Need Inspection lot creation at only one storage location level - QA07

Hi,
I have shelf life expired material at different storage location. When ever i run QA07.System generates inspection lot for all storage location.But I want to process the inspection lot for only one storage location. Please guide me how can we map this reqmnt.
Thanks in advance for your relevent response.
Thanks & Regards
Kundan Kumar

Hi,
Next inspection date is maintained at the batch level, not at the storage location level.
You can suggest the following solutions if it is feasible in your business scenario.
Scenario 1: Batch is inwarded in one storage location"A" & stored for some time, then it is transfered to other storage loactions B & C (like production storage locations).
In this case suggest to transfer the batch to storage loactions B & C just one or two days before the actual consumption of the batch & also keep the opening period  in QA07 sufficient days (between 10-15 days), so that the sytem will create the inspection lot in one storage location "A" . Since the batch is still not transfered to B & C, the system will not create inspection lots in B&C.
Scenario 2: Batch is inwarded in all the storage locations with the same batch number.
In this case suggest to inward the same bacth with different batch numbers, keeping the all other characteristic values same
With Best Regards
Vithal

Similar Messages

  • Need to display the Stock Values at storage location level - 0IC_C03

    Hi All,
    I am developing Stock Movent Report on 0IC_C03 - Material Stocks/Movements.
    I have more than one storage location for plant. Stock quantities are calculating at storage location level and Stock Values are calculating at plant level.
    I have no issues with quantities. Only problem with Values.
    2LIS_03_UM is not picking the starage location, so that the revaualtion values are falling under unassigned nodes. When i set filter on storage location these values were not showing as they are under un assigned nodes (#).
    I want to get the Stock Quantity and Stock Values at Storage location level in my report.
    I found that soulution for that is Applying SAP Note : How to Realize summarized display of stock values on storage
    I have done development as per the document. But when i run the Query it is going to debug mode first and then it saying This program cannot display the webpage
    Can any one faced the same situation, Please help me if so.
    Thanks in Advance.
    Gopal N

    Hi Sachein,
    I am getting this An exception(CX_RSR_PROPAGATE_X) occured when debugging, and then it leads to next screen saying that:
    This program cannot display the webpage
       Most likely causes:
    You are not connected to the Internet.
    The website is encountering problems.
    There might be a typing error in the address.
       What you can try:
         Check your Internet connection. Try visiting another website to make sure you are connected. 
         Retype the address. 
         Go back to the previous page.
         More information
    Please let me know you need any more information.
    Thanks in Advance
    Gopal N

  • Availibility check at Storage location level

    Dear all,
    we have implemented inventory management ( not wm and lean wm ) , my business scenerio is when i am creating the STO the availibility check is carried out which is considering all the storage locations of supplying site
    e.g  SL01 - Unrestritrd Use
           SL02 - Damage
           SL03 - Resrved
    My client requiremnt is when availibility check should carried out it should conside only one storage location i.e SL01 - Unrestricted use stock and should not considere Stock of other storage location except SL01.
    What configuration need to be done
    Thanks and Regards
    tara

    Dear,
    Check at: http://www.sap-img.com/sap-sd/configuring-availability-check-through-checking-groups.htm
    http://sap.ittoolbox.com/groups/technical-functional/sap-log-pp/availability-check-storage-location-1283776..
    Regards,
    Syed Hussain.

  • Using BAPI_MATERIAL_AVAILABILITY for storage-location-level

    Hello experts,
    To determine the ATP quantity Iu2019m using the function module BAPI_MATERIAL_AVAILABILITY. I need to get the ATP quantity on storage-location-level; for this the following parameters are set:
    - PLANT
    - MATERIAL
    - UNIT
    - CHECK_RULE
    - STGE_LOC
    The result in table WMDVEX is for different storages locations the same, but in transaction CO09 I have different quantities for the storage locations.
    How can I determine the ATP quantity on storage-location-level?
    Thank you for your hint.
    Regards,
    Kurt.

    Hallo Brad Bohn,
    thank you for your suggestion.
    Iu2019m using an own rule (as copy of rule A), the own rule donu2019t use purchase orders.
    In CO09 I have the following ATP Quanties:
    09.09.2009     BStand          1,775     0     259
    09.09.2009     LgBest     0001     785     0     459
    09.09.2009     LgBest     0002     989     0     452
    09.09.2009     LgBest     0003     22     0     20
    The function module provides only 259 for each storage location.
    There is another function module AVAILABILITY_CHECK. Can this function module also be used to determine ATP quantity?
    Thank you & best regards,
    Kurt.

  • Inspection lot creation on storage bin

    Hello all,
    I am wanting to learn how to create an inpection lot of stock within a storage bin.
    I ask because we have many storage bins in our warehouse location storing the same material.
    If I do a MIGO 322 transaction in inspection lot there is no where to specify bin location, it looks at the warehouse as 1 storage location.
    In the lower half of the migo screen there is a 'storage bin' section but it is blocked out and I cannot identify which storage bin I am wanting to inspect within that storage location.
    I know I can create a transfer through LT01 however this still doesn't appear in QA32 inspection lots.
    I want the bin location to stay in the same storage location but be flagged for quality inspection.
    Thanks,
    Chris
    Edited by: gmanwizo on May 7, 2011 5:58 AM

    Hi,
    It seems you have both MM and WM activated. You have to assign storage locations to warehouse numbers in customizing, definition of organization step. Then when you do a 322, transfer requirements will be created by the system and you can transfer the material to a storage bin by turning the requirement into a transfer order. Assignment of new storage locations to warehouses may be tricky, you better ask for consulting on this matter.

  • Inspection Lot Creation after UD

    Dear PP/QM Masters,
    I have question regarding inspection lot creation after UD for the same batch number.
    There will be several GR during one shift for one SKU with the same batch number.
    F.E. shift (6 am to 2 pm) at 7 there will be first GR of finished good. Inspection lot is automaticly created and QA at 9 will make UD for this lot. If production will made GR after that a new inspection lot will be created for the same production batch.
    Is there any possibility to make only one inspection lot even if UD is taken.
    Thanks and regards,

    I guess what bothers me is that for your selection of "2" you include date. Our standard SAP system does not include date on that key choice.  Just material/batch/storage location.
    I re-tested one just to be sure.  Created a new process order for 30. Reveived 15.  Got an 04 inspection lot created.  Processed the lot, posted out the 15 to unrestricted and made the UD with an Accept code.
    Then I GR another 10.  These went straight to unrestricted as I expected.  Then I posted the final 5 in a 3rd GR.  Same result.. straight to unresticited.
    I'm not sure why your not seeing the same.  Again, seeing that 'date' in your number # choice is bothersome.  If some modified that to include the date of receipt and included the time stamp in that, then your going to get new inspection lots.
    Are you sure they didn't post it to a different batch on the second or third posting.  And of course, this does refer to the same process order.. correct?  You not using three different process orders for this are you?
    Craig

  • Inspection lot creation during GR with respect to Purchase Order

    Dear Experts,
    Here is my Question
    Inspection lot creation during GR with respect to Purchase Order
    Inspection type 01 set in the material master
    inspection lot will be created during GR for a Purchase order
    from my understanding for every GR a inspection lot will be created
    No batch Management
    but the requirement is irrespective to GR qty and number of times of GR
    we need inspection only one inspection lot
    For Instance
    There is a PO for 1000 kg no batch management
    now i do GR for 100 kg for 10 times with different dates
    now i need to have only one inspection lot
    not 10 inspection lot for each 100 kg
    can any one suggest a solution, please advise my understanding is correct
    Many thanks
    Raj

    Dear Raju,
    There is a solution for that .The setting can be done two ways, either in the material master or in the configuration
    1) Material Master
    MM02> QM View> Inspection Setup> 01> Control Insplot> 'X' An inspection lot for each purchase order item/order item 0r  An inspection lot for each material document and material
    a) 'X' An inspection lot for each purchase order item/order item
    This Means
    This setting is limited for use with the inspection lot origins 01 and 04.
    An inspection lot is only created during the first goods receipt for each PO item or production order.
    b) '1' An inspection lot for each material document and material
    If you set this indicator, the system creates only one inspection lot for a material document (in a goods receipt transaction) for each material. This setting is useful, if several purchase orders or partial deliveries are processed for the same material in a goods receipt transaction.
    2) You can do this default in the config
    SPRO > Quality Management >  Quality Inspection > Inspection lot creation >  Define Default values for inspection type > 01> Control Insp lot
    Hope this helps
    Regards
    gajesh

  • Quality inspection lot creation during GR for STO

    Dear Friends,
    I have a Scenario for Quality inspection lot creation during GR with respect to STO
    can use inspection type 01
    or is there any other inspection type to create inspection lot during GR for STO
    Thanks & Regards
    Raj

    Dear Friends,
    when i maintain inspection type 08
    Inspection lot is created in GR  Plant
    Thanks for that
    but when i am moving the stock from  Plant  Sloc A to same plant Sloc B one more inspection lot is cretaed (movment type 311)
    if i go to SPRO i can deactivate 311 movement type to avoid creating inspection lot
    but it is client level , i need to restrict only for one plant
    is there any other way to control  just one inspection lot for one GR
    if you are not clear with my writing pls do not hesitate to ask for more information
    Thanks & Regards
    Raj

  • Automatic inspection lot creation  upon reaching the next inspection date

    Hi qm experts,
    I have this scenario; my client wants to make an automatic inspection lot creation as well as posting to quality inspection stock of certain materials upon reaching its next inspection date defined in the msc2n transaction; how shall i make the inspection set-up of this materials??Thanks
    Regards,
    Matildo, Edsel F.
    QM Consultant

    Ok, you have me confused.  You want to do this as a one time thing?  I thought you want it to look every day, or every week, for batches that have reached their next inspection date?
    If its a one time thing, then yes, just run QA07 one time.  It only looks at unrestricted inventory.  Do not set up any parameters in the bottom half of the screen for expiration date.  If you do, any of those that have reached expiration date will be moved to blocked stock and no inspection lots created.
    If you want this to run regularly, you, or someone, needs to use QA05 to set up the batch job to run on a regular basis witht the approriate "days" value for how often your running it and how far in advance of the inspection date you want lots created.  And of course tick on "to inspection stock".
    There is no "automatic creation" as I think your thinking.  You either run QA07 once a day, or once a week or as often as you want to.  OR you set it up in a batch job (QA05) to be run once a day, once a week or as often as you want to.
    When the batch job is running, it 'appears' that the lots get created automatically.  But it is the QA07 program being run in batch that is creating them.
    Craig

  • Inspection lot creation

    Dear Experts,
    Reqiurement as follow :
    We have four plant like 1000,1001,1002,1003,1004
    System creates inspection lot when we do GRN against in stock transfer PO when STO from
    1000 to 1004, 1001 to 1004, 1002 to 1004, 1003 to 1004, as we have activated inspection type 08,01 in MMR.
    My requirement is system should not create inspection lot when STO from 1003 to 1004 only.
    We can not deactivate inspection type as we need inspection lot when STO from other plant.
    Please help in this scenario.

    In QM, we can deactivate the quality for certain movement type.That means though QM is active in material master, if we are using any movement type for which QM is not active, it will not generate the inspection lot. For STO from plant 1003 to 1004, use the movement other 101 i.e copy of 101.
    Copy 101 movement say as 901.Using following path deactivate QM for this new movement type 901.
    SPRO - QM - Q. Insp - Insp lot creation - Insp for goods movement - Deactivate insp for movement type. Select the indicator "QM not active".
    Now use movement type 901 for STO from plant 1003 to 1004.
    Vishal Jonnalwar

  • Inspection Lot creation for the 103 movement type

    <<Don't ask for or offer points>>
    Dear Experts,
    we have the requirement of Creating the Inspection lot for the 103 movement type. we have done all the necessary settings for 103 movement type (in OMJJ and under the node   Quality Management --> Quality Inspection -->Inspection Lot Creation -->Inspection for Goods Movements) but still I am unable to achieve the results. Same is happening for 105 movements.
    Kindly let us know what settings need to be done in order to achieve the same.
    Full points will be awarded for the reply
    Regards.
    Edited by: Matt on Sep 18, 2011 4:44 PM

    Hi,
    If you have activated two inspection types (eg 01, 0101) of same inspection lot origin (01), in material master you should  have a preferred indicator set for the inspection type for which you want to be selected when you perform goods receipt.
    This check box is available in the inspection type set up in the Material master.
    Also check whether the post to inspection stock indicator is set for the material (in the inspection type), then only material will be posted to inspection stock.
    Please confirm, what happens to the stock after making MIGO. check in MMBE and confirm
    Go through the link and maintain the necessary settings. I think default settings for 01 type should work.
    http://help.sap.com/saphelp_470/helpdata/en/2d/350e4d448c11d189420000e829fbbd/content.htm
    Regards
    Hari

  • Inspection Lot Creation after GR

    Dear PP/QM Masters,
    I have question regarding inspection lot creation after goods receipt.
    There will be GR once at the end of the shift with batch number. As batch generated during shift will be different, there will be multiple GR entry. But for every material only one result recording per shift is required and not for all batches generated. So, how to avoid creation of so many inspection lot? Automatic Inspection lot creation is required hence no question of manual creation of inspection lot.
    I checked function module ‘QAPP_CUST_IP_CREATE’ for inspection point functionality but its description “You can use the available function module to generate inspection points for the inspection during production already when the inspection lot is created.” Can I use function module ‘QAPP_CUST_IP_CREATE’ for restricting creation of inspection lot after GR?
    Request all Masters to help me in solving this.
    Thanks and regards,
    Devang

    Dear All,
    First of all thanks a lot for your response.
    I checked ‘Control Inspection Lot’ setting but even that can not solve my problem as in our case though GR with confirmation will be once in a shift (though in system shift is not defined) but batches will be different and hence material document will be separate. And requirement is to have single inspection lot per shift even if batches and material documents are separate.
    One option is to have multiple line items for GR in MB31 or MIGO or in COR6N. But all this transaction allows only one line item for GR against process order. So, can you suggest any function module or option to have multiple line items for GR.
    Thanks and regards,
    Devang

  • Inspection type 01 - inspection lot creation based on vendor batch number

    Hi Guys,
    this topic has been discussed several times here, but I was not able to find a suitable answer for my question.
    I am facing the folowing requirement:
    I have activated inspection type 01 for a raw material.
    I am receiving a firs goods receipt from vendor A with vendor batch number 0001.
    The system creates its own goods receipt batch number 0546 based on internal numbering.
    A new inspection lot is created.
    I am posting a second goods receipt from vendor a with vendor batch 0001.
    The system creates a new batch number 0547 based on internal numbering.
    A new inspection lot is created.
    I do not want to get the second inspection lot, because I received vendor batch 0001 before and I am assuming it has been inspected or is in inspection.
    Option 1: Post the second goods receipt against the first internal batch number created.
    I am aware of this need at the moment, but a user is not always checking if there is an internal batch with the same vendor received before.
    Can I customize the system to create inspection lots based on the fact that the vendor batch number was received before?
    Or do I have to use an exit and some ABAP code to get the wanted result?
    Thanks for your advice in advance.

    You need to use one of the enhancements that Do-Wook has suggested.  There is no standard SAP way to suppress the inspection based on the vendor batch number.
    With the first enhancement you use the system to check for a previously received vendor batch and if one is found, then that batch number is proposed and not the next one from the numbering series.  In this case, the lot isn't created than due to the inspection lot control of the inspection type.
    With the second enhancement you check the vendor batch number and if it's been received you suppress the inspection lot creation and the stock goes right to unrestricted.
    You'll probably need to do one or the other.  Myself, I prefer the first enhancement.
    Craig

  • Inspection lot creation based on "right" inspection plan version

    I manage inspection plan ( inspection lot origin 01 ) with Change number; in this way I have differents inspection plan version based on date.
    When I do a Good Entry based on purchase order , I need that system creates inspection lot version based on the purchase order creation date and not , as now, based on good entry date
    Is it possible ?
    When I create the purchase order I send to vendor also the inspection plan characteristich that have to be maintened ; for this reason I need to find same characterist during good entry inspection
    Regards
    Silly

    You need to use one of the enhancements that Do-Wook has suggested.  There is no standard SAP way to suppress the inspection based on the vendor batch number.
    With the first enhancement you use the system to check for a previously received vendor batch and if one is found, then that batch number is proposed and not the next one from the numbering series.  In this case, the lot isn't created than due to the inspection lot control of the inspection type.
    With the second enhancement you check the vendor batch number and if it's been received you suppress the inspection lot creation and the stock goes right to unrestricted.
    You'll probably need to do one or the other.  Myself, I prefer the first enhancement.
    Craig

  • Early Inspection Lot Creation on Goods Receipt

    I work for a company that melts steel into batches referred to as Heats.  Each of these Heats are processed through various steps to create tubing.  In the tubing operations multiple Heats are applied to production orders but the integrity of each Heat is always maintained.  If we do a Goods Issue for 6 Heats into a production order, we expect to do a Goods Receipt of 6 Heats from that production order and inherit all of the Heat related characteristics for each Heat processed.  At certain points we do laboratory tests for chemisties and properties of each Heat.  These tests are run while the order is being processed through other operations but need to be recorded against the batch.  We are thinking that we need to do Goods Receipt Inspection with Early Inspection Lot Creation.  It looks like this method will create a single Inspection Lot upon release of the Production order.  Is there a way to create multiple Inspection Lots that will correspond to Heat batches prior to the actual Goods Receipt?

    6 partial GR (Heats) are done against 1 production order? Then, you will have one inspection lot and one usage decision for the entire lot (03 / 04: Goods Receipt Inspection with Early Inspection Lot Creation.).
    Think this: Each heat can be one sample/ inspection point each, in case of early goods receipt. So, if you have 6 samples: 3 pass and 3 fails, then do the Usage decision on 3/6th of the quantity at the end of the test: this needs to done manual stock psting while doing the UD.
    So, you do the inspection at the sample levels, but not at multiple inspection lot level.
    There is a way to create mutiple inspection lots on partial GR for the same process order.
    The logic lies like this, if your previous inspection lot is reset on usage decision, then you will get a new inspection lot when doing a partial GR.
    If the UD is not reset case:
    (a) Usage decision open: It will increase the QI stock in the same inspection lot. This means no new inspection lot creation.
    (b) Usage decision done: It will post to unrestricted, thinking that the rest of the sample is OK!! So, again no new inspection lot creation.
    This I tried on 04 inspection type. I am not sure on 03. Hope this helps!!

Maybe you are looking for

  • How to make an animated gif on a imac

    Hi guys I am running an Imac OS X 10.9.4. I would really like to make some animated gif's if possible. Can anyone help me please? I tried some instructions using Preview, but my preview does not allow saving a file as a .gif, nor does half the things

  • Why won't my iPad connect with iTunes, Why won't my iPad connect with iTunes

    I have iTunes on my system version 10.6.0 and when I connect my iPad it charges and immediately tells me not charging,when I open I tunes it will tell me to download version 10.6.3 ... But the computer recognizes the iPad without iTunes but I can't c

  • How to start managed servers in parallel?

    Hello everyone, I am developing a wlst script that would start all managed servers on a particular machine (machine_name should be provided) from the admin server side. The script works fine. However, since there were some domains that have 25+ manag

  • Time Limits for iMovie clips

    I have a movie in iMovie 10.0.4 on my iMac that is 30 minutes long and has 30 individual clips. Normally in iMovie you push the "SHARE" button and then transfer the movie to "iTunes" then I can drop the movie into Toast and import it to a DVD. I have

  • Connecting grid to view\query

    I need some tutorial sample project explaining how to connect a grid to view\query from a DB. I failed to google it - any links?