Network & Activity status

dear all,
how we can reverse the network or activity status which are already Release.
ie if we release the network or activity the system status say REL.
is their any procedure to again revert back to its original status which was as before releaseing it.
thanks in adv.
regards
parikshit

hi gaud ,
i think u cannot undo release . u can have some user status for additional control  to stop actual posting or any other requirements ....
regards
pushpa

Similar Messages

  • How can I have "active" status on a PnP network?

    I use DC++ to connect to a peer-to-peer network.  Using the FIOS router, I have been relegated to "passive" status on the network, which limits the number of contacts I can make.  Is there a way to configure the router for active status?  TIA whh
    Solved!
    Go to Solution.

    whh wrote:
    I use DC++ to connect to a peer-to-peer network.  Using the FIOS router, I have been relegated to "passive" status on the network, which limits the number of contacts I can make.  Is there a way to configure the router for active status?  TIA whh
    The number of contacts is limited by the number of connections that you can have through the Network Address Translation Table. NAT for short. I am assuming you mean peer to peer and not Plug N Play PnP. There have been many router complaints regarding the NAT table being to small. Use the search feature at the top of the forums page and search for NAT. Other option is use your own router that is not supported by Verizon. Your ONT would need to be setup for Ethernet and if you have TV the Actiontec would need to be connected to your router. Remember custom router configurations are not supported by Verizon residential FIOS. There have been loads of postings about how to use your own router.

  • How to view history status of a Network activity of a WBS element

    Hi,
    Which transaction can I use to view history of a Network Activity on a WBS element? I want to know when were changes made on an activity, e.g. when it was REL or TECO etc, and by whom.
    Thanks.
    PS_PS01

    YOu can get the same in all the PS Transaction where you can get the disply of user & system status. The prerequisite as Ahmed Pointed out you must have ticked on change document and atleast ordstatchange and opstatchange ticket ( for the ordertype and Plant  combination )
    If the same is done than you can check as below,
    check in CJ20n > Click on any of activity> click on Blue ( Status Icon )>Extra>Change Document -->All.
    System will disply the status( User  & System ) change history of that activity.
    With Regards
    Nitin P.

  • Status of WBS element triggering confirmation of network activity ?

    Hello,
    Can you please let me know if the following requirement could be solved using workflow in PS module :
    Setting of 'Fully invoiced' status (FNBL) on WBS element in CN02 transaction should trigger the confirmation of network activity (transaction CN25).
    How this possibly could be done using workflow ?
    Regards, Wieslaw

    Hi,
       its possible to raise a workflow on Setting of 'Fully invoiced' status (FNBL) on WBS element in CN02 transaction .
      BOR: bus2054
      Do status managemnet to raise a  evnt of this BOR  ( BSVW  ).
      In the work flow in one of the method of extended BOR,
        do the confirmation of network activity thru  some bapis,etc.
    For confirmation:
       BOR: PSAFRU method:    NetworkConfirmation.Create
       check if this is helpfu
      create an instance of this nd check if this method helps.

  • How to block status profile in Network Activity

    Dear All,
    Is there any way to block status profile in network activity? Is it possible block base on network type / network profile?
    Cheers,
    Nies

    Hi,
    we can block the status profile by using network type. Define your own order types in txn kot2_opa.same will be displayed in txn opsc with out status profile. assign the same network type in network profile.
    regards,

  • DSEX status for Network Activity

    Hi,
    1. How do I set DSEX status for Network Activity using BAPI?
    2. How do I update scheduled dates for an activity once DSEX status is set, through BAPI?
    Regards
    Shrikant

    Hi Abhishek,
    Thanx for ur reply. I am already aware about that BAPI but looking for functionality which PM order maintain BAPI provides. In that BAPI, if you pass X in constraints DSEX flag gets set. Later if you pass dates in constraint dates field, the scheduled dates get updated. So I am interested to find out how one can update the scheduled dates, once DSEX is set.
    Regards
    Shrikant

  • Workflow for network activity confirmation CN25

    Dear Experts,
    In CN25 tcode for network i am giving the input and pressing save button. In that tcode there are three activity status namely partial confirmation, manual confirmation and confirmation i.e PCNF, MCNF and CNF. I am using BO AFVC_NETW to trigger my workflow. As per workflow design i have given CNF, PCNF, MCNF as starting events. So when any one of the status gets from CN25 my workflow will trigger. Also at a time only one status has to be set. But when i press save button in CN25 its triggering all the three statuses. This is quite surprising. How are three statuses set at same time ? So three workitems are generated for all three start events.
    I used SWU_OBUF and checked again but still all three statuses are set. Is it problem with BO or problem with Project System (PS) if any for that tcode.

    Dear Experts,
    Can you please help me out in this regard. I hope my requirement is clear.
    Regards,
    S Bharath

  • Settlement rule for Network activity

    hi,
    in my project, settlement rule of network activity is automatic to the superior WBS..  however i noticed that the default settlement rule is FUL.. is it possible to make setting such that the default settlement rule would still be to the superior WBS but it is PER (periodic settlement insted of full)
    how to do this?
    thanks in advance.

    see OSS note 317871
    Summary
    Symptom
    When you create a network or a new network activity, the respective settlement rules can be generated automatically by default. In the standard system, default rule PS1 is currently supported for this. This default rule creates a settlement rule for the full settlement.
    A default rule for the generation of a settlement rule for periodic settlement does currently not exist.
    Additional key words
    CN21, settlement rule
    Cause and prerequisites
    At present, the function is not supported in the standard system.
    Solution
    The attached program creates a corresponding new default rule PS2 which generates a periodic rule. In Customizing, you can assign this default rule to the affected network types afterwards.
    It is planned to include this default rule in a future release in the standard system.
    Source code corrections
    Header Data
    Release Status: Released for Customer
    Released on: 18.06.2007  07:57:36
    Priority: Recommendations/additional info
    Category: Advance development
    Primary Component: PS-COS-PER Automatic and Periodic Allocations
    Secondary Components: PS-COS-PER-SE Settlement
    Affected Releases
    Software
    Component Release From
    Release To
    Release And
    subsequent
    SAP_APPL 40 40B 40B  
    SAP_APPL 45 45B 45B  
    SAP_APPL 46 46B 46B  
    SAP_APPL 46C 46C 46C  
    SAP_APPL 470 470 470 X
    SAP_APPL 500 500 500  
    SAP_APPL 600 600 600

  • Actual Cost not updating to Network Activity from CATS

    Dear All,
    Am back here for the expert suggestions / guidance.
    I am facing issue with respect to system not updating the actual cost in network activity / projects posted through time sheet i.e. CATS. I have planned my resource cost through work centre assigned with activity type, formula and cost centre. I have kept the employee master data in place with maintaining the 315 infotype. In CAT2 i am posting the respective time sheet on the particular network activity and am transferring the cost into projects by CAT5, the plan cost is getting updated but actuals are not hitting the projects.
    Kindly do the needful and suggest me if am missing something out of the track
    Thanks
    Praveen Mohanachary

    HI Gokul,
    There wasn't any error during confirmation and i have also checked in CN30 as well as COFC transaction. It is posting the time and the activity is getting the PCNF status set but there isn't any actuals posted. I used CATA for some activity and also used CAT5 for certain activity both are not posting actuals on projects.
    Thanks
    Praveen B M

  • SPA941 -- No Network Activity/Link Light

    Greetings-
    First time poster here. I just recently acquired a Linksys SPA941 second hand. It worked just fine until I had to relocate it to my new office.
    Anyway, the phone powers up just fine but seems to hang at the "Initializing Network" screen. After about 90 seconds or so, it goes to the main menu.
    Unfortunately, I am unable to ping the IP that the phone was assigned. Furthermore, my network router shows no link light or network activity coming from the phone.
    It seems as if the phone menus are working fine, but the network isn't.
    Any ideas? I've performed numerous factory resets, tried setting the network settings myself, used a different network cable, power cable, and a different port on the switch. No dice.
    I should note, other devices connected to the same switch are working just fine.
    Is there anything that I can do to spare this phone from the trash can?
    Thanks for your assistance!

    “Initializing Network” message in your SPA941 tells you that the unit is trying to get a connection to the network. By default the unit should be set as DHCP; however, so if there were no filters or restrictions on the number of DHCP users or devices allowed to be part of that network the unit should be getting a valid IP address. If it has a valid IP address but still has the same message, check if the registration of the VoIP account in your SPA941 has a status of “Registered”. You can look it up by accessing the web utility of the unit. Try to use this link on how to access the web ui of the SPA941: 
    http://linksys.custhelp.com/cgi-bin/linksys.cfg/php/enduser/std_adp.php?p_faqid=16560&p_created=1211... 
    Check the Info tab for the status. It should be saying “Registered” for extension number you setup the VoIP line account. If it is “Not Registered” for status, review the VoIP parameters. Maybe due to the resets you made, those parameters are gone. Ensure also that the firmware of the SPA941 is at it’s latest version.  Other than this, I suggest contacting Cisco Tech support to further look into your concern. I believe this unit belongs to the business series devices that Cisco is now supporting. Try to go to this link for the other business series devices and the site where you can get hold of Cisco for support: 
    http://www.cisco.com/web/products/linksys/index.html

  • Refrain user to copy network activity

    Hi Experts ,
    I have a very unusual requirement and need to your help to solve it.
    REQUIRMENT : We have a project in CLSD status , and network and its activities are also in CLSD status. Now , if a user selects a network or network activity in the same project (CLSD Status) , and right clicks on it , he is able to copy that activity and paste that again into the project.
    We have to stop the user from copying a network or activity of any closed project.
    Please suggest how to overcome this issue ...
    Thanks
    Ajay

    Hi Ajay,
    As a standard SAP you can't create the networks even after TECO itself ( hence not possible even after CLSD as well)..Hence seems there is some problem with your system..  Pls check.
    Regards
    K Ramaiah

  • Network Activity deleted

    Hi
    I have a Purchase Requisition, it is account assigned with a Network number. The activity of the Network is deleted using CJ20N. It consequently deleted the Purchase Requisition line item.
    Is there a way to undelete the Network activity using CJ20N?
    Regards
    Ram

    Hi,
    In CJ20N >Goto> Settings->Options> Tick " Display Deleted Objects".
    The deleted  activity will now be seen in CJ20N with different colour.
    Now you can select that activity->Edit> Status>Deletion Flag> Undo.
    Regards,

  • Undo of deletion flag for network activity

    Dear Gurus,
      When I am uploading the network activity from MSP, unfortunately deletion flag was set to all the activities and network. I undo the flag for network, but I couldn't find and activity under the network. Also, I am unable to create with the same number as well.
      Kindly help me undo the deletion flag for the act ivies.
    Regards,
    Punith.

    When you are in CJ20N, click settings and option, there select "Display deleted objects", now open your project, you will see activities with deletion flag status now. select and undo the deletion flag status.

  • FM to get activity status AALK

    Hi
    I am looking for the BAPI or RFC to find the AALK status of activity within a Network. I have network number with network detail and activity number.
    Thank you
    UC

    Hi
    you can use FM STATUS_TEXT_EDIT in order to get the system status of the network activity you mentioned. It is returning in "line" the system status of the object. (meaning it could be something like REL AALK... therefore it contains the status you want to locate).
    In order for the FM to work you need to provide the object number of the network activity. This can be found by linking tables AUFK and AFKO (through aufnr=network number that you already know) and then AFKO and AFVC through (aufpl).
    In table AFVC, field VORNR stands for the activity id and the OBJNR is the table field you need to provide to the FM to work.
    You can try to run the function module in SE37 and check the result before proceeding in anything else..
    Hope it helps
    Panagiotis

  • CAT2 - Activity Status not confirmed

    Hi,
    I am using CAT2 to record the working hours of a network activity for a particular personnel. After releasing the project,  i input the actual working hours and save it. The status of the activity is not getting confirmed. I am not getting the actual cost in the project.
    But when i confirm the activity directly through CJ20N the actual cost is getting posted.
    Kindly suggest.
    Thanks & Regards,
    Kabir

    Hi Kabir,
    Check the Data Entry Profile in CATS customization and see if -
    1. Auto-release of time data is enabled. if yes, then Release not required after CAT2.
    2. Checkbox Approval Required is flagged. If yes, you have to approve the time data entered in CAT2 by using CAPP.
    I assume the following in your business case:
    1. Work center and activity have been assigned to activiity in PS.
    2. Allocation (rate) is maintained in KP26 for the combination of cost center assigned in the work center and activity type assigned in the activity.
    Now, when you select this activity is CAT2, the work center and activity type gets defaulted. Please confirm. If not, we will see it separately. To deal with the present issue, if it does not get defaulted, enter manually in CAT2.
    Referring to the first para, please do the rest of the processing (release and approval, as appropriate) and carry out Transfer to PS (CAT5). The time data entered, approved (if required) and transferred to PS must reflect as actual work against the activity is PS and additional status PCNF should get appended in the activity. You should be able to see actual cost booked against the activity.
    Please try this and revert. Hope this works.
    Regards,
    Rahul Tarapure