New batch creation during mvt 309 via MIGO

Hi,
I'm doing a transfer posting material to material (movement type 309). I want the system to automatically create a new batch (for the receiving material). 
I've set in OMJJ for movement type 309 to create batch automatic/manual without check
I've also set M7199 from "W" to "E".
Once that was done, using MB1B, the system was able to automatically create a new batch for me based on the internal batch number range. However, when i tried the same movement using MIGO, it doesnt work. in MIGO, system always populate the "from" batch into the "dest" batch field.
Is there any way i can set so that in MIGO, the system to propose a new batch?
many thanks in advance

Possibly, have a look at OSS 748216.
https://websmp230.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=748216
Regards,
Nick

Similar Messages

  • Batch number format setup and auto batch creation during first GR

    Dear all,
    This is a batch question.
    I know that both the master batch and the stock data for the batch are created automatically during the first goods receipt. Thus, I do not need to create this data manually.
    My question are following:
    1 - what is the machnism that trigger this auto-batch creation in the system during the first goods receipt? is it from some kind of configuration?
    2 - If I want my batch number to appear in certain format, for example, first four digit is customer code, middle two code is country code (i.e. US, UK), and the remaining as goods receipt date. How do I setup this in the SAP system.
    3 - If batch classification is active, one can assign characteristic values to the batch when entering the goods receipt. HOwever, normally when I perform a goods receipt in MIGO, after putting in the production date and the batch number, I will hits the checkbox and if no problem, I will post the 101 document. WHERE in the MIGO screen I can assign the characteristic value to the batch?
    Thanks.

    My question are following:
    1 - what is the machnism that trigger this auto-batch creation in the system during the first goods receipt? is it from some kind of configuration?
    ==> Yes - See IMG activity 'Define batch creation for Goods Movements'
    2 - If I want my batch number to appear in certain format, for example, first four digit is customer code, middle two code is country code (i.e. US, UK), and the remaining as goods receipt date. How do I setup this in the SAP system.
    ==> See exit EXIT_SAPLV01Z_003
    3 - If batch classification is active, one can assign characteristic values to the batch when entering the goods receipt. HOwever, normally when I perform a goods receipt in MIGO, after putting in the production date and the batch number, I will hits the checkbox and if no problem, I will post the 101 document. WHERE in the MIGO screen I can assign the characteristic value to the batch?
    [[> See IMG activity 'Activate Batch Classification for Goods Movements in IM"

  • Batch creation during goods issue to order

    i had a scenario where  4  production lines are used to produce fg material,in final operation all material produced in different lines are mixed . i am using different grades of raw material( single raw material) in different ratio in each line . during adding raw material in the operation  batch number is recorded .
    in each line 1 ton of material is produced for 1 hour , i had a production order of 100 tons i had to produce 25 batches ( each batch produce 1 ton ) in each line , and each time batch number should be recorded. if raw material from 1st operation enters to 2nd operation in 1st line new batch is again added in 1st operation this process continues un till production order quantity is reached.  how to map this scenario in sap.
    Thanks

    Hari,
    I am not sure if I understood your requirement exactly. But in the first pass did you check WIP batch functionality?
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/20ff2779-f9d3-2b10-9dab-e9d84c5953c5?overridelayout=t…

  • New batch creation good receipt

    I would like to create new batch code automatically on good receipt if it hasn't existed in the system.
    Is this related to the movement type or transaction code(MB0A or MIGO) or an user who process good receipt?
    Is this configuration or user authority?
    Could anybody let me know how to do the set up.
    Thank you very much for your help.
    Best regards,
    Miki

    Hi Indranil,
    Thanks for the information.
    It is blank for good receipt 101 so it should work fine but it sometimes doesn't work.
    Is there any configuration to select plant?
    I would like to investigate when it doesn't work.
    I am still checking.
    Thank you.
    Best regards,
    Miki

  • Batch creation during process order

    Dear all,
               Can any body tell me for some materials Automatic batch is not creating after releasing the process order.
    Regards
    Ravi

    Dear,
    Go to MM02 of these materials click on work scheduling view and check which scheduling profile is maintained there.
    Then go to CORY and check same scheduling profile for Auto Batch Creation. If scheduling profile is missing then assign same in work scheduling view of material master.

  • Automatic batch creation during goods reciept

    hello all,
    we have a 7 plants and one company code,all the plants batch management is active during goods recipt..i.e during goods recipt batch is created automatically by system.
    now ifor one plant i do not want to create batch during goods reciept.
    what are the configuration steps?
    regards
    simran

    Hi
    Deactivate Batch management in Material Master. Remove tick mark for 'Batch management' in 'Purchasing' view of mat master.
    While doing this, you need to ensure that no previous stock is available in the system and also no purchasing document should exists for that material.
    Thanks
    Sachin

  • Automatic multiple batches creation during GR

    Hi Experts,
    I have a problem, wherein in a PO i m entering 1 line with a material code, but vendor sends total quantity in multiple lots specified in invoice.My query is how can i do GR for multiple lots in single transaction?
    Thanks
    KDS

    kdshah wrote:
    Hi Experts,
    > I have a problem, wherein in a PO i m entering 1 line with a material code, but vendor sends total quantity in multiple lots specified in invoice.My query is how can i do GR for multiple lots in single transaction?
    >
    > Thanks
    > KDS
    Hi KDS,
    If your query is to assign automatic batch numbers in GR, then you need to configure this in IMF> Logistic General > Batch Management for relevant movement types.
    As I told, if the vendor is sending different split quantities (say 100 PC as 20, 35, 15, 20,10) you can assign different batch numbers for each of the receipts (Automatic system generated) OR if you wish you can also enter Manually.
    Remember that once the batch number is consumed (like cancellation of the GR), system takes next batch numbering still the canceled number can be manually used.
    Anything else pls revert
    Shiva

  • No New Batch number creation at the time of Material Transfer Movement(309)

    We are upgarding from 4.6C to ECC6.0. We have an issue in regards with the material movement type 309. At the time of creating the material tranfer using the same material as issuer and receiver, the same plant and storage location ( this process is used by the business to diferentiate batches).
    In 4.6C a new batch number is created automatically when 309 movement is posted; stock and characteristics transfered are allocated at the new batch created automatically.
    The same case in ECC6.0 does not create a new batch as done in 4.6C. We have looked for any SAP note or forum discussion without success.
    If anybody has an answer for this issue, let us know.

    As a matter of fact these configuration has been checked before, additionally we compare configuration at 4.6C and ECC6.0 and it is the same but the new batch creation (for this specific case) is working at 4.6C, not at ECC6.0.

  • Duplicate Batch number creation during MIGO wrt PO

    Dear al SAP
    We have activated batch management at material level and set external number range. During MIGO say for the first line item, I have entered external batch number as 123. If I give the same batch number for the second line item of the same material code, system should throw an error message.
    Pls explain in detail SPRO setting required for this.

    In Logistics General -> Batch Management -> Creation of New Batches -> Define Batch Creation for Goods Movements select the option "E" Manual and check against external number range

  • Batch creation at MIGO

    Hi Guru,
    We are doing STO ( stock tranfer order) between plant and batch management is active for the client.
    We would like to avoid the creation of new batches at MIGO especially for the STO GRs.not for the rest of the GR at MIGO. and during the GR against STO ( outbound delivery at MIGO) system should accept only the existing batch
    Means New Batch should not get created for the STO GRs( GR outbound delivery at MIGO).
    Is it possble to have this through any standard customization? or any other work arround.
    regards
    Santha

    You have to restrict it with help of user exit

  • Batch determination during MIGO

    Dear all,
    This is question regarding the Sort rule used during Batch determination during MIGO (GI).
    Below are what i've done:
    1. Maintain Batch search strategy via SPRO
    2. Maintain Batch search condition records via MBC1. Here I maintain the sort rule = ZSORT.
    FYI, sort rule contains characteristic fields: (1)BATCH_CREATION_DATE, (2)BATCH_NUMBER.
    3. Performing GI via MIGO, in Batch determination screen there is a column showing "Characteristic sort." From here, i can view how the characteristic fields and its value being sorted.
    Problem arise, in above screen, i can only see (1)BATCH_CREATION_DATE only display in column "Characteristic sort.". Missing of characteristic field (2)BATCH_NUMBER.
    Could you please comment on what went wrong? Please comment
    This is the setting used for BATCH_NUMBER (TCode CT04):
    Basic data    
    Chars group = BATCH
    Status = Released
    Format  = Char
    Number of Char = 10
    Value Assignment = Single value
    Values
    No maintenance
    Addnl data
    Table name  = MCHA
    Field name = CHARG
    Procedure for value assignment = Not Ready for input
    Restriction
    No maintenance

    Dear all,
    I've got my issue solved. There are 2 areas i applied fixes:
    1. Sort rule's characteristic field should come from the same class as Selection criteria (MBC1)
    2. Sort rule's characteristic field's setting in CT04, it should coming from table field that declared in tab "Addnl data".

  • Creation of new batch while transfer posting

    Dear Experts,
    Please guide me to meet the following requirement:
    I am posting the Goods Receipt for the production order to the Quality stock by using indicator X in T Code MB31. The material is batch Managed and QM is not implemented.
    Now after the Quality Inspection this batch is posted to Un-restricted Stock with movement type 321. Here the requirement is to create a new batch whereas system is setting the original batch (batch in QI stock) as receiving batch. My requirement is to have a new batch number here either automatically (incremental for internal number range) or could be entered manually.
    But when I enter a new batch number the system throws an error message "Batch MATERIAL_NUMBER PLANT SLOC BATCH_NUM does not exist". Message no. M7042. The requirement is to post the stock to a new batch here.
    Experts, kindly help me clear my understanding as where I am going wrong. How to be able to create a new batch here. Also how to generate a new batch number automatically during the goods movement.
    Thanks & Regards,
    Rohit.

    Hi Rohit,
    Sometime back, I have copied the below information from this forum for ref. Just check the usefulness of this information for your requirement.
    You can further enquire about this with other gurus in this forum, before taking any decision.
    Configure Customer Exits for intern. batch number assignment
    You can use SAP enhancement SAPLV01Z for internal batch number assignment. This enhancement contains two function module exits that you can use to define number ranges or templates for batch numbers.
    u2022     EXIT_SAPLV01Z_001. You use this exit to replace the number range object and/or interval proposed by the system with your own number range object and/or interval.
    In addition, you can, for instance, stop the system from assigning an internal number depending on the material or plant. You can also use this exit to stop the dialog box from appearing.
    u2022     EXIT_SAPLV01Z_002. Using this exit, you can either change the number assigned by the system, or assign your own number.
    Note
    Both exits contain a communication structure with application data from the respective business transaction (plant or material type, for example). If you need further information, such as the time, the user name or the date, you must include them yourself in one of the exits.
    The system always checks whether the assigned batch number already exists in the system. If it does, it terminates the function without assigning a batch number.
    Example
    In function module exit EXIT_SAPLV01Z_001, the system uses the material type to determine number range interval XY. This number range is then used to determine number 0000100123 as the next batch number .
    In function module exit EXIT_SAPLV01Z_002, the final batch number 'ABCD100123' is determined from batch number 0000100123 and plant ABCD. The system suppresses the leading zeros.
    If you do not use a sequential counter for the batch number, you can skip internal number assignment in exit EXIT_SAPLV01Z_001 to specify your own batch number in exit EXIT_SAPLV01Z_002.
    Activities
    1. Implement the required enhancement.
    Either create a new project or use an existing one.
    2. Activate the project.
    Your enhancement works only after the project has been activated.
    Madhava

  • Batch Updation with new Batch via IDoc

    Hi,
    Is it possible to update the existing batch at the delivery level with the new batch from the IDoc during the Picking or PGI
    I checked the FM WS_DELVRY_UPDATE2 which is not allowing to do this...
    Any pointers on this will be helpful
    Any Clue on the above issue ?
    Thanks in Advance
    Rajesh
    Edited by: Rajesh on Mar 6, 2012 8:39 PM

    Possibly, have a look at OSS 748216.
    https://websmp230.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=748216
    Regards,
    Nick

  • Cannot update batch header during MIGO GR using BADI MB_DOCUMENT_BADI

    I am trying to update next inspection date via MIGO when Goods Receipting a production order which is held in the batch header and in a classification we have set up. I have used function modules to try and perform the update.
    I have used both 'VB_UPDATE_BATCH' and QEVA_BATCH_UPDATE both by themselves and in an update task to update field QNDAT. (1st one updating MCHA and MCH1 the second one to update MCHA).
    I had the code before in POST_DOCUMENT of BADI MB_MIGO_BADI and this made no difference either. Sometimes it updates if I cancel the material document and redo the goods receipt with the same production number but this is very inconsistent. I need this to be done when I am posting the goods receipt.
    Does anyone have any ideas as I am at the end of my tether with this one?
    Many thanks
    Regards
    Larissa Maryniuk

    used BAPI_CHANGE_BATCH in method CHECK_ITEM of  MB_MIGO_BADI

  • Batch Determination during MIGO Movement 543 O

    Dear All SAP Gurus,
    I want to know about batch determination during MIGO transaction for subcontracting cycle , movemnt type 543 O -consumption for parts provided to vendor.
    In Brief: Suppose clients executing subcontracting cycle and send the RM/PM against subcontracting PO to vendor. At the time of MIGO we have to enter the batch number of RM/PM which we had sent to vendor. But when we serach the batches available at the vendor it shows number of batches. My client want batch determination process so that system will take the batch number accordingle po as we sent material with reference to po.
    Please suggest in this matter or if any one has solution please tell.
    Thanks in advance
    Mahesh

    Hi Mahesh,
    Go to SPRO > Logistics - General > Batch Management > Batch Determination and Batch Check > Batch Search Procedure Allocation and Check Activation > Allocate IM Search Procedure/Activate Check > Here assign Batch Search Procedure "ME0001" to Movement Type 543 O
    Then go to MBC1 and maintain condition record for Strategy Type ME02 i.e. Plant and here keep selection method as "O"
    In MIGO, click on "Stock Determination" button for automatic batch determination.
    Hope it helps!
    Preethi.
    Edited by: preethi R on Nov 24, 2008 2:10 PM

Maybe you are looking for

  • One account with two skype numbers, want to forwar...

    that's it. i have one skype account that had one skype number forwarding to one land number. works fine. bought another skype number in order to forward to a 2nd land number. but cant find any way to do this on skype.  skype just wants all forwarding

  • Preview Images Upside down

    When importing images into lightroom the previews are upside down. Once imported they are rightside up. I'm thinking there is a preference I need to change. Thanks, Brian

  • Fireworks - Creative Cloud Plan

    I would like to purchase Fireworks on the creative cloud single application plan... is this possible?

  • Add "LEVEL" to existing WF

    Im NEW to WF, had training a couple of years ago and now tasked with a change to an existing WF. Reviewed User Guide, but it doesnt touch on modifying a WF in the way that I need to... The existing workflow begins at the Customer level. I need to add

  • How to use 13-20 month early upgrade

    So I hear everyone talking about how Verizon is ending the 13-20 month early upgrade and that now you will only be able to ugprade after 20 months, but I didn't even know you were ever able to upgrade after 13 months. On My Verizon, it says I am elig