New Plant creation - Urgent

Hi all,
I have created a new plant 5500 and did all required changes in SPRO. I have created a sample material and tested mm configurations by creating its PR. while saving the PR, system throws an error that
"Account assignment mandatory for material VS_TEST_1 (enter acc. ***. cat.)". when i enter any thing in account assignment, this error resolves and system asks me a gl account.
we have also other plants in the system and no other material for other plants asks for account assignment category. What configurations should I do so that system does not ask for any account assignment??
Please respond.
Regards,
AI

Hi,
use t.Code: OMS2 and select ur mat. type and click quantity /value updating TAB, system will take to new screen and now for your new plant select check box of quantity & value updating  and save.
Now try creating PR.
Regards,
Biju K

Similar Messages

  • Error in new plant creation

    Hi,
    I have created one new plant by copying a standard plant. I copied this plant by coping all the tables from standard plant only. While creating PR for that new plant  I am getting the following error u201C Valuation Area not definedu201D.  Here the valuation area is maintained at plant level only. If I check in Account determination(Table T001k) the valuation area for that new plant not updated.
    If I check plant tables getting error " Error in foreign key dependencies.
    How to solve this issue? If any one face this kind of issue please let me know.

    Hi,
    Please check at spro log- mm valuation, wheather the plant is defined as valuation area or the company code.
    if not please aagain copy the tables to the plant by copying function and check.
    Regards,

  • STO settings related to new plant creation

    Hi,
    Please help in understanding the (STO Configuration settings covering all possible scenarios in STO) when we have a new plant to be created in the existing system.
    Regards

    Please avoid asking like this.  Please go through the forum rules before posting, where it has been very clearly mentioned that before posting any query in SCN, you should search in SCN or Google, to find out whether the topic has already been discussed. 
    For information, this topic (STO configuration) has been discussed many times and you can very well take the inputs from there.
    G. Lakshmipathi

  • FI requirements for new plant creation

    Dear all,
    My cusomer wants to extend the plants from one company code to another company code.
    Regarding this, Can any one let me know the requirements need to be done from the FI perspective including all settings and assignments.
    Points will be awarded for ur information.
    Regards,
    Manu.

    Hi Manoj,
    I don't think there is anything to do with FI perspctive. But if there is any validation with that plant you have to change those thing e.g. business area.
    If you find teh answer is useful to you please assign the points.
    Regards,
    Reva

  • New Lot Creation - Urgent

    Hi all,
    I have an issue to discuss. I have some stock that has not been entered into the system and that stock is free of cost. I want a quality inspection for this stock. How can i do a quality inspection of this stock without raising a PO??
    I know we can enter the stock in quality inspection in the system using movement type 563 in MB1B. But how a lot can be created for this stock in qa32 so that quality inspection and finance check can be done?
    Please respond.
    Regards,
    AI

    Hi Al,
    One option is to create a free of charge PO and refering to this PO you can receive the goods in transaction MIGO. You can set the QI stock type wether in your PO or in MIGO.
    I'm not sure you can receive goods via transaction MB1B...(maybe MB1C but FOC PO is better I think)
    BR
    Csaba

  • Abap dev for new plant

    Dear all,
    We acquired new plant, and we are inegrating that new plant which is not in sap, into our sap system.
    and lots of customizations have to be done.
    I understand that on the mm front new plants creation, assignments to cocode, BA etc happen.
    I am quite sure about abap front.
    What developemnts would be needed on abap front:
    like extension of all teh materials to the new plant.  I think this can be handled through LSMW.
    what else abap developments do i expect.

    This will depend on, when and where the data related with plant is required.
    As per my understanding the ABAP development which summarize the data at plant level will be impacted.
    In case , you have hardcoded values on the basis of plant , then you have to consider the new plant also.
    Get all the Z reports related with plant information and check. Its will be easy if you view the modification log and naming convertion.Hope it help you.

  • Sdconfigeration for new plant

    Hello All
    My client has purchased new plant ,which is not having SAP.Now he wants operations for this plant to be done in SAP, as SAP is available with client.
    Pls let me know what all the confirgeration has to done from SD perspective for the new plant creation.
    Thanks a lot in advance.
    Regards
    T.Srikanth

    Dear Srikanth,
    -->First you need to define the Plant with MM people in the IMG through this path
    SPRO>IMG>Enterprise structure>Definition>Logistics General-->Define, copy, delete, check plant
    -->Plant need to be assigned to the existing company code
    SPRO>IMG>Enterprise structure>Assignment>Logistics General-->Assign plant to company code.
    -->As SD consultant you need to assign the new plant to the existing sales organisation and distribution channel.
    SPRO>IMG>Enterprise structure>Assignment>Sales and Distribution-->Assign sales organization - distribution channel - plant.
    -->Maintain the shipping point determination for the new plant through OVL2 transaction.
    -->You need to extend the material to the new plant if you want to do the activities from the new plant with already existing material.
    -->If your business involved Excise process then you need to the CIN related settings to your new plant.
    SPRO>IMG>Logistics general>Tax on goods movements>India-->Basic settings.
    I hope this will help you,
    Regards,
    Murali.

  • Manual for creation of new Plant in SAP

    Hi Members,
    I need to test in quality finance related activities, creation of Profit center, Cost center, Standard Heirarchy, etc.. Does anyone help me with the manual for role of Finance guy in creation of new Plant..
    Rgrds,
    Ravi

    Hi Ravi,
    Please find the below link for steps to create plant with screens.
    http://www.saponlinetutorials.com/how-to-create-plant-in-sap-mm-define-plant/
    BR, Srinivas Salpala

  • Creation of a new plant

    Hi Gurus,
    While creating a new plant in real time, is advisable to copy a standard plant or define a new plant ? Please give reasons.
    When a plant is copied what are the various parameters that are copied to the target plant ?
    Thanks & regards,
    Surender

    Surender,
    SAP recommends creation of plant by copying. Generally when a new plant is created it should be copied from any of the existing plant which functions similar to the new plant.
    The reason for this is when creating we may miss to update all the required configuration and all the configuration tables with links would not get updated. This also reduces time of setting plant as you need to just change/add configuration where ever required in the new plant.
    But if you are a fresher trying to test in your test system... create it in create method so that you will understand in the hardway as what all needs to be configured, it will be a good learning which you will not forget. Please dont try this when you are working with a client system as this make give you lot of trouble and need lot time to resolve issues.
    Regards,
    Prasobh
    Regards,
    Prasobh

  • Creation of new plant and the impact of business

    Hi to all
    i am creating a new plant, and would like to know the impact of the plant, what are the changes to be made in the customization, i want to know what are the chages required, and let me know after unit testing and integration testing what activity to be performed, as i am at go live stage and in the production client how to extended the master data,  what is data migration how it can be done,
    thanking you

    Hi there,
    As an SD consultant, these are the things you need to take care.
    Assign the plant to the company code in OX18.
    You need to assign the new plant to the sales org / distribution channel in OVX6.
    Then assign the shipping point to plant in OVXC. If WH is active for your plant, then assign warehouse WH to plant & storage location in LE assignment.
    Reg the master data, you need to assign the material master to the new plant. Also maintain the MRP profiles, plant specific data in the MM01.
    Maintain the shipping point determination in OVL2 & storage loc determination in OVL3 (OVL3 if required)
    Check with MM, PP & FI if they need to maintain any plant specific configs. There are some configs from their end for sure. For eg for production orders, purchase orders, movement types etc.
    Reg the testing, you need to ensure that plant gets proposed automatically when a new sales order is created. Also maintain the relevent plant specific condition records.
    Similarly when PGI is done, it should update the transfer postings in MM & FI w.r.t plant.
    Even tough your project is in final stages, you have to do a regrious testing when a new plant is created. Testing cannot be compromised for time lines. It will lead to serious production issues if tsting is not properly done.
    Regards,
    Sivanand

  • Creation of new Plant in productive system

    Dear All,
               I have to create 3 new plants. the system is already productive from the last one year.
    can anybody guide what will be the effects if i create new plants and send the transport to the production system.
    what need to be looked for side effects if any?
    pl give your valuable suggestions.
    Thanks and regards
    Ajay

    If you create new plants - there is no adverse effect but you have to make sure that the plant you create is copying by the existing.
    other things if you have any custom reports based on the plant then the new plant should be included, authorization needs to be consider if any basd on the plant,
    etc

  • Creation a new plant by copying

    Dear all,
    I working in a project where we need to merge on plant to a new company code.
    I believe that can be solve with Tcode EC02, which actually will copy all characteristics from that plant to the new one under a different company code, won't it?
    This basically means that also all the information related to procedures (like release procedure), Output types for inventory management, etc, etc will be copied, meaning that we wont have to do any new development?
    I assume we will still need to do some customizing like MRP Controllers and so on, or this transaction will also copy all tables?
    Thanks a lot in advance for your confirmation,
    Mario

    Hi Suraj,
    That basically means that unless we decide to create any new development/customizing everything will be exactly copy as from the original settings, am I correct?
    My question comes due to the project where I'm working now. Customer basically wants to close one company code and take everything to another Company Code, therefore we will need to replicate everything as it is now (Plants, SLocations, Controlling Areas, Sales Orgs, etc).
    My assumption is that when we create new plants with reference from the old one, also all values under tables will be copied, so we won't have to spend time in customizing, and we will be able to focus on other activities that may require customizing or more work.
    Could you please advice me on that point?
    Thanks a lot for yor time!

  • UD Issue in new plant - Urgent

    Hi all,
    I have created a new plant, business area and sales organization 5500. I am executing a test run. while performing a Usage decision in qa32, when i click to select the UD code, system says that :
    Selected set code does not exist, or data entered is incomplete
    Message no. QV 121
    Diagnosis
    Code in code group * (selected set Z01 in plant ) does not exist.
    Procedure
    Enter a valid combination or complete combination, or make sure that the combination is available in the selected set.
    What does this mean? Should I need to do any changes in SPRO ? If yes then where?
    Please respond,
    Regards,
    Aisha Ishrat

    It should be maintained in QS51.

  • Creating a new plant and its effects/changes required in FI/CO

    Hi Experts,
    My client is going to create a new plant in SAP so I would like to know as to what effects does it have in FI/CO.
    New plant is proposed to use functions FI, CO, SD, MM-WM and QM
    I am aware that it needs to be assigned to company code and certain account determination may change depending on the way transactions take place in new plant.
    Other than above, I would like to know if there are any specific points on which I need to concentrate and take care to ensure a smooth flow in FI/CO and no break up of existing system.
    Thanks,
    GAN

    HI,
    Below points you have to look.
    1.Assigning new plant to company code and then assignment of purchasing organization to plant.
    2.Vital steps:-Need to active your valuation area(new plant) in OMWD t.code with valuation grouping code.
    3.Maintain MRP Controller/Controllers
    4.Assign sales organization, – distribution channel – & new plant
    5.Active quantity & value updation for new plant for all material types
    6.Use LSMW or BDC with MMZ1 t.code for material ( old material or used material) uploading to new plant.
    7.All info record need to be created with LSMW
    8.Creation of any valuation types & MRP data
    9.For new plant Excise Reg. number need to be assigned in Maintaining Plant Settings(
    SPRO ->> Logistics general ->> tax on Goods Movements->>India ->>Basic setting ->> Maintain Plant Settings)

  • List of activities before closing a plant permanently- Urgent please

    <b></b>Dear MM Gurus
    i require your expert help in suggesting me a detailed action plan, here is my issue
    we are going to c<b>lose our plant </b>in 1 month and i would like to know w<b>hat are all the list of action points that we need to take care of from now on to finally we close,</b>
    so that we are left with zero unused stocks and all the open orders are all completed successfully, no excess, and so that this transition phase happens smoothly without any errors.from both MM/ WM/ PP/ QM and LE perspectives
    also we plan to replace this current plant we are closing with a new plant and what should we do if
    we need to copy all current plant config to new plant?
    <b>how to copy all the master data like material master, info records, SA's vendor masters etc over to the new plant-
    is there any standard mass upload tools for this activity or do we need to create custom programs or which do you suggest to advice considering the very short time i have, pls explain in detail??
    </b>
    your response will he rewarded as this is very urgent
    thanks in advance for your help and all your valuable responses are truly appreciated
    chakri

    Hi Chakri,
    In this situation we look for below areas in MM
    1) Closing stocks.
    2) Open PO's
    3) Pending Payments to vendors
    4) Sub-Contracting status.
    close all po's at cutoff date & take the closing stock of materials with value & note the g/l account value these should tally in new plant.
    for po's pending for delivery close it or cancel it.
    Material master / vendor master etc . . . master data's is adviseable to extended using LSMW or BDC.
    Hope this will help u.
    Regards
    Rang

Maybe you are looking for

  • [SOLVED] Authentication with AP on 3.6.* with Intel Wireless adapter

    Edit 06/2014: Solved ages ago via 3.10+ Kernels tested: 3.6.2-1, 3.6.3-1, 3.6.4-1. After the latest kernel upgrade my wireless can't authenticate with my AP, wicd-gtk hangs on "authenticating" and then says "bad password". lspci -vnn | grep -i net 02

  • REGISTERING FINAL CUT PRO TO MY APPLE ID

    I have recently bought an ex rental iMac which came with Final Cut Pro pre installed. How can I register it to my apple ID so as to be able to get updates and have it show in my purchased apps in app store?

  • Post XML over HTTPS

    We are trying to do the following. Can anyone help by providing any pointers as how to do it. 1. A java client will be posting XML over http(s) to the Tomcat server. 2. The Tomcat server has to do the following: - Validate the user credentails and ve

  • Track the progress of a URL loading

    I want to know the progress of a URL I load. The file is about 5mb. I create a new url : new URL ( "http://<the file>" ); But I want to display a progress bar for the loading. How can I proceed, I don't know the file size (it can be 5mb, 6mb or 7mb).

  • How can I sort faces by alphabetically?

    I have more than 1000 faces in Photos. It is a nightmare to find one in the faces screen for editing, mixing or renaming purposes. In iPhoto faces were sorted alphabetically.