Need step-by-step procedure for PR Release without classification

Hi,
Can any one please let me know the detailed/ step-by-step procedure for releasing a Purchase equisition without classification.
Thanks,
Prasuna.

Dear,
Check: http://sapdocs.info/wp-content/uploads/2009/07/Step-by-step-guide-of-SAP-PR-Release-Strategy-configuration-a-case-study.pdf
Regards,
Syed Hussain.

Similar Messages

  • PR Release without classification

    Hi ,
    In case of a PR release without classification are following things possible
    1] Like in PR Release with classification , we can maintain Currency  as a characteristics & then system calculates rate equivalent to base currency maintained in value characteristics.Hence  can I handle multiple currencies scenario with PR Release without Classification?
    2] Release a PR at Header Level
    Please answer,
    Thanks & regards ,
    Prasad

    Hi Mohammed ,
    How this will happen?
    That means system automatically converts it or what .?
    Can you pls. explain in detail , if possible.
    'Ours is a free text based procurement scenarios , no material master >
    Thanks & regards ,
    Prasad

  • Need to write a procedure for Log files (scheduled jobs)

    Hi,
    We have around 50 scheduled jobs.Jobs will run parallelly. In these jobs, some jobs will repeat at different timings.in these some jobs are daily jobs and some are weekly and some are monthly and some will run first and second working day of the month and some will run on some particular days.
    Now I want to write a procedure like, For every job it should create a log file like "
    <Job_Name> started on <Date> at <start_Time(timestamp)> and completed on <Date> at <End_Time(Timestamp)> successfully.
    <Job_Name> started on <Date> at <start_Time(timestamp)> and completed on <Date> at <End_Time(Timestamp)> abnormally.
    If all jobs complted successfully it should send an email to the mailgroup with attached log file (which contains the details of all the jobs) with format as follows.
    Jobname Start_date Start_time End_Date End_Time Status
    SALES 21-May-2011 12:00:00 21-May-2011 12:01:00 Completed Successfully
    21-May-2011 12:15:00 21-May-2011 12:16:00 Completed successfully
    Proudcts 21-May-2011 23:00:00 21-May-2011 23:16:00 Completed successfully
    ITEMS 21-May-2011 23:00:00 21-May-2011 23:16:00 Completed successfully
    If the status ="Completed abnormally" for any particular job
    immediately it should send an mail to the group like " FATAL_MESG_JOBANAME_Date_Time(timestamp)"
    for example if SALES job was failed at 15:00:00 then immediately it should send a mail.
    if ITEMS got failed then it should mail ( in between any job got failed it should send an email).
    if every thing is going cool then need send a final success mail to the group.
    so Please let me know how to write a program for this requiremnt.
    Thanks in advance.

    832581 wrote:
    Hi,
    Thanks for giving valuable link to gain the knowledge on DBMS_SCHEDULER.
    But here I didn't get clear idea to write a program which I need to schedule the job for every 1hr.
    Please suggest me to write the program..
    ThanksYou'll have to read the link i sent. Or google for an example.

  • Give execute access on SP_WHO2 stored procedure for a developer without giving VIEW SERVER STATE access.

    Hi,
    Is there anyway, we can give just execute access on sp_who2 SP for a developer without giving VIEW SERVER STATE access?
    Please let me know ASAP? Any help is greatly appreciated.
    Thanks,
    Vel
    Vel Thavasi

    Thanks Erland,
    I tried on master as well. Seems like no luck. I think, I am messing up with certificate or access level!! Would you mind in modify my script and help me out on this issue?
    CREATE
    CERTIFICATE uSPWHO2Cert
    ENCRYPTION BY PASSWORD
    = 'testpwd'
    WITH SUBJECT =
    'Certificate to run usp_who2',
    START_DATE = '20140901',
    EXPIRY_DATE =
    '20300101'
    go
    --drop certificate uSPWHO2Cert
    -- Create the certificate user and give it rights to access the test table.
    CREATE
    Login uViewServerStateUser
    FROM CERTIFICATE
    uSPWHO2Cert
    go
    create
    proc [usp_who2]
    as
    exec
    sp_who2;
    GO
    GRANT
    Execute ON
    usp_who2 TO uViewServerStateUser
    go
    -- Sign the procedure.
    ADD
    SIGNATURE TO
    usp_who2 BY CERTIFICATE
    uSPWHO2Cert
    WITH PASSWORD =
    'testpwd'
    go
    --drop proc usp_who2
    Grant
    View server
    State to uViewServerStateUser;
    Grant
    Execute on
    usp_who2 to testuser;
    -- Run as the test user, to actually see that this works.
    EXECUTE
    AS LOGIN
    = 'testuser'
    go
    -- First run the unsigned procedure. This gives a permission error.
    EXEC
    usp_who2
    go
    revert
    Thanks again!!!
    Thanks,
    Vel
    Vel Thavasi

  • Do I need to follow a procedure for reinstalling acrobat 7.0 professional?

    I need to perform a system recovery on my laptop and I wonder if I am going to have any issues reinstalling acrobat 7.0 professional.

    Or if you can deactivate before the recovery it might do the job. Sometimes a recovery is not needed, but you can reinstall the OS without recovery. To do that you will find instructions on the new, but if you follow the install button rather than recovery you should reach a screen that gives you a choice to reinstall or repair. The repair is more likely what you want. In that case, system files are replaced, but your system retains most other parts of your setup.
    Here is a link with directions for XP (Note the page where it says to NOT use the restore). http://pcsupport.about.com/od/operatingsystems/ss/instxprepair1.htm
    Similar processes are available for Win 7. The steps that MicroSoft provides that suggest to use Restore to repair your machine are misleading. The repair you want is part of the install process (review the screen shots in the line). I have done this several times and it is a life saver for someone like me who has a lot of software that is not part of the original installation included in the system -- in fact most of the software I use regularly.

  • I have Photoshop CS5Extended.  I want CS6.  I need to know the procedure for purchasing and download

    Please help me.

    If you click the Buy button you should then be presented with the screen section shown below.  If you are not seeing that, try using a different browser.

  • Need to install single app for multiple ids without user intervention to do a first time sign in.  Can we encrypt the login information in the install

    In old Volume license days, we just script the install with a single license key for CLP licensing.  Now it requires a different package for every single install with a different login id.  What if you have to do 10 or 100 with multiple ids

    Moving this discussion to the Enterprise Deployment for Creative Cloud, Creative Suite forum.

  • Upgrade procedure for multiple WLCs without N+1

    Hello, I would like to discuss another method of a bulk controller upgrade and see what other engineers take on this upgrade path would be.
    Say I have an instance of 8 4404s with 50 APs each, In this case I have N+1 redundancy where I can follow the normal proceedure
    Normal Proceedure
    Move all APs to controllers 1-4
    Preload all APs with the new code version
    Upgrade and reboot empty controllers 5-8  to new code version
    Move all APs to 5-8 with new code versoin
    Upgrade empty 1-4
    Move all APs back home
    Now take the same scenario only chage it to 80 APs per controller. I've now lost my N+1 and cannot do it quite as smoothly.
    As opposed to trying to follow the normal proceedure and have an extended window of "brown outs" How about doing it all at once.
    Black-out accelerated proceedure:
    Preload new code on all controllers
    Preload new image on all APs on all controllers
    Reboot all 8 controllers at the same time.
    Allow time for APs to connect back and load the new image
    I assume with this proceedure that I might see around 15-30 minutes of actual downtime to the site but it seems like that could be preferable to two-three hours of brown outs.
    What are your thoughts, and do you feel that 15-30 minutes is

    Michael,
    Welcome to CSC!
    I have 40+ WLCs and like you looked at this very closely. In my environment I do a predowload and reboot them all. Ive tried the surgical approach and in my case if you get aps bouncing back and forth on WLCs they will upgrade then downgrade etc.
    Also note -- If you are on 7.0.98.0 code, predownload "may" have a bug. I noticed an issue during a recent upgrade in mu network and later someone commented about the same issue here on CSC.

  • Step by Step procedure for Integration of B0 with BI 7.0, Portal

    Hi,
    My key concerns include integration with SAP Portal, which I did not find in instalaltion guide.
    Please advice on step by by Procedure for BO with BI 7.0 starting with the right version of BO to be installed.
    1. Which version compatible with BI 7.0 SP 12, LATER TO BE UPGRADED TO sp 16
    2. Source of data will be BI and reports will be using BO.
    3. What are components to be installed
    4. Prerequisites for Integration with BI AND SAP Portal.
    5.Steps for Integration with BI 7.0
    6. Steps for Integration with SAP Portal- Where to get the sample iviews. What to do for connction between Portal and BO - this i didnt find in installation guide
    Thanks,
    Harish

    HI,
    here the items:
    SAP Side:
    - all machines have to be in the same domain
    - BI has to trust the portal
    - BI has to accept SSO tickets
    - EP has to generate SSO tickets
    BusinessObjects:
    - SAP Authentication has to be configured
    - BI system should be configured has default system in the options of the SAP authentication
    - authentication.default parameter in the web.xml for InfoView has to be set to secSAPR3
    - BusinessObjects has to be in the same domain
    EP side:
    - in the system landscape configure the Crystal Enterprise Server Properties for your BI system
    - import the portal iview template that is part of the SAP Integration Kit
    - create a new iView
    Ingo

  • How to configure release procedure for rate contracts release

    Dear all,
    How to configure release procedure for rate  contract following are the requirements
    they are two release codes c1 & c2 <=100000,>=100000
                    if  c1 is not there c2 has to be approved
         Change in the value of the rate contract contract
         Change in the validity of the rate contract
         Addition of deletion of line items
    While using a non u2013 released rate contract in the PO an error message should shoot out.
    Also the logic should be changed while using the rate contract in the PO.
    The usage of the rate contract should be till the validity of the rate contract. i.e. the measurement should be end date of the rate contract and the PO creation date and not the delivery date of the PO. &
    It should be possible to refer existing valid rate contracts in purchase orders.
    Regards,
    bhaskar

    Hi,
    In SAP rate contract is known as value contract denoted with wk. The release procedure for rate contract is same as that of other contracts and scheduling agreements. The tables  for contracts will vary with SA (Scheduling agreement) .You may try and maintain condition records based on the customer combination and maintian the validity date of condition records as per your requirement.For contract and PO will have the same header/item table as EKKO/EKPO, and the release
    class in standard is the same FRG_EKKO, you can use the same for contract.
    To distinguish if it's a contract or PO, EKKO-BSART can be used.
    For contract EKKO-BSART will be MK or WK, while PO will have NB/UB etc..
    You can restrict the document type to set up the release strategy for only contract.
    Of cause, you can also create your own release class Z* for contract copying standard
    one FRG_EKKO via CL01/Class type 032, and then assign the class Z* to customizing:
    OLME:
    -> contract
    ->Release Procedure for Contracts
    ->Define Release Procedure for Contracts
    ->Release Groups
    If you have already created the PO release class.
    Assign a new chracteristic of Document Category -BSTYP
    Please check below link for detailed release procedure. I hope this wil help you out .Thanking you.
    http://wiki.sdn.sap.com/wiki/display/ERPSCM/RELEASE+PROCEDURE#RELEASEPROCEDURE-TABLESUSEDFORRELEASEPROCEDURES

  • Need to create procedure for insert tax line into ra_interface_lines_all

    Dear
    I need to create a procedure for insert a tax line into ra_interface_lines_all against the line type "LINE".
    after inserting the record i will run the auto invoice program to see the changes. kindly share how i can achieve through procedure.
    scenario:-
    after order dispatch workflow back ground run and data populated in ra_interface_lines_all where interface line id is null there i need to insert tax line against multiple orders.
    I know the join. when line type = 'LINE'  then tax line must have link_to_line_id of the line type line. my question is this when order number change how i can insert tax line against the line type line.
    regards,
    Fs
    Message was edited by: 832296

    Dear
    I need to create a procedure for insert a tax line into ra_interface_lines_all against the line type "LINE".
    after inserting the record i will run the auto invoice program to see the changes. kindly share how i can achieve through procedure.
    scenario:-
    after order dispatch workflow back ground run and data populated in ra_interface_lines_all where interface line id is null there i need to insert tax line against multiple orders.
    I know the join. when line type = 'LINE'  then tax line must have link_to_line_id of the line type line. my question is this when order number change how i can insert tax line against the line type line.
    regards,
    Fs
    Message was edited by: 832296

  • Procedure for Archive the data

    Hello Experts,
    I need to write a procedure for clean up the data base. Below is my rek.
    User should be provided with options of entering the table name and also should be given option to select whether he wants to delete all the data or archive the table.
    --> Program should provide the list of tables that are related to the table name that was given by the user. (This is not required if the table is stagging table, as they don't have constraints associated with them)
    --> If user wants to archive then the data in the tables and its related table should be archived (exported) into a flat file and then delete the data from each table in a sequence. Else, we need to delete the data without archiving.
    Can you Please let me know the procedure for the above rek and also I am not sure about the archiving the data. If you don't know the table name and the columns. so How can you define a cursor record to handle the record.
    Can you please send me the complete code for the above rek to [email protected]
    I appreciate help in this regard.
    Thanks & Regards,
    Sree.

    Can you please send me the complete code for the
    above rek to [email protected]
    I appreciate help in this regard.The goal of this forum is not to make your job, but to assist you with guidelines, references, and concepts, on specific issues. If you want someone to code for you, then you should hire a programmer instead.
    ~ Madrid

  • Stored procedures for User Tables

    Can somebody please help me with this matter?. I need to add stored procedures for user tables. Is there any way  of doing so?.
    Thanks in advance.
    Ernesto.

    Ernesto,
    You have posted multiple threads for the same question.  Please check the other thread and close this one:
    Stored procedures in User Tables
    Thanks,
    Gordon

  • Forte v3 - date for commercial release

    Greetings All
    Does anyone know when Forte 3 will be released and, more particularly,
    when the Forte training materials will have been upgraded to the new
    version ?
    I'm taking both Forte application development classes in the UK in a
    month's time, and am hoping they will cover release 3.
    Kind regards, Robin.
    Robin M. Roos <[email protected]>
    Computer Consultant, Milton Keynes, UK.
    Progress (see you in Boston?), Actuate, and Forte in due course...

    At 10:36 PM 5/20/97 +0100, Robin M. Roos wrote:
    Does anyone know when Forte 3 will be released and, more particularly,
    when the Forte training materials will have been upgraded to the new
    version ?R3 beta is available now to pretty much anyone with a serious need. R3 is
    projected for "production" release in August which means that any new users
    will get it then as will any existing users who ask for it. About three
    months later will come the maintenance release mailed without request to
    those on maintenance.
    R3 training is available now, although I believe it is a 3 day
    "differences" class, i.e., go ahead and do your basic training and then
    take the differences class to get ready for R3.
    =========================================================================
    Thomas Mercer Hursh, Ph.D email: [email protected]
    Computing Integrity, Inc. sales: 510-233-9329
    550 Casey Drive - Cypress Point support: 510-233-9327
    Point Richmond, CA 94801-3751 fax: 510-233-6950

  • PO release strategy , classification tab

    Dear Friends ,
    I am designing the release strategy for PO.
    Characterstic designed as- Value / Plant/ Document type.
    But while doing the -define release procedure for PO->Release strategy - where in classification TAB , given characteristic are not getting for selection.
    Regards,
    Mahesh.

    HI
    Please close the thread,when its solved....

Maybe you are looking for