Needed areport for a material with its length & width

Hi friends i need a report in which i am to show material , plant , storage location , batch no , & material length & material width ( its charcteristics are defined by using a class ) , i have found table AUSP in which
field ATFLV field is populated with length & width details but i am not getting how to link this with material no & batch kindly anybody send me elaborated steps will be very thankful if with appropriate codes ,bcoz m new to abap .
      Regards
      Digvijay rai

HI SOURAV ,
i tried this you are saying what is correct but when i m taking the cuobj = internal object no , there is problem that but have differnt no as cuobj of 50 char & internal object no is of 18 & numc so there is problem
regards
digvijay rai

Similar Messages

  • Serial Number creation for a material with stock type

    Hi,
    I am not able to create the serial number for a material which should have valuation type, plant and storage location using the function module ITOB_SERIALNO_CREATE_SINGLE.
    There is no export or changing parametre for this function module for Valuation type(EQBS-LBBSA),
                    Plant(EQBS-B_WERK) and
                   Storage Location(EQBS-B_LAGER)
    Can any one suggest me the BAPI or function module to create a serial number for a material with valudation type, plant and storage location rather tan going for BDC to transaction code IQ01.
    (Note: We can create the serial number with valuation type manually using the transaction code "IQ01" for agiven material.)
    For suitable answers would be rewarded.
    Regards
    Badari
    Edited by: badari Narayana on Feb 10, 2008 5:20 PM

    I have the solution below.
    - Don't change Serial no. profile
    - Goods issue all stock with mvt 201 or 261 into temporary cost object and note your text.
    - Change Serial no. profile in material master
    - Goods receipt all stock (You may ref. material doc.) and you need to input serial number for all materials.
    Hope this solution can help you.
    Edited by: Saiyaman on Dec 9, 2009 5:33 PM

  • Problem with an enter inventory count for a material with serial number

    Hi all,
    I must post an Enter inventory count with the transaction MI04 for a material with serial number that it has more 250,000 of serial number, but the system give an error message of dump.
    Are there any alternatives to post the inventory document?
    Thanks.
    Best regards,
    Gaetano

    you can't but uplaod using LSMW rather entering manually otherwise you need coremod

  • Creation of Material Master for a material with Material Type NLAG

    Hello Sirs,
         I have to create a material which will be consumed directly. I would use the
    material type NLAG (Non stock material). If I create a material with this material type, will it contain an Accounting view where in I can maintain the price of the
    material? If it contains an Accounting view, which type of Price control should be
    used (Moving average or Standard)? Further, can we maintain an info record for
    a material with material type NLAG?How the price updation happens?
    Regards
    Yoga

    Hi Madhu,
        Thanks for your reply. But, I have one more doubt. For non stock materials, we
    will specify the cost centre and G/L account at the time of creation of Purchase order. Then, do we have to specify the valuation class at the time of creation of
    Material Master since there is no automatic account determination?
    Regards
    Yoga

  • Costing run for a material with alternative BOM

    Hi Friends,
    My requirement is to have product costing for a material with 3 different BOMs, in CK11N i can change the alternative BOM number to have costing run for 3 differesnt boms, but in ck24 how to proceed, My client requirement is such that the standard price should be the average price of the costing run from 3 different boms, and they are not interested in manual price change in MR21
    Regards,
    Arun Kumar R V

    Hi Arun,
    You can have a Standard cost estimate based on only one of the alternative BOM and Routing. This alternative is selected based on the business ie., whichever alternative is generally used in production frequently. This will be the std cost and whenever you do the production using the other alternatives, the difference in cost will be captured as Variance.
    There is no option of having average or cost estimate for each alternative at the same time.
    There is absolutely no use in maintaining price in MR21 for an in house produced material, since during Prod Order process the planned costs will be arrived at based on the quantity structure of BOM & Route only.
    Thanks & Regards,
    Vijaya Bhaskar A
    Edited by: Vijaya Bhaskar A on Jan 7, 2009 8:57 AM

  • MRP run for header material with bom usage-3

    Dear All,
    We have header material with bom usage-3.We maintain the stock at child components only ,not at header
    I have created the planned independent requirement for header material.I have created a sales order but sales order is not shown in md04.
    What can be the further setting  I am missing for mrp run of above scenario.
    with regards,
    pradeep

    Dear ,
    Couple of checks points for you :
    1.Check the material master Sales Org Veie-Item Categoery .As you have mentioned Item Categoery -TAQ which is not relevent for requirement planning throgh schedule line category -CT ( CT means there will not be any inventory or good movement and requirement will not be passed for MRP ) .Only CP -line item categoery does requirement passing through MRP and it will show u in MD04. So the summery is if you want to generate an MTO order for the same FG material , you should matian the Sales Line item categoery as MTO in sales Org View and it will pop up in VA01 whiel logging Sales Order .
    Generally , TAQ item categoery are used in Project Billing or Delivery .ok  and they will not be having any availabilit check so it KP ( no check ) .
    But for MTO order , you should have availablty chek 02/01 in MRP3 view and also MTO Sales Item categoery .
    Based on the above information logg an sales order , release credit chek in VKM3, SAVE and check in MD04.
    Create PIR in MD61 and Run MRP on the both cases .I have tested its working .but noit with TAQ item categoery ok
    2.Why do you need to create Sales Order for dependent Item-Y because it will be in X-BOM item  ? Make sure that Y- should have Sales Item categoery in material master -MM02-Sales Org View as NORM item .If you really want to create sale sorder for this item , it should TAN or NORM .
    3.Other PIR detail is fine .
    Try and revert back
    Regards
    JH

  • Creation of Sale Order for configurable material with availability check.

    Hi,
    We have a scenario in which the material is configurable. The configurable material (X) has few variants (Ex: X1, X2, X3, X4, X5). While booking the sale order, we use the material number (X).
    Further, the material planning is done for the variants X1, X2, X3, X4, X5. The standard variants are planned for production in advance.
    1.     While booking the sale order, we want the availability check of the stock (type matching to happen). What needs to be done in configuration?
    2.     While booking the sale order, there is a possibility that the configuration selected will not match with any of the standard variants due to some additional requirements of the optional features, in such cases how to link the standard variants to the sale order & create requirement for additional requirements.
    Regards,
    Umesh

    Hi Umesh,
               1.Create material master for configurable material and variants in mm01.
               2.Maintain BOM for the configurable material in CS01
               3. Configur the variant configuration steps
                  a. Create charecteristics T.code CT04
                  b. Create values and assign classes
                  c. assign the values to charecteristics
                  d . Maitain dependence  T.code CU01
                  e.create configuration profile t.code CU41
                  f.stimulate the configuration profile.
    4. Do the availability check configuration through this path
    IMG --> Sales and distribution > Basic functions ,> Availabilty check and Transfer of requirements.
    5. Maintain the Availbility check field and MRP views in the material masters other wise you sit with PP people and do that
    I hope it will help you
    Regards,
    Murali.

  • Create inbound delivery for same material with multiple batches

    Hi Experts,
    An ASN( advanced shipping notification) contains multiple batch numbers for same material or line item.An IDOC has different segments with batch numbers but in SAP while creating Inbound delivery(VL31N) only batch number ( segment) get posted automatically in SAP other batches are need to post manuaaly.
    I am using IDoc type : Delivery03 ,Message type: DESADV
    How to resolve this problem?
    Thanks,
    Anil

    Hi Anil,
    Welcome to SCN for your first post. Did you check with your functional people about this.
    Regards,
    Madhu.

  • Multiple EAN maintainance with one material with its stock quantity

    Hi,
    I have a question with regards to EAN.
    Basically, I would like to maintain multiple EAN number and its correspondent stock figure of a material into the material master (see following example):
    Material: 100200
    EAN1   1234903948193 stock quantity  100pcs
    EAN2   8374772990291 stock quantity  130pcs
    EAN3   1378882990201 stock quantity  163pcs
    Does the above possible to be maintain in material master basis view in the additional view with its relevant quantity?
    The business rational for maintaining multiple EAN for this material is because this material can be produced in UK, Germany, & France:
    EAN1  UK, EAN2  Germany, EAN3  France.
    And further, business would like to keep track of how much stock quantity it has on each of these EAN:
    EAN1  100pcs, EAN2  130pcs, EAN3  163pcs.
    Please advise. Thanks
    tuffy

    Hi,
    Multiple EANs can be maintained for a material in material master but the stock number cannot be tied to it.
    For this you can use alternate methods like split valuation where in the valuation type refers to the EAN and this way you can maintain an indirect reference between EAN and stock numbers.
    Hope this helps.

  • GR for BOM Material with Serial number

    Hi all
    I have 2 serialised materials A and B, A is the Parent Material and B the child material (BOM Scenario), both having serial numbers
    I want to do GR without PO (501movement type) for the A material with the serial number, while doing GR i want BOM to be trigerred and at the same time i need to enter the serial number for the child material also.
    This is not a subcontracting scenario, here i am not issuing any goods to vendor, i am getting some used parts which i want to track individual accessiroes wise with serial numbers.
    Kindly suggest the backend settings
    Regards
    Amuthan M

    Try MASE. it hold the last serial number.

  • Table for HU material with packed material

    Hi all friends
    In my business scenario i need to print the Handling Unit in Export invoice where i need to print the HU (Boxes) with all material pack in this HU (Box). Eg. one Box have packed material X, Y, Z,
    Please tell me which table i can found that material with HU (Box) no.
    full marks will be given

    Hi
    Try this function module HU_GET_HUS.
    In the ET_ITEMS table you will get all the child items.
    If the child item ET_ITEMS-MATNR is having value means, that is the lowest level.
    If you are looking specifically for tables means, you will get the details in VEKP and VEPO table.
    Regards
    Madhan D
    Edited by: Madhan Doraikannan on Nov 12, 2008 10:47 AM

  • How to raise PO for a material with transport cost but no material cost?

    Hi experts,
    My client wants to raise a PO in SAP for a material that will be purchased free of cost.
    He only wants to invoice the vendor for delivery/transport costs.
    Now, as I see it, a free-of-cost PO is not possible because it does not allow adding any pricing conditions. May be I am not aware of some tweak that is available.
    Please provide your help on this. Thank you.

    Hello,
    Firstly Prepare a Po with a line item that you want, then chick the Free check box.
    then go to the Item tab (below), go to conditions & add freight (Freight % or Freight (Value) ) with the required amount.
    you can change the Assignment from the Vendor to a Transporter / Freight forwarder, that you want.
    That is it. you will have a Po with no Commercial Value but just Transport Cost.
    Thanks & Regards,
    Atul Sabnis
    Edited by: Atul29 on Jul 7, 2011 1:52 PM

  • GATP allocation check for configurable material with characteristic

    Hi APO Gurus,
    We are using configurable products and wanted to go for GATP  allocation check based on Characteristics.
    The scenario is goiven below,
    All our products are configurable materials. At the entry of sales order , the characteristic values are updated and then the sales order is checked for GATP.
    When the order come to APO-GATP for allocation check , here I want to check the allocation for configurable material.
    But the allocation quantities are given for a combination of Configurable material and its characteristics.
    How can we map such scenario?
    Do I  to create the CVC at family level that is configurable material level ?
    How the characteristic values are considered in allocation.
    Waiting for your reply.
    regards,
    Ravi

    answered.

  • I have flash professional cc and I need air for desktop application with .exe or .air that should contain all swf's and captive air runtime in one Installer only . I don't want to install separate adobe air runtime .

    I need Air for desktop application either in .exe or in .air with embedded captive runtime just like .apk . I don't want to install adobe air separate . everything should come in installer
    I have adobe flash professional cc development tool , let me know whether I have to go with other development tool???
    your reply will  increase my confidential level
    please anyone can help me to solve this problem
    Thanks&regards
    Niranjan

    Adobe Flash Professional CC manual
    1) Create new project
    2) Configure your Project properties
    3) Embed runtime, so you users can use Adobe AIR without pre-installed Adobe AIR runtime
    4) After publishing you will receive %APP_NAME%.app folder that contain your project files

  • Cancel insp.lot for batch material with serial number?

    We have a problem with an inspection lot....
    A few months ago we made a goods receipt for batch material... it ended up in Q- stock.
    The weeks went by and the material was changed ito a serial number material... that process works fine...
    But now we want to scrap the material that is batch-handeled ... the inspection dont want to let go.. it want serial numbers... even if I create serial numbers for this the inspection lot
    dont let me register any numbers.. So I cant cancel/delete it... And after all I just want to scrap the batch...
    Can someone help me?
    // Andreas

    if stock of that material with serial numbers exist, then scrap that stock and disable the serial number for the material by deleting the serial number profile in the work scheduling view of the material master.
    then try cancelling the inspection lot. After cancelling the inspection lot, activate the serial number for that material again and bring back the scrapped stock into the unrestricted use.
    Note: please advice the users not to post any stock for that material till you complete this or else block the posting t.code for all the users.

Maybe you are looking for