My subscription is renew from 27/2/2013, but it is...

My subscription is not working

Wrong user forum. For ExportPDF and similar online subscription services the user forum is at:
https://forums.adobe.com/community/acrobatdotcom 
Be well...

Similar Messages

  • Can I save data in a snapshot from signal express 2013 LE?

    Can I save data (in txt or excel format) from a snapshot from signal express 2013 LE?  My data buffer is too larege to export to excel.  When I try to take a snapshot, I do not see any data.  Are snapshots supported in the LE mode?  This is the free version that comes with the USB 6009 ADC.

    Yes, the snapshot function is available for SignalExpress 2013 LE. Does the snapshot function as intended when you try other projects?
    Daniel P.

  • Data Model damaged, Cannot connect to Access 2013 from within Excel 2013

    Hello,
    Recently I am not able to use PowerPivot for Excel 2013 and I cannot connect to my Access 2013 database tables from within Excel 2013. Whenever I try to click on a slicer in my Excel worksheet, it gives me the following error: "Excel was unable to load
    a necessary component. This component might have been damaged or deleted. Reinstall the client software or data source driver software for your database."
    I am using Microsoft Office Pro Plus 2013 on Windows 7, 64-bit version. I have tried reinstalling Microsoft SQL Compact Edition 2005 and reinstalling Office 2013. I have run out of ideas and am a loss what to do next ? 
    Can anyone help point in the right direction for a possible solution to this problem ??? 
    Would appreciate all help.
    Thank you.
    ~Maneesh
    The problem with being punctual is, there's nobody there to appreciate it !!!

    Hi
    This is the forum to discuss questions about apps for office develop. For your question is more about Excel, I will move this thread to the TechNet forum for
    Excel
    The reason why we recommend posting appropriately is you will get the most qualified pool of respondents, and other partners who read the forums regularly
    can either share their knowledge or learn from your interaction with us.
    Thank you for your understanding.
    Best Regards
    Lan
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • My old iphone 4 is showing the latest icloud backup as today, why is my new iphone showing the only backup is from 12/3/2013 ...where is my current backup ?

    Please help ! Where is my current icloud backup ?? It shows backed up on my old iphone but not on my new one. I updated my new iphone and it updated with an icloud backup from 12/3/2013 which restored a bunch of  things that are no longer valid.  How can i get the correct backup restored to my new iphone ??

    Hello Shelly700,
    The following article provides details and troubleshooting steps that can help get your iPhone to reappear in iTunes.
    iOS: Device not recognized in iTunes for Windows
    http://support.apple.com/kb/TS1538
    Cheers,
    Allen

  • Publication of the big-sized Enterprise projects from Project Professional 2013 to Project Server 2013 takes about 60+ minutes.

    Dear Sirs,
    I need your support over the following MS EPM 2013 issue:
    Publication of the big-sized Enterprise projects from Project Professional 2013 to Project Server 2013 takes about 30+ minutes. We
    need to reduce this total publication time down to acceptable working values 10+- minutes.
    Environment information:
    Single App Server (Virtual): 16 Gb RAM, x64 4xCPU, HDD > 50 GB free disk space, OS Windows Server 2012 Standard Edition x64 Service
    Pack 1, MS SharePoint Server 2013 and MS Project Server 2013 with CU December 2013 (KB 2850024) applied.
    Single RDBMS MS SQL Server (Virtual): 8 Gb RAM, x64 4xCPU, HDD > 200 GB free space, OS Windows Server 2012 Standard Edition x64 Service
    Pack 1, MS SQL Server 2012 x64 SP 1 Enterprise Edition.
    We have 1Gbit LAN between APP, DB server and 1Gbit LAN between APP and Proj Prof Client.
    Yes, we are on the way of migrating to the Prod environment
    with 3-tiered architecture (with SP1 slipstream and CU December 2014 applied), but this issue also
    presents there.
    Project’s file information:
    Tasks in the file: [~4900], resources in the file [~396] enterprise task’s custom fields used in the file [~23].
    Project save procedure for this new project would last about 7 minutes. Project publication would last about 47 minutes. We noticed that
    tasks synchronization process took about 1 second for each ~2,5 tasks, to add them to the sharepoint tasks list. So for all 5148 tasks it took about 5148/3/60 =  34 minutes. Other 13 min was used for reporting database publication and other tasks relevant
    for new sharepoint site creation.
    Case 1: Issue description:
    During the Enterprise project’s file save and publication we have the following sharepoint 2013 log messages:
    07.31.2014 12:43:17.22 Microsoft.Office.Project.Server (0x0358) 0x3D5C SharePoint Foundation Monitoring b4ly High Leaving Monitored Scope
    (Persisting list changes). performing time =376.068676326181 22dca99c-4696-70f1-e9e2-06851d0bcffd
    07.31.2014 12:43:17.69 Microsoft.Office.Project.Server (0x0358) 0x3D5C SharePoint Foundation Monitoring b4ly High Leaving Monitored Scope
    (Persisting list changes). performing time =361.652807828928 22dca99c-4696-70f1-e9e2-06851d0bcffd
    It shows that sharepoint spend at least ~350 milliseconds (or 0,35 sec*4900 tasks = 1715 sec, or 28,5 min) for each task update during
    project publication. And we also have another log file that shows that about 0,7 sec (or 0,7 sec*4900 tasks = 3430 sec, or 57 min) sharepoint spend for save each task in project file to project server. So total save and publication time more then 60+ minutes
    for that project file. The same result we have even if user didn’t do any changes at the project file.
    We use only enterprise projects (dbo.MSP_EpmProject_UserView.projectvisibilitymode = «False»), and do not use sharepoint tasks lists,
    but the synchronization between MSP Plan and SharePoint tasks list works at any case.
    Case 2: Issue description:
    - For the second test we created a new project with new sharepoint project’s site on basis of our «issue» project, with total amount
    of tasks in it of 5148 (yes, we increased the tasks list default limit at the sharepoint site up to 6000 items in it – standard limits for sharepoint view list – 5000 items).
    - Project save procedure for this new project would last about 7 minutes. Project publication would last about 47 minutes. We noticed
    that tasks synchronization process took about 1 second for each ~2,5 tasks, to add them to the sharepoint tasks list. So for all 5148 tasks it took about 5148/3/60 =  34 minutes. Other 13 min was used for reporting database publication and other tasks
    relevant for new sharepoint site creation.
    -Then we deleted the
    tasks list for that new test project from the sharepoint site and republish the project plan one more time. This time project save procedure took about 7 minutes, project publication about 2 minutes and 3 minutes for other relevant queue jobs. So total time
    is 12 minutes.
    As a conclusion: yes, we have determined
    the exact problem - during synchronization process (from Project Server to SharePoint) it perform copying all tasks and related data from Project to SharePoint in spite of fact that you changed only ONE task or ALL of them. At any case, synchronization will
    copy ALL of them from Project Server to SharePOint task’s list.
    Our workaround is to disable the task’s synchronization for such big-sized project plans:
    – to delete the SharePoint «tasks» list at the SharePoint site tied with project plan.
    - or deattach the SharePoint site from the project plan.
    Thank you for reading this topic, please if you also forced with such issue provide us any known workaround or maybe any official response
    \ feedback from MS about it.
    Thank you in advance,
    Best Regards, Andrey

    Regarding my topic, I also said that every time when sync works it updates All items from project’s plan at Project Server to corresponded task’s list at SharePOint server. Inspire of the fact that you changed only One task or group /
    all of them at your project’s plan.
    And it seems to me and my colleagues that it’s probably (maybe) a “bug” at the product. Here is what we have if looked a little bit closer to the code:
    Share Point determines what task to sync from Project’s plan to sharepoint list. To do that sharepoint needs to know was that task changed or not, based on the following fileds (check SQL stored procedure “[MSP_READ_TASKS_FOR_SYNCRONIZATION]”):
    TASK_UID    TASK_NAME    TASK_START_DATE    TASK_FINISH_DATE    TASK_PCT_COMP    TASK_PARENT_UID    TASK_OUTLINE_NUM   
    WSS_LISTITEM_UID   TASK_ID    TASK_IS_ACTIVE
    We noticed that at any case synchronization performs for all tasks, EXCEPT the ROOT one. Then we looked at the comparison of TASK_PARENT_UID field. So sharepoint compares TASK_PARENT_UID with ParentID (this is internal name for lookup
    field “Tasks” at the Sharepoint, and it stores their values at the format "ID;#Title").
    And comparison performs like following:
    SharePoint looks for Task at the Tasks’s list corresponded to Project’s plan with ID represented at the TASK_PARENT_UID field. Then it takes SharePoint ListItem ID (“int” type) and store it to the “num” parameter;
    num = this.GetCachedListItemByUniqueId(listItem.ParentList, nullable.Value).ID;
       2.Then it compares “num” with task’s “ParentID” at SharePOint as follow with operator “!=”:
    ((SPItem) listItem)["ParentID"] != (System.ValueType) num
       3. If comparison was success (true) – then it tell us that values (at the Project’s plan for tasks) was changed, then it need to be synchronized. Corresponded Method setup “true” flag, and then returns it.
    The “bug” is that this expression at the Step 2 will always return “true”, because in fact it compares “string” (see above – that this is lookup field at SharePoint side)
    with “number”. For example if the parant task ID is “55”, then we get:
    "55;#Task 1" != 55
    And by the rules of .Net the “string” will never equal “number”
    Furthermore this is approved by the SharePoint logs:
    In that case we always get the note “Setting ParentID to” at the logs (we see it if turns on Verbose for “Project Server” -> “Sharepoint Integration” category).
    So at any case of publishing project’s plan we always get that note at the logs for tasks that have Parent task, and we have Parent for all of them EXCEPT the ROOT one, exact logs represented further:
    10/15/2014 02:37:32.26    Microsoft.Office.Project.Server (0x07D8)    0x06E8    Project Server    Sharepoint Integration    ado0d   
    Verbose    Setting ParentID to 1    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d 10/15/2014 02:37:32.62    Microsoft.Office.Project.Server (0x07D8)    0x06E8   
    Project Server    Sharepoint Integration    ado0d    Verbose   
    Setting ParentID to 1    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d 10/15/2014 02:37:32.63    Microsoft.Office.Project.Server (0x07D8)    0x06E8    Project Server   
    Sharepoint Integration    ado0d    Verbose   
    Setting ParentID to 1    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d 10/15/2014 02:37:32.67    Microsoft.Office.Project.Server (0x07D8)    0x06E8    Project Server   
    Sharepoint Integration    ado0d    Verbose   
    Setting ParentID to 1    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d 10/15/2014 02:37:32.69    Microsoft.Office.Project.Server (0x07D8)    0x06E8    Project Server   
    Sharepoint Integration    ado0d    Verbose   
    Setting ParentID to 5    bf2fc29c-7727-b00d-fa4a-34f22ea9ec1d
    The following is the complete Method’s code from the corresponded reflector:
    private bool UpdateParentID(DataSet taskDS, DataRow row, SPListItem listItem, Dictionary<Guid, SPListItem> redoEntries)
    bool flag = false;
    int index = taskDS.Tables[0].DefaultView.Find((object) DataRowExtensions.Field<Guid>(row, "TASK_PARENT_UID"));
    if (index >= 0)
    Guid? nullable = DataRowExtensions.Field<Guid?>(taskDS.Tables[0].DefaultView[index].Row, "WSS_LISTITEM_UID");
    int num = -1;
    if (listItem.Fields.ContainsField("ParentID"))
    if (nullable.HasValue)
    try
    // STEP 1
    num = this.GetCachedListItemByUniqueId(listItem.ParentList, nullable.Value).ID;
    catch (ArgumentException ex)
    if (redoEntries != null)
    if (!redoEntries.ContainsKey(DataRowExtensions.Field<Guid>(row, "TASK_UID")))
    redoEntries.Add(DataRowExtensions.Field<Guid>(row, "TASK_UID"), listItem);
    //STEP 2
    if (num != -1 && ((SPItem) listItem)["ParentID"] != (System.ValueType) num)
    ((SPItem) listItem)["ParentID"] = (object) num;
    ULS.SendTraceTag(845443U, (ULSCatBase) ULSCat.msoulscat_PS_ProjectSharepointIntegration, ULSTraceLevel.Verbose, "Setting ParentID to {0}", new object[1]
    ((SPItem) listItem)["ParentID"]
    //STEP 3
    flag = true;
    else if (((SPItem) listItem)["ParentID"] != null)
    ((SPItem) listItem)["ParentID"] = (object) null;
    ULS.SendTraceTag(2495056U, (ULSCatBase) ULSCat.msoulscat_PS_ProjectSharepointIntegration, ULSTraceLevel.Verbose, "Resetting ParentID to null");
    flag = true;
    return flag;
    Any thoughts about it would be much appreciated!

  • I would like to extend the screen from my circa 2013 27in iMAC with thunderbolt onto my circa late 2006 imac using the DVI port on that iMAC. Is this possible? If not is there another approach I can use?

    I would like to extend the screen from my circa 2013 27in iMAC with thunderbolt onto my circa late 2006 imac using the DVI port on that iMAC. Is this possible? If not is there another approach I can use? My 2006 iMAC is showing it's age but I figure I can use it as just a monitor just fine. Assuming I can connect the two together.

    That older iMac isn't designed to receive video input through the mini-DVI connection. Only certain newer iMacs are able to be used as displays.
    Your only options are to use something like ScreenRecycler mentioned above.
    ~Lyssa

  • I am running Acrobat X Pro on Windows 7 in Parallels. I have tried to install the Acrobat updates, but they won't install. Today I tried to create a pdf from a Word 2013 document and it crapped out. I tried to uninstall Acrobat and got Error 1310. Error w

    I am running Acrobat X Pro on Windows 7 in Parallels. I have tried to install the Acrobat updates, but they won't install. Today I tried to create a pdf from a Word 2013 document and it crapped out. I tried to uninstall Acrobat and got Error 1310. Error writing to file: c:\Config.Msi\feea.rbf. What do I do?

    Hi Beverly ,
    Please refer to the following and see if this helps.
    https://helpx.adobe.com/creative-suite/kb/error-1310-error-writing-file.html
    Regards
    Sukrit Dhingra

  • File Attachments in Conferences: Permissions don't follow when upgrading from 2010 to 2013

    Hello all,
       Here at Unisys we are upgrading our Lync Enterprise Infrastructure from 2010 to 2013.  We have found that when we do this, any conference that has an attached file the permissions of the file do not follow.  The
    options for a file permissions are Organizer, Presenter, and Everyone.  If in 2010 it is Everyone, after the upgrade, it is always reset to Organizer.  Not a big deal, but every user will need to be trained to
    go back in and reset the permissions on the file, else, they will not be visible by the other conference attendees. 
       We have a case open with Microsoft on this, and I've scoured the web trying to find others that have seen this.  Any thoughts? 
       Thanks, and it's very cold in Texas today :-)
    Jason Weaver
    Jason J. Weaver

    Thanks for the update Eason.
    Here are a few notes from the Msoft case that we are not 100% in agreement with:
    This is not only in the case of migrating user
    from 2010 to 2013. This happens even when the user is not migrated to 2013.
    You can reproduce the behavior by joining the same meeting in 2010. This is a
    default behavior of meeting configuration and this has been set this way for
    security reasons so that if organizer is not present, nobody can view the
    attachments without the permission of organizer.
    However, when we test in our environment, we can add the attachment and like you say, it is set to EVERYONE.  When we exit the meeting and rejoin with OR WITHOUT the organizer present, the attachment is still there, Everyone can see it. 
    However, when we migrate users from 2010 to 2013, the attachments are set to organizer only. 
    Go figure.  Not the end of the world, we just need to make sure we are able to explain to our users that the attachments are still there and that the organizer of each meeting will need to go back in and re-permission each conference. 
    Take care, see you all in Vegas-
    Jason J. Weaver

  • Calendar - how to make it start from Nov 1 2013

    Hi,
    I have a calender item in my application.... my data has started to archive from Nov 1 2013.... is there a way to restrict my calender to start from Nov 1 (at the moment it pretty much shows all the months/days and causing confusion to my userbase as they think I have previous month's data as well)
    Thanks in advance

    Hi (???)
    Which version of Apex are you on?
    By "Calendar item" do you mean the Date Picker ?
    If so, the Date item Picker  in Apex 4 onwards has a Minimum Date Setting
    See the links below.
    http://blog.iadvise.eu/2010/07/08/apex-4-0-date-picker-item-minimumdate-and-maximumdate/
    Oracle &amp;amp; Apex Geekery: Dynamic Date Range in APEX Datepicker - no Plugin required
    Kofi

  • Import contacts from old outlook 2013 to new Outlook 2013

    I recently had to get a new computer.  I removed the boot drive from the old computer and installed it as drive F on the new computer. This worked great in recovering my large data files.  However, drive F contains an instance of Outlook 2013
    as does drive C.  How do I copy to or import drive F's contact info to the new Outlook 2013 contacts?  I do not need the old email messages as I already have gotten them from the email service provider.

    Hi
    As per the information and details provided by you, to import contacts from old Outlook 2013 to the new Outlook 2013 please follow these steps: -
    Collect Files from the Old Computer
    First, you need the PST from your old computer. In most cases, they will be in the default location Outlook uses. To quickly access the default PST location outside of
    Outlook, paste this line in Windows Explorer’s address bar:
    %USERPROFILE%\Local Settings\Application Data\Microsoft\Outlook
    Copy the Files to the New Computer
    Now, you will copy the PSTs to the new computer. If you have several PSTs in the folder and are not sure which one is the one with your data, look at the file dates and
    file sizes. If you have 265KB PST files, they are empty and don’t need to be moved.
    Paste the following line into the address bar.
    %USERPROFILE%\Application Data\Microsoft\Outlook
    In this folder you will have the NK2, SRS, XML, outlprnt, and VBA project files.
    Open the AppData Roaming folder using the following command and copy the NK2 file to the folder.
    %APPDATA%\Microsoft\Outlook
    Create a Profile
    After the PST file is on the local drive, type mail in the start search field on the
    Start menu or go to Control Panel, Mail then opens the profile dialog. (If you use the
    Category view, mail is under the Users group; in Win 64-bit, Mail is under 32-bit application.
    Click the Show Profile button.
    Click Add to create a new profile.
    Enter a descriptive name for your profile.
    Enter the name you want to use for your display name, your email address, and your password.
    Add Your Existing Data File (PST) to the Profile
    If you have an Outlook data file PST, and you want to use with your new profile, then please follow these steps: -
    Select the newly created profile, then click Properties.
    Click Data files button to open Account Setting dialog to the Data files tab.
    Click Add then browse to your existing PST file.
    If the PST is a native Outlook 2003/2007 file type, choose the top entry for the Outlook Personal File. Click Ok.
    Select your existing PST file.
    You can enter a friendly name or just click OK to return the Account Settings dialog.
    Click the Sets as Default button. Select the PST Outlook created when it created the profile and click Remove. If you want, click Open folder to find and deletes this PST.
    I hope this information will be helpful for you.
    Thanks and regards
    Shweta@G

  • Exchange server name not changing in mail profile after migration from 2010 to 2013

    Following a migration from 2010 to 2013 we are finding that for a number of users the old exchange server address stays in the mail profile (control panel -> mail -> e-mail accounts) which causes Outlook not to load.
    We are able to go into control panel -> mail -> e-mail accounts and change this manually to the new exchange 2013 server address but we have quite a number of users and don't really want to do it manually.
    Shouldn't it be updating automatically and if so why is it?

    Hi,
    Yes, it should be changed by autodiscover. Does this issue occur to all the migrated users?
    I have seen this kind of issues before when migrating from Exchange 2003/2007 to Exchange 2010. The most efficient way is to rebuild the Outlook profile.
    Thanks,
    If you have feedback for TechNet Subscriber Support, contact
    [email protected]
    Simon Wu
    TechNet Community Support

  • Convert from 2009 to 2013

      I have a drvier code from Watlow that I need to convert from 2009 to 2013 and is attached.  Could someone help with this?
    Attachments:
    Example Cntl.ctl ‏5 KB

    Just open them up in LabVIEW 2013 and save them.
    There are only two ways to tell somebody thanks: Kudos and Marked Solutions

  • I want to cancel a eurosport player 1 renewable subscription automatic renewal they quick charging me £2.99 i have tried before to cancel it but they keep charging me help

    I want to cancel a eurosport player 1 renewable subscription automatic renewal they quick charging me £2.99 i have tried before to cancel it but they keep charging me help

    See Here...
    iTunes Store: Purchasing and managing auto-renewing subscriptions
    If necessary Contact the Developer / Supplier / Provider...
    And/ Or iTunes Support  =  Use this Link  >  Apple  Support  iTunes Store  Contact

  • I created a calendar in the wrong calendar year.   I need to change it from 2012 to 2013. Help!!!

    I created a calendar in the wrong calendar year.   I need to change it from 2012 to 2013. Help!!!

    N000295, I am afraid you will have to start all over again. There is no way to change the year of the already created photo calender.

  • TS1424 I recently took out a one month subscription on my Ipad to Euro Sport. This subscription will renew automatically at he end of the month. How do I cancel this subscription? Thanks for any help

    I recently took out a one month subscription on my Ipad to Euro Sport. This subscription will renew automatically at he end of the month. How do I cancel this subscription? Thanks for any help

    I recently took out a one month subscription on my Ipad to Euro Sport. This subscription will renew automatically at he end of the month. How do I cancel this subscription? Thanks for any help

Maybe you are looking for

  • How to I get rid of an "Open With..." option that doesn't exist?

    I've tried to find out how to remove an element of the "Open With..." options but don't seem to be getting much traction. I have an old application listed in the "Open With..." pull down menu that doesn't exist anymore, but when I select the file, us

  • Vertical line in a report

    Hi every body, In a report I need to draw a vertical line using sy-vline up to a certain height. i am writing d code like write : 50 sy-vline.Then it just draw a vertical line upto one row level.But I want upto the end of the page. How can i draw ver

  • Abstract Methods and Override Don't work For SubPackages

    I have an abstract class called "A" in a package called test. package test; public abstract class  A     int x;     public A (int x)         this.x = x;     abstract void testMethod(); }And I have a sub class of "A" called "SubA" in a sub package of

  • Satellite C55-A-1PC purchased in November does not start up any longer

    I bought this item from Amazon.de at the end of November and only had time to install MS Office 2010 as I already own a license for it and wanted to avoid purchasing the 2013 version. In anycase the notebook functioned normally afer that, but after C

  • Daily Errors in the System Event Log

    Once a day, presumably due to scheduled maintenance task running, on our Windows 8.1 systems (set up with local accounts) we're seeing the following DistributedCom messages, ID 10010, logged: The server {BF6C1E47-86EC-4194-9CE5-13C15DCB2001} did not