Network Costing in PS by period

Is it possible to plan network activities in specific periods based on
the specific dates which are input as per Workforce Planning to
override the Basic Start and Finish dates on the Activity? For
example,
A network activity has a start date on Oct 1 and an end date of Nov
30. Thus this activity spans two periods.
6 hours of work are planned at 10 pounds per hour resulting in £60 plan
value.
In Workforce Planning, 5 hours are planned in October, and 1 hour is
planned in November.
Can the system be configured to use the weight of hours planned in each
period to form the basis of the planning resulting in £50 plan in
October and £10 plan in November? Currently, I cannot find a way to
influence this via standard configuration for PS, Workcenters, etc.
Distribution keys seem limited in that they are based on percentages only and there doesn't appear to be a setting to use actual date planning to drive the calculations.
I have heard that there is functionality for products such as XPM or
cProjects that may have enhancements in this area which could prove
useful if there is no standard config in ERP to influence this.
Thanks,
Kevin

Hi Kevin,
The best way would be to create your own distribution key and use it.
Go to KP80 and create User Defined==> Independent key
Input the factor for all relavant periods:
In your case:
Period  (for Calander yr)           Factor
10                                         5
11                                         6
Ravi Shrivastav

Similar Messages

  • Cost of sales accounting & period accounting

    Hi folks,
    I want to know the difference between cost of sales accounting & period accounting. where do we use them and which is preferable. thanks in advance.
    Regards,
    Vijay

    Two accounting methods used for generating profitability statements are the cost-of-sales method and the period accounting method. Applying either method to a given set of business transactions under a given set of laws yields the same bottom-line result (profit) in concept. The difference is in how the overall profit and loss picture is presented.
         Companies must choose to use one of these methods for generating their legal financial statements. <b>The choice is often determined by country-specific legal requirements.</b>
         Cost-of-sales accounting
         With this method, the emphasis is on matching the revenues for goods and/or services provided (the value that a company gains as a result of sales) against the related expenses for those items (the value that is lost when products are transferred out of the company). Therefore, this accounting method displays profit and loss information in a manner optimized for conducting margin analyses, and as such it is optimal for the sales, marketing, and product management areas.
         Period accounting     
         With this method, the emphasis is on summarizing the activity and situational change over a period of time, for a given organizational unit. Therefore, this accounting method presents the revenues and primary expenses that have been incurred during a given period of time and the changes in stock value levels, work-in-process, and capitalized activities. As such, it is optimal for the production and profit center areas.

  • WARNING: Failed to get Network Cost info from NLM, assuming network is NOT metered, error = 0x80240037

    I have couple of VMs Server 2012 R2 RTM on Hyper-v Host running the same OS.
    All machines including host and VM that is not in domain have an error in Windowsupdate.log:
    AU WARNING: Failed to get Network Cost info from NLM, assuming network is NOT metered, error = 0x80240037
    FW and UAC are off on all. There are posts on web discussing the same error but most of them connect this to WSUS or Config Manager. And it is clear because we are touching Windowsupdate.log when troubleshooting WSUS. And because WSUS on 2012 is BUGGY this
    error confuses too.
    Finally, as mentioned earlier I deployed NEW server 2012 not from SYSPREP and did not place it to the domain. Updated the machine from MS update. Everything is OK beside the same error about COST :).
    So now it is clear it has nothing to do with WSUS or Configuration manager. It indicates to some Network issue. But there is no clear answer. Some suggest just to ignore the error if everything is OK. But I would like to have a clean log. And it is just
    interesting what could cause the problem. Is it Hyper-V stuff or Server 2012 itself. Anyway I guess I am doing right by posting a question on HV forum since here are people that should know 2012 .
    Thanks.
    see the log below
    2013-12-16 20:32:03:610  752 b44 Setup SelfUpdate check completed.  SelfUpdate is NOT required.
    2013-12-16 20:32:04:047  752 b44 PT +++++++++++  PT: Synchronizing server updates  +++++++++++
    2013-12-16 20:32:04:047  752 b44 PT   + ServiceId = {9482F4B4-E343-43B6-B170-9A65BC822C77}, Server URL =
    https://fe2.update.microsoft.com/v6/ClientWebService/client.asmx
    2013-12-16 20:32:04:047  752 b44 Agent Reading cached app categories using lifetime 604800 seconds
    2013-12-16 20:32:04:047  752 b44 Agent Read 1 cached app categories
    2013-12-16 20:32:05:016  752 b44 PT   + SyncUpdates round trips: 2
    2013-12-16 20:32:06:422  752 b44 Agent   * Found 0 updates and 14 categories in search; evaluated appl. rules of 449 out of 701 deployed entities
    2013-12-16 20:32:06:422  752 b44 Agent *********
    2013-12-16 20:32:06:422  752 b44 Agent **  END  **  Agent: Finding updates [CallerId = AutomaticUpdates  Id = 2]
    2013-12-16 20:32:06:422  752 b44 Agent *************
    2013-12-16 20:32:06:422  752 b44 IdleTmr WU operation (CSearchCall::Init ID 2, operation # 20) stopped; does use network; is not at background priority
    2013-12-16 20:32:06:422  752 b44 IdleTmr Decremented PDC RefCount for Network to 0
    2013-12-16 20:32:06:422  752 b44 IdleTmr Decremented idle timer priority operation counter to 1
    2013-12-16 20:32:06:422  752 ba0 AU >>##  RESUMED  ## AU: Search for updates [CallId = {5393115A-5840-4CB4-9C66-F68034E75DF8} ServiceId = {9482F4B4-E343-43B6-B170-9A65BC822C77}]
    2013-12-16 20:32:06:422  752 ba0 AU   # 0 updates detected
    2013-12-16 20:32:06:422  752 ba0 AU #########
    2013-12-16 20:32:06:422  752 ba0 AU ##  END  ##  AU: Search for updates  [CallId = {5393115A-5840-4CB4-9C66-F68034E75DF8} ServiceId = {9482F4B4-E343-43B6-B170-9A65BC822C77}]
    2013-12-16 20:32:06:422  752 ba0 AU #############
    2013-12-16 20:32:06:422  752 ba0 AU All AU searches complete.
    2013-12-16 20:32:06:422  752 ba0 AU AU setting next detection timeout to 2013-12-17 22:55:28
    2013-12-16 20:32:06:422  752 ba0 AU WARNING: Failed to get Network Cost info from NLM, assuming network is NOT metered, error = 0x80240037
    2013-12-16 20:32:06:422  752 ba0 AU WARNING: Failed to get Network Cost info from NLM, assuming network is NOT metered, error = 0x80240037
    "When you hit a wrong note it's the next note that makes it good or bad". Miles Davis

    Hi pob579,
    Sorry for the late .
    I want to know if your network connection indicates " unidentified network ".
    If that is the case , you can try the step below :
        open the "local group policy"
        expand  local computer policy -->computer configuration -->windows settings -->security settings
    --> network list manager policies
        in the right pane you will see Unidentified Networks , double click it , then you can configure the
    Location Type when the network connection is unidentified
        If there is domain , you need to change the same entry in "Domain Policy"
        after that please restart your computer
    Hope this helps
    Best Regards
    Elton Ji
    We
    are trying to better understand customer views on social support experience, so your participation in this
    interview project would be greatly appreciated if you have time.
    Thanks for helping make community forums a great place.

  • Easy cost Planning & Network Costing

    Dear All
    In one Project can we use both Easy cost Planning & Network Costing. Easy cost planning is generally used when you have structure with WBS only. Network cost planning is a combination of group of activities, all these having their relevant cost elements/ work center combination. can we manage both this in one project. If it possible please explain in detail.
    Regards
    Nivrutti

    What is your business requirement ? It depends on that. Yes your understanding is quite correct. We use easy cost planning in the initial phase of project. Easy cost planning can be done in various versions including  0 plan / actaul version.  If you does easy cost planning in 0 along with network costin you will double up lannning cost.
    Network costing can only be done in plan / actual version 0 only.
    Best approach is to use easy cost plnnaing as rough cut level apart from 0 version. And use network costing. However it may very a/c to business requirement.
    With Regards
    Nitin P.

  • Re: Query for Cost center actual by period.

    Hi Experts,
    Good Morning everybody,
    I want cost center actual values (with cost element) by period. I have created query through T.code-SQVI by joining tables COSP and CSKS.
    I got the report, but i cannot see the foreign currency postings in SQVI report. so there was a difference between SQVI and KSB1 report.
    Why i cannot see Foreign currency postings in SQVI report. please advise me, whether any other table that i can use in the query for cost center actuals by period.
    Thanks in advance & Points will be assign for useful answers,
    KUMAR

    See the answer in FI thread.
    Hi,
    KSB1 is based on COEP table. COSP shows only external postings. You should take COSS as well for internal postings in CO. Check the nature of the join with CSKS: notice COSP has OBJNR field which is not the same as KOSTL in CSKS.
    Anyway, I'd suggest you using not the join between tables, but one of standard logical databases SAP provides. For cost centres, you can use CIK.
    Regards,
    Eli

  • Network costing stored in CO version 1 or 2

    Hi All,
    Can we use the CO version 1 or 2 for network cost planning otherthan 0 and how?
    I want to store the network cost planning in CO Version 1 or 2 and not in version 0.
    Regards
    Muzmail

    Hi Amit.Amerash,
    Actually the problem with my client is that they are planning materials/services to the project from time to time.There is no single time material planning so it will create problem while running RA because system will post wrong COS to the project.
    So i was thinking that if possible to store network costing in version 1 and i can do manual cost planning in 0 for system to post exact COS .otherwise i have to tick off the addititive indicator for order cat 20 in OPSV.
    I want to see both network cost planning and manual cost planning in the system.
    Regards
    Muzamil

  • Network costing in Project system

    Hi,
    I have created network costing variant. i want to create cost planning in cj40 it is not update in Order/ network column but it is update in planning column.
    regards
    purna

    Hi,
    Costing varaints are different topics for planning and actuals values. please read sap help documents.
    More over, you are not doing any cost planning in CJ40 for network or it is being used for WBS element level.
    In reports, order column, you will see the cost rolled from network activity.  CJ40 cost planning will display planning column. every things working well here as you are doing.
    Please try to post your query in such a way that it should be readable and understandable to others.
    Did you make out any thing from your query after posting?. Sorry about that.
    Thanks,
    Sudhakar

  • How to reverse network cost

    Hi All,
    Can someone tell me how to how to reverse network cost
    done thru cj9k
    to bring back the project to its originall status
    Thanks,
    Regards,
    Mercy

    Hi Mercy,
    The CJ9K do the plan costs calculation,  the FI posting and purchase cause the actual costs and commitment. They have nothing to do with each othter.
    To reserve the plan costs is somehow strange requirement. To remove the costing reporting information, the CJEN (with delete flag set) may the right one.  But there is no transaction to reserve the plan costs.  You can initialize the costs relevant information, e.g. planned work = 0, then re-calculate the network.
    Kind regards,
    Zhenbo

  • Ignore already planned network cost in RA

    Dear All,
    My client uses network cost planning and option determine planned cost after release. Now client decided to use Result Analysis (RA) and want to use Unit Cost Planning (UCP).
    Now, problem is RA (KKA2) considered already planned network cost for running project. So that we cannot use UCP in loading full cost of any running project.
    Please, suggest any way to avoide network planned cost in RA.
    Regards,
    Nilesh.

    Dear Virendra and All,
    Thanks, Virendra for your useful answer.
    I want to share another two options to check its possible effects, they are as as follows:
    1) Remove costing variant from network and activate option do not dtermine plan cost.
    2) Use any suitable RA userexist for selecting plan cost in RA (From suitable source).
    Request, your opinions on above two options and any other effective option from your side.
    Regards,
    Nilesh.

  • Network costing

    Dear Experts................
    Can any one plz explain the scenario of Network costing.
    Process and steps.
    Regards
    Chandra

    Hi Chandra,
    You can plan project costs in two different ways:
    1.Manual cost planning in the WBS
    2.Cost planning using activities (network costing)
    When you plan dates and resources in network activities, the system determines the corresponding planned costs automatically.
    Planned costs are determined for the following objects:
       1.Activity inputs for internally-processed activities
       2.Primary costs for externally-processed activities and services
       3.Primary costs for general costs activities
       4.Primary costs for material components
    Please refer link as mentioned below for more details
    http://help.sap.com/saphelp_47x200/helpdata/en/df/561213c3c411d1ad990000e8a6353a/frameset.htm
    Regards
    Tushar

  • Cost of sales and period accounting approach

    Hi friends,
    i have little bit confusion about
    1. What is Cost of Sales Accounting and
    2. What is Period Accounting approach in Profit Center Accounting?
    Regards,
    Siva Reddy S.

    Hello,
    For concept, pl refer to below link:
    http://help.sap.com/saphelp_47x200/helpdata/en/eb/13811243c411d1896f0000e8322d00/frameset.htm
    For Cost of sales accounting, you have to activate functional area. Revenues are only compared for cost of goods sold in COS whereas in period based, you also compare revenue reserves, WIP etc.
    Thanks,
    Sourabh

  • Issue in service order billing- total cost is positive but negative cost exists in different periods

    Hello Experts,
    Need you advice/solutuin on the below scenario:
    In a service order the total accumulated cost is positive, (some material positings has been reversed in some other periods, so that is displayed as negative cost in the cost overveiw): but when we try to the billing in DP90. it is asking for credit memo request also. 
    In the DIP profile configuration following characteristics are maintained for generation of dynamic items:
    Activity type, Cost element, Material, Object number, Period, Posting row, Transaction Currency, Unit of Measure,
    As per my understanding negative cost is taken into consideration because of the "Period" characteristics maintained in the ODP1 tcode. And this is causing the creation of credit memo request due to cancelled postings in different period, as a result for that period total accumulated cost is not positive.
    My analysis may not be correct, Please let me know your understanding on this and how we can handle this situation if not want to create the credit memo request (because it will require extra configuration i.e. sales area mapping etc and may lead to change in interfaces etc..)
    Regards
    Pankaj verma

    Hello Experts,
    Please give your inputs.

  • Cost element/cost center planning for period

    Dear Guru`s,
    My client wan`t to plan the g/l with cost center/cost element period wise. How can I achieve this???

    Hi..
    If you transfer plan data from cost center accounting to Financial Accounting, refer to sap help portal site:Transferring Plan Data from Cost Center Accounting - General Ledger Accounting (FI-GL) (New) - SAP Library

  • Apply previous period Costing run to Current period

    Hi ,
    Is there any way I can apply a previous period costing run to the current period?
    I had done a full costing run through transaction CK40N on Oct 2010 with the following dates
    Posting Period: November 2010
    Costing Date From: Nov 1st 2010
    Costing Date To: Dec 31st 2010
    Qty Structure Date: Nov 1st 2010
    Valuation Date: Nov 1st 2010
    How can I apply the results of this costing run to December 2010? I do not want the costing run to affect November 2010 and I also do not want to re-run the costing run.
    Thanks,
    Sincerely,
    Nicky

    Hi,
    We have just completed the analysis of the November costing run which consisted of a  huge list of materials. We do not want to re-run the costing run for December because we will have to do the analysis again and we fear that we will not be able to update costing before Dec 31st 2010.
    Is there no other way to re-apply the Nov Costing run results to Dec?
    Sincerely,
    Nicky

  • New costing run within same period for relased cost estimate

    Hi All
    Once we have run the costing run. The price is marked and released. Then If we have to again runthe costing run, system says price for the priod has been released and doesnt allow to proceed.
    How to overcome this? Cant we run costing run as and when required and multiple times release it in the same period?
    Please help me
    Regards
    Rakesh

    Hi Rakesh,
    I would like to know what is your requirement of running the Standard Cost Estimate for second or third time in the same period...?
    If you feel that, Standard Cost which was marked and released needs to be updated as per the changes in BOM, Routing etc, you can still do it...
    First, go to transaction code CKR1 (Re-organization of Cost Estimates), select the parameters like company code, plant, material (for which you want to reverse the Cost Estimate), select the radio button for "Current Standard Cost Estimate" and execute.
    Then, Current Standard Cost Estimate will get reversed. You check for confirmation in the respective material master -- Costing 2 View whether the Current Planned Price has become blank or not.
    Then you do CK11N and CK24 again for marking and releasing....
    Try this and pls revert back for further explanation...
    Srikanth Munnaluri

Maybe you are looking for

  • How can I revert to an earlier version of Thunderbird? 31.1.2 is giving me bugs.

    Thunderbird has been working great for me for years. I'm on a Windows 7 desktop computer. The new version 31.1.2 got auto-installed yesterday, and now I have the popup window to "Add Security Exception" happening all the time, even with different mai

  • Premiere CS6 not opening in OS X 10.9.1 Mavericks.

    Hey guys. I'm so tired at this point...I spent almost two working days trying to make AE and Premiere work after updating OS X yesterday to 10.9.1. AE works, but Premiere CS6 doesn't even open. It starts but then I get the beach ball and after severa

  • Whats the best way to manage/display images ?

    I'm building a yet another photo management application that is designed to be a Picasa2 "lite". I've got a lot of JPGs I need to manage, all of which are loaded asynchronously and cached over the web. The same image may appear in multiple places, (i

  • Difference between BD87 & BD73

    All, First question is the difference between BD87 & BD73.       - BD87 Process inbound IDocs       - BD73 Reposting IDocs Second question is when i reprocess iDoc in BD87, then another IDoc generated with status 70, the original one has status 53. s

  • Elements 10 doesn't recognise the raw files but does the JPEG.

    I have just bought a new camera a canon 5dmk111 and have been shooting in Raw+Jpeg. When I try and transfer them onto my PC in Elements 10 it only recognises the JPEG's and not the RAW. I have previously been using a canon 400D and not had this probl