New lot size - consolidates the requirements in the past + current month.

Hi All,
My client has requirment where he needs a monthly lot size "MB" for the Raw materials but that lot size must consolidate the requirements in the past month as well with the requirment of the current month so that we only have one requirement.
In current scenario if we use MB lot size and if we have requirment of 100 pc in month of May and 100 PC in month of June then 2 PR will be created. One for Last month and another for this month. Client wants only one PR for both month and wants Last month requirment sto be clubed with this month requirment it self.

There are more that 1000 Raw materials and most of them have past due requirments. Reason that it has to be done during PR stage it self taht combining different PR to single materials so many materials will be very difficult and time consuming. 
Thanks for suggestion though. But client did not accept it.

Similar Messages

  • Periodic lot size PR not covering the requirement for the periods

    Dear Experts,
    I am using customized monthly lot size size key with Periodic lot size procedure and number of periods 3 months.
    The MRP is creating one purchase requisitions for all the requirements for the first month only. The second and third month requirements are not included for the purchase requisition quantity. The second and third month requirements are kept opened without any PR.
    The planning harizon is 100 days which is more than 3 months. There is no maximum lot size restrictions. But still why the purchase requisition quantity is not included the second and third month requirements.
    Please give your valuable suggestions.
    thanks and regards
    Muru

    Dear Experts,
    I am using customized monthly lot size size key with Periodic lot size procedure and number of periods 3 months.
    The MRP is creating one purchase requisitions for all the requirements for the first month only. The second and third month requirements are not included for the purchase requisition quantity. The second and third month requirements are kept opened without any PR.
    The planning harizon is 100 days which is more than 3 months. There is no maximum lot size restrictions. But still why the purchase requisition quantity is not included the second and third month requirements.
    Please give your valuable suggestions.
    thanks and regards
    Muru

  • I am trying to download a free trial of photoshop for my macbook pro and it says there is an error and that the requirements for the new version is not supported for the mac I have. I have looked at the list of requirements but have no idea how to tell wh

    I am trying to download a free trial of photoshop for my macbook pro and it says there is an error and that the requirements for the new version is not supported for the mac I have. I have looked at the list of requirements but have no idea how to tell what I do and do not have?

    Apple Menu --> About this Mac.
    Mylenium

  • New lot size in MRP view

    Hi ALL
    Any one can suggest how can we configure a new lot size for  MRP view in ECC.
    regards
    Vikas

    Hello Vikas,
    I am not too sure ? Can you not change the field ? It doesnot need any cofiguration on the MRP view level. The value needs to be set
    Thanks
    Amber

  • On installation of Firefox 4 beta, it tells me that it won't run on my Mac. When I go to system requirements, it takes me to a page for Firefox3.6 requirements. Where can I find the requirements for the beta?

    The link to system requirements for Firefox 4 beta takes you to a page that gives you the requirements for Firefox 3.6 instead. I assume that the requirements for the beta are different as I can't seem to install the beta on my Macs. Where can I find the beta system requirements?

    I never expected Mozilla to neglect the users of Apple's PowerPC (PPC) computers, while still supporting much older operating environments such as Windows XP. So, I should just throw away a $6,000 system, which is still fast and functional, and contribute masses of heavy metals to land-fills because…?
    I'm hurt and confused after supporting Firefox for many years — installing and using it not only on my own computers but on most of my customers' computers. Now I have to tell my customers with PPC Macs they can't have a secure cross-platform browsing experience from Mozilla. They'll have to learn to use some other browser, or buy a new computer.
    If one doesn't buy a new computer every year, one doesn't deserve Firefox 4. This is sort of sounding more like a Microsoft™© doctrine. (But wait, I can still have Firefox 4 on a ''SERIOUSLY CRAPPY WINDBLOWS XP pile of rubbish?!'') Please open your eyes Mozilla. This just doesn't make sense.

  • I want to upgrade my 2008 Mac pro to the latest one, will it meet the requirement for the future Software that's coming out for the next four years?

    I want to upgrade my 2008 Mac pro to the latest one, will it meet the requirement for the future Software that's coming out for the next four years?.

    I'd wait. What can't you do that you need? You mean you want to buy a new model, then why not wait for an actual new one, not the two year old 5,1, when you need to and have outgrown.
    Yours will run Mountain Lion. yours is 4 yrs old and still supported and has life left.

  • The requirements of the CSA system

    Dear All
    I need to debloy the CSA solution on my network and I need to know the Hardware and Sotwatre requirements for the server and the clients and any thing related to the CSA to be deployed successfully.
    Please mention them in details.
    Thanks in advance,

    You can read the requirements in the document located here:
    http://www.cisco.com/en/US/docs/security/csa/csa60/release_notes/CSA60RN.html#wp136711
    Or read below:
    System Requirements (CSA MC)
    Minimum Server Requirements
    System Component
    Hardware
    • IBM PC-compatible computer
    • Color monitor with video card capable of 16-bit
    Processor
    1 GHz or faster Pentium processor
    Operating System
    Windows 2003 R2 Standard or Enterprise Editions, Service Pack 0, 1, or 2
    Note To run terminal services on the CSA MC system, you must edit the MC policy.
    File System
    NTFS
    Memory
    1 GB minimum memory
    Virtual Memory
    2 GB virtual memory
    Hard Drive Space
    9 GB minimum available disk drive space
    System Requirements (Agent)
    To run Cisco Security Agent on your Windows servers and desktop systems, the requirements are as follows:
    Agent Requirements (Windows)
    System Component
    Processor
    Intel Pentium 200 MHz or higher
    Note Up to eight physical processors are supported.
    Operating Systems
    Windows Vista Business and Enterprise editions with service pack 0 or 1.
    Windows Server 2003 (Standard, Enterprise, Web, or Small Business Editions) Service Pack 0, 1, or 2
    Windows XP (Professional, Tablet PC Edition 2005, or Home Edition) Service Pack 0, 1, 2, or 3.
    Windows Embedded Point of Service (WEPOS) 1.1
    Windows 2000 (Professional, Server or Advanced Server) with Service Pack 0, 1, 2, 3, or 4
    Note Citrix Metaframe and Citrix XP are supported. Terminal Services are supported on Windows 2003, Windows XP, and Windows 2000.
    Memory
    256 MB minimum-all supported Windows 2003, Windows XP, and Windows 2000 platforms
    512 MB minimum-for Windows Vista.
    Hard Drive Space
    60 MB or higher
    Note This includes program and data.
    Network
    Ethernet
    Note Maximum of 64 IP addresses supported on a system.
    To run Cisco Security Agent on your Solaris server systems, the requirements are as follows:
    Agent Requirements (Solaris)
    System Component
    Processor
    UltraSPARC 400 MHz or higher
    Note Uni-processor, dual processor, and quad processor systems are supported.
    Operating Systems
    Solaris 9, 64 bit, patch version 111712-11 or higher installed.
    Solaris 8, 64 bit 12/02 Edition or higher (This corresponds to kernel Generic_108528-18 or higher.)
    Memory
    256 MB minimum
    Hard Drive Space
    50 MB or higher
    Note This includes program and data.
    Network
    Ethernet
    Note Maximum of 64 IP addresses supported on a system.
    To run the Cisco Security Agent on your Linux systems, the requirements are as follows:
    Agent Requirements (Linux)
    System Component
    Processor
    500 MHz or faster x86 processor (32 bits only)
    Operating Systems
    RedHat Enterprise Linux 4.0 WS, ES, or AS
    RedHat Enterprise Linux 3.0 WS, ES, or AS
    Memory
    256 MB minimum
    Hard Drive Space
    50 MB or higher
    Network
    Ethernet
    Note Maximum of 64 IP addresses supported on a system.

  • Trying to download Mavericks I get install_error_distribution_signed_by_Apple. then I get kicked off to Lion troubleshooting,I meet the requirements what the h***?

    Trying to download Mavericks I get install_error_distribution_signed_by_Apple. then I get kicked off to Lion troubleshooting,I meet the requirements what the h***?

    Try this thread, it worked for me: https://discussions.apple.com/message/22873594#22873594

  • OS X 10.10.1 installer says the requirement for the update does not meet

    Greetings.
    I noticed the auto update setting of my MacBook Air had been not working for a month or so today.
    So I tried to manually update OS X 10.10.1 (released Nov 17, 2014) and got this message from the installer: "OS X Update can't be installed on this disk. This volume does not meet the requirements for this update."
    But the thing is, my mac already meet the requirement, as description of the update.
    My mac is on OS X 10.10 and OS X Yosemite 10.10.1 Update states the system requirement as "OS X Yosemite 10.10"
    How can I update my mac? What can be the source of this problem?
    FYI, once I participated in Public Beta of Yosemite and clean-installed 10.10 from 10.9 with disk formatting.
    Tried solution: rebooting, and repairing permission and repairing OS disk using Disk Utility.
    Thank you in advance.

    Barney-15E wrote:
    In About this Mac, click on the Version number. It will change to a build number. Please post that. Although it sounds like you don't have a beta still installed, it may be still hanging around which would cause the problem you see.
    The GM Build was 14A389.
    Never knew the version number could be clicked, and now it says 10.10 (14A379b).
    I googled the build number and it's Public Beta 4. Now it is clear that my mac still have old beta version AND the OS X showed a message to me when I tried to download a copy of Yosemite from the App Store:
    Maybe the OS thinks itself as a full release of 10.10 for some reason. It explains why it did not auto download and install the system updates, regardless of the auto update System Preference of App Store.
    Now I am going to download and re-install 10.10 rather than updating the OS.
    Thank you very much Barney-15E for providing the clear answer and others for reading and giving advices.
    Have a nice day!

  • Does anybody knows about the 'requirement' in the output type.

    Hi,
    When i check the code of those 'requirement' for the output type.
    Found there existed FORM <b>KOBED</b>_9XX and FORM <b>KOBEV</b>_9XX.
    sometimes the same code in those 2 Forms.
    My questions, what the difference between KOBED and KOBEV??
    Thanks!!

    Hi
    Well these are used in Requirement in OutputDetermination
    Where both KOBED & KOBEV are subroutines and they are same only for one or two requirements but if you see all the requirements they are not same.
    KOBEV is used for adding requirements related to header conditions.
    KOBED is used for adding requirements related to both header and item conditions.
    If you put your routine in KOBED that is good enough.
    But if your requirement checks only header fields (like customer, order type etc), it is recommended to use KOBED for performance issues.
    OSS Note 156230 contains a very clear and thorough description of this function.
    Hope this helps and solves your query
    Cheers

  • I am unsure on how to re-upgrade my account. I still meet the requirements for the student discount.

    I am unsure on how to re-upgrade my account. I was previously using the student discount until I recently realized that I was charged $9.99. I emailed Spotify to inquire about how I could still be granted the student discount. I was then told by them that I simply need to re-upgrade my premium subscription to the student discount at anytime. I am not sure how to do this because I receive the message, "It appears that you are not eligible for the discounted product that you are trying to purchase. If you'd like you can still upgrade your account to premium at any time." I was hoping someone could give me simple step by step directions as to how I re-upgrade my account to receive the student discount. Thank you!

    I have the same problem!!

  • Lot Size OMI4

    Hi Team,
    Can anyone guide me to understand the importance of the below highlighted fields in OMI4 with some exmaple? I am reading the F4 help but i can not understand it.
    Thanks

    Hi Sugan,
    If the help is not enough, I recommend to make an individual test in your sandbox to understand what is the meaning of each parameter.
    For example, you ask about the meaning of Last lot exact. This is what the help says:
    Controls whether the last lot is planned exactly in the whole plannning
    horizon, and not according to the settings for the lot-sizing procedure or for
    the rounding value/rounding profile.
    When you select this field, the quantity available is zero at the end of the
    net requirements segment and the gross requirements planning segment in the MRP
    list and the stock/requirements list.
    This means that you only procure what is needed. This avoids remaining stocks
    and, when applicable, high scrapping costs, but the remaining requirements are
    covered by the last lot. This is useful for discontinued materials.
    So this what you can do if you want to understand the help. Imagine that you have a code with minimum lot size and rounding equal to 500 CS.
    This is the MRP result using lot size MB:
    As you can see at the end of the product life (once there is no more demand, you will see that you have a remaining quantity.. cause because you had monthly lot size and rounding qty = 500 CS.
    Imagine that you copy lot size MB in a new lot size Z2, but you flag the parameter: "Last lot exact". So the only difference between MB and Z2 will be the Last lot exact flag. You run the MRP and this is the result using Z2:
    Note that there is no remaining qty. So as is mentioned in the help, this helps to avoid remaining quantities at the end of the product life.
    You can follow the same approach to understand each of the other fields if the help is not enough.
    Thanks and Regards,
    Mariano

  • Selecting the correct lot size...

    Hi,
    I have some problem in selecting the correct lot size, please help me solve it.
    The requirement of raw materials per month is 100nos. But the vendor cannot supply them in qty required by us but supply can happen in 1000nos. I cannot purchase all the quantities as materials cannot be kept in store for long period.
    Which type of lot size is suitable for this type of scenario. Is there any SAP standards available or configuration is required?
    Regards,
    Pavan

    Hi Pavan,
    This is not a lot size issue  , but a process issue.  You cannot choose a lot size unless you are clear what is the qty for which you expect  PR in this case?
    Once that is clear,  you  will get lot size as needed
    cheers
    Rav

  • Different fix lot size depending on the production version

    Hi all,
    I have the next scenario:
    2 production versions. 2 different fix lot size por each. So:
    Prod Version 1 - Fix lot size 200
    Prod Version 2 - Fix lot size 300
    I created the Quota Arrangement just to make SAP to take my favourite version. And trought the quota, I can define the lot size for each version. BUT.
    If I change the version in the order or in the planned order, the quantity don't change.
    So: How can I manage 2 different fix lot size for 2 different product versions? If I change the version once the order is created, how can I do the system change de quantity to the right one?
    Thanks in advante
    << Please do not offer points >>
    Edited by: Rob Burbank on Oct 1, 2010 2:53 PM

    I have n't  tried this scenario,
    This is my Idea
    Create a two production version
    for ex: lot size 100 to 1000, set the rounding profile qty as 1000
    for lot size 1001 to 99999, set the lot rounding profile value to 5000
    BY this way u can get the two lot based on the rounding profie
    Expert; please correct if i am wrong
    Edited by: Sundaresan . E. V on Oct 1, 2010 4:12 PM

  • MRP net requirement calcualtion for Lot sizes

    Hi all ,
    Can some one help me on this ..
    I want to set up the MRP for the Raw materials Procurement .
    for this i want use MRP type as PD and lot size as WB Weekly lot size .
    but as per the requirement the MRP is run daily , i need clarification on certain things such as how does the system calculates the weekly lot size ?  say if the requirement is converted into PR on the first day of the MRP run ,followed by that if the requirement varies does the system creates a new PR or it changes the Qty in the existing PR if its was not converted to PO .
    what are the stock types considered during PR creation and how are the delivery dates determined during the PR creation ?
    thanks ,
    ksr

    Hi Chris
    You can try to set up a maximum lot size and a takt time on the material master.
    Take a look on the F1 help of this field on the material master:
    Takt time
    If a requirement quantity (for example, for capacity reasons) cannot be procured in a single lot, you have to schedule several receipts. In conjunction with the overlap indicator in the lot size (set in Customizing for the lot size), you can use the takt time to specify that these receipts are offset, that is, that they are delayed by the takt time.
    You enter the takt time in workdays.
    Use
    The system uses the takt time if a requirement is covered by several receipt elements due to restrictions on lot size such as maximum lot size (with all lot-sizing procedures) or rounding value (with fixed lot size with splitting).
    BR
    Caetano

Maybe you are looking for

  • Please, somekind of help? (Finland)

    Problem in dv7 with Bt -dongle. ASUS USB-BT400 USB Adapter Bluetooth 4.0 The problem: http://kuva.termiitti.com/v.php?img=32944 Problem is related to BPM X1 Headphones.

  • Calling another class from a java program

    I tried to call the Server1.class from the password program, but I failed. The password program source code is as follows: class PasswordDialog extends java.awt.Dialog implements java.awt.event.ActionListener      * Constructor. Create this visual di

  • Dictating written messages in iMessage, Viber, WhatsApp.

    Dictation: the ability to dictate written messages (i. e. not sound files!) in iMessage, Viber, WhatsApp come and go for no apparent reason. The button alternates between grey=inactive and black=active.  Why? What can be done to correct this? This oc

  • Applications Stack

    I have had OS X Leopard on my computer since it was released, and for a while I had all of my apps in dedicated stacks. Recently I was cleaning up my computer and discovered DragThing and started using that instead, until it was suggested that I remo

  • Using Photoshop CS6 vs 2014

    Open letter to Adobe: In Summary: I consistently go back to Photoshop CS6 over Photoshop 2014 due to the way 2014 handles. I am an advanced user and use Photoshop to create art from photographs for clients. Even though I know there are advanced featu