange,CN=Services,CN=Configuration,DC=Domain,DC=local
    Identity                  : Mobile Mailbox Settings
    ObjectCategory            : domain.local/Configuration/Schema/ms-Exch-Mobile-Mailbox-Settings
    ObjectClass               : {top, msExchMobileMailboxSettings}
    OriginatingServer         : domaincontroller.domain.local
    IsValid                   : True

    Hi Sourabh Kumar Jha,
    According to the description, I know that only one user has this issue.
    Please try to re-configure ActiveSync for the specific user.
    Also try to re-set ActiveSyncOrganizationSettings via following command:
    Set-ActiveSyncOrganizationSettings –DefaultAccessLevel Quarantine -AdminMailRecipients [email protected] –UserMailInsert “Your mobile device is temporarily blocked from synchronizing with the server while permissions
    are verified.”
    Thanks
    Mavis Huang
    TechNet Community Support

  • Work Center  takes only 6  activity types

    Hi
    I    have   6  types of labor  activity type  ( L1 to  L6 )  ,  1  machine and  1 set up.  Total  8  activity  types.
    Now   if   the  planned  labor  is  eg  L1,  the  actual  may  be  L6.  But    I  cannot  assign     all   6  labor  type in the  work center.    Work center  allows  only  upto  6  activity types.
    I   checked  in  HR  module,  where  in   CAT2  we  can   record  ACTUAL  activity type  /  order  / employee data.  This can be moved to  controlling.      But  when  it  is  planning,  then  I  dont  know.
    How  can  I   accomodate  all  6  labor  type in the  work center.
    Thanks
    kamala

    Hi Kamala
    If you are in a production order scenario -
    You will have to create 2 work centers... One for Labor and another for Machine/Set up... there by you will have 2 operations in routnig
    If you are in a process order scenario -
    You can do with one single work center... This will accomodate 6 act types..
    Apart from work center, there is a concept of "Secondary Resource" in Process order scenario, which can accomodate your other 2 act types...
    Regards
    Ajay M

  • More than one work center for one operation

    Hi Experts,
    Is it posssible to assign more than one work center to one operation,in a maintenance order?
    for example if head fitter and helper has executed maint.activity,how we can do this
    Thanks in advance
    Regards
    Prashil

    Dear,
    You cannot assign more then one workcenter to a one operation.
    But you can assign to a sub operation,i.e to operation one workcenter and to suboperation anotherworkcenter.
    For Sub-operation:
    Go to task list change >>> Operation tab.
    Let say your first operation number is 0010. Then below it for next operation change operation number to 0010 and next to it there is field for sub-operation give there number 0001 or 0010 as per your requirement. Select suitable control key and work center, give description and press enter. your sub operation 0001 will be created for operation 0010.
    I hope it will solve your query,
    Thanks,
    Mohit

  • Logical link / Work center for directly accessing "Business Activities"

    Hi All,
    We are upgrading from CRM 5.0 to CRM 2007. One unique challenge that I have encountered is the access to search, change or create - BUSINESS ACTIVITIES (Leading Transaction category: BUS2000126) in the CRM Web UI. We would like to directly access Business activities through a work center -> Logical link or a Logical link, in the SALESPRO business role.
    This is available in the IC_AGENT business role. But you need to create a preceding Interaction record and then create a followup activity -> Business activity. We do not want to do this. We want to be able to access the business activites directly. For example, Leads and Opportunities can be accessed directly through the work Center: "Sales Cycle".
    Does anyone know if there is a work center that I can use in SALESPRO business role that will give me direct access to Business Activities . I can use the transaction launcher to access the HTML version of the winclient transaction (T Code: (CRMD_BUS2000126) but I do not want to use the transaction launcher. Any ideas?

    Well I am pretty Serious?!!!
    The standard SAP delivered "ACTIVITIES" WORK CENTER has the following Logical links for CREATE:
    Activity
    Activity Scheduling
    Activity Template
    Appointment
    E-Mail
    Interaction Log
    Task
    Visit Plan
    And when you use the Activity create - you ONLY have the option to create:
    Interaction log - Channel report
    Interaction log - Partner report
    Task - Approve
    Task - Recurring Task
    I would expect to see more than this. There are other BUS2000126 Business Activity transaction types which are enable to be maintained online in SPRO. But they do not show up here. I can use the Search - Activity logical link and then use Activity Type to find the other Transaction types. But not in Create. I can control the transaction types that can be displayed for Leads and Opportunities. It doesn't seem to work for Activities!!!!
    Is this part of standard CRM 2007 SALESPRO delivered role functionality??? I have SAP_ALL and SAP_NEW and have access to the other Business activities in my security role. My Ophthamologist did confirm that my eyes are doing fine so far. So this has something to do with the way this 'Work Center' has been designed. Apart physiological/anatomical impediments what am I missing???
    Thanks,
    Ramesh

  • How to create a work center for Workflow

    Dear all,
    I need some material or help to create work center in workflow
    for agent assignment.
    or
    How to assign Multiple responsible agents for a specific task
    Regards,
    Gaurav Sood

    Hi Imthiaz,
    Good Morning,
    I will Like describe you the secnario that i am in.
    I have customised workflows for
    1. Please release PO
    2. PO release effected.
    Both creator and relesing authority get notification for the same
    in SAP Inbox.
    In Addition to that i want to assign few other people who should get notification of mail PO Released.
    can you explain a bit more about Expression table
    regards,
    Gaurav

  • How do I create a new Work Center for the transaction launcher and links

    Hi
    The requirement here is for me to find out if I can create a new Work Center that will contain up to 6 assignment blocks and each block having either links to websites and BW reports, or triggers to R/3 applications via the transaction launcher.
    Can I do this purely through customising or do I need to create a new view using BSPs? If I can do it through customising please could I have a few pointers to what component I would need to use/copy?
    Regards
    Declan

    Hi Robert,
    Thanks again for taking the time to reply.
    Just so I understand, if I want to show a work center I need to link it to a component / view? I think this was the original query - do I need a developer to create the view that contains the 6 blocks with their links to reports, transactions and websites? I think when I talk about blocks I mean 1 viewset containing 6 views. There is no SAP standard view that would suit my requirements is there? Even if the work center had 8 views, I can always hide the two views in configuration.
    After the developer has created the view, I then reference that component in the target Id in the define logical links section of my work center.
    If my understanding is right, then it follows that it is not possible to create a user specific work center without some development.
    Is this correct?
    Cheers
    Declan

Maybe you are looking for

  • Can I use Target Disk Mode over USB?

    When I enable Target Disk Mode on my MacBook Pro, can I connect that via USB to a PC (which doesn't have FireWire) and use the Mac as an external hard drive? If not, are there any third-party products which would let me do this?

  • Iphone/ipad sync problems

    We have all of our devices set to 'Manually manage music and videos'. M daughter's iPhone 5s is obviously very new but suffers from the same issue. We are running iTunes 11.1.1.11 on Windows 7. iTunes ignores the Manually manage setting. It syncs ite

  • Help understanding use of OS_ROLES!

    Hello, I'm attempting to undestand how the OS_ROLES flag works. I'm running Oracle 10g XE on OpenSuSE 10.2, and I thought that I had it cracked. However, I've discovered that the mapping of groups-to-roles appears to be based on the group ownership o

  • SX50 cheat sheet?

    Does anyone make the big poster size 'cheat sheet' for the SX50, like they have for the big Canons? 

  • Use of bcc

    For many years I have emailed members of my group using the bcc facility on the first line of the email address.  The addresses are separated with a semi colon. Now it seems that sent messages are not delivered. The message is only delivered to the f