Hi,
Anyone know where to find new materials for the 3D toolkit? How does one create a new material? I need a realistic looking stainless steel and something that looks like nickel plated metal. Some good brass would be nice, too. None of these are included in the materials (.rhm files) that ship with AC3D.
Thanks,
JEff

The materials listed in the tab in 3D toolkit are in a folder under the location where you installed Acrobat 3D.
By default the path is:
C:\Program Files\Adobe\Acrobat 7.0\Acrobat\3D Toolkit\Materials\
To create a new preset material I usually just copy and paste an existing one and then rename it to what I want it to be.
Then when you select it, the main screen will display a sphere textured with that material. In the "Scene Tree" panel expand the Materials folder. This will list the internal materials to the .rhm file. Rename the material listed there to what you want and then double click on it. That will open the material properties dialog which allows you to change all of its properties.
Grayson

Similar Messages

  • BX initialization for new materials

    Hi,
    I have a question on 0ic_c03 cube.
    According to the doc 'How to Handle Inventory managemnet Scenarios in BW', we have done all the procedures for Bx initialization, BF/UM history data load, and BF/UM delta load every day. so now the question is: for the new materials which are come in later than the date of the BX initialization, do we still need to do the BX init for them, and yes - then how can we do it; if no - why?
    Please advice,
    Ping

    The init bx and BF/UM history data loading for our BWP(BW production system) was done in 2004 by my ex-colleague who already left our company; so I am not very sure exactly whether he followed the procedure in How to handle Inventory management PDF...
    But we have refreshed the DEV(R/3 development system) with a copy of PRD(R/3 production system) in Feb, and I have deleted all the data in BWD, and loaded the copy of PRD data to BWD system in mid of Feb, followed the procedures in PDF. and this morning I have checked the materials in BWD system, the KFs are all matched to DEV(R/3).
    While in the meantime, in BWP system the '0totalstck' and '0valstckval' for the same Matrials not matched in PRD system(r/3); but '0isstotstck' and '0rectotstck' are matched.
    according to your advice, this problem in BWP system caused by th compression of BX, BF and UM init and history data laoding. But my question is:
    1, now, Is there a way for me to track back what kind of compression optionin tab Collapse(with mark Update or without Marker update) he used when he did the BX/BF/UM init loading in 2004?
    2, Now there are lots of production delta loading in BWP system since 2004, and if I want to correct the compression issue, is it ok for me to just follow your steps in your previous mail, and <b>redo</b> the compress for BX/BF/UM with the correct compression option. will it affect our exiting production data?
    3, what else could be teh reason  caused this problem in BWP system, and what is teh best way for me to resolve it.
    Waiting for your feedback,
    Ping

  • New materials are installed for ps but 3D materials are not showing up??

    I installed and downloaded new materials for the 3D part in photoshop cs5 but the materials do not show up when I edit the 3d object. anyone know or encountered this problem before?
    Thank you
    gothamcrusader0101

    Hi,
    So you downloaded the Materials.zxp and used Extension Manager to install?
    Do you have any of the .p3m files here:
    Users/user/Library/Application Support/Adobe/Adobe Photoshop CS5/Presets/Materials
    or /Applications/Adobe Photoshop CS5/Presets/Materials
    If not, that's where they should be. We've seen the Extension Manager installation have various problems including silent failures. You can change the Materials.zxp extesion to .zip and then unzip to find the individual material files. Copy them manually over to the user directory.
    Now launch Ps and with a 3D layer selected and an existing material targeted, click the material picker icon and then go to the upper right flyout. From this menu you should be able to replace/append the previewed material samples. Hopefully this screen shot illustrates this OK.
    regards,
    steve

  • CIF new materials to APO

    Hi Guys
    Need your help in the following:
    I am CIFing new materials to APO and in General Selection options for Material, I wish to do a multiple selection based on a class. I works fine manually however I wish to save the classification value in the variant for background job.
    Can you please  suggest how to save the variant for Integration Model with Classification for Material
    Thanks in advance
    Rahul

    Hi Rahul,
    The existing filter criteria for materials, in CFM1 transaction may not serve your purpose.
    When generating an integration model the system determines whether entries exist in the MARC table
    (plant data for the material). I do not think the class/characteristics data will be available in MARC table.
    OSS note 369541 suggests modication to be able to transferring segments of the MARA table (general material data).  However, I note your point that, you want only additional filter criteria and do not want to transfer any additional fields to APO.
    Please check the function module  u201CCIF_MATERIAL_PRODUCT_MAPu201D if this can be useful for you.
    There is also a customer exit SAP R/3 customer exit: EXIT_SAPLCMAT_001 and  you may please check  this.
    Regards
    Datta

  • Goods reciept with new materials

    Hi MM Gurus
    Could you please explain the process how we process the purchase order  with a material and recieve other two materials which is processed by the vendor.
    My scenario is like this
    I have created a material and sent to the vendor where he will process the material and send me the two new materials and the weight should be equal in the both directions.
    Thanks,
    Sateesh.

    hi
    this is purely subcontracting process
    Subcontracting process --> Converting part X to Y :
    (Note: X is components (one or more than one material like raw materials, etc except finished product) & Because Y is finished product (which is produced by external vendor or sub contracting vendor)
    Follow the steps: for SC process
    -> We have to provide at least one component to the vendor.
    ->Components (X) given to vendor are listed in PO
    -> Components are determined via BOM (for creating BOM: t.code: CS01) or manually (directly you can maintain /explode the components) entered in PO
    -> Can be requested through PR & can be converted in PO / Scheduling agreement under Item Category" L "
    -> PO (t.code: ME21N) is placed on finished material (Y). Price is maintained in the Subcontracting Info record. (t.code: ME11)
    -> We issue goods to vendor to provide components to vendor (special stocks O) : t.code: ME2O  (here u can use mov type 541 also)
    -> GR is done for the finished good (Y). At the same time consumption of the component (X) is posted.
    -> And you can also trigger requirement through MRP
    Movement types used for the subcontracting process :
    -> Transfer posting from unrestricted use stock to the stock of material provided to vendor : 541+ O
    ->GR of finished product wrt Subcontract PO : 101 + O
    -> GI of the components consumed - 543 + O
    -> Byproduct posting : 544
    -> Transfer posting : plant to plant -one step: 301 + O
    Quality to unrestricted : 321 + O
    Hope this will clarifies you,
    regards
    kunal
    award if helpful
    Edited by: kunal ingale on Aug 11, 2008 11:45 AM

  • Report to check new materials assigned to a particular plant

    Hi,
    Can you please help me with this issue. I want to know about any report or transaction which can give me the list of the materials which are assigned to a particular plant for a given period of time. i.e. I like to know whenever any new material is assigned to our plant.
    Thanks in advance,
    Sachin

    However,
    If you are using storage location you can use the table MARD  "Tcode SE16"
    In this table you find the columns Material/Plant/Storage location/curent periode/ created on
    But you have to verify that all article are created at the storage location level

  • Using CSAI_BOM_MAINTAIN for adding new materials doesn't work

    Hi all,
    I'm trying to use CSAI_BOM_MAINTAIN to add / delete materials to an equipment parts list, but despite sy-subrc = 0 as result no materials are added to the list.
    I don't really know which arguments have to be passed to this fm, are there any suggestions? I've tried to get results with
    - equnr
    - stlty
    - stlan
    - werks
    - stlal
    - datuv
    - idnrk
    - matnr
    - stlal
    However, this still doesn't achieve what I want it to do...
    CSAI_BOM_READ / CSAI_BOM_DELETE work fine, also does CSAI_BOM_MAINTAIN work to create an empty list.
    Thanks in advance &
    best regards
    Tim

    Hi !
    I am seeking information on the FM CSAI_BOM_MAINTAIN, let me know if you found any reports or manual that you can use to solve my problem, I'm doing an ABAP program data loading of equipment materials list.
    Any information I can provide much you appreciate it.
    Thanks!
    Juan Eduardo Rios
    SAP ABAP Consultant
    Maracaibo, Venezuela

  • Report for New Materials

    Hi All,
    I need to create a report of materials created under the specified date range.
    Can you give me an idea about which table needs to use and how to sort that getting newly created materials.
    Thanks
    John K.

    Dear,
    Please check at : Material list creation date wise
    Regards,
    Syed Hussain.

  • Delete materials and add new materials for creating quotation

    Hi All,
       I am using BAPI_CUSTOMERQUOTATION_CHANGE for changing a quotation.
    i have 5 materials in an internal table i_matnr.
    M1
    M2
    M3
    M4
    M5.
    i have to delete the existing materials from the Quotation and insert all the five materials of i_matnr.
    How to achieve this.
    Any help will be deeply appreciated.
    Thanks,
    Ibrahim

    Hi
    To delete the existing items in quotation pass the item number and material in structure QUOTATION_ITEM_IN and set the update flag as 'D' to delete in structure QUOTATION_ITEM_INX.
    For quotation change u can also use  -- BAPI_QUOTATION_CHANGEBOS
    Regards,
    Raghu

  • R & D - Use of NEW materials for Laptop casings:

    I would like to suggest use of Carbon Fiber and/or Bamboo (fire preventive) !
    I should like to hear, if my idea has any appeal ?
    Regards,
    Leif S. Jakobsen
    E-Mail: [Personal Information Removed]

    Hallo Jim,
    I'm working on the NXT in a laboratory. I'm tring to make a different humen-robot interface and try out some different kinds of positioning systems. Very often my supervisor comes in the lab with gasts and shows al the project we are doing here. And also mine, and these gasts never laught at me.
    with kind regard,
    Andries

  • How to activate the new fields on material master(MM01/MM02/MM03) for existing Materials

    Hi,
    We have a requirement to add  some custom fields as a new tab in additional data option(Descriptions, Unit of measure, etc.) in Basic data of Material master (MM01/MM02/MM03). I have successfully added and these custom fields and they are not part of standard(MARA, MARC) but a custom table and the updates are also done in custom table.
    For new materials, I can see the new tab in additional data screens of basic data view and I could successfully create/change/display using MM01/MM02/MM03. However I cannot see the new tab/fields for existing materials in the system in all 3 tcodes (MM01/MM02/MM03). This is not a main view in material master so that I can extend it by MM01.
    Is there any setting or mass generation program I have top perform so that I can see and maintain these new fields for existing materials. Appreciate any leads or help on this.
    Thanks,
    Harry

    Hello Harry,
    Goto t.code SPRO ---> Display IMG --->  Logistics - General --> Material master --> Configuring the material master --> Create program for customized screens
    Use the above path and create the screen and assign it to the sequence using the below link as reference.
    **************** - Tips - Implementing screen exits for MM01/MM02/MM03
    Regards,
    Thanga

  • LSMW for extending materials to new set of plants

    Hello All,
    Our requirement is to extend some hundreds of materials to a set of few plants. Can this be done in LSMW? Or should BDC be used??
    Please elaborate on this.
    Regards
    Mahesh

    Hi Girish,
    How can I extend materials to a new plant and Sales Org.  through LSMW?
    I use the Standard Batch Object 0020, program RMDATIND for creating new Materials the first time (this qworks fine), but there is no option 'Extend to existing material'  or there is no field called Reference Material...
    Maybe it is because we use internal numbering of the new Materials that makes it unpossible to extend materials to existing material-numbers?
    Thank you, regards, Walter.

  • Creation of new product hierarchy and products in SAP CRM.

    Dear all,
    please help with resolving of following issue:
    In CRM system base hierarchies were replicated from R/3 system with materials. Current requirement is to create new materials in CRM directly (as standalone scenario). As far as I understand, I have to create new hierarchy with required list of set types in order to allow creation of products in CRM directly (product type = material). Can anybody describe changes in the system step by step, what should be changed and where?
    As a result I need to have a possibility to create products in CRM directly for sales scenario processing.
    Thank you in advance!

    Hi Jorge,
    thank you so much for your reply!
    Here what I tried to do:
    1. I created new category in hierarchy R3PRODSTYP, added 3 set types: COMM_PR_MAT, COMM_PR_SHTEXT, COMM_PR_UNIT as basic set types.
    2. In the SPRO - Cross-Application Components - SAP Product - Settings for Product Type - Number Assignment - Define Number Ranges for the Product Type "Material" I found my new product category is unassigned, so I assigned it to the "CRM Products" group.
    3. Farther I tried to create a new product for created category in CRM Web UI, but was not able to find it in the Base category search field. All categories correctly displayed from R3PRODSTYP, but my new category is absent. What can be the reason of category absence? Btw, it cannot be found even when I try to display whole hierarchy in Web UI, however, in SAP GUI, it can be seen via tcode comm_hierarchy.
    Here is the setup of hierarchies in the system:
    I have no idea how to check #3 "Ensure the hierarchy is assigned to CRM application".
    Can you please suggest, what should be changed in addition? Thank you!

  • How to do a clearance sale on a list of materials

    Hello,
    I got a request from our spare parts department that I'm not sure how to handle. They have a list of about 30 materials that they want to get rid of through a clearance sale. That is, they want to sell off all of the remaining stock of those materials at a discount. After the inventory is cleared, they want those parts to effectively become make-to-order parts, and they want to raise the price. So the parts are not being discontinued or obsoleted, just cleared from inventory.
    Does anyone have ideas on how we might configure this type of clearance sale? I looked into using promotions and sales deals, but they only seem to allow for sales based on a specified period, whereas we want the promotion to end based on when stock is depleted. I searched here and elsewhere for other ways of accomplishing this, but came up empty.
    Any help is greatly appreciated. BTW, we're on 4.6c.
    Regards,
    - Greg

    Good question. It doesn't look like there is a good option for clearance discount available (unless you're running Retail or are ready to invest in some additional "solution").
    Since it's only 30 materials, maybe the easiest way would be to create the new material records for them and move the stock to the new materials through inventory adjustment? This would affect the reporting but if you report by Product Hierarchy, that should still be good.
    I've noticed how in many stores when you buy a clearance item they actually have special barcodes on them. I.e. those are, essentially, not the "real" materials anymore.

  • Report generation toolkit (1.1.2) and 8.5

    I am not as crazy as I thought!
    I wrote a program today that collects data from excel reports in many directories using cell names and it worked well.  Unitl I saved it.  I had been saving the sub vi's, but when I went to close them I got a message about unsaved changes and I guess I clicked to save the changes today.  The program never worked the same again.  I would get errors like 41106 and 41110 at random (problems with excel not opening and other stuff).  I tried adding waits which slowed everything down and worked mostly.  But the only way to not drop data and get errors was to have a copy of excel open while getting my data.
      Well I just uninstalled/reinstalled the toolkit and rebuilt the vi that was having problems with the fresh install and everything is great again.  So my question is why does the toolkit have problems when I save it in 8.5?  The warning does say that the vi's are from 7.1 and I cant find any updates so I am hoping this is the latest version that came with my 8.5 suite.

    Hi Bryan,
    There should not be a problem with saving the VIs from the Report Generation toolkit in LabVIEW 8.5. I have checked the readme files to make sure but RGT 1.1.2 should work with any version of LabVIEW later than 7.0. However, the readme does discuss an specific upgrade issue. It says if you previously created VIs that use the built-in Report Generation VIs in LabVIEW Professional, Full, or Base packages or VIs from a previous version of the Report Generation Toolkit, installing the Report Generation Toolkit 1.1.2 might break the VIs you created. If the VIs you created contain any of the following VIs, edit them so they are compatible with the Report Generation Toolkit 1.1.2.
    Append Front Panel Image to Report VI—The Image Format input of the LabVIEW 6.1 version of this VI is a different enumerated type than the current toolkit version. Right-click the input and select Create»Control or Create»Constant from the shortcut menu to create a compatible control or constant.
    Append Table to Report VI—The connector pane position of the show grid lines input changed from the Report Generation Toolkit 1.0.1 version of the VI. Reconnect the original wire to the new input location.
    Get Report Settings VI—The cluster order of the font settings input changed from the Report Generation Toolkit 1.0.1 version of the VI. Right-click the output and select Create»Indicator from the shortcut menu to create a compatible indicator.
    Report Express VI—If a VI includes the LabVIEW built-in version of the Report Express VI on the block diagram, the VI breaks after you install the Report Generation Toolkit 1.1.2. Double-click the Report Express VI to launch its configuration dialog box, then click the OK button. Reconnect all wires to the Report Express VI.
    You might need to relink the following subVIs after installation because the connector panes changed in the Report Generation Toolkit 1.1.2. Right-click the VIs and select Relink to SubVI.
    New Report
    Dispose Report
    Append Front Panel Image to Report
    Append Hypertext Link Anchor to Report
    Append File to Report
    Append Horizontal Line to Report
    Set Report Font
    One thing that might have happened is if you had created the program in an earlier version of the toolkit, then saved it in the new version of the toolkit, maybe some of the upgrade issues regarding the VIs listed aboved cause LabVIEW to start giving you errors. Also, which version of excel are you using? After you re-did the VI program, have you tried to save it again and see if the same problem occurs?