Net bill value - why not possible in SAP

hai,
I have one basic doubt. Why SAP is not showing the balance amount of the bill? ex bill value is Rs.10000.00 partpayment received Rs.5000.00  in sap for partpayment, the saparate document is creating but it is not deducting the bill amount. Why it's not showing the balance as Rs.5000.00.
Is there any logic.
govind.

hai Anand,
Like bill is Rs.10000.00 ( inv.no 100)
Part payment 1 - Rs.5000.00 (ref inv.No 100)
Part Payment 2 - Rs.4000.00 (ref inv.No.100)
Part Payment 3 - Rs.1000.00 instead of that if i enter Rs.3000.00 it will also accept and in reference detail it will show the same invoice number what we have adjustedin earlier.
while entering the part payment 3, if exceed Rs.1000.00 the system dont want to allow the entry. Is it possible.
govind.

Similar Messages

  • Billing Value is not updating in Cube for 2lis_13_vditm

    Hi All,
    I am getting Billing Value in PSA for 2lis_13_vditm, while its not getting updated in 0SD_C03 Cube. My transfer rules and transformation both are activated.
    In PSA, i am getting Billing value for M and I both document category, while in cube I am getting value 0 for both document category.
    I am not getting any error message.
    Thanks in Advance,
    Rishit

    Hello,
    Please check if there are any Start Routines , Char Routines or End routines written in the transformation
    Also check if a constant is assigned to it.
    Waiting for your feedback
    Regards
    Nitin Bhatia

  • T400 4GB Vista or Windows 7 32 bits with PAE. Why not possible?

    Hello,
    I have read some articles about enabling 4GB of RAM in Windows Vista 32 bit version enabling PAE as discussed here: http://www.ocmodshop.com/ocmodshop.aspx?a=989
    I have tried this method and others and I have disabled DEP in Windows and in the BIOS.
    Is this possible to reach 4 GB of RAM in 32 bit OS with PAE in T400? I have read that in windows 2008 is possible (also linux) but why not in Vista32 or windows7 32?
    Cheers!
    Jorge
    Message Edited by hardaway on 02-13-2009 03:53 PM
    Message Edited by hardaway on 02-13-2009 03:54 PM
    T400 (2767-AK3)

    I mean why is not possible to use a 4GB ram in a 32 bit OS with PAE in the Lenovo T400.
    I know in other machines is possible.
    T400 (2767-AK3)

  • Remove apps from I tunes history...why not possible?

    I´d like to remove purchased apps from my I tunes history. Not just hide them, but completely delete them...so far I´ve only been able to hide them, why is it not possible to remove them completely?

    Becasue this is not a feature of itunes.

  • Periodic billing value is not dividing as per the months.

    Hi,
    While mapping periodic billing plan-my requirement is net value 10,000 should split into as per the end date months. But if we see the net value in billing plan  is multiplying with the months as per the year i.e.130,000/- is coming which is wrong.
    But it should come as 10,000/12= PER MONTH VALUE .(NET VALUE IN CONDITIONS/MONTHS).
    Can you guide me to meet the requirement.

    Hi Suman,
    My sales order value is 10,000/- which I would like to charge my customer for the coming 13 months service.
    I have maintained the same in my condition tab (Second screen shot).
    But if I see my billing plan the net value is coming as 1,30,000/-. Means it is multiplying instead of dividing.
    My requirement is 10,000/13 =
    But currently coming as  10,000*13=.
    Hope you got my problem.

  • Billing value should not exceed contract(value based contract) value

    Hi,
    We are using value based contract and in item category we set E in incompletion rule which stops me to create relaease order where its value exceeds the contract value.
    But via release order we recognize revenue(service based revenue recognition) and we do billing directly through contract via milestone billing plan,
    At present i can bill more then my contract value.Now i want to system should not allow me to bill mre then contract value.
    I checked the option in VOV8 and VOV7 but all those are meant for release order not for bliing.
    Thanks in advance.

    Hi Satya
    You can set the billing amount in milestone billing plan itself. based on that value billing will done.

  • Things that are tough/not possible in SAP WAD but can possible in BO Webi

    Hi ,
    I would like to collect some features or tasks that are tough to make in SAP Web application designer and those are now avilable in BO Webi or BO reporter.
    My main agenda is to collect some features where i could show that Bo webi is much more smarter then SAP WAD.
    Thanks

    Hi,
    Visit these...
    [Business Objects|http://www.businessobjects.com]
    [SAP|http://www.sap.com]
    [Product Gruides|http://help.sap.com/businessobject/product_guides]
    Here you have a world of information to collect.
    Regards
    Jacques

  • MBP 17" mid 2010 Snow Leopard Native: why not possible to install Snow Leopard in some new Hard disk?It appears "impossibile 'cause you have Mac OS X" 23.1.1."

    Guys, I want to install SL in some hard disk. It's the native OS, the one came with the MBP. But after having installed Lion, my MBP doesn't allow me to install from the original dvd of Snow Leopard, telling me "impossible because you have Mac OS X” 23.1.1. istaller".
    Someone can help me?

    hey thank you for your answers. I've written that I want to install snow leopard in a new hard disk, not over the lion. In other words, I want a hard disk with the faster snow leopard, that was the native OSX of my MBP mid 2010. But using the last procedure you suggested me, the dvd doesn't appear. I repeat, there's something changed in the firmware that blocks snow leopard.
    the comunication that appears when I insert the original dvd of SL is something like "impossible to install snow leopard because you have Mac OS X” 23.1.1. istaller".

  • Dual standby why not possible asha 200

    In asha 200,
    while using data the other sim remains inactive & signal goes away...
    I want both sim active as in other phones..
    I use one sim for data n other for call,sms but whenver i use data other sim remains inactive so i miss important calls...
    Plz any solution for that?

    With a Nokia? Not aware of. MediaTek based Dual-SIM-Standby phones have found a solution using slower data, but staying available for SMS and incoming calls, although they are not Dual-SIM-Active.
    I am not aware of such a solution in Nokia or Samsung land. For such out-of-date chipsets, you have to go for call-forwarding not to miss important calls. Alternatively, you could try an UMTS/3G enabled phone like the Nokia 301 whether this helps in your situation – depends a lot on the used network. Anyway, my tests failed with that as well.

  • Billing value in milestone billing exceeds net value.

    Dear all Sap Gurus,
                            I have a situation where in my Sales Order i booked 10 quantities for an item with item category Tao,with each having value of Rs 1000. So net value for the item is Rs 10000. Now in billing plan my client bills on value basis. an bills for 5 times.1st time billed for 3000,next time 4000,then 2000,then 3000,then 5000. Now the billing value for the item is 17000.My net value is Rs10000 and my billing value is 17000.this should not happen the billing value should not exceed net value.i am stuck with this concern.i require this on priority basis as reports will show this entry.looking forward to your help.

    Hi,
    I think, in milestone billing, value of TAO item is immaterial(as long as it is non-zero). Whatever value you have in the billing plan would get billed. So I dont see any issue in your case.
    Regards,
    Sridhar

  • Error while calculating the net present value

    Dear experts,
    Please help me in solving the following error.
    I am trying to do project vaibility analysis through pre investment analysis in appropriation request, interm I'm trying to calculate the IRR for the project.
    I have created the appropriation request and given all the data in that including the planed values for the project.
    In Variants tab of appropriation request, preinv. analysis sub tab, i have clicked the button Calculate preinvestment analysis figures , ( I hvae not mentioned any values in that screen, its picking the plan cost from the planed values of the appropriation request) there I'm getting an error saying
    Error while calculating the net present value
    If I open the message it is as follows:
    Error while calculating the net present value*
    *Message no. AO215*
    Diagnosis
    An error occurred during calculation of the net present value.
    The yield curve for determining the net present value is not completely maintained. Possible causes are:
    1. Evaluation type IM01 does not exist (table ATSYC).
    2. Yield curve types 9990 (bid) and 9991 (ask) have not been created (table JBD14) for the currency of the controlling area of the appropriation request.
    3. Reference interest rates have not been created for the yield curves (tables T056R and JBD15).
    4. Interest rates are not maintained for the complete planning time period for the reference interest rates.
    5. Under certain circumstances, the standard exchange rate types 'G' and 'B' may be inconsistent.
    Procedure
    Check your Customizing settings:
    1. SAP supplies the evaluation types.
    Remember, SAP supplies the evaluation types in client 000. You have to copy them into your working clients. If you do not have them in your system, you can create them in Customizing for the Treasury component (Treasury Management -> Market Risk Management -> Evaluations -> Define Default Settings). Create evaluation type IM01 with bid yield curve type 9990 and ask yield curve type 9991.
    2. In Customizing for appropriation requests (under Planning), create a bid yield curve type 9990 and an ask yield curve type for the currency of the controlling area of the appropriation request.
    3. Create at least one reference interest rate for each yield curve.
    4. Maintain the reference rates, starting at the minimum fron the point at which you you have planned costs or revenue.
    5. Check Customizing of the exchange rate types 'G' and 'B' in the IMG under Global Settings -> Currencies.
    I have checked all the procedures of the said customization and the values are similar to that of the error message, but still I'm unable to proceed further.
    I have goe through the note 160375, but did not succeed on this issue.
    Can any one help me out in solving the above error and also can any one explain me the process in SAP to calculate IRR?
    Is there any more customization missing or whats wrong going in that process?
    Please help me out...
    Thanks in advance..
    Regards,
    Praveen.

    Are you installing a Demo version of NetWeaver? If so please post your questions and search for answers here: SAP NetWeaver Application Server
    If this a real full blown system please contact the OSS, via the Marketplace (service.sap.com) or by OSS transaction in your SAP System.

  • RFC to HTTP Interface - Access using NULL object reference is not possible

    Hi All,
    I am working on a Interface RFC to HTTP where in I am sending the data to a third party system.
    Using PI 7.3 and Adapter type XI to send this data.
    I am getitng an error Short dump occured when executing message in qRFC queue <Queuename>: Date/time 02.12.2011 08:44:57, user XXXXX, runtime error: Access using NULL object reference is not possible.
    <SAP:Code area="INTERNAL">QRFC_SYSTEM_DUMP</SAP:Code>
    I am entering the parameters such as target host,service number,path correctly with addrseing type as URL.
    The message is failing in the call adapter step with the above error.
    There are no messages stuck in SMQ2 as well.
    Now on the other if I use the  adapter type HTTP_AAE the messages is getting successfully delivered with the same parameters mentioned above.But as we know it is a plain adapter and will not have the SOAP envelope.
    We would want to send the data using the XI adapter.
    Any idea as why this issue is happening?
    Helpful answers will be rewarded points.
    Thanks & Regards,
    RK

    Hi,
    please go through below threads,
    Error for all the interfaces
    Access via NULL object reference not possible., error key: RFC_ERROR_SYSTEM
    hope it will help you
    regards,
    ganesh

  • Very Urgent--Adding Header condition amount in Net order value of PO

    Dear friends,
    Our client has following requirement.
    ---In Purchase order ,Header conditions related to delivery costs are using.
    --Currently when we add the header condition,that amount is not adding to the Net order value and not adding to the total value in the PO print document.But proportionaly distributing to the line items.
    --Because of this two problems one is not adding to net order so not considered for release strategy,secondas it is not adding in the net order value,header condition amount also is not coming in the total value in the print out.
    --Currently, this header amount is splitting and posting seperate line item for GR/IR clearing act in MIGO and MIRO..
    I have removed the Statistical tick and accrual tick in IMG, then header amount is adding to the Net order value and adding in the total value in the PO print. But in MIGO/MIRO, This amount is adding to the GR/IR clearing act ,instead of seperate GR/IR line item in MIGO/MIRO documents, But client wants the postings shall be made similar to previous one.
    I have checked with removing only Stastical key and not removing the accrual key.But header condition is not adding to Net order value. I have searched for User exits/BAdis,suitable are not found.
    How the Header condition amount can be added to the Net order value without removing the Statistical key in IMG.Are there any User exit/BAdis,
    Please suggest.
    Regards,
    Dayanand

    Dear Sairam,
    Thanks for your reply.
    Asper your suggestions i tried as follows.
    1) We have got condition types like surcharges/discounts before "Net inc dis"
        and Delivery costs/accruals/frieghts after "Net inc dis".
    2) My requirement is that whatever conditions types after Net inc dis like Del costs/Frieghts are not included in Net order value in PO,so amount is not included in Release strategy and print.Currently this amount is coming as seperate line itemGR/IR Clearing account in MIGO/MIRO.
    3) Asper your suggestion,i tried with Surcharge  condition existing before "Net inc Disc"--This is a header condition(Cond.cat is Insurance),but stastical tick is not there in Scema. I tried as it is ,amount is adding in Net order value.But seperate line item for this amount is not coming in MIGO/MIRO
    4) When i ticked the accrual key and statistical tick and added Accrual-FR1,then PO created ,amount is not adding in Net order value.
    5) When i removed only Stastical tick only even though amount is not adding.
    6) When i removed the Accrual tick also i.e both the ticks then only amount is adding in Net order value.But Line item of the header condition is not dispalying as a seperate line item in MIGO/MIRO
    For these Header conditions ,seperate line item shall come ,at the same time amount shall add in Net order Vaue for the purpose of including in the amount for Release strategy and print.
    Please suggest how to do it.
    Regards,
    Dayanand

  • Issue with Net ***. Value

    Hi experts,
    I am doing Ret.Del via delivery.Then while creating the excise Inv in J1IS,the net ***. Value is not reflecting automatically...Is there any link between the GI Indicator in Ret. Del..
    Kindly help

    Hello,
    You are asking about the Net ***. Value in J1IS ?
    As per my knowledge, System is calculating/proportionating the duty values and *** Value from the Entries in MIGO and not per what is maintained in J1ID.
    Please elaborate on your problem.
    Regards

  • Line item Net value is not coming in Header Net Value

    Hi All,
    I have four conditions
    1) A condition with condition cat.Price this is annual price condition and condition value comes from condition record.
    2) B condition with condition cat.Discount & Surcharge this is monthly dis. and condition value comes from condition record.
    3) C condition with condition cat.Discount & Surcharge this is monthly dis. and condition value comes through pricing routine(formula value).
    4) D condition with condition cat.Discount & Surcharge this is monthly dis. and condition value comes by USER EXIT (this value is basically pervious month condition C Net value) .
    5) E condition with condition cat.Discount & Surcharge this is monthly dis. and condition value comes through pricing routine (formula is condition C - D and resultant value should come in condition E)
    When i am creating sales order for Jan month sales order
    condition A , B, C is considered and value of condition E comes perfectly in net value column of line item and in net value of sales header matches.
    But When i creating sales order for Feb month sales order header net value
    condition A , B, C, D is considered and value of condition E comes perfectly in net value column of line item and in net value of sales header does not match. In net value of header system is considering only Condition value C.
    So my query is why system is considering condition C value and why not the Net value of line item.
    My PP is as follow:
    Step          Cond.type      From       to       Man      Reg     St   subtotal      Req   Caltype  Bastype      
    10     A                    X       2     
    20     B                    X       2     
    30     C                    X       2         601
    40     D                    X       2     
    50     Net value     30     40          X        1
    60     E          50                 2         25            5
    70     Total           60     
    Please help me where is going wrong.
    Thanks & regards
    Sree

    Hi Sanjay
    Just go to V/06 and check wheather header data has been checked or not. That could be the reason it has not copied to header data
    Regards
    Srinath

Maybe you are looking for

  • Adding data to multiple tables using one form in Access 2010?

    Hi All, I have a access database with two tables and I want to create a single form to enter data into that tables. How to adding data to multiple tables using one form in Access 2010? I don't have to much knowledge of access database? Please help me

  • Run time error while saving the production order in CO02

    HI Experts, While i am releasing and saving the production order the system is giving the runtime error. Please help. Runtime Errors         UNCAUGHT_EXCEPTION Exception              CX_SLD_API_EXCEPTION Error analysis is An exception occurred that i

  • Passing an array to a method

    This is probably a really simple question - but I'm new to java! Object (is that the right word?) Car consists of some information about a car - registration number, engine size etc. I have defined an array of objects of type car, and I want to pass

  • LightDM-devel does not allow to change desktop environment

    Hi, I'm new to Arch and I'm trying LightDM under systemd as my display manager. I don't know if this is the right place to ask about it, since it involves a package from AUR but if anyone can help me, I'll appreciate it. I am currently using XFCE4 as

  • Cropping PDF's to Trim Lines

    I'm having trouble finding a way to crop my pdf's to the trim lines in automator. I have used the Preview Crop to crop images, but that is not working for what I'm trying to accomplish. I have inconsistent sized pdf's that just need to be cropped to