New infraestructure for ECC 6.0

Hello,
We are going to migrate to ECC 6.0 version and we are just configurating the new infraestructure. In Our company we are 470 users and we are not sure if we need frontend servers and another DB and application server or only DB+aplication server.
Someone can help me?
Thanks in advance.

Hi..
I guess you should try to run the sizer provided by SAP.
http://service.sap.com/quicksizer
This should give you some more clues and pointers on the sizing aspect for the required upgrade.
Regards,
Abhijeet

Similar Messages

  • EDI - ECC 6.0 DOCREL value.  Old value 46C, what's new value for ECC 6.0?

    Good morning all.  We are upgrading from 4.6C to ECC 6.0.  When  testing the inbound idocs for Purchase Orders, I am getting en  error on the DOCREL field.  It says that the value 46C is  invalid.  My question is: what is the valid value for the ECC  6.0 version of R/3?  Are there different values for different message types?  Thank you in advance!

    Hi,
    > 1 : How much space i exactly need for the same.As per document i will need 50 GB extra for DB and Some file system space for Downloading S/W and some temporary space.But as per discussion with some of my friends who did EHP5 upgrade it took approx 350 GB extra space, Also as per document in CHECKS Phase i will get the message for the sapce requirement but for the Presentation purpose i need to provide these detail to Client.Can you give your opinion.
    >
    > (Our Databse size is around 1TB )
    >
    Space required will be around 50-80 GB only. Initially you will need more space because it will ask you to create some new containers. But after upgrade you can delete old containers that will be empty and can release some space. Same has been there in post-installation steps of EHP5 upgrade guide.
    >
    > 2 : I want to know what will  be the impact on other systems like EP and PI, After activation of new functionalities how they will be reflected on the Portal or i need to upgrade my EP system as well ?????
    > Similarly what steps i need to perform for BI and PI systems.
    >
    You can check SAP note 1388258 for the same.
    Thanks
    Sunny

  • New functionality in ECC 6.0 for auto clearing of bank clearing account.

    Is there any new functionality in ECC 6.0 for auto clearing of bank clearing account.
    Regards,
    Kishore

    Hi,
    There no new functionality in ECC 6.0 for auto clearing of bank clearing account. Still you need to depend on Manual / Electronic bank statement to clear them.
    Thanks
    Prasada

  • New tcodes in ECC 6.0 for obsolete tcodes in 4.6C

    We are doing security upgrade from 4.6C to ECC 6.0.
    There are some tcodes have been deleted in ECC 6.0, but I don't which new tcodes will replace them.
    I am looking for the new tcodes in ECC 6.0 for list of tcodes in 4.6C (below) which have been deleted in ECC 6.0:
    AL02, AL08, AL10, AL18, AL21, AL22, CN90, CN92, CN94, KSRP, SAPSAP_IA,
    SB02, SO80, ST08, S_P9C_18000155, S_P9C_18000155
    Note:  i verify the table PRGN_CORR2 in ECC 6.0, and the list provides from OSS note 991377, however both of them not include those tcodes I mention above.
    Your input with the new tcodes, that replace the tcodes above, will be appreciated.
    Thank you
    Steve

    Hi,
    This thread may help you with the required information.
    Re: TCode set for ECC6.0 compared to 4.7
    Rgds,
    Raghu Boddu

  • New functionality in ECC 6.0 with Enhancement Package 3

    Hi Experts,
    Can any one tell me what new functionality is added in Enhancement package 3 (ECC 6.0)?
    Thanks & Regards,
    Simar

    Hi,
    There no new functionality in ECC 6.0 for auto clearing of bank clearing account. Still you need to depend on Manual / Electronic bank statement to clear them.
    Thanks
    Prasada

  • Transfer rules are not exist for ECC Quality source system in BI Dev

    Hi,
    I Connected BI Dev system To ECC Dev and installed the sales, purchasing,... data flow, but here i am not getting the quality data to show the reports, to get Quality data  I established the connection between BI Dev and ECC QA, while installing the transfer rules for the ECC QA data sources there no transfer rules are exist(only some of them exist) in the business content, but all the update rules,... are exist, when i right on the data source say create transfer rules it is proposing App praposal.
    When i select source system as ECC dev while installing the transfer rules i can see all the transfer rules, but when i select source system as ECC QA i can see only some transfer rules.
    only problem with transfer rules(some of them exist), for remaining all objects are properly existing in business content for ECC QA source system.
    Regards,
    chandra

    Hi Fayzrakhmanov
    Thanks for the quick reply. We are not moving the stuff to QA. We are only connecting QA ECC system to BI Dev. We already have datasources moved to ECC QA and created source system for ECC QA in BI Dev.
    The problem is I am not able to get Business Content transful rule for new source system. We I can find some but not all unlike development.
    Help on this would be appreciated.
    Thanks

  • Replication Issue for ECC BP to CRM BP

    Hello Experts,
    I am trying to Create a BP in ECC with transaction BP, but whenever i save the BP in ECC, the BDOC gets stuck in CRM with the error message that 'Grouping CUBP does not exist',
    Everything was working fine before, but recently we had created a copy of Account Group 001 for ECC customer for a Z accoutn group, we made all the required settings in ECC in transaction PIDE and then ran the inital load 'DNL_CUST_KTOKD' the new account group did come over to CRM in table CRMC_T077D and the account group is working fine, the customers created in ECC are getting replicated to CRM, but now the BP created in ECC does not gets replicated to CRM and give the above stated error message in the BDOC.
    PLEASE HELP!!

    Hello Shoaib ,
    In the CRM as well as ECC system in the customising SPRO :
    Cross-Application Components   >SAP Business Partner
    Business Partner   >Basic Settings
    Number Ranges and Groupings   > Define Groups and Assign Numbers Ranges
        >  CUBP Grouping could be missing in any one of the systems. Could you please check this.
    Thanks & regards,
    Krishnen

  • Cross Application Time Sheet (CATS) - Documentation for ECC 6.0

    Hello everybody,
    i'm searching for new documentation for customizing of Cross Application Time Sheet (CATS) for
    SAP ECC 6.0.
    I found on
    http://help.sap.com/saphelp_nw04/helpdata/en/64/3fff9a470211d189720000e8322d00/frameset.htm
    support SAP link.
    I have also Cross Application Time Sheet (CATS) pdf documentation but for SAP R/3 4.6c release.
    Can somebody suggest me where to find "how to" pdf documentation for ECC 6.0 release?
    Thanks
    Jerry

    Hi,
    you can refer to books by SAP press... Configuration CATS
    and can log on to Service.sap.com
    Regards,
    Kapil Kaushal

  • Enhancement Pack 2 for ESS for ECC 6.0

    Can anyone provide me with document on the new functionality of Enhancement Pack 2 impact on ESS for ECC 6.0?
    Or where I can find this documentation?
    What areas of ESS & MSS does it cover?
    Thanks
    WB

    Thanks Chris
    Still confused.
    Are you able to tell me what is the latest enhancement pack for ESS, the reason for asking is that I'm looking for more details on the new iViews as contained in Note 1048386 see below
    Thanks
    WB
    In the previous ESS Business Package (BP) version, the links for starting processes were provided in the workset Life and Work Events. With EhP2, the links for starting the processes are provided in the workset that the process belongs to thematically (for example, the process 'Change of Working Time' is provided in the workset 'Working Time'). The following list provides an overview over the processes available in the standard system and the worksets they are assigned to.
    Benefits and Payment
    o Company Loans
    o Membership Fees Sports Club
    o Status Overview
    Working Time
    o Change of Working Time
    o Status Overview
    Own Data
    o Change of Address
    o Personnel File
    o Status Overview
    Life and Work Events
    o Maternity Leave
    o Birth of a Child
    o Termination
    o Status Overview
    The available processes are integrated in the navigation of the ESS Homepage Framework.

  • Security Guide for Enhancement Pack 4 for ECC 6.0

    Hello,
    I am trying to analyse the impact of applying Enhancement pack 4 for ECC 6.0, Can someone help me find any security guides for it.
    It is an existing system and few additional modules are being implemented.
    Kind Regards.

    Hello,
    We have applied EHP4 on an exisiting(running) ECC 6.0 System. Can someone help me find answers to below queries
    a) What is  the SAP standard process to start with Security bit.
    b) Do we need to run SU25 steps. If yes, which one of them.
    c) Since the purpose of applying EHP4 was to activate few set of new business functionalities, we intend to affect the existing security design at the minimal. What is the best approach for this.
    Kind Regards,
    Abdul

  • GUI 620 Patch 66, 710 Patch 5 for ECC 6.0

    We are in the process of installing support packages 4 - 12 for ECC 6.0.  Obviously, we're going to do this in stages because of the amount of notes each package contains.  My question to the forum is regarding issues you may have encountered by running GUI 620 patch 66 for any support pack installation for ECC 6.0.
    I'm trying to convince my team that we need to upgrade the GUI to support the new enhancements.  Are there any requirements, suggestions, experiences, and/or opinions you can give that would reveal issues with using GUI 620 with ECC 6.0?

    Hi Rod. You need to read  notes, and only you and your company should make a decision about GUI version.
    You do not must use 640 or 710 , but this versions are newly and are created by newly Visual Studio from Microsoft. For example the upgrade to 640 are the disputable decision becose 14th of October 2008 end of maintenance for SAP GUI for Windows 6.40.
    Read this notes, and make a decision :
    Note 147519 - Maintenance strategy / deadlines 'SAP GUI'
    Note 929300 - SAP GUI for Windows 6.20: Limited support
    Also the latest patch for 620 is 72. Regards.

  • Install Best Practices- Baseline Package for ECC 6.0 EHP4

    Hi All,
    I know its not the right forum to post this message, but posting here as i didnt get the info from the related forum, apologies for that.
    Now we are planning to install SAP Best practices-Baseline Packages for ECC-EHP4 in our new server.
    Can anybody help me out what are the steps to be carried out. Now we have completed installation of Linux & we want to install BP for General, not for any specific industry.
    B/regds,
    CB

    Please post this question in SAP Basis Forum.
    Alternatively, you can check documents in scribd/ help.sap.com
    Raghavan

  • What's new in  SAP ECC version(Technically)

    Hi ALL,
    iam and ABAPer new to SAP ECC version.
    can u post me th document related to SAP ECC version (what are the technical changes in ECC& Syntax change in ECC)
    thank u

    Hi,
    Welcome to SDN!
    In SE38, click the blue icon (Information) with the "I" in it.
    Click "New Features in ABAP".
    There should be a subfolder there which says "ABAP Changes by Release".
    There is also a very good document from Thomas Jung here in the SDN
    that contain a lot of hardcopies of the changes.
    /people/thomas.jung3/blog/2005/05/15/abap-46c-to-640-delta-training
    Also, check the following threads:
    Re: ABAP Changes for release ECC 5.0
    Re: Technical difference between 4.7 and ECC 5.0
    best regards,
    Thangesh

  • NEW Tcode for Subcontracting

    Hello
    Has anybody heard of the transaction code ME2ON(new Subcontracting functionality regarding the movement types for components) which is a new tcode for Subcontracting process where the movement types being used are 30A . Could any body tell me how the transaction works . This is as per the new version  ECC 6.0 EP4 .
    Thanks

    Hi
    In my knowledge there is no t.code like ME2ON. There is a new t.code Adsubcon for subcontract with special stock.
    But you have to activate few (check in OSS) business sets in SFw5 for that. The below link will help you
    http://help.sap.com/saphelp_di471/helpdata/EN/ed/ac8ec81bbc4bd5bc182a749f479765/frameset.htm
    Regards
    Antony

  • Setting up transport management system for ecc 6.0

    hi,
    does anybody know a good guide how to set up a tms for ecc systems?
    regards
    manu

    You sent only a fraction of the web.xml so I have to make a few guesses...
    I'm assuming that the login-config tag is within a web-app tag (otherwise I
    think you'd get a parsing error). Did you include any security-constraint
    tags? By default, in a webapp everything is publicly accessible. You must
    specify which url's are constrained within a security-constraint tag.
    See the .../samples/examples/webapp/security/WEB-INF/web.xml file for an
    example of this and read the spec at
    http://java.sun.com/j2ee/dtds/web-app_2_2.dtd (search for
    "security-constraint").
    If you continue to have problems please repost with a full config.xml.
    Neil Smithline
    WLS Security Team
    BEA Systems
    "Khoze" <[email protected]> wrote in message
    news:3a94481b$[email protected]..
    >
    Hi,
    I am trying to setup a BASIC security for the Web Application on Weblogic6.0, by
    adding a xml tag
    <login-config>
    <auth-method>BASIC</auth-method>
    </login-config>
    to the web.xml file in my application folder. This doesnt seem to work. Ihave been
    reading the documentaion, but cant seem to find a solution as to how toset up browser
    based security for my web application. Does anyone have suggestions tothis?
    >
    Thanks

Maybe you are looking for

  • Any way to get multicam to work with HD?

    I am using multi-cam mode in Premiere and it is essentially unusable because of lag. I am presuming this is caused by a bottle-neck of the hard drive, as my system monitor is showing only 50% RAM usage and ~80% cpu. I have tried everything i know to

  • Can no longer print to Samsung ML-1710 (since 10.4.6)

    Simply put, my Samsung ML-1710 no longer appears as an available USB printer in the list. It's essentially as though it does not exist. The issue has come up since I updated my machine to 10.4.6 (2006-05-16 19:38:20 -0400: Installed "Security Update

  • Getting an error in Java Project in SAP NetWeaver Developer Studio

    Hi, I am getting this error in my Java Project developed in SAP NetWeaver Developer Studio. Exception occurred during launch Reason: Source locator does not exist org.eclipse.jdt.debug.ui.javaSourceLocator Is this problem of not defining some Externa

  • Inadvertently deleted user folder with terminal command - HELP!

    Hi I was using terminal to delete my hosts file using the following command: sudo rm -rf /Users/xxx/.ssh/known_hosts Unfortunalely, I misplaced a space after the username, and deleted most of my user files. I thought something weird was happening whe

  • MCRE report

    Hi Experts, I met a problem with report MCRE. When I use the MCRE to generate a report, the Qty withdrawn listed here for a specific material in a specific production order is different from the Qty withdrawn displayed in the production order (CO03).