Net requirement calculation considering stock ( Strategy 52 )

Hi All,
we are using the planning strategy 52 for process industry and according to the standard functionality the stock of finished product will NOT be considered when MRP run and consumption.
For various reason like customer return we might have the stock of FG. when forecast is finalized and PIR is build in demand management MRP will generate the planned order (type VP) based on the consumption logic. but if stock exist system will not consider it and continue to generate the dependent requirements for the raw material. this is really not acceptable by my client. we want the MRP run considering the stock of FG whensystem generates planned order for PIR.
Is there any other way to fix this issue?
we try to use user exit and set consumption indicator 4 for requirement type of VSE.but we failed. the answer is PIR ONLY consumes the requirement elements. Stock somehow a receipt element.
any pointer is highly appreciateed.
Reagrds,
Mao Ye
Edited by: Mao Ye on Apr 7, 2008 5:38 PM
Edited by: Mao Ye on Apr 7, 2008 5:41 PM
Edited by: Mao Ye on Apr 7, 2008 5:43 PM

Dear,
Stg 52, will create planned order equivant to the PIR created. and when sales order is created, the planned order is created.
Hence the wayout is use stg 40. this will suit your requirement, create PIR and run MRP. Planned order is created.
Do not convert the planned order to production order and give this autjorization to one who can take decision in shopfloor and coordinate.
You can also use stg 74 ...just see the help link
http://help.sap.com/saphelp_47x200/helpdata/en/cb/7f9b7043b711d189410000e829fbbd/frameset.htm

Similar Messages

  • Net requirement calculation

    Dear Gurus
    In Net requirements calculation, Safety Stock, Recipts (Purchase Orders, Production Orders, Firmed Procurement Proposals), Requirement qty(Pir, Customer requirements, Material reservations) are considerd
    In My Situvation, I want to exclude considering Safety stock while doing net requirements calculation
    Kindly tell me the setting i have to do
    regards
    palaniappan

    Dear Planiappan,
      In IMG Production + Material Requirements Planning + Planning + MRP Calculation + Stocks + Define Safety Stock Availability maintain 100% in AvSafetySt field. So in planning your 100 % safety stock will be considered.
    Regards
    Sunil Kumar

  • MRP Net Requirements Calculation

    Hi Guys:
    I defined a Planning Horizon of 40 days, for Example if  today is the start date Since Planning horizon is 40 days (01/30/2012).
    Vendor Lead time = 2months
    Purchase order to vendor with Delivery Date (12/20/2011)  : 5000 Pc
    Purchase order to vendor with Delivery date ( 03/04/2012): 6000Pc
    Onhand Inventory = Zero
    So i have Sales order for 10000 with Delivery Date ( 12/28/12) with in the Planning horizon.So when I run MRP using MD02 ,
    Does the system consider Purchase orders with delivery dates  that are outside planning horizon into the net requirements calculation?
    thanks for the help.
    Kodali

    dear friend,
    as far as i know the available stock is calculated as follows:
    plant stock
    safety stock
    +
    receipts (pur.orders, prod. ordersfirmed proc. proposals)
    requirements quantity (say, PIRs, mat. reservations,...)
    =
    available stock
    shortage occurs if available stock is negative, that is, the requirement quantities are greater than expected receipts and stock quantity.
    so, system specifies the date of the issue (for example, customer requirement, planned independent requirement, reservation, forecast requirement) as the requirements date.
    regards,

  • Net requirement calculation for Sales Order

    Dear Experts,
    I have configured a strategy comprising both( KE,040) and (LSF and 100), say the strategy is Z0.But the system is not doing net requirement calculation for the dependent requirement(always proposing Pr Req though there is stock).Checking group and checking rule, I have created like the standard PP order.Will anybody Pl. guide me regarding this?
    Regards
    Reshmi

    Hi,
    1. The MRP group or the strategy group in the MRP view of the material master record determines what requirements type is used.
    If you have not specified this information, the requirements type will be selected through the item category of the sales order item and the MRP type in the MRP view of the material master record.
    If you have maintained both an MRP group and a strategy group, the system uses the strategy group (precedence to strategy group).
    You can enter the strategy group directly in the MRP view. If you have specified a strategy group, you do not need to enter an MRP group.
    The configured Strategy group need to be copied from a standard Strategy and even if you group many Strategies(Max 7) you ned to check the req Type assigned to it .
    2. The item category is derived from the item category group in the Sales view of the material master record and from the order type of the sales document. Together with the MRP type in the MRP view of the material master record, the item category determines what requirements type is selected. The MRP group in the material master record is irrelevant here.
    The advantage of this method is that the selection of the requirements type depends on the business process (such as quotation, sales order, or repair).
    All the above Points need to checked in your case
    Pavan

  • Rescheduling horizon impact on net requirement calculation

    Dear MRP experts ,
    What is the impact of Recrudescing horizon on net requirement calculation .
    Regards
    Sasikanth

    Dear Sashikant,
    The rescheduling check is used to change the dates of already existing firmed receipts not planned on the same day as the requirement to suit the requirement date.
    If you look at MD04, the rescheduling date is based on the Stocks Requirement date. 
    In the net requirements calculation, the system checks whether warehouse stock or firmed receipts are available to cover requirements. If a material shortage exists, the system usually creates a new procurement proposal.
    Within this rescheduling horizon, the net requirements calculation checks whether, after a requirement, a firmed receipt exists, which can be used to cover this requirement. Then the system displays a rescheduling date as well as the exception message Bring process forward for this receipt. The net requirements calculation then uses this receipt and the system will only create another procurement proposal if the receipt quantity is not sufficient to cover the complete requirement. Several firmed receipts can be used to cover one requirement.
    hope it helps. please revert back.
    Regards,
    Alok Tiwari

  • Net requirement calculation in MRP

    Hi Gurus,
    Is there any way we can exclude Created Purchase order ( Not yet released ) in MRP run for the Net req calcualtion . ( pl suggest other than exit )
    Regards,
    Prasanna

    Hi prasana
    Net requirement calculation in MPR will include firmed receipts. ( P.O.). You can only block what are all given in plant parameter.
    We can exclude in Availability Check, in scope of Availability check setting.
    Regards
    J. Saravan

  • Excluding Stock From Net Requirement Calculation in PPDS

    Dear All,
    We can exclude stock on hand from Net Reuirement Calculation in ECC MRP by selecting Strategy 11 ( Gross requirement Plannung). Is there any Functionality like this in APO PPDS or SNP to exclude the Stock.
    Regards
    Sunil Kumar

    Hi,
              Its possible in SNP, try modifying stock on hand macro in planning book and overwrite initial column value to zero. hope this helps.
    Regds,
    Prasad

  • Net requirements not considered in MD04

    Hi Gurus,
    We have strange case where the requirements are considered in MD04 , however the reciepts are considerd .
    See below , deliveries are not deducted from available stock. But ASN are considered .                                                                               
    Rec/Rqd qty   Available qty
    31.01.2011     Stock                                                            7,676      7,676
    05.01.2011     Order     0012412021/000010/0001               60-     7,676
    20.01.2011     Deliv.     0213820099/000300/0000               96-     7,676
    25.01.2011     Deliv.     0213782526/000010/0000               260-     7,676
    26.01.2011     Deliv.     0213782524/000010/0000               184-     7,676
    26.01.2011     Deliv.     0213782530/000010/0000               400-     7,676
    26.01.2011     Deliv.     0213782533/000010/0000               216-     7,676
    26.01.2011     Deliv.     0213782535/000010/0000               288-     7,676
    27.01.2011     Deliv.     0213844933/000020/0000               41-     7,676
    27.01.2011     Deliv.     0213881786/000010/0000               96-     7,676
    28.01.2011     ShipNt     4502098918/00010          07     416      8,092
    28.01.2011     ShipNt     4502098918/00010          07     624      8,716
    28.01.2011     ShipNt     4502098918/00010          07     208      8,924
    28.01.2011     ShipNt     4502098918/00010          07     416      9,340
    What could be the problem here ? Please advise.
    Thanks in advance

    Veesh,
    Are the Versions for the period 04 & 05 same as Period 06.  Please not only active Version of the PIR would be displayed in MD04.
    Regards,
    Prasobh

  • MRP Net Requirements calculation in External procurement Vs STO

    Hi gurus,
    Lets say I have a FG 1234 which has raw component 9999.
    Case1:
    Setting for 9999 is externally procured.
    I have a stock of 50 pc for 9999.
    I got order for 60 pc for FG 1234.
    so system will only create purchase reks for 10 pc of 9999 as it already sees 50 pc in stock.
    Case 2:
    Setting for 9999 is externally procured but from one of our own plant (Using SPK 40)
    I have a stock of 50 pc for 9999.
    I got order for 60 pc for FG 1234.
    will system create STR for 10 pc of 9999 as it already sees 50 pc in stock? or will it create STR for 60 pc without checking stock in the ordering plant?

    >
    dorian661 wrote:
    SPK 70 will not create an STR. Stock of 9999 will be checked in supplying plant. In case there is a shortage, a procurement proposal will be created against the dependent requirement here. Stock is not checked in ordering plant. You will notice that dependent requirements for 9999 will be seen in the supplying plant.
    Dorian,
    Thanks for the reply. so are you saying that in SPK70
    In ordering plant - MRP will not look at the stock situation for that material
    In supplying plant - system will check stock requirement and create dependent requirement for the shortage amount
    and in spk70 case, against what element is the delivery done to the ordering plant? in spk40 delivery is done against STO.
    Thx

  • Considering stocks of both plants in special procure. type scenario.-urgent

    Hi dudes,
    Our client is using special procurement type 80(prod.in alternative plant), he is getting planned order in delivering plant as requirement generated by planning plant. while running MRP in both plants, it would consider only the stock of planning plant but not the stock of delivering plant suppose stock is made in delivering plant individually(say manual orders). As the requirement generated by planning plant, the planned order will be generated in delivering plant irrespective of its individual stock.
    can we make the system to consider what ever the stock in delivering plant and create no planned order if stock is there.
    thanks in advance
    Robert

    Robert,
    If that was your requirement why not use Special Procurement key 70 (Withdraw from alternate plant). In this case system only creates reservation and Planning at Supplying plant will be based on the Net requirement calculation considering all recipets, Stock and Issues.
    Regards,
    Prasobh

  • Exclude Stock Transfer from MRP Net Requirements

    Hi,
    Is it possible to exclude the Stock Transfer Orders from the Net Requirements generated by MRP? I want to base the requirements only from historical consumption. In my Stock/requirements list (MD04) for example, the Requisition generated by MRP increases in quantity since there are open Stock Transfers which are to be served by that plant to other plants.
    Regards,
    Lee

    Nazrin,
    Availability check configuration (OVZ9) has no impact on MRP.  MRP relies on its internal rules when it is performing its net requirements calculation.  You have very little control over which elements are included/excluded.
    You can exclude selected storage locations from MRP planning.  Stock and reservations against these storage locations will therefore also be excluded. 
    You can exclude a material from planning, change the material master MRP type to ND.
    Your best bet, though, would be to set your PM planning process up such that these materials never create the reservation in the first place.
    Regards,
    DB49

  • Best Method to calculate Net requirement

    Hi Expers,
    can you suggest the best methods to calculate net requirement for FMCG products in APO Production and distribution planning.
    Best Regards,
    Anandharaj

    Hi Anandharaj,
    There are multiple threads, SAP Notes and documentation in the web about this.
    Please read this note that explains everything about Net Requirements:
    448960
    - Net requirements calculation (documentation)
    You can also check this article:
    Net Requirements Versus Pegging in SAP ERP and SAP APO - SAP Planning
    Hope this helps.
    Kind Regards,
    Mariano

  • Pricing - Requirment / calculation type / base value

    Dear Friends,
    Thnaks for the support and guidance provided by you for my previous posts
    In Pricing Procedure we give Requirment, Calculation type and Alternative formula for condition base value, I would like to know where do we exctly define all this?
    Or are they standard? If standards where we can see how they works?
    Regards
    Vishal

    Hi,
    go through the below Examples for better understanding ..
    Example: 1
    Condition Type: PR00
    Requirement 2 Item with Pricing
    Purpose:
    This is an example of a pricing requirement.  This requirement is met if the document item category is relevant for pricing and no previous condition in the pricing procedure has set the condition exclusion flag. This requirement can be assigned to condition types in the pricing procedure to avoid unnecessary accesses to the database when an item is not relevant for pricing or a condition exclusion indicator has been set.
    Example: 2
    Condition Type:  Net value
    Calculation Type: 2 Net value
    Purpose:
    This is an example of a condition value formula.  This type of formula can be used to influence the value shown for the condition in pricing.  A condition value formula is assigned to a condition type or value line in the pricing procedure.
    Formula '2' sets the value equal to net value that has been calculated so far for the item in the pricing procedure.  It contains the amount excluding taxes.
    Example: 3
    Condition Type: R100
        Alt.Condition Base Value: 28 (100% Discount)
    Purpose:
    This is an example of a condition base value formula.  A condition base value formula can be used to influence the basis the system uses when computing a pricing value.  A condition base formula is assigned to a condition type in the pricing procedure.
    Formula '28' sets the rate of the condition to a 100% discount.  This formula was delivered with condition type R100 to support free goods functionality.
    Reward if it is useful,
    Chandramohan

  • How to have  make to stock strategy for configurable items

    Dear Frndz,
    My client would like to have make to stock strategy for their configurable items, pls help me out with the step by step procedure of the same.
    Regards,
    Srini

    Hi
    K-Mat Creation steps
    1) Create Char in CT04 with assignment of Control indicators and Char values
    2) Create Class in CL02 with type 300 and assign the Char to it
    3) Assign this class to Material in Classification view in MM02
    4) Create Configuration Profile in CU41 and Main Profiles for PP & SD relevancy
    5) Assign Constraints and Procedures to Each Profile as per the rules required by design or Business
    6) Create a Configurable Material (Mat type - KMAT) with Classification,Sales,MRP,Accounting views and   Planning stg 25
    7) Create A Super BOM(for K-mat) and assign all the comp with Proper Selection & Pre conditions
    8)Create Super Routing(For K-mat) and Assign all operations with Proper Selection
    Material Variant(MV) Creation Steps(Material variants are the stockable items in VC Scenario)
    1) Create a MV with Material type FERT and Stg 10 or 40 (Classification view not essential)
    2) Assign the K-mat material to this MV in Basic data - 2 view in Cross Plant CM field and click on Configure variant tab to select the fixed char value combination for this MV. Do the same steps in MRP-III view
    By this way u can make the stock of configure items
    Regards
    Brahmaji

  • MF60 : HOW CREATE REPLENISHMENT PROPOSALS WITHOUT CONSIDER STOCK

    Dear guru ,
    I have a request for MF60.
    I WANT TO CREATE AUTOMATIC REPLENISHMENT PROPOSAL.
    I DONu2019T WANT TO CONSIDER STOCK IN THE PRODUCTION STORAGE LOCATION.
    I WANT TO CONSIDER ONLY RESERVATION OF PRODUCTION ORDER.
    HOW CAN I DO THIS ?
    Thanks.

    Hello,
    Pull List checks the stock situtaion at production storage location and calcualts the quantitiy of missing parts. Here you cannot omit the stock at production storage location. if the requirement  quantitiy is not met by stock at prod sloc , then only system will look for the stock at another location.
    Using the stock determination rule , u can define the sequence in which storage location to be selected , but you cannot exclued the stock at one location.
    Hence in standard SAP your requirement is not possible, i am not sure ,please try to implement some enhancement.
    regards
    Pradeep Kuamar

Maybe you are looking for

  • How to specify the webLogic server startup script to use different config.xml  file ??

    Hi, I have 2 weblogic startup scripts (startWebLogic.sh and startWebLogic_recovery.sh) for the same domain. startWebLogic.sh uses config.xml file. I would like to use config_recovery.xml as the configuration file for startWebLogic_recovery.sh How wou

  • Cover flow missing

    I have installed itunes on my laptop but there is no cover flow option, none at all, just the old style version of viewing, I have downloaded latest version

  • Mm functional specifications needed

    hi friends   can any body send some sample functional specifications related to MM and the steps to prepare specification and the situations when we prepare such docs thanku

  • BridgeTalk.bringToFront - not working anymore

    I have been putsing around with a script since CS6.  Suddenly with the most recent updates to CC BridgeTalk.bringToFront ("aftereffects"); isn't working. So I've been trying to test it using extend script.  I open a new javascript set it to run the E

  • Problem in multiple selection in result page.

    Hi all , My requirement is to create a search and result page and in result page i need to add two buttons for delete and create new, the delete and create new is working fine for single selection mode, but for multiple selection the create new is no