My MBP 3 week away even with lead times improve 3-5 days

How can this be I placed an order for my MBP on 17 of March delivery on 11 of April. Lead times on Apple web site 3-5 working days. Is that mean I will get my MBP soon maybe this week. Anybody's lead time improve.
I am from London UK
Thanks guys.
Pedja

I ordered last night, it says estimated ship on the
28th and delivery by the 30th.
Not too long a wait
PowerMac G5 Mac OS X (10.4.5)
Wow, yours is being sent out quick. I ordered on 3/22 and mine says ship date by 3/29, delivery by 4/5? Did you order a CTO, or just a standard model. Maybe me getting a CTO is causing a hold up. We ordered at pretty much the same time.

Similar Messages

  • Where to go to see Lead Time settings? Calendar days vs working days

    Hi everybody,
    II'm trying to find the screen where details regarding Lead Time settings are shown. I'm looking specifically for information on the type of days we're using to identify Processing LT's. I'm not certain whether we're using calendar days or working days.
    I'm sure there is a simple way of finding this information out, but just don't know where to look/change the setting.
    Thanks,
    BG

    This is NOT a setting that you can view.
    Oracle always behaves like this.
    Best way to verify this is to create an item with PreLt=5, Processing LT=7 and Post-processing lt=5.
    Then create a sales order with a due date of say 9/21. Make sure 9/1 to 9/21 is regular 5 days week.
    Assuming no holidays, it will mean that you need material on the dock on 9/15 (5 days of PPLT = 7 calendar days.)
    So when MRP/ASCP creates a Req/PO, the promised date will be 9/15.
    Also, the Days from today will point to 9/1 - which includes 7 days of processing + 7 days of preprocessing (5 working days)
    Hope this answers your quesiton.

  • N8 charging light stays on, even with leads remove...

    If I connect my N8 to my PC with the USB cable, the charging light stays on even after the cable has been removed.  See this pic: http://img815.imageshack.us/i/imgp2508k.jpg/
    I have to reboot the phone to get the light to turn off.

    I think that the light is controlled by the middle pin in the connector. Check it very carefully with a magnifying glass to see if any of the pins are bent or if there is any metalic dust in there.

  • Yahoo Wont go away even with other options.

    My yahoo will not go away, I click the firefox tab in the top right and click options and it shows all my tool bars, so I unchecked yahoo, but when I close down firefox, and start it again maybe the next day it appears again! I have also tried going to add on, then extensions to disable or remove it. But when I go to it, it just shows a blank page. HELP!

    http://kb.mozillazine.org/Uninstalling_toolbars

  • Unwanted messages that will not go away even with ...

    I get two sometimes three messages a day from someone calling themselves The Handicap King.
    When I check the message details the sender is: (no name) IMPORTANT.
    I've tried to send a STOP message but all I get is "Invalid characters in recipient field: IMPORTANT".
    I have a 6300 Nokia phone.
    Is there anyone out there that help me remove these annoying messages?

    All you can do is contact your network provider and ask them to block them. Not all networks are willing to do this unfortunately.
    Also have a google around as some countries have methods of reporting companies that don't make it easy to opt-out.
    There is nothing that nokia can do to help you and no software is available for series 40 phones like the 6300 to filter incoming messages. Only S60 smartphones can have call and message filtering software installed on them.
    Message Edited by psychomania on 12-Aug-2008 05:22 PM

  • HT201401 Hi, My iphone 4s started to show randomn shut downs and would turn on only when connected to charger even with proper charge..after 2 days of randomn power off the phone went off and stuck at red battery indicator for charging..it wont turn on.tr

    Tried to reset but no use..not responding..i had a spare iphone 3gs ..which i started to use in mean time now its showing same symptons ..Anybody can help and throw some light..my phones have  expired warranty

    Gdgmacguy : my friend , i tried all basics soft reset, hard reset on my iphone 4s..the phone is not booting at all its stuck red battery screen..even itunes is not recognising the device...
    My other concern is, i started to use my spare iphone 3gs after my 4s gt dead..but 3gs is also showing same symptoms..randomn switch off and will boot only once conected to charger with plenty of charge..i tried to restore, reset on this device..im afraid it might crash as welll...so need a solution..

  • Retina MBP, grey screen of death (GSOD) 3 times in first 4 days. Hardware issue?

    I just picked up a Retina MBP 4 days ago. So far I've mostly just done light web browsing on it (using Google Chrome Canary), maybe ten hours of total usage. It's died to the Grey Screen Of Death (GSOD) three times so far. Is this likely a physical hardware issue, or are there some software kinks they are working out? Should I try to return it within 14 days, or take my chances getting it fixed if it turns out to be a hardware issue?
    This is my first mac (previously all thinkpads), and I have to admit that if a windows laptop BSODed on me three times it would be in the return mail, and I wouldn't even bother to re-order. This is because I have enough experience with windows to know that three BSODs doing nearly nothing is absolutly a hardware problem. What's it like on the Apple side of the fence? Is this probably a hardware issue, or possibly poor quality control on drivers?

    Digging in a little deeper, I found the location of the kernel panic logs, and all three of them look like they are the same Intel HD4000 driver bug ticked by Google Chrome which is talked about here.. Perhaps it's not bad hardware after all.
    https://discussions.apple.com/thread/4086406?start=0&tstart=0

  • Manufacturing Lead time, milestone operation wise

    Good Evening to All !
    I have a scenario. I am explaining this scenario through 1 example.
    We have a material 'X'. Inhouse production time for this material is 6 days, which is maintained in MRP2 view.
    Now in Routing of this material 'X' there are total 10 operations starts from 1 to 10. Operation No. '4' & Operation No. '10' are milestone operation. The workcenter for both milestone operations are different. Now in house production time which I maintained in material master is total lead time for material 'X'.
    The requirement is:  Workcenter of Operation "4 "wants to know on daily basis that what quantity should be delivered from their workcenter.
    Now my question is that can I maintain this lead time(6 days) in 2 parts as:
    Till operation "4" my lead time is 5 days &
    From operation "5" to Operation 10 lead time is 1 day.
    Please suggest all possible solutions.
    Can APO help in this scenario.
    Thanks in Advance.

    If you run MRP with "lead time scheduling" (instead of "basic dates"), it will schedule the order by the routing, and let you know the planned workload for each WC in advance.

  • MD04 dates not showing lead time scheduled dates

    Hi experts,
    In my MD04 screen, dates are not showing lead time scheduled dates (showing only basic dates scheduling) even after MRP run with lead time scheduling.
    Please let me know if there is a way that the date column in MD04, shows the finish date from lead time scheduling.
    thanks
    Jay

    Hello
    Production dates are not displayed on MD04.
    You can include additional fields on MD04 using a BAdI and you can use your own logic to add the production dates.
    You will find the relevant BAdI on the following document:
    BAdIs for MRP
    BR
    Caetano

  • Lead Time recalculation/update

    Hi,
    The requirement in my project is the following:
    I have a lead time for one material of 10 days. After two months I have recieved 2 PO's, one with 14 days and other with 12 days. The new lead time should be 13 days.
    There is any way to calculate this and update the material master?
    Thanks in advance,
    Guiza

    Guilherme,
    WPDTC is the TCode that you run to calculate the planned delivery time.  This transaction is available as of version 4.7.  Currently we are upgrading from 4.7 to ECC 6.0 and it still exists in 6.0.  There is a good description at this link in the SAP Help Library.
    [http://help.sap.com/saphelp_47x200/helpdata/EN/f3/41b53c4d36265ce10000000a114084/frameset.htm|http://help.sap.com/saphelp_47x200/helpdata/EN/f3/41b53c4d36265ce10000000a114084/frameset.htm]
    This program gives you a report of what the planned delivery times are in the info record, material master, vendor, and the calculated PDT based on documents and actual deliveries in the system.  You select the items you wish to change and click the Change Planned Delivery Time button.  You get a pop-up to verify you want to change the values.  Basically, this is a mass change tool for planned delivery time similar to physical inventory transaction MIBC - Set Cycle-Counting Indicator that calculates and changes the material master indicators.
    Hope this helps,
    Paul

  • Incorrect delivery dates and lead time in SC & PO for Internal Catalog

    Hi experts,
    In a scenario,
    In SRM 4.0 creating SC from Internal catalog and from that SC po is created.
    The information reflected in SAP is not accurate with the information in mysupply catalog.
    PO's related to a vendor catalog is supposed to be 45 days (lead time) but in some cases of POs the lead time is showing 2 days. There's no consistency in information because some PO's in 45 days and some POs having 2 days though the POs are in same dates.
    Can you please give me some solution to this problem.? And Also the details How to approach to find out with tech debug.
    Thanks,
    Charles.

    Hi experts,
    In a scenario,
    In SRM 4.0 creating SC from Internal catalog and from that SC po is created.
    The information reflected in SAP is not accurate with the information in mysupply catalog.
    PO's related to a vendor catalog is supposed to be 45 days (lead time) but in some cases of POs the lead time is showing 2 days. There's no consistency in information because some PO's in 45 days and some POs having 2 days though the POs are in same dates.
    Can you please give me some solution to this problem.? And Also the details How to approach to find out with tech debug.
    Thanks,
    Charles.

  • ASCP Yield and Resource Lead Times

    Hi,
    I am working on Advanced supply Chain Planning on R12. Both ERP Source and Planning are on different instances. We are also using Oracle Shop Floor Management. In the Network Routings we have included a lead time resources at step 10, 20, 30. The resources are as follows:
    These resources are defined as 'Machine'
    Resource for operation 10: ASSY-LT, 112 hours, Schedule 'yes'
    Resource for operation 20: TEST-LT, 64 hours, Schedule 'yes'
    Resource for operation 30: PACK-LT, 48 hours, Schedule 'yes'
    We also have only one shift with 8 hours. The resources are not available for 24 hours.
    We also have yield at each of the above operations.
    Lead time rollup calculates 28 days for the item correctly.
    We are encountering a problem with ASCP Plan. The start dates and yield calculations using constrained plan with Enforce Demand Due Dates constraint seems problematic. If we check 'Calculate Resource Requiremnents' option, the plan calculates yield but the lead time gets reduecd by one third and start and completion dates for a planned order (and ATP etc.) are not accurate.
    If we uncheck 'Calculate Resource Requiremnents'option in the plan, lead times are accurate but plan does not calculate yield.
    We are not sure what is causing the problem.
    Does anybody know what options or profiles control this behaviour?
    Your help is highly appreciated.
    Thanks.
    Vijay

    Hi Vijay,
    important for your lead time calculation is the setup of the calendar and shifts and what shifts are assigned to the resource.
    You say you do not have enabled the 'Available 24h' option. We are also using leadtime resources in certain cases, for example LT for Assembly. But in these cases we enable the 24H option. Next to this we set the Resource capacity to 'unlimited' by setting units to a very high number (1000 etc.) on resource level, to prevent that the system gets into capacity conflicts here.
    And the yield calculation indeed should be quite independent of the leadtime resource.
    best regards,
    David.

  • Compute manufacturing lead time

    Pls tell the detailed computing lead time in oracel.
    Thandks

    If you run MRP with "lead time scheduling" (instead of "basic dates"), it will schedule the order by the routing, and let you know the planned workload for each WC in advance.

  • Lead time on purchase order

    Hi all
    For ordering spare parts, could you please confirm from where the lead time is picked up on the order ?
    From the PIR or the material master ?
    Thanks in advance!

    It should take from the info record in case you are creating a PO.
    for PR from MRP  it comes from the Material master.
    so for PO , Info record will be given  first priority and If info record is not there then it will take from material master.
    So calculation will be
    Leadtime (Info record/ Mat.master) + GR processing time + Purchase processing time = Delivery date
    Lead time is in  calender days. GR processing time and Purchase processing time are working days.

  • Time Evaluation with multiple time events

    Dear Friends,
    I have an issue in our current project. Kindly try to help me with a solution.
    We are working on Time Management module with Positive Time Recording method and evaluation- India. (Payroll module is not implemented)
    My issue is:
    Evaluation with multiple time events in a day: In our project, we have a scenario like the employees record multiple clock in and clock out times for one day and are uploaded into infotype 2011. But during time evaluation, only first Time event that is P10 (Clock In) and the last Time event P20 (Clock-out) in a day should be considered for evaluation, ignoring any multiple time entries in between duration in the table TEVEN (Infotype 2011).
    Pls let me know how this requirement can be met. Do we need to define any new PCR’s or create any functions? If yes, pls tell me the process in detail as I am new and implementing Time management (Positive Time recording with Evaluation) for first time. Try to help me as soon as possible.
    Thanks & Regards,
    Chiranjeevi
    Edited by: chiran reddy on Feb 15, 2008 2:20 PM

    is it not possible to enter only the first p10 and last p20 from the time systems into 2011.

Maybe you are looking for