Need to check the data flow from R/3 to BW server.

Hi BI experts,
This query is regarding need to check the data flow from R/3 to BW server.
As of now I have some set of reports which I would need to take up in BW. The requirement is  to go through the list of transaction codes for reports in R/3 and find out if there are already  any existing objects in BW system which I can use for these reports.
So, can u plz help me.

Depends what are your Tcode or Reports users run in R/3 and they want the same in BW.Then in BI Content we have Out of the box Delivered reports.You can activate those Load data and use it.
Gimme T-codes you have I can send you Standard reports in BI or Cube you can get these from.
~AK

Similar Messages

  • How to migrate  the data flow from DB CONNECT sourse system from 3.5 to BI

    Hi
    can any one tell me how to migrate the data flow from DB CONNECT sourse system from 3.5 to BI 7.

    Hi,
    Go to Infoprovider to which your DB connect DS feeds and Right Click on Data source-> Then Migrate-> With Export---> You have to build new 7.0 Transformations and DTP's etc.
    ~AK

  • Why do my rules fail in the data flow from connector view to Meta view?

    I have Meta directory 5.0 alongwith the iplanet Directory Server 5.0 installed which is working fine.
    I have created an instance of NT Domain Connector which retrieves entries in a Connector view.
    Where do I get the examples about writing the data flow rules for the NT Domain Connector for flowing specific entries from CV to MV. Basically I do not want the NT Groups in the MV. Also I want to create an additional attribute e.g myflag whose value should be updated manually in the CV. And now if myflag = 0 I dont want this entry to be moved to MV and if myflag = 1 the entry should be moved to MV.
    I tried to write a few rule but it fails in testing only (Rule Tester). And I am not able to locate the exact error in my rule. Does it require any specific configuration ?
    Thanks
    Amol Talap

    You should post your rule.
    But either way, have you tried this:
    (objectclass==ntuser) or
    (objectclass!=groupofuniquenames)
    The first set allows only entries that are user.
    The second allows only entries that are not groups.
    As for the flags, try this:
    (myflag==1) or
    (myflag!=1)
    Same effect as above.
    Further more if rule testing fails, it could that you are not referencing the right Directory when using the rule tester. The rule tester does not always point to the right location.
    J.F.

  • In table  rows , i need to check the date validation of perivous ent'd rows

    Hi All,
    I'm using adf 11g.
    I have a table with add and delete button in jsff. In jsff page , i mean table row have one lov column and date column and enterable inputtext fields .
    Conditions 1.lov value , date column and inputext value should be unique . this can be handled by alternate key.
    2. if user enters value like
    lov value date inputtext
    v1 01/02/2011 ipt1
    v2 01/02/2011 ipt2
    v1 01/01/2011 ipt3 here , lov selected v1 is already selected in first row, i want to validate dat second occurance of v1 with combination date and inputtext should be
    unique --- it makes unique with compare to first row .but i have to check second v1 date should be always greater than the first v1's date .
    User can add n number of records of keeping date variance , but the same lov value having record , the date should be always less than the perivouse entered row date (same lov value ).
    how can i handle this date check . business rules / validation .
    thanks in advance .
    Edited by: user9010551 on Jun 16, 2011 9:23 PM
    Edited by: user9010551 on Jun 16, 2011 11:25 PM

    you have to make use of this technique - in memeory filtering
    http://download.oracle.com/docs/cd/E12839_01/web.1111/b31974/bcadvvo.htm#CEGBEICF

  • Mapping data flow from R/3 to BW

    Hello,
    I am pretty new to BW and I have been tasked with creating a detailed map of the data flow from R/3 into BW. 
    I need to record where the data originates from in R/3 (field names/tables) and literally track the flow of that data all the way including any info objects along the way to any cubes that it may be sitting in.
    How do I track this flow ? And how can I identify what a characteristic in BW is in R/3 ?
    Has anybody had to create a similar data flow ? If so how did you approach this ?
    Many Thanks,
    Matt

    Hi Matthew,
    From the R/3 side:
    BW treats all the data from R/3 as Datasources.
    From the Datasource the upload of data to the cube is done as..        
    <b>Datasource->Transfer Rule->psa/infosource->communication structure->cube</b>
    (for a 3.5 system)
    in case of 7.0 system... data flow is as follows...
    <b>Datasource->infopackage->psa->transformation/DTP-> Data target(cube)</b>
    -> Go to transaction <b>RSA5</b>( for Business Content datasources ) and <b>RSA6</b>( for all the active Datasources ) found in the system.
    -> There you can find all the data that you want...(For your mapping purpose this will do..)
    -> You can as well check from the BI side in the transaction RSA1 -> click on the Monitor button on the left ( for custom objects ) or Business Content button -> choose the object from the tree... right click and replicate to find if all of them were used.
    Hope this helps!!
    <b>*</b><i>Reward Pts if useful</i><b>*</b>
    regards,
    Naveenan.

  • Trans Code to check the Date of Termination in Setup Tables-Very Urgent!!

    Hello BW Gurus,
          I need to check the date of termination I have given while filling up the setup tables to verify when my delta loads would stop running. NPRT transaction code just gives me the time it took to fillup the tables but the date of termination is given as zero's, so please can someone let me know how to see that.
    Thanks in advance,
    Anjali
    Message was edited by: Anjali

    Hi,
    If I understood it right, you wanted to predict when the actual date of termination would occur or you wanted to know what parameter you did input on the job that is now running?
    <b>Case 1:</b>
    As far as I know, that Info cannot exactly be determined since it will depend on various factors e.g. CPU speed, I.O. Speed, Amount of data to be process etc. etc. which I dont think SAP could predict as exact as possible (<i>if ever an option was provided</i>).
    During the early stages of our project, we did that but we base the run time from history. Meaning, we always log (on top of existing <i>SAP Job Logs</i>) the run times in Excel and we somehow use that data to predict the actual Date of Termination.
    <b>Case 2:</b>
    In case you wanted to see the parameter while its running, I have no suggestion but for you to debug the currently running program.
    In <b>SM51</b>, click the Active job and choose menu Program/Mode->Debugging. On the fields on the lower left portion, type <b>RMCSNEUA-DATUM</b> (got this value when you execute the Table Setup, say OLI9BW; Press F1 on the date of termination field) this would give you the actual date you have provided. 
    If I have helped, please grant points...
    --Jkyle

  • Need to Understand the Packet Flow

    Dear Friend,
    I need to understand the packet flow of the below diagram.
    I have configured MPLS on R2,R3 and R4. And IBGP is configured on R2 and R4. Now I am able to reach from R1 to R5's Loopback address. I need to understand the packect flow from R1 to R5 like If I ping from R1's Loopback  to R5's Loopback address then Source IP is 1.1.1.1 and destination IP is 5.5.5.5. What will be the packet structure at R2, R3,R4...??????????
    Please explain in details......Me really confused as R4 has not route about 5.5.5.5 also 1.1.1.1...How it forwards the packets??????

    Sanjib
    So R2 and R4 are PE devices and R3 is a P device ? And you are not doing MPLS VPNs, just normal MPLS ?
    If so R4 must have a route to 5.5.5.5. Did you mean R3 does not have a route ?
    With MPLS any P device only knows how to get to other P devices and PE devices. It does not know about any networks outside the MPLS network. The PE devices have routes to any external networks connected to them and know how to get to P and other PE devices.
    Note that in terms of PE/P reachability the routing/LDP information has already been exchanged and an MPLS forwarding table built. So for reachability between PE/P routers (ie. not outside the MPLS network) route lookup do not need to be performed, it is simply a matter of removing and adding labels.
    So assuming you are not using MPLS VPNs and that MPLS labels have been exchanged between all P and PE routers -
    R1 pings 5.5.5.5
    1) R1 does a route lookup for 5.5.5.5 and sends it to R2.
    2) R2 is a PE device. It does a route lookup for 5.5.5.5 and sees R4 as the next hop (this route has been exchanged via MP-BGP).
    3) R2 then need to send the packet to R4. To do this it looks in it's MPLS forwarding table to see how to get to R4. The MPLS forwarding table tells it which label to attach to the packet. It adds this label and sends the packet out of it's interface to R3.
    3) R3 is a P device. It does not need to do a route lookup for 5.5.5.5. It simply looks at the incoming MPLS label and consults it's MPLS forwarding table. It will have an entry in it's table saying that an incoming packet with an MPLS label of x should be sent out with an MPLS label of y. It changes the label and sends it out to R4.
    4) R4 receives the packet, removes the label, does an IP lookup for 5.5.5.5 and sends it to R5.
    Note that actually R3 might not add a label as there is something called Penultimate Hop Popping where if the net hop from the P router is a PE router it sends the packet without a label to save extra processing on the PE router. If you had multiple P routers only the last P router before the PE router would do PHP.
    The key thing to understand is that the P devices don't do route lookups when forwarding data. They simply switch labels. Whereas the PE devices do need to do route lookups for destinations outside the MPLS network. 
    Jon

  • Data Flow from Source systemside LUWS and Extarction strucures

    Hi
    Can Anybody Explain the Data flow from Source system to Bi System .Especially I mean the Extract Structure and LUWS where does they come in picture ,the core data flow of inbound and out bound queues .If any link for the document  would also be helpful.
    Regards
    Santosh

    Hi See Articles..
    http://wiki.sdn.sap.com/wiki/display/profile/Surendra+Reddy
    Data Flow from LBWQ/SMQ1 to RSA7 in ECC (Records Comparison).
    http://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/enterprise-data-warehousing/data%20flow%20from%20lbwq%20smq1%20to%20rsa7%20in%20ecc%20(Records%20Comparison).pdf
    Checking the Data using Extractor Checker (RSA3) in ECC Delta Repeat Delta etc...
    http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/80f4c455-1dc2-2c10-f187-d264838f21b5&overridelayout=true 
    Data Flow from LBWQ/SMQ1 to RSA7 in ECC and Delta Extraction in BI
    http://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/business-intelligence/d-f/data%20flow%20from%20lbwq_smq1%20to%20rsa7%20in%20ecc%20and%20delta%20extraction%20in%20bi.pdf
    Thanks
    Reddy

  • How to check the date is initial in the calculated keyfigure

    Hi,
    While calculating the difference between the two dates , i need to check the date is having the values or not in the calucluated key figures .how to achieve this .
    number of days = delviered date -  creation date
    All the dates are key figures
    Regards,
    Raj

    Hi there,
    It depends on what you want to retrieve.
    If you have this:
    day 1 - day 2
    If day 1 is initial, you'll have day 2 as the result of the difference which is correct. If in the other hand day1 is initial you'll have - day 2 as the result. So you just need the ABS() formula to give the absolute value of the difference.
    What exaclty do you want to achieve? only do the formula when both day 1 and day 2 have values? Retrieve always a positive value of the formula no matter if day 1 is initial or day 2 or both?
    Can you give a complete example with values of what's happening and what do you pretend to achieve?
    Diogo.

  • Sql Query need to extract the Work Flow information from Hyperion Planning

    Can Any one give me the sql query to extract the Work flow from Hyperion Planning in 11.1.2.1.
    I can extract from the Hyperion Planning but it is not in required format again I need to do lot of formating. I need the information as per the flow structure is showing linke in one perticular planning unit in all coloumn format. Hence only sql query will help me to extract this kind of information. could any one provide the sql query to extract this kind of request.
    Thanks in Advance.
    Edited by: 987185 on Feb 9, 2013 10:57 PM

    If you have a look at the data models in - http://www.oracle.com/technetwork/middleware/bi-foundation/epm-data-models-11121-354684.zip
    There is the structure of the planning application tables, have a look at the HSP_PM_* tables
    Alternatively you can look at extracting the information using LCM.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Need to Extract the Data From "0BBP_TD_CONTR_2"

    Hi,
    I need to extract the data from SRM extractor "0BBP_TD_CONTR_2". I do not have much knowledge in SRM. Can any one give me the steps how can i check the extractor its not like R3. All kind of help will be appreciated.
    Thanks

    Never mind guys i figured it out. Thnaks

  • I need help proving the date tag on a photo stored in my iPhoto is from the date it was sent to my iphone/date it was imported into iphoto - and that it is NOT the date the photo was actually taken.  Please help!

    I need help proving the date tag on a photo stored in my iPhoto is from the date it was sent to my iphone/date it was imported into iphoto - and that it is NOT the date the photo was actually taken.   I recieved a photo via text on my iphone and then I synced my iphone to my macbook and now it is in iphoto.  I already know that the date on the photo per the tag that shows up on it in iphoto is NOT the date the photo was actually taken.  I need article or literature or something confirming the tag is from when it was sent to the iphone and/or when it was imported.  I greatly appreciate some assistance!

    All I am trying to do is find something on a forum board or article etc stating that the the date showing in iphoto could be the date it was imported or synced or sent to me and not the actual date taken.
    The date on the photo could be anything because you can edit the date with iPhoto or any of 100 apps, free and paid for. So, the date on the photo will prove nothing, I'm afraid.
    Regards
    TD

  • How can I see website data from itouch 4th generation?  My 8 yr old may have been on inappropriate sites and I need to see the data from website data stored on the itouch.

    How can I see website data from itouch 4th generation?  My 8 yr old may have been on inappropriate sites and I need to see the data from website data stored on the itouch.

    There is no way to see where he has been.
    Go into Settings > General > Restrictions > Safari and turn it off. Then add the MacGruff browser from the app store. After that go back to Restrictions and turn off the ability to add apps.

  • Need to grab the data from Web Page and send it to SAP using PI

    Hello Experts,
    I need to grab the exchanges rates from the below link.
    http://www.cbr.ru/scripts/XML_daily.asp?date_req=09-06-2011.
    This link returns an XML . I need to get the data from this XML page and post it to SAP ECC using PI.
    My requirement is that, process should start from the ECC and grabs the data from the web page which gives you the XML and post this data into ECC using PI. We have a RFC written in ECC side to post the data in ECC.
    Please help me to identify the adaptor's needed and what should I need to do to initiate the process from ECC.
    Would it be a Async or Sync process ?
    I would really appreciate the inputs.
    Thanks.
    Gaurav.

    Hi,
         Any particular reason that you want to go for a sync process as then you would need to either use a BPM (RFC to BPM where you use sync/async bridge to get the xml file from the specified link and then send the response back to ECC) or go for a synchronous Java proxy on the receiver side which will grab the exchange rates and then map back to the RFC response structure. In this case, you can avoid the BPM.
    Else, as mentioned in Michal's blog, you can break it up into 2 seperate scenarios. RFC/Proxy to File and then File to IDoc/RFC/Proxy which will get the exchange rates into ECC.
    Another option can be Proxy --> PI --> ECC(IDoc/Proxy/RFC). Here you can grab the exchange rates from the link in your message mapping through a UDF.
    Regards

  • Data Flow from TXT to a table error

    Hello,
    I am trying to fill in the data from a .txt file I have into a table in a DB. Previously this worked fine in DTS and I can still do it when I import the DTS command but I want to update this to a data flow because the DTS commands needs to be run on 32 bit
    and I'm using 64 bit. 
    I'm getting 3 errors:
    [OLE DB Destination [322]] Error: SSIS Error Code DTS_E_OLEDBERROR.  An OLE DB error has occurred. Error code: 0x80040E21.
    An OLE DB record is available.  Source: "Microsoft SQL Server Native Client 10.0"  Hresult: 0x80040E21  Description: "Multiple-step OLE DB operation generated errors. Check each OLE DB status value, if available. No work was done.".
    [OLE DB Destination [322]] Error: SSIS Error Code DTS_E_INDUCEDTRANSFORMFAILUREONERROR.  The "input "OLE DB Destination Input" (335)" failed because error code 0xC020907B occurred, and the error row disposition on "input "OLE
    DB Destination Input" (335)" specifies failure on error. An error occurred on the specified object of the specified component.  There may be error messages posted before this with more information about the failure.
    [SSIS.Pipeline] Error: SSIS Error Code DTS_E_PROCESSINPUTFAILED.  The ProcessInput method on component "OLE DB Destination" (322) failed with error code 0xC0209029 while processing input "OLE DB Destination Input" (335). The identified
    component returned an error from the ProcessInput method. The error is specific to the component, but the error is fatal and will cause the Data Flow task to stop running.  There may be error messages posted before this with more information about the
    failure.
    Before I changed the Flat File Source input advanced editor input and output properties to text stream [DT_TEXT] because the table has VarChar I also had an other error but this seems to be resolved. The only problem is if I look at the mappings the
    input is text stream [DT_TEXT] but the output is a string and I am unable to change this in the advanced editor of the OLE DB destination. I can change it but it changes back on it's own.
    Could I please get some help on these errors?
    Thanks

    Hi SQLNewbie101,
    According to your description, when you change column data type in the advanced editor of OLE DB Destination, it always changes back.
    Based on my research, the column data type is already confirmed by the destination table, it depends on the columns in the table, so we cannot change it.
    To fix this issue, one way as you said, we can use Data Conversion Transformation to convert the [DT_TEXT] data type to [DT_STR] after Flat File Source. Another way is directly change the column data type in the Advanced tab of Flat File Connection Manager
    Editor as below. Then double click the Flat File Source to update the columns.
    If there are any other questions, please feel free to ask.
    Thanks,
    Katherine Xiong
    Katherine Xiong
    TechNet Community Support

Maybe you are looking for

  • Preview not updated in 3.2?

    If I edit a picture, i.e. change contrast etc. the preview (to see the whole picture) gets fuzzy and will be updated and getting sharp again only if I change to another picture and come back or if I display the picture in 100% size and switch back to

  • Sound problems while playing an i-pod thru i-tune

    DJ working with two HP Pavilions with I-tunes 7.4 and one 30g and one 80g I-pods thru a Pioneer mixer(both computers conect thru audio output with cables miniplug to RCA stereo) and two powered EV sxa100 Speakers. While playing all songs it sound dir

  • Finder window indicates incorrect amount of space left.

    I have a 750 GB hard drive in my 2008 MacBook Pro. The finder window says that there are 1.1 TB available. System Information says: MAC HD: Capacity:749.16 GB (749,162,397,696 bytes) Available: 275.14 GB (275,144,097,792 bytes). What is going on? Tha

  • Imac G5 17" and 20"

    I was wondering if anyone has ever transferred the innards of a 17" imac into a 20" imac, both G5. Any one tried it or any comment about the possibility?

  • Adobe form as mail attachment

    Hi Experts, I am using xml based Adobe forms (ordinary print form) in WebDynpro  component. I got one requirement to send that form as an attachment to dynamic email id either from form or from WebDynpro  component. I tried using email submit button