Needs steps,  key points while undeploying & unclustering an bpm engine

Hi,
We are using Oracle 10G 10.3.2 in a clustered weblogic version with clustered servers - each catering to different workflows.
Need to undeploy a process which is currently deployed in one of the cluster engine
What are the steps/ key things to be considered while doing this. There are no bpm instances of that particular process
Thanks,
-Sree

Hi,
We are using Oracle 10G 10.3.2 in a clustered weblogic version with clustered servers - each catering to different workflows.
Need to undeploy a process which is currently deployed in one of the cluster engine
What are the steps/ key things to be considered while doing this. There are no bpm instances of that particular process
Thanks,
-Sree

Similar Messages

  • HT201442 I am got error while trying to restore,, but i just only error file with 3194. I try many step by install lastest version and fix host file, but still fail. Anybody can give me any key point to solve this problem? Thank you

    I am got error while trying to restore,, but i just only error file with 3194. I try many step by install lastest version and fix host file, but still fail. Anybody can give me any key point to solve this problem? Thank you

    Error 3194:
    This device isn't eligible for the requested build
    It means that Apple has stopped signing the version of iOS that you have, try downloading the latest iOS version, then try Restore again.

  • What are the key points to beconsider while upgrading from 4.7 to ECC 6.0

    hai
    What are the key points to beconsider while upgrading from 4.7 to ECC 6.0
    please provide sufficient material
    points will be rewarded
    regards
    v.sridhar

    Hi Sridhar,
    Please visit the following links:
    http://service.sap.com/erp
    http://solutionbrowser.erp.sap.fmpmedia.com/ (Functional perspective)
    http://service.sap.com/instguides --> mySAP Business Suite Applications --> mySAP ERP --> mySAP ERP 2005 --> Upgrade
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf
    For Functionality Differences pls refer to the below site -
    http://solutionbrowser.erp.sap.fmpmedia.com/
    After opening the site, please select the Source Release Version which is 4.6 b Then Select the Target Release Version which is "mySAP ERP 2005" or ECC 6.0
    Select the Solution Area like Financials, Human Capital Management, Sales....
    Select module like MM, PP, SD, and QM.....
    Click on Search
    then it displays the Release Version and the Delta Functionality. Which can be downloaded to a word document if required.
    And also check the release notes of ECC 6.0 in service.sap.com.
    When you are upgrading from 4.6C to ECC6
    Nothing major, follow the same process you'd follow if you were updating PI service packs in R/3 or enhancing data sources. Empty queues in RSA7 and lbwq. Also empty setup tables through lbwg as the upgrade doesn't like it if these tables contain data. This is all on the R/3 side (although you empty RSA7 by running each delta TWICE in BW).
    To transfer queues from lbwq to rsa7, execute jobs through LO cockpit (lbwe).
    Some of your data sources could also be using sm13 instead of lbwq, so do check it out as well.
    For installing ECC 6.0 you required a solution manager key. With out solution manager key you cannot install ECC6.0.
    For ECC 6.0 is called net weaver component here you have ABAP+JAVA stack.
    ECC6.0 supports UNCODE.
    For installing 4.6 you don't require solution manager key. It only having ABAP stack.
    4.6C supports NONUNICODE.
    Major difference is ECC6 is netwear product having WASJAVA+ABAP
    secondly support unicode apart from this we have other diff. you can get form master guide from service.sap.com/instguides.
    Please go through the link that is shown here and if there is any doubts then feel free to ask.
    Major difference is ECC6 is net weaver  product having WASJAVA+ABAP
    secondly support Unicode apart from this we have other diff. you can get from master guide from service.sap.com/instguides
    For installing ECC 6.0 you required a solution manager key. With out solution manager key you cannot install ECC6.0.
    For ECC 6.0 is called net weaver component here you have ABAP+JAVA stack.
    ECC6.0 supports UNCODE.
    For installing 4.6 you don't required solution manager key. It only having ABAP stack.
    4.6C supports NONUNICODE.
    Please also Refer sdn thread and make a small search where u can find lot of information Reg this
    olution Browser would give the differences (Features):
    http://solutionbrowser.erp.sap.fmpmedia.com/ Give source and target versions.
    Release Info:
    ECC 6.0:
    http://help.sap.com/saphelp_erp2005/helpdata/en/43/68805bb88f297ee10000000a422035/frameset.htm
    Refer below and search for posts on this topic on sdn
    There are so many differences between the version in different objects
    I
    These are the some of the settings that are differed in the two versions and in that two objects
    Please visit the following links:
    http://service.sap.com/erp
    http://solutionbrowser.erp.sap.fmpmedia.com/ (Functional prespective)
    http://service.sap.com/instguides --> mySAP Business Suite Applications --> mySAP ERP --> mySAP ERP 2005 --> Upgrade
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf
    For Functionality Differences pls refer to the below site -
    http://solutionbrowser.erp.sap.fmpmedia.com/
    Upgrade from 4.6c to 6.0 ECC
    upgrade from 4.7 to ecc 6.0
    Please Do Reward If Really Helpful,
    Thanks and Regards,
    Sateesh.Kandula

  • Steps to follow while creating Database table in notes or paperwork

    what are the steps to follow while creating Database table in notes or paperwork
    Thank you,
    Regards,
    Jagrut Bharatkumar Shukla

    hi,
    1. Goto Transaction SE11.
    2. Enter the table name to be created. It should start with a Y or Z.
    3. Press Create
    4. Enter the Short description for the table
    5. Enter the Delivery class for the table. It can be 'A', 'C' or other.
    6. In the Fields tab, specify the table fields and the corresponding data elements or the built-in data types.
    7. If the table needs to be made a client-depenedent table, the first field should be MANDT.
    8. Goto Technical settings of the table and sepcify the Data Class and Size for the table. Also, there u can specify if buffering for the table should be allowed or not.
    9. Now, activate the table.
    if helpful reward some points.
    with regards,
    Suresh Aluri.

  • What r the steps that involve while v r using DBCONNECT AND UDCONNEC

    Hi All,
    What r the steps that involve while v r using DBCONNECT AND UDCONNECT AND IN WHICH DIFFERENT SCENARIOS V USE THEM.
    REGARDS
    KK

    Hi,
    To Configure UD Connect on the J2EE Server for JDBC Access to External Databases;
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/58f4db47-0501-0010-a2bf-ff01b150fdff
    To create Driver on JDBC side
    http://help.sap.com/saphelp_nw70/helpdata/en/b0/6e62f30cbe9e44977c78dbdc7a6b27/frameset.htm
    Configuring the BI Java Connectors
    http://help.sap.com/saphelp_nw70/helpdata/en/43/e35b3315bb2d57e10000000a422035/frameset.htm
    Then to extract data use this...
    Before you can transfer data from UD Connect sources into BI, you have to generate the metadata (the information about the source object and source object elements) in BI, in the form of a DataSource with a function module for extraction.
    If your dataflow is modeled with objects based on the old concept (InfoSource 3.x, transfer rules 3.x, update rules 3.x), you can generate a DataSource 3.x for transferring data into BI from a database source system.
    Prerequisites
    You have modeled the InfoObjects that you want to use in the InfoSource and the data target or InfoProvider according to the UD Connect source object elements.
    Note the following background information:
    Using InfoObjects with UD Connect
    Data Types and Their Conversion
    Using the SAP Namespace for Generated Objects
    Procedure
    You are in the Modeling InfoSource tree of the Administrator Workbench. First create in InfoSource and activate the communication structure. Then generate the generic DataSource using the wizard in the InfoSource maintenance.
    1. Choose InfoSources ® Your Application Component ® Context Menu (right mouse click) ® Create InfoSource.
    2. Select the type of the InfoSource.
    3. Under InfoSource, enter the technical name of the InfoSource, and assign a description and choose Continue.
    The system creates an InfoSource and shows it in the InfoSource tree under your application components.
    4. In the context menu of the InfoSource, choose Change .
    The communication structure maintenance screen appears.
    5. Using the previously modeled InfoObjects, create the communication structure (see Communication Structure).
    6. Save and activate your communication structure
    7. In the dialog box that follows you will be asked whether you wish to activate the dependent transfer program. Choose No.
    8. In the InfoSource menu, choose Extras ® Create BW DataSource with UD Connect.
    You get to the dialog box where you can assign a UD Connect source object to a DataSource and then generate the DataSource with the extractor. The fields for the DataSource are already being displayed in the table on the left side of the screen. The fields have the same name as the InfoObjects that you have used in the InfoSource.
    9. Select the RFC Destination for the J2EE Engine.
    Make sure that the local server is running. If the local server is running and you cannot open the table for RFC destinations, start the local server again.
    10. Choose the UD Connect Source in which the data that you wish to access is located.
    All available sources that are connected to the J2EE Engine are provided for selection in the input help. n instances are available per adapter.
    11. Select the UD Connect Source Object.
    All available source objects that are available in the selected UD Connect source are provided for selection in the input help. Source objects can be multi-dimensional storage or relational objects.
    The system generates the name of the DataSource in the namespace 6B.
    The DataSource is then replicated in BI.
    The myself system is assigned to the InfoSource as source system as well as the DataSource.
    The system generates a proposal for the transfer rules.
    Since the DDIC structure and the function module are located in the SAP namespace, the following entries can be requested during generation:
    Developer and object key or
    Developer key or
    Object key and
    Transport request
    If you do not make the requested entries, the generated infrastructure is not usable.
    14. Change or complete the transfer rules as needed. For example, if a source object element is not assigned to a unit InfoObject, you can determine a constant for the unit, such as EUR for 0LOC_CURRCY (local currency).
    15. Save and activate your transfer rules.
    Recognizing Manual Entries
    You can enter and change the RFC Destination, UD Connect Source and UD Connect Source Object manually. In order to validate these entries and the ones that depend on them, choose Recognize Manual Entries. For example, if you change the selected RFC destination, all of the field contents (US Connect Source, UD Connect Source Object, list of the source object elements) are invalid. If you choose Recognize Manual Entries, the dependent field contents are initialized and have to be maintained again.
    Result
    You have created the InfoSource and DataSource for data transfer with UD Connect. In the DataSource overview for the myself system, you can display the DataSource under the application components Non-Assigned Nodes.
    When modeling InfoObjects in BI, note that the InfoObjects have to correspond to the source object elements with regard to the type description and length description. For more information about data type compatibility, see Data Types and Their Conversion.
    The following restrictions apply when using InfoObjects:
    Alpha conversion is not supported
    The use of conversion routines is not supported
    Upper and lower case must be enabled
    These InfoObject settings are checked when they are generated.
    Based on the large number of possible UD Connect sources, the most diverse data types are possible in the output system. For this reason, a compatibility check is made at the time of generation of the UD Connect DataSource that is based on the type information supplied by the source systems. This attempts to decrease the probability of errors during the extraction process.
    (Refernce:SAP Notes)
    Hope this helps,
    regards
    CSM Reddy

  • DOT1X-1-INVALID_WPA_KEY_STATE: Received EAPOL-key message while in invalid

    I'm working on with a customer on a 2106 controller with 1130 series ap's. Everyting seems fine until the client does a reauthentication. At this point the clients send a stream of authentication attempts to the RADIUS server (40 or so a second). The RADIUS (Microsoft IAS) is passing the authetication. The Controller has the error: DOT1X-1-INVALID_WPA_KEY_STATE: Received EAPOL-key message while in invalid state (0) - version 1, type 3, descriptor 254 with the mac address of the offending client in the log, at the same rate of the authentication storm. The clients have current drivers. We are using the Microsoft supplicant and have the Microsoft updates (SP2 and relevant wireless patches) installed.
    I'm currently testing using the Intel supplicant, but have not been doing it long enough to see if it is an issue with that supplicant.

    Okay.... for this wlan ssid, you selected WPA+WPA2. Here you should define either WPA w/ tkip or WPA2 w/ AES.... or both. WPA2 performs better than WPA, but that depends on your client supporting WPA2. Since you selected PSK, you must of entered a pre-shared key. So in the AAA server tab, you don't have to enable local eap authentication.
    For local eap, you need to choose wpa+wpa2 and 802.1x. This will also require a certificate on the WLC. I won't go into this too much because you are using PSK. Now on the client side, you would configure the ssid and either wpa tkip or wpa2 aes and psk... not enterprise. Enter you pre-shared key in the client and you should be good to go!

  • How do I sync my new ipad mini with my old ipad 2, without losing any apps or data in notes?  I need step by step instructions for first-time sync with ipad mini.  Thanks.

    How do I sync my new ipad mini with my old ipad 2, without losing any apps or data in notes?  I need step by step instructions for first-time sync with ipad mini.  Thanks.

    If you synced it many times, you have to have a backup. It's just a question of how old that backup is now. When did you last sync?
    First of all launch iTunes on your computer and go to Edit>Preferences>Devices. Do you see any backups for you iPad in that window? If so, how new is the newest backup? That will be the backup that you will want to use. But remember that if you use that backup and it is one month old, you can only restore from that date back in time. Anything that you did on the iPad in the past month will not be in that backup.
    Turn on the new iPad Minin and start activating OTA via WiFi. You will get to a certain point in the process where you will be given the choice to Set up as new, Restore from iCloud - or Restore from iTunes. You will want to select Restore from iTunes.
    That is the short and sweet version. There are step by step instructions in this article. This applies to the mini as well as the iPad 4 or the iPad 3 for that matter.
    http://www.everythingicafe.com/how-to-set-up-new-ipad/2012/03/16/

  • How to hide product key page while installing SQL server 2012 ?

    I need to hide the product key page while installing SQL server 2012 enterprise edition
    I was trying to use the following command
    Setup.exe /ACTION=Install /FEATURES=SQL /INSTANCENAME=Intuition /PID=<My product Key.
    /IACCEPTSQLSERVERLICENSETERMS
    The product key was applied , but the install screen is being shown with the Product key i have provided and it is in editable mode.
    Is there any way i can hide this SQL server product key page ?
    The reason is we are including SQL setup in our application and as per Microsoft policy we should not reveal the product key to user. If we are able to hide this from installing page , we can hide the installation command in some exe.
    Note : Customers need fulfledged versions so we can't install SQLExpress.

    Hello,
    Could you try using /Q or /QS parameter?
    http://msdn.microsoft.com/en-us/library/ms144259(v=sql.110).aspx
    Hope this helps.
    Regards,
    Alberto Morillo
    SQLCoffee.com

  • Error at step 42/45 while install Solution Manager 4.0

    Hi SAP guru,
    I'm install Solution Manager 4.0 on Windows 2003 R2 with Oracle10g
    and JSDK 1_4_2_16, while facing step 42/45 (Configure System Landscape Directory). Its shown error below.
    ERROR 2008-01-17 16:02:04
    CJS-30059  Java EE Engine configuration error.<br>DIAGNOSIS: Error when configuring J2EE Engine. See output of logfile java.log: 'JSE'.
    ERROR 2008-01-17 16:02:04
    FCO-00011  The step configSLDMainLocalMapSecRolesToUsers with step key |NW_Onehost|ind|ind|ind|ind|0|0|SAP_Software_Features_Configuration|ind|ind|ind|ind|5|0|NW_Usage_Types_Configuration_AS|ind|ind|ind|ind|0|0|NW_CONFIG_SLD|ind|ind|ind|ind|0|0|configSLDMainLocalMapSecRolesToUsers was executed with status ERROR .
    Any solution for this problem?
    PS. I was ran sapinst.exr SAPINST_SKIP_ERROR=true on step 39 (Install Software Units) after set SDM mode = integrated.
    Thanks in advance

    Hi Snehal,
    The log I paste above was too many days ago. Thus, I'm get a new one from Log Browser for you.
    ERROR 2008-01-21 19:05:35
    CJS-30059  Java EE Engine configuration error.<br>DIAGNOSIS: Error when configuring J2EE Engine. See output of logfile java.log: 'JSE'.
    ERROR 2008-01-21 19:05:35
    FCO-00011  The step configSLDMainLocalMapSecRolesToUsers with step key |NW_Onehost|ind|ind|ind|ind|0|0|SAP_Software_Features_Configuration|ind|ind|ind|ind|5|0|NW_Usage_Types_Configuration_AS|ind|ind|ind|ind|0|0|NW_CONFIG_SLD|ind|ind|ind|ind|0|0|configSLDMainLocalMapSecRolesToUsers was executed with status ERROR .
    and this from sapinst_dev.log as your requested.
    INFO       2008-01-21 19:05:35
               CJSlibModule::writeInfo_impl()
    Execution of the command "C:\j2sdk1.4.2_16\bin\java.exe -classpath E:/usr/sap/SOL/DVEBMGS01/j2ee/cluster/server0/apps/sap.com/tclmctcutilbasic_ear/servlet_jsp/ctc/root/WEB-INF/classes/ com.sap.ctc.util.ConfigMainExt XXXXXX ahosapso:50100 J2EE_ADMIN XXXXXX" finished with return code 0. Output:
    TYPE=A<BR>STATE=401<BR>INFO_SHORT=Error connecting to http://ahosapso:50100/ctc/ConfigServlet?param=com.sap.ctc.util.SecurityRoleConfig;MAP_SECURITYROLE_TO_USER;ROLE=DataSupplierLD,USER=SLDDSUSER,COMPONENT=sap.com/com.sap.lcr*sld,HOST=ahosapso,P4PORT=50104,J2EE_ADMIN=J2EE_ADMIN,J2EE_PASSWORD=des19(66|31|151|231|117|153|233|51|218|54|). The provided user data might be incorrect or user might be locked.<BR>CONFIGURATION=
    TRACE      [iaxxejsexp.cpp:188]
               EJS_Installer::writeTraceToLogBook()
    NWException thrown: nw.configError:
    Java EE Engine configuration error.<br>DIAGNOSIS: Error when configuring J2EE Engine. See output of logfile java.log: 'JSE'.
    ERROR      2008-01-21 19:05:35
               CJSlibModule::writeError_impl()
    CJS-30059  Java EE Engine configuration error.<br>DIAGNOSIS: Error when configuring J2EE Engine. See output of logfile java.log: 'JSE'.
    TRACE      [iaxxejsbas.hpp:460]
               EJS_Base::dispatchFunctionCall()
    JS Callback has thrown unknown exception. Rethrowing.
    ERROR      2008-01-21 19:05:35
    FCO-00011  The step configSLDMainLocalMapSecRolesToUsers with step key |NW_Onehost|ind|ind|ind|ind|0|0|SAP_Software_Features_Configuration|ind|ind|ind|ind|5|0|NW_Usage_Types_Configuration_AS|ind|ind|ind|ind|0|0|NW_CONFIG_SLD|ind|ind|ind|ind|0|0|configSLDMainLocalMapSecRolesToUsers was executed with status ERROR .
    TRACE     
    <html><head></head><body><p>An error occurred while processing service <b>SAP Solution Manager 4.0 Support Release 1 > SAP Systems > Oracle > Central System > Central System Installation</b>. You may now</p><ul> <li>press <I>Retry</I> to repeat the current step.</li> <li>press the <I>View Log</I> button to get more information about the error.</li> <li>stop the task and continue with it later.</li></ul><p>Log files are written to <b>C:/Program Files/sapinst_instdir/SOLMAN/SYSTEM/ORA/CENTRAL/AS</b>.</p></body></html>
    TRACE      [iaxxgenimp.cpp:1093]
               showDialog()
    waiting for an answer from gui
    Edited by: jitpanu sriudomwat on Jan 24, 2008 3:47 AM

  • FCO-00011 The step ExeProcs with step key

    Hi Seniors,
    I have tried to install SAP ERP ECC 6.0 IDES ERP2005 SR3 , I got the error in installation step 19/26 (Create SAP Stored Procedures).
    OS : WIN 2008 SERVER
    DB : MS SQL 2008
    I have fallow the Note 1152240.
    Error log :
    ERROR 2010-03-02 12:08:20.282
    FCO-00011 The step ExeProcs with step key |NW_Onehost|ind|ind|ind|ind|0|0|NW_Onehost_System|ind|ind|ind|ind|2|0|NW_CreateDBandLoad|ind|ind|ind|ind|10|0|NW_Postload|ind|ind|ind|ind|10|0|NW_Postload_MSS|ind|ind|ind|ind|2|0|MssProcs|ind|ind|ind|ind|1|0|ExeProcs was executed with status ERROR .
    Please help me,
    Thank you,
    Sagar K

    Dear Markus,
    In that log also same error message,
    =============================================================================================================
    WARNING[E] 2010-04-23 19:46:55.288 [syxxcfstrm.cpp:406] CSyFileStreamImpl::open() FSL-02015  Node /db2/db2SM1/.dbsrc.sh does not exist.TRACE 2010-04-23 19:46:55.307 [iaxxejsbas.hpp:408] handleException<ESyException>() Converting exception into JS Exception ESyException. TRACE 2010-04-23 19:46:55.307 Function setMessageIdOfExceptionMessage: modlib.jslib.caughtException WARNING[E] 2010-04-23 19:46:55.307 CJSlibModule::writeError_impl() MUT-03025  Caught ESyException in Modulecall: ESAPinstException: error text undefined.TRACE 2010-04-23 19:46:55.308 [iaxxejsbas.hpp:483] EJS_Base::dispatchFunctionCall() JS Callback has thrown unknown exception. Rethrowing. TRACE 2010-04-23 19:46:55.397 [syuxctask.cpp:1382] CSyTaskImpl::start(bool) A child process has been started. Pid = 782582 TRACE 2010-04-23 19:46:55.590 [syuxctask.cpp:1382] CSyTaskImpl::start(bool)
    A child process has been started. Pid = 782584 ERROR 2010-04-23 9:46:55.803 [sixxcstepexecute.cpp:951] FCO-00011  The step setUserEnvironment with step key|NW_Onehost|ind|ind|ind|ind|0|0|NW_Onehost_System|ind|ind|ind|ind|2|0|NW_Users_Create_Do|ind|ind|ind|ind|5|0|setUserEnvironment was executed with status ERROR . TRACE 2010-04-23 19:46:55.833 [iaxxgenimp.cpp:752] CGuiEngineImp::showMessageBox  <html> <head> </head> <body> <p> An error occurred while processing service SAP Solution Manager 4.0 Support Release 4 > SAP Systems > IBM DB2 for Linux, UNIX, and Windows > Central System > Central System. You may now </p> <ul> <li> choose <i>Retry</i> to repeat the current step. </li> <li> choose <i>View Log</i> to get more information about the error. </li> <li> stop the task and continue with it later. </li> </ul> <p> Log files are written to /hm/cdmedia/Install/sapinst_instdir/SOLMAN/SYSTEM/DB6/CENTRAL/AS. </p> </body></html> TRACE 2010-04-23 19:46:55.833 [iaxxgenimp.cpp:1255] CGuiEngineImp::acceptAnswerForBlockingRequest
    Waiting for an answer from GUI
    =============================================================================================================
    Appreciate your suggestion.
    regards,
    Guna

  • Need steps for rehosting FR currently running on windows 2008 R2 to LinuxOS

    Need steps for rehosting FR server currently running on windows 2008 R2 to Oracle Linux 5 OS
    I found something for essbase in oracle EPM whitepaper library but not for FR. Did anyone of you out there try this.
    Any ideas/thoughts.
    Thanks in Advance

    If it's 11.1.2.1 or 11.1.2.2 you simply install it in the new host, configure it and you can either manually edit the mod_wl.conf file to point to the new server or you can re-run the web server (OHS) configuration wherever it is installed. Beware though that if you do this you will not be able to run FR against HFM.
    Pablo

  • Need Steps for Configuring BI 7.0 with ECC 6

    Hi All,
    I need steps for configuring BI 7.0 with ECC 6, Please if anybody has material, Please share with me...
    Regards,
    Kiran Telkar

    Hi,
    regarding bi7 and ecc6.0 Configruration,pls chk this
    https://www.sdn.sap.com/irj/sdn/developerareas/bi?rid=/webcontent/uuid/e78a5148-0701-0010-7da9-a6c721c6112e [original link is broken] [original link is broken] ...
    http://sheffield.gumtree.com/sheffield/57/13455557.html
    https://www.sdn.sap.com/irj/sdn/developerareas/bi?rid=/webcontent/uuid/e78a5148-0701-0010-7da9-a6c721c6112e [original link is broken] [original link is broken] ...
    *pls assign points,if links useful*
    regards,
    CSM Reddy

  • Need Step-by-Step Instructions for Permitting FTP access behind WRT54G V6

    I just got my wireless router set up.  I'm a complete novice at this, so any help anyone can provide will be appreciated.
    I have an FTP server running on my computer, but FTP requests are not getting through.
    I need step by step instructions how to set up the router to pass FTP requests through to the computer.  I mean basic steps!  How to access the configuration page(s), what to change, what I need to do about an IP, which ports to forward, etc.
    Or point me to the documentation or web site with this information.
    Thank you!

    Check the FAQ of Linksys. See here
    However, if you are a "complete novice" I would strongly advise not to do so. Providing servers on the internet requires knowledge about networking and security of your computer. Else, too often, the server ends up as porn relay or worse.

  • HT1296 need steps to sync my I phone contactsa and calendar to outlook 2010

    Need steps to sync my I phoneb 5 contacts and calendar to my windows 7 pro, outlook 2010

    You sync contacts & calendars through iTunes to supported applications on your computer. You select such on the "Info" pane, in iTunes, while your phone is connected. Before doing so, make sure the supported applications on your computer are not empty...make sure there is at least one unique entry in each. This will generate a merge or replace prompt when you do sync, select merge. Never sync to an empty application on your computer, doing so will erase the data on your phone.
    Regarding your mail account, actual emails are not synced through iTunes. Whether your emails are kept in sync or not is determined by the type of mail account you have. Only an IMAP or Exchange account can be kept in sync, not possible with a POP account.

  • Key Points in SAP MM

    hi everyone
                        can anyone suggest me on what are the key points that needs to be mentioned in sap mm consultant resume.

    Ok am going to tell you the most important key point in your MM resume.
    Just be honest and add only what you are aware of in your resume. If you feel there are few important points which will enhance your opportunities, learn them first and then add them to support the statement you added in your resume.
    P.S - You can use this key point in any resume. Not only MM
    Vikranth

Maybe you are looking for