New plan version - Copy from plan to plan

Hello,
I copied a new plan version X from plan version 0 with KP97. Now I realized that only planning primary costs were copied. Is it possible to copy also the secondary costs (resulting from assessments) to the new plan version. If not, is it possible to copy the plan assessment cycles from version 0 to version X. Or can the existing plan cycles (KSUB) can be used for both versions (hoever I could not find a selection field where I can choose the required plan version)?
Thank you in advance for your feedback.
Ali

Hi,
a plan assessment cycle contains CO-version information in its header date.
You can use KSU7 to copy a plan assessment cycle from version A to version B, just enter CO-version B in the header data of the copied cycle and ensure that in "sender values" the version is initial (thus the header data CO-version takes place).
BR Christian

Similar Messages

  • How to create a new view by copying from standard view in IC webclient?

    Hello, expert,
    I need to enhance a sap standard component (BP_Factsheet), inside it I need to create a new view by copying from an existing standard view (Acitivities). However when I try to make a copy, I was asked for destination BSP application, I entered the Z-Application which I used when defining enhancement for the component. After the copy, I don't see the new view.
    Then I tried the destination BP_factsheet, instead of the z-application, then after the copy, I can see the new view. However since it's in SAP application, it seems like it's a MOD, not enhancemnet, and inside the new view, the classes (for context, context nodes, etc.) are not in custom namespace (not starting with Z).
    So please let me know how can I make a copy of sap standar view in custom namespace.
    Thanks in advance.
    Jayson

    When copying you can put any BSP name..normally the practice is to prefix the standard name with a Z.
    Secondly when you want to make changes to the individual classes and methods you need to right click and say enhance. Then the AZ class names etc would be generated. The view should appear in the component wherein you copied the original view from.
    I hope this helps.
    The cookbook should have details on this. Otherwise also its quite intuitive.
    Award points if it helps.
    Thanks.

  • My playlist didn't show up on new laptop after copying from the old laptop

    What can I do when my playlists didn't show up on new laptop after copying from the old one?

    abombaci wrote:
    I just simply copy only the whole iTunes music folder to my external hard drive, that's it and it goes good. That way if you just copy the whole iTunes folder it also carries along with it all it's subfolders. If subfolders aren't carried over you may end up with a library with missing album arwork. Album artwork, iTunes media folder, itunes previous libraries, itunes XML folders etc., etc. You get the picture.
    Yes.
    This is much better way than changing the media folder location.
    Keep everything in the same iTunes folder.
    However, when I do it this simple way as compared to the Apple way it doesn't save my play counts or ratings.
    Since it is exactly the same library, everything should be the same.
    Then just go to external drive click on iTunes folder and then in iTunes add folder to library and all your songs load up. This isn't moving the library but just backing it up.
    You don't need to add anything.
    Hold Option and launch iTunes.
    Select Choose library... and select the iTunes folder you copied to the external.
    You can delete then /Music/iTunes/ folder as this same folder was copied to the external and this is now your iTunes library.
    You can also do this top make a backup of the iTunes library (thoug you should be making a backup (Time Machine or some other backup program) of yoru entire computer.

  • New Layer Via Copy from Extension

    Hello everybody,
    I'm trying to create a new layer using the Layer > New > Layer Via Copy functionality... and I did scan the code using the Scripting Plug-in with this result:
    var idCpTL = charIDToTypeID( "CpTL" );
    executeAction( idCpTL, undefined, DialogModes.NO );
    Then I did convert it to:
    var application:com.adobe.photoshop.Application = Photoshop.app;
    var idCpTL:Number = application.charIDToTypeID( "CpTL" );
    application.executeAction( idCpTL, undefined, DialogModes.NO );
    But this code raises this exception:
    Error: NULL pointer was encountered
              at flash.external::HostObject/__call()
              at com.adobe.csawlib::CSHostObject/hostCall()
              at com.adobe.photoshop::Application/executeAction()
    I've tried to change "undefined" for "null" or any other idea... but with no luck. What am I doing wrong here?
    Thanks a lot!

    Reselect is way too flaky to rely on, and is not going to survive long at the best of times.  I find the whole saving selections thing too time consuming and an annoying interruption of workflow — even if you right click and save an alpha channel.  So I nearly always copy the selected pixels to a new layer, because it works on so many levels.  You can ctrl click the layer to reload the selection; use layer styles, create shadows under the layer…
    Best practice is to add the Alt (Opt) key to Ctrl j so you remember to name it.

  • COPA -Copy Plan version 1 from Plan version 2 in KEPM

    Hi,
    In KEPM transaction code,I have planned for version 1.Now i wanted to copy the data from version 1 to version 2.what proceedure should i follow for this.kindly help me
    Thanks
    Kishore

    create a new planning package with characteristic Version = 2
    (if you have defined verison 1 also on the planning level, you should create a new planning level)
    then create a planning method under Copy with version 0 as source...
    cheers
    matej

  • Issue in PS Cash Management Planned payment coming from SD billing plan

    Issue in PS Cash Management:
    Coming from my sales order (SD billing plan), I get cash management lines item in PS ==> table COFP (Document Lines (project cash management)) with value type 62 (Planned Payments).
    Then I invoice the WBS element with VF01. During invoicing, the system creates new line items in COFP with value type 54 (Invoices).
    Issue
    The problem is that planned payment (value type 62) is not reduced and whatever the invoice is, planned payment are the same.
    From my understanding, new lines item should have been created with negative sign in order to reduce planned payment amount. Like invoices are reduce when payment is done.
    Who can you confirm?
    What are your feeling?
    Thanks in advance

    Helo,
    Regular setting for PS cash management have been done such as:
    - FM area creation
    - Assignment Fiscal Year variant to FM area
    - Activate PS cash management
    Once the setting is correctly done, we can follow incoming & outcoming payment on project.
    Table COFP is then impacted.
    B/R

  • New Development system copy from Production

    Hi All,
    Hope you can help me out here with some ideas.
    We are currently planning to implement a new SAP BW Development system, and for this we would like to make it a 1:1 copy of our current production system. Meaning all from customizing, ABAP, workbench objects etc.
    But what we do not want is all the transaction and master data in infoobject, cubes etc., we are only interested in the structure and objects. Therefore we can rule out "System copy".
    My question is then, is there any other ways to do this when system copy is a no go? I know we can do client copy but then we will not get all the workbench / ABAP programs which we need.
    Any ideas on how to do this?
    Thx. in Advance

    Hi Rasmus,
    But what we do not want is all the transaction and master data in infoobject, cubes etc., we are only interested in the structure and objects. Therefore we can rule out "System copy".
    Options 1: As BI objects are cross client , copying client will not solve your purpose 100%.
                    You can perform system copy and then clean up data in DEV
    Option 2: You can create a new Development and then create TRs for required configuration objects and move to new development system.
    Option 3: Use SLO tools to perform container copy without any data.
    Hope this helps.
    Regards,
    Deepak Kori

  • Hyper-V 2012 R2 creating a new vhdx and copying from a source vhdx will physical file size reduce?

    Hi,
    I'm running Hyper-V 2012 R2 as part of Server 2012 Essentials.
    As seems common from other threads I've read I have created an expanding VHDX with a maximum size too large (almost the same size as the physical disc it lives on). Although there is only around 350GB of data in the VHDX, the actual file size is approaching
    900GB on the host.
    I'm using the "Add New Virtual Disk" wizard to make a new VHDX to replace this massive file. I want the contents of the old VHDX to be copied to the new one so in the add disk wizard I selected the option to copy the contents of my new disk from
    the original.
    So my question is: the source VHDX is 900GB, the data inside the is around 350GB. What size is my new VHDX likely to be? Is it likely to reduce to nearer the actual data size?
    I'm asking because I'm currently running this operation to an external USB drive and it's painfully slow - going to take hours to complete. If the size isn't going to reduce I may as well cancel it and look for a better option.
    Any comments appreciated.
    David

    I am assuming that you are using dynamic virtual disks for your VHDX (they can be dynamic or fixed).
    And, it is usually some type of transaction, backup agent, of the like that causes this type of behavior.  Some action that requires a cache on disk that is later deleted.
    There is a shrink action that can be done, but that will not optimize fully.
    The way to fully optimize is to mount the old virtual disk and create a new virtual disk and mount it, and then copy the contents from one to the other.  This lays the files out in a nice orderly way, without anything being written to the end of the
    virtual disk causing it to expand strangely.
    Over time, if you are still using the backup agent (for example) that got you into this situation, you will be there again.
    Brian Ehlert
    http://ITProctology.blogspot.com
    Learn. Apply. Repeat.

  • New to Mac - Copy from External HDD is Hung

    Hi folks,
    Newbie to Mac here. I am trying to manually copy files from an external HDD. I've been selecting folders to copy into a finder window. I have most of the files copied but the system has hung up on a particular folder. It quit copying about halfway through a 10GB folder full of photos. I selected the Stop Copying button and now the copy window is hung and I can't close it. Apparently I can't force quit Finder. Also, I can't restart the computer with the copy window hung up.
    On a PC I would just hold down the power button to force a shut down and then re-start. Should I do the same with my Mac?
    Also, any suggestions on what I should look for when trying to diagnose the cause of the copy being hung up? Any special characters that OS X doesn't like?
    Thanks in advance!
    Nick

    OPTION-click and hold the Finder's Dock icon and select Relaunch, force quits the Finder. As for the file hang, most likely a corrupted file. Launch Disk Utility, select the ext HD, and repair the disk to ensure it isn't a hardware issue. If the hang continues, then you'll have to find out which file(s) are corrupt. You do that by selecting half, try to copy, and then try the other half, repeating until track down the culprit(s). There's no easy way.
    Once you sort out this issue, see:
    Switching from Windows to Mac OS X,
    Basic Tutorials on using a Mac,
    Mac 101: Mac Essentials,
    Mac OS X keyboard shortcuts,
    Anatomy of a Mac,
    MacTips, and
    Switching to the Mac: The Missing Manual, Snow Leopard Edition.
    Additionally, *Texas Mac Man* recommends:
    Quick Assist,
    Welcome to the Switch To A Mac Guides,
    Take Control E-books, and
    A guide for switching to a Mac.

  • Options to maintain persons in active plan version from a current plan vers

    Hi,
    We have two plan  version currently in use. Plan version 01 in the current status and plan version ZZ in the active status. Few employees are still with the current plan version and are active in the system.
    Can anyone guide me how  to maintain the Persons that are still with Plan Version 01 and active in the system ?
    Because we need to somehow maintain them also with ZZ otherwise our Ugraded  system wil not show all reports correctly...This would be considered as Masterdata correction....
    I mean how to move the persons from the plan version 01 to active plan version ZZ and how there relationships will be maintained.
    Edited by: deepti saxena on Sep 19, 2008 8:49 AM

    Hi sikindar,
        Thanks for the quick reply. I executed transacn PP01 . I entered the emp id . but when i select the infotype relationship and try to maintain or dispaly it; it takes me to either PA20 or PA30 screen.
    Please guide me how to change the plan version of the employees.
    Thanks
    deepti

  • Copy PO with Invoice Plan

    Hi guys,
    is there any function or way to copy a PO with Invoicing Plan?
    If I try to create a new PO by copying from an existing one, everything is copied unless the Invoice Plan.
    Who can help me?
    Thanks.
    Fabio

    Hi,
    An Enhancement is required in PO, whereby we can should explore the possibility to use two custom buttons, one at PO line item level for copying the Invoicing Plan from the current PO line item to any other desired PO line item, and other button at the PO header level for copying the Invoicing Plan from the current PO line item to all the PO line items. This requirement will be possible if we get a Screen exit to create some custom sub-screens & add these buttons in that sub-screen to meet our Business requirement, the logic for which can be coded in the Screen Exit. For meeting this requirement, there is a Screen Exit in the below enhancement from T-Code SMOD 
    Enhancement: MM06E005 - Customer fields in purchasing document
    Screen Exit: SAPLXM06. For more clarity refer the below link. I hope it will resolve your issue. Thanking you.
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/100675db-2464-2e10-319c-fb9f37c41abe?quicklink=index&overridelayout=true

  • Plan Version

    Hi All,
    Can you please explain the concept and use of Plan Version.
    Regards,
    Chinmay

    Identifies the organizational plan you are currently working with by providing a short description of the plan.  from F1
    go to oopv transaction and create the different plan version
    2. then go to table T77S0 and set current plan version to plogi plogi
    3. go to transaction ppom_old here in settings you can choose current plan or any other plan.
    4. if you want to copy exsisting org structure to other plan version see the report: RE_RHCOPL00
    Plan Version Contains a one or two alphanumeric key which differentiates between
    scenarions in you organizational plan.
    Organizational Management allows you to manage scenarios in parallel in
    various plan versions.
    It basically defines which  plan of the org structure to use.Suppose if want one current org structure (say A)and one org structure for future( say B) after 2 years,then we take 01 ie current plan as assign to the org structure A and assign 02 to org structure B.This will say that A is the current plan and if want an alternative plan its B. Hope i am clear
    Edited by: Sikindar on May 2, 2009 11:28 AM

  • Plan versions

    Hi ,
    I have an issue in creating plan versions.
    When I create new plan version and go to activate it then I get a message "If you change the active plan version, you must ensure that all of the objects from the Customizing plan version '.:' are activated in the active plan version.
    To do this, start report RHWFACTI "
    Can any body throw light on what this message mean please.
    And when I go to create new org unit then the plan version which I created should come automatically but its not coming. What may be the problem?
    Any help would be fine.
    Thanks in advance,
    Shanti geera

    Hi Kapil,
       I tried to create plan version and when I go to save it then again  I am getting the old message
    " when the active plan version is changed PD objects should be activated"
    and then when I  activate the plan version in table T77SO along  with PLOGI PLOGI  and when I go to create org units in t code PO10  screen then my plan version which I have activated is not appearing automatically, I need to change it manually.
    Actually when we create and activate our plan versions the screen of maintain plan version i.e, OOPV should have tick mark in both active and current boxes for our present PV. But only active box is ticked but not current box.
    Why is this happening?
    I even checked in table V_T77SOSC there PLOGI PLOGI CURRENT PLAN which I activated is appearing,
    but in tcode OOPV my plan version is marked as active but not marked as current. Where as it should be marked as ticked in active and current boxes right.
    I think you are getting what I have wriiten..
    What may be wrong?
    Can you just check this and tell me what is the mistake I am doing here please
    Regards,
    Shanti

  • Update DSO with planning function independently from saving data in realtim

    Dear all,
    I have an realtime cube which will be loaded via planning function and/or data entry queries.
    In order to track the entries, I store all companies with status in a DSO objects, by using a planning fuction which calls a function module and inserts entries in the DSO table. The planning function will be start by clicking a button in a web application.
    For example: A company enters data. The value will be stored in the realtime cube and the DSO entry will be created with company xyz and status 1.
    Sometime it is necessary to create a status entry in the DSO without entering data in the realtime cube. (  In order to provide an other department to enter data in during status 1).
    In this case the planning function which calls the function module in order to insert entries in DSO is not working because there is no data exchange with the realtime cube.
    How can I change DSO entries independently from writing data in a realtime cube or not.
    Any help would be great.
    Best regards,
    Stefan from Munich/Germany

    Hello Marcel,
    i have one planning function which copies data from one version to another within the cube and another planning function (type fox) which calls up an ABAP function module in order to update my status DSO. see below:
    DATA FISCYEAR TYPE 0FISCYEAR.
    DATA COMPANY TYPE ZMCOMPANY.
    FISCYEAR = OBJV( ).
    COMPANY = OBJV( ).
    CALL FUNCTION Z_FM_SEND_FOR_APP_PLAN_C01
    EXPORTING
    I_COMPANY = COMPANY
    I_FISCYEAR = FISCYEAR.
    normal way:
    User enters data via query and sends data to headquarters (1. planning functions copy from version 1 to 2 and second planning functions changes status in DSO from 1 to 2.) This works.
    not normal way, but somethis necessary:
    User does not malke any entries, and headquarters wants to change the status via an own web application. In this case the first planning function runs, but no data were copied because there are no entries. So far thats ok, but at least the second pölanning function should run and change the status in the DSO from 1 to 2. And exacltly this is not working. I suppose that the reason is, that there are no data in the cube.
    Any ideas would be great.
    Best regards,
    Stefan from Munich/Germnay

  • Tcode KEFC and message:"Plan version is not supported"

    Hello all,
    Please is someone aware of solution for this situation:
    - I upload with tcode KEFC forecast datas from excel file in CO-PA
    - receiver records are created with errors
    - when I check for the errors system tells me that "Plan version is not supported, diagnosis : Plan version "0" has not been created in operating concern "1000", Procedure: Transfer version "0" to operating concern "1000" and maintain the attrributes for that version"
    - my concern is that when I check in customizing Planning, Initial Step: display view settings in operating concern details the version "0" is existingin the operati,ng concern "1000"
    So do you have a solution for this issue?
    Thanks and best regards
    JCO

    Hi Sudhakar,
    Thanks for answer but version "0" is tickled for Plan Actual, WIP and variance and I don't understand what to do about KEPM.
    Best regards
    JCO

Maybe you are looking for

  • Cannot print to hp c7180 all-in-one using eprint from my ipad2

    Just installed hp eprint on my iPad 2 and when I try to print eprint finds a number of printers but not the one on my home network which is a hp photos art c7180 all-in-one. This question was solved. View Solution.

  • Adobe flash player for xbox?

    is there a adobe flash player for xbox?

  • BT Cloud - images not displaying in BT Cloud View

    I have had an issue several times now with image thumbnails not displaying in BT Cloud View. All I get is a green or grey icon/tile. It is not all the images - just some of them - and they will open OK and display in a photo viewer. Images display OK

  • Saving Images to memory

    I have a PCI 1408 card. My labview program is supposed to capture images when triggered. How do i store the images to the computer memory and called it back when i need it? other then using the buffer LL ?

  • Need to keep Premiere Pro open while Encore transcoding?

    So I used the Dynamic Link function to export my project from Premiere Pro CS5 to Encore and started building a Blu Ray disc. Do I need to keep Premiere Pro open while Encore is transcoding? Task Manager says Premiere is still using 20-40% CPU so I a