New lot size in MRP view

Hi ALL
Any one can suggest how can we configure a new lot size for  MRP view in ECC.
regards
Vikas

Hello Vikas,
I am not too sure ? Can you not change the field ? It doesnot need any cofiguration on the MRP view level. The value needs to be set
Thanks
Amber

Similar Messages

  • Default lot size for MRP type

    Hi,
    Can we set default Lot size for MRP type ?
    Regards
    Karthik

    Dear,
    Yes you can do it by creating material master with MRP Pofile.
    First you need to create MRP Pofile in MMD1 where you need to define the LOT SIZE and MRP TYPE which you want then make these value as Fix Value.
    Then Create material master MM01 with this MRP Profile and check your result.
    Regards,
    R.Brahmankar

  • Configure lot size for MRP

    Hi Experts,
    I would like to configure lot size for 3 monthly, can any one explain me the configuration procedures?
    Thanks alot
    Rgds,

    Hi Vivek,
    I copied the Z3 form MB, and changed the no of periods into 3. and there're no difference between material assigned with Z3 or MB.
    We haven't activated MRP4 view, do I have to activate that view first to make this happen?
    for your additional info, I use MRP type (configured) based on ROP.
    Pls help.
    Thanks

  • Lot size procedure & MRP

    Dear All,
    What is Lot size procedure and how it will affect during MRP run?
    Please provide some example against explanation.

    Suppose,
    Avaialble Stock= 50
    PIR 150 on 25/06 
    PIR 60 on 27/06
    When you run MRP,
                                 Avaialble stock
    PIR 150 on 25/06       100
    Planned ordre 100       0
    PIR 60 on 27/06         60
    Planned order  60        0
    For 1st PIR, The NEt requirement is 50-150=-100, So planned order for 100 is created.
    For 2 nd PIR, the ner requirement is 50-150-60+100= -60, planned order for 60 is created.
    In toto, net requirement = Stock-total requiremens+ Total receipts
    Regards
    Ratan
    Edited by: Ratan on Jun 24, 2009 11:31 AM

  • New lot size - consolidates the requirements in the past + current month.

    Hi All,
    My client has requirment where he needs a monthly lot size "MB" for the Raw materials but that lot size must consolidate the requirements in the past month as well with the requirment of the current month so that we only have one requirement.
    In current scenario if we use MB lot size and if we have requirment of 100 pc in month of May and 100 PC in month of June then 2 PR will be created. One for Last month and another for this month. Client wants only one PR for both month and wants Last month requirment sto be clubed with this month requirment it self.

    There are more that 1000 Raw materials and most of them have past due requirments. Reason that it has to be done during PR stage it self taht combining different PR to single materials so many materials will be very difficult and time consuming. 
    Thanks for suggestion though. But client did not accept it.

  • Table for Lot size.......

    Hi All,
         I am an ABAPER. I have to create a Lot size Review Report. In which transaction will i find the Lot size key, Lot size description and MRP Controller.
    Thanks,
    Ibrahim

    Hi,
    Happy new year,
    U can get the lot size  and mrp controller details in MARC table.
      U can get the details in MRP 1 view of material master(which also has the lot size description)(t'code:mm01  /02   /03)
    Regards
    Edited by: Hemanth Krishna.Rai on Jan 7, 2009 2:59 PM

  • Lot size key

    Hi ,
    In one scenario , it is required that planned prders will be created where the req for 5- 8 days is clubed together and order date is not created on some specific day .
    Will lot ize key help in this regard .
    Regards
    ShankarR

    Hi,
    Connect the planning calendar to your lot size key
    First, you will need to set up the planning calendar.
    Menu path: Production -> MRP -> Master Data -> Planning Calendar (MD25)
    You will then need to use this planning calendar (the one you created) in the material master when planning your raw materials (MRP2 View in 4.6C - Field name : Planning Calendar).
    1. When you maintain the planning calendar you will need to enter a valid from date and valid to date.
    2. Your periods will also need to be set up and they will be weekly, for example:
        From Date : 11/23/2001    To Date : 11/29/2001   (11/23 is a Friday, this is your from date).
        Do this for as may weeks as you wish (say weekly for 2 years).
    3. When you have set up the planning calendar, you will then need to make some changes to the weekly lot size configuration
        (WB), or you may need to create a new lot size key if you do not want to change 'WB'. Essentially, you will need to use the
        following in the lot size configuration (OMI4) :
        No. of Periods : 1
        LotSizeProced.: P
        LotSize ind : K
        Scheduling : 1

  • Minimum Lot Size Ignored

    Hello All,
    To replicate scenario, I have created new material with minimum lot size 10 pcs and created independent requirement (LSF) and then created scheduling agreement.
    Independent requirements as 8 pc for every day.
    Now when I run the MRP and check in MD04, for the last requirement, planned order was raised for just 9 pcs, ignoring minimum order qty/minimum lot size functionality.
    Just for information, Lot size -EX, MRP type PD, Strategy group 10 (though these factor doesnot influence).
    Any more settings/customizing required?
    BR,
    Krishna

    Dear Krishna,
    I guess you must have activated the check box for Last Lot Exact for the Lot size - EX in T.code OMI4.
    If so means remove this and then check with new requirements and MRP run with planning mode - 3.
    Regards
    Mangalraj.S

  • Rounding value and Minimum lot size

    Hi all,
    Finish material is X and Raw material is Y.
    Bom- For Preparing Xu2019s 1 Qty, 1 Qty of Y is required 
    In Material Master of Y - Rounding value and minimum lot size is 10,
    Project needs 5Qty of X.
    When MD51 for Project execute u2026 PR of Y must be of 10 as per rounding value and minimum lot size, but it is creating PR of 5 qty.
    Above scenario working properly if I take MRP run with MD02 for material X for 10qty, after MRP PR of Y will be created for 10qty.
    With Regards,
    Ashish

    Dear,
    By default, the lot size works as lot-for-lot quantity in the make-to-order and project scenario.
    Go to OMI4 select your Lot size and define Lot Size: SOP  1 or 2Lot-for-lot with rounding. Better create new Lot size as ZX with these setting.
    If you always want lots to be created for the multiple of the rounding value, you must specify a minimum a multiple of the rounding value.
    Example: minimum lot size: 10 and rounding 10.
    Please try and come back.
    Regards,
    R.Brahmankar

  • Daily lot size not working for more than 5 days grouping

    Dear All,
    I want to create the procurement proposal for 6 days once. So I have created new lot size ZB by copying TB and maintained no of periods as 6.
    Assigned the lot size in Material master. After MRP run, the procurement proposal created for every two weeks on Monday. It is not created as expected (6 days once). Is there any other settings needs to be maintained to achieve the requirement?. The same problem happening for the no of periods 7,8,9 also with daily lot size.
    I don't want to use the planning calendar for this. Daily lot size is working only upto no of periods as 5.
    Could you please someone explain the standard functionality of daily lot size with combination of no of periods?
    Thanks in advance.
    Regards,
    Ganesh

    Ganesh,
    Check if your lot size is something similar to screenshot below. It is important that you have lot sizing procedure as 'Period lot size' and period as 'Daily lot size'
    With the above lot size (number of period as 8 days) I can see expected results.
    Regards,
    Himanshu

  • Lot size data

    I have a maximum lot size for my procurement parts. If my requirements for a day are higher than this quantity I want to have a supply with my maximum quantity for this date and the other quantity on the next days. Not at the same day.
    The system creates splitted deliveries for the same day.
    Which settings are necessary?
    Thank you for suggestions.

    Hi,
    Use Lot size EX - Lot for lot order qty and assign max lot size in MRP1 view.
    In MRP 2 view assign TAKT time 1 day.
    So when MRP run system will generate procurement proposal for the required qty if it is less than max lot size.
    If the requirement qty is more than max lot size system will split the qty & generate one more procurement proposal for the next day.
    Regards,
    Dharma

  • Weekly lot size configure

    How can i configure the weekly lot size which should plan the matrilal in the week days not at the start of the week .
    as per my knowledge if it is weekly then As standard the system tries to schedule the receipts for the first requirements date in a period for the weekly lot size (WB).
    for WB (weekly lot size ) it will not accept the other lot size  in the customization.
    Plz let me know
    Regards
    piyush

    Hello sir  ,
    Thanks for the reply ,
    The requirement is a new lot size like WB, but the End of planning time fence (10days ) should not be rounded to the start of next week.
    actually our client wants to use the Planning time fence 10 days  & total replinishment time 10 days for the material & that should consider in the planning the material  & in the MD04 screen also it should look with the same date .
    i have mentain the planning time fencce 10 & total replinishment type 10 days but when i see the md04 it is showing the differant dates to me
    example from todays date for
    todays date 31.04.2009 (5 day working as per the factory calendar)
    19.04.10 -- end of time fence
    If i want "End of planning time fence" date is same like "End replenishment lead time.
    14.04.10 -- end of replinishment time
    14.04.10 -- end of time fence
    how i will achive this .
    I have used the material with firming type but i am not able to see the the replinishment time in the MDo4 as mrp element as a .
    please provide me a details .
    Thanks in advance
    regards
    piyush
    Edited by: PiyushY on Mar 31, 2010 4:25 PM

  • Lot Size OMI4

    Hi Team,
    Can anyone guide me to understand the importance of the below highlighted fields in OMI4 with some exmaple? I am reading the F4 help but i can not understand it.
    Thanks

    Hi Sugan,
    If the help is not enough, I recommend to make an individual test in your sandbox to understand what is the meaning of each parameter.
    For example, you ask about the meaning of Last lot exact. This is what the help says:
    Controls whether the last lot is planned exactly in the whole plannning
    horizon, and not according to the settings for the lot-sizing procedure or for
    the rounding value/rounding profile.
    When you select this field, the quantity available is zero at the end of the
    net requirements segment and the gross requirements planning segment in the MRP
    list and the stock/requirements list.
    This means that you only procure what is needed. This avoids remaining stocks
    and, when applicable, high scrapping costs, but the remaining requirements are
    covered by the last lot. This is useful for discontinued materials.
    So this what you can do if you want to understand the help. Imagine that you have a code with minimum lot size and rounding equal to 500 CS.
    This is the MRP result using lot size MB:
    As you can see at the end of the product life (once there is no more demand, you will see that you have a remaining quantity.. cause because you had monthly lot size and rounding qty = 500 CS.
    Imagine that you copy lot size MB in a new lot size Z2, but you flag the parameter: "Last lot exact". So the only difference between MB and Z2 will be the Last lot exact flag. You run the MRP and this is the result using Z2:
    Note that there is no remaining qty. So as is mentioned in the help, this helps to avoid remaining quantities at the end of the product life.
    You can follow the same approach to understand each of the other fields if the help is not enough.
    Thanks and Regards,
    Mariano

  • MRP Settings - Minimum Lot size / Saftey stock /Lot Size

    Hi
    I am confused about some of the settings , We set M1(Monthly lot size ) and PD MRP type settings, We maintained the Minimum lot size as 2500 lb and the safety stock as 300.
    I tested by changing the Parameters , I am confused.
    Please clarify me
    Did MRP is going to suggest the PR once if the stock went below 300 ?
    Did MRP is going to wait for the PIR to get accumulate the Minimum lot size settings ?
    What will happend if the time bound is beyond a month ?
    Please help me to understand the concept
    Thanks
    JJ

    Hi,
      Use tcode OWD1 to create rounding profile.
    Select create icon for creating new rounding profile.
    Input new profile name.
    In that Threshold value & Rounding value is available.
    Input your value & save.
    In MRP1 view give the input of rounding profile.
    Example given below for easy understanding.
    Threshold value  Rounding value
        1- 20 -
    >                20
      60- 100 -
    >              100
      900-1000 -
    >           1000
      8000-10000 -
    >     10000
    If your requirement is 7, it will convert to 20.
    If your requirement is 23, it will convert to 40.
    If your requirement is 76, it will convert to 100.
    If your requirement is 435, it will convert to 440.
    If your requirement is 844, it will convert to 860.
    If your requirement is 910, it will convert to 1000.
    If your requirement is 8045, it will convert to 10000.
    Hope it will helps you.
    Regards,
    Dharma

  • MRP Type P1 & Lot size PK

    Dear All,
    This is REM scenario,
    Client is going scheduling agreements
    material master Settings
    MRP Type - P1
    Planning time fence - 10
    Lot Size - PK
    Procurement type - F
    GR Processing time - 2 days, No plad delevery time maintained.
    in planning calendar we are going with only one day as Friday
    and we made previous day is working day if friday is holiday.
    After MRP system is proposing dates for schedule lines as
    16/06/2010 ( wednesday ) Rescheduling date as 07/06/2010 ( Monday ) ( Rescheduling in i.e 10 )
    How system is proposing this dates
    Please share your views or if required more info then revert back
    i cannot upload Docs as my company policy is not allowing
    Regards
    Madhu

    Hi ,
    Bring process forward (reschedule in)
    Within this rescheduling horizon, the net requirements calculation checks whether, after a requirement, a firmed receipt exists, which can be used to cover this requirement. Then the system displays a rescheduling date as well as the exception message Bring process forward for this receipt. The net requirements calculation then uses this receipt and the system will only create another procurement proposal if the receipt quantity is not sufficient to cover the complete requirement. Several firmed receipts can be used to cover one requirement.
    It does not take in to account the GR processing time and it is purely based on the stock requirement date , parameters in Procurement and Scheduling in the Material Master
    So it will consume the requirement  backward scheduling and bring the Process forward.
    Kumar which  strategy are you using ?  scheduling agreement is of weekly , daily or monthly bucket ?
    How many days SA bring to Production and How many days SA for forecast you are doing ?
    Are you using any Program to convert these SA in to PIR and upload ( using any program ) .
    Regards,
    Jayavimal
    Edited by: jaya vimal on Jun 16, 2010 1:33 PM