New Products Lunch - Planning with Planning Material
Hello All
WE Plan we planning material (strg 63).
Each finish good is assigned to a planning material and in each planning material we maintain parameters like consumption mode and consumption periods.
For products current in production this strategy works fine, but for new finish goods that are not yet in production the ,confirmation is a challenge.
Imagine a planning material that contain both types of materials, in production and a new materials that start production in month 3.
The consumption indicator is 2 (backwards and foreword) and the backward consumption period is 30 days.
if you enter a sales order today and if planning allow he gets confirmed for today even thou production only start in month 3.
Any advice to make sure SAP only confirms after the 3 month even thou planning exists before? and how to make sure that only the planning that is maintained after the production start is considered even thou the backword consumption is define to look back
any comment / suggestion is appreciated
Thanks
PCoelho
hi
In Planning with planning material Planning material means if there is a material which determines the profitability of the company or which is of great importance to the company.
The planning strategy "Planning with planning material" is particularly useful if you have several
finished products with the same main assemblies.
Here, you define a planning material which contains the common assembly and its BOMs.
The planning run is carried out for the planning material which triggers the production and
procurement of the planning material's components.
The sales order for a finished product which refers to the planning material reduces the planned
independent requirements of the planning material and simultaneously triggers final assembly.
When processing the sales order, you can check whether the planned independent requirements
quantities cover the demand (that is, the availability check as a check against the planned
independent requirements).
In the material master record of the planning material, you must enter strategy 60, the consumption
mode and the consumption periods. In the material master records which refer to the planning
material, you must enter the planning material as a reference and strategy 60. The consumption
periods are calculated starting from the planned independent requirements of the planning material.
Similar Messages
-
Planning with planning material
Hi All,
I am working on the make to stock scenario where I am working on the strategy 63(planning with planning material).
As per scenario once I entered the sales order for variant material it should consume the PIR of the planning material but it did not happen with my case. I maintained the necessary master data for both the material like consumption parameters for planning material, strategy group 63 for both the materials, planning material for the variant material and individual and collective indicator for both materials but it didn't work.
Can you please provide me the reason why it is not happening?
Thanks in advance
Lalithi
The system finds requirements type VSEV because the strategy group has been set to 63.
See the Table of Planning Strategy Assignments.
The requirements are passed on to MRP. The stock/requirements list (Logistics -> Production -> MRP-> Evaluations ->Stock/reqmts list) displays the information for the planning material.
The planned orders are not yet "real," because the variant product cannot be produced until after receipt of the sales order. Technically speaking, the planned orders have order type (VP). It is impossible to convert these (VP) planned orders into production orders, or to use them in a repetitive manufacturing environment. The Conversion field in the display of the planned order is not set, which indicates that it is not possible to produce this planned order.
The MRP run also creates procurement requisitions for the components
The main objective of this strategy has now been reached: procurement for the components has been triggered, even without sales orders, based on the sales forecast from Demand Management only. Procurement of the components can occur in a variety of ways. Here we are assuming that a goods receipt (for a purchase order, for example) takes place.
A sales order for a variant material is entered
· Suppose that, for this example, an order with a quantity of 90 pieces is entered with a required delivery date of today. This order can be confirmed after the first planned independent requirement date
· The consumption parameters have been maintained correctly ( Consumption mode, Bwd consumption per., Fwd consumption per.) in the planning material.
· This date and the planned independent requirements can be found.
For more information, see Consumption Strategies and Logic.
award points if useful
Regards
ramesh -
How to add new product in interactive demand planning(IDP)
Hi gurus,
How to add new product in interactive demand planning(IDP), can you suggest me, when i click data view in IDP, it will show new product.
Regards
babuHi Raj,
Since the New Product is already in MPOS what you need to do in your Data view is to go to "Selection Window" on the left side of the screen(make sure you dont click on the existing selection ids). Select Product at the top, the planning version will come in the next row and then you again select the Product as charateristic and enter the New product name against the Product(Characteristic) and then save it in case you want it to use for your future references. When you will double cilck on the newly made selection id you will be able to see you product with the keyfigure details in right side.
Please let me know if it works.
Thanks,
Anand. -
SAP PP- Planning with Planning Material(60)u201D
Hello SAP-Guruu2019s
Pls explain the Strategy u201C Planning with Planning Material(60)u201D and pls give any examples if possible.
Thanks in advanceDear,
This planning strategy is particularly useful for planning BOMs that contain variant as well as non-variable parts.
This trategy allows you to plan the variants of one product. The term variant indicates "similar" parts; which implies a much higher number of variants. With this strategy, for example, you can easily exchange a component in all similar BOMs.
For Strategy 60 , Availablity check is carried out "Check against planned independent requirements" , inthat case Only planned independent requirements are taken into accout and Confirming. There is no ATP check logic.
Please refer thislink,
[Planning with Planning Material(60)u201D|https://forums.sdn.sap.com/click.jspa?searchID=17043588&messageID=5369851]
Regards,
R.brahmankar -
Production Order GR with Planned Price
Dear All,
We are using following steps for production order=
1) Create BOM, for Semifinished material with Price control = "S"
2) Create Roting, with all Keys PP01, PP02 and PP03 with Material allocation to respective steps
3) Standard Cost Estimation using CK11N and CK24
4) Create Production order using CO10 with Material and WBS Element.
5) Material issue against Reservation. But the material may be changed after releasing prodction order first time. And Actual issue for the BOM material may be more or less in qty.
6) Final confirmation with completion of last phase confirmation of production order.
7) Production Order TECO
8) Prodction Order Settlement using KO88
Now my problem is while I am doing final confirmation the GR done is with Planned price (Based on BOM) + Subcontracting charges which it is set with production order while releasing it for the first time.
Kindly tell me is the system behaviour is correct or wrong?
We are expecting that GR should happen with the actual material issue price + Subcontracting charges only.
Please reply.
Thanks & Regards,
Vishal KadiaVishal,
This is for your information.
If you have production order of 1 EA- Starnadar Price =10 rs
Raw material cost=5
Activity Cost=2
Overhead Cost=2
So COM=9 rs
Suppose after production order creation plan cost is 9 rs, hence after confirmation there is no varience (plan vs actual) so actual cost is also the same 9 rs.
Now as you said if system will go for GR against actual cost, that will post in cost of good mfg account at the time of GR.
As per std SAP after GR also you can issue the material to that order, hence if you will go for more goods issue of new material against that order (unplanned issue) of rs 5 for the same order then the actual cost will again change (recalculated), but for that oredr material is allready GR with actual cost, then you will not able settle the cost of newwly issued material on that order.
So whatever the plan and acual cost GR will be done against std price maintioned in material master ( 10 rs)
This is my understanding.
Hopes that will clear your dought.
Tara -
Planning with configurable material
Hello All,
We are using a Configurable material and i have a question about the configurable material. The Configurable FERT material should be a MTO and all the configured components should be MTS. I want to enter the forecast for the components in Md61 and put them in stock and the requirement from the Configurable finished good should consume the PIRs. can anyone tell me what strategies i should use at each level. Thanks in Advance.Hello
I have tried above suggestion, but they did not work. The sub assemblies (variant components) are not being consumed by the Fert level requirement. It is creating Another new requirement, it is not consuming the PIRS for the sub assemblies. Can someone suggest me what to do here.
Edited by: jags on Nov 28, 2009 5:58 AM -
Time phased planning with planned orders
I'm trying to get time-phased planning (MRP) to generate planned orders after the lead-time up to the planning horizon. I cannot get this to work so perhaps I should explain the scenario to see if this is possible. (This is all finished goods procurement, no manufacturing).
Scenario:
I have a DC in the US which gets supplied from a DC in the UK on a 4 week lead-time. MRP runs every week and generates a purchase requisition (converted to STO which gets picked and issued etc).
The DC in the UK gets supplied from vendors on average 3 month lead-time. I get forecast requirements from UK and EMEA regions (stores) and want to also have planned orders from the US DC so that the MRP run on the UK DC will add the total requirements together and give me vendor orders.
As you can see from the lead-times a single STO from the US DC doesn't give me demand over the total 4 month lead-time which means the UK DC doesn't order enough. If I could get planned orders to generate then it would all come together (simple DRP model?)
At the moment I'm working round it by running "PD" MRP first on the US DC and then changing the RP type and running time-phased MRP to get a single STO but this isn't perfect and means I have to run it manually every Sunday. (Also the logic is not quite the same between both methods).
Can anyone point me in the right direction?
many thanks
MarcusHi,
I'm using a copy of the R1 MRP type with the only change being that the "RP ind. forecast" configuration is set to G so that forecasts are included in the requirements calculation. I only have forecast values going out to the planning horizon so they need to be relevant.
I have planning and delivery cycles maintained along with lead times and goods receipt times also but no planned order generation.
Is there somewhere else I should check?
thanks! -
I need to modify an incorrect mailing address on my AppleCare Protection Plan certificate. After I registered a new product with AppleCare I realised that I'd entered the wrong postal address during the registration process and now I need to update my details to show my correct address. I've been trying for several hours to find a way to modify my address on the AppleCare site, with no success. Any help/advice would be greatly appreciated!
Contacting Apple World Wide for Support and Service
http://support.apple.com/kb/HE57
Apple Contact USA
http://www.apple.com/contact/ -
No Automatic Dispatching Of Planned Order to new Production Version
Dear Sir,
When rescheduling an operation from one line to another, the system
checks whether a production version exists for the material to be
produced that contains the new production line as the preferred work
center. If such a production version is found, this version is taken
over into the planned order. The planned order is scheduled again based
on the production version.
The second function allows you to automatically search for an
alternative work center in the case of a capacity overload of a work
center, and to dispatch the operations to it. The predefined
prioritization of the alternative work centers is considered in this
case.
The indicator Reschedule with production version must be set in the
strategy profile.
My issue is sytem does not making automatic Dispatch to the second
Production version for the material at the time of insufficient capacity
Best Regards
Rami Abd El Fattah Mohamed,PPQM Functional & Technical Application
ConsultantIn the dispatching control u can remove operation date check indicator and regarding the termination indicator SAP help says"
"if you have not set this indicator then dispatching is not terminated but carried out without taking the production version into account. That means that the planned order is scheduled with the old standard values and the formulas from the new work center and dispatched to the new line."
Please check if it works now.
thanks -
Need help with how much a new iphone will be.
I smashed my first one yesterday and is now unusable. Im currently on a 2 year contract plan with Telstra and just out of the 1 year mark.
i dont know what to do next.. Please help.
ThankyouHi tiarnafromnsw,
If you have a damaged iPhone, you may find the following page helpful:
Service Answer Center - iPhone
http://support.apple.com/kb/index?page=servicefaq&geo=Australia&product=iphone
Regards,
- Brenden -
Change of sales order in combination with planned/released production order
Hi Guru's,
How do you deal with changes in the sales order in combination with planned orders and the scenario how to deal with release production orders?
Can you tell me the SAP scenario, technically or reports or transactions or user exits, etc?
Thank you in advance,
EricHere You have 2 scenarios
1. Sales order changed at planned order stage
In this case any chagne of quantity done in the sales order level will be taken care by the Planned order until it was not firmed .
In case if it was firmed for the increased qty you will get a new planned order getting created.
In case if it is reduced and if it was unfirmed it will get changed accordingly
2. Sales order changed at production order stage
if the planned order was converted to production order change we can manually changes the respective Production order util no confirmation was done to any operations..
is all this scenariors you are looking for if it is helpful let me know
thanks..
dskumar -
HT201198 Can I transfer my AppleCare plan to a new product
I bought the iPhone4S and AppleCare protection plan with Sprint when it came out in October. A little under a month ago, my phone was stolen while I was downtown and I purchased another iPhone through Sprint. They told me to contact Apple to see about getting my AppleCare plan transferred to the new product. I've searched around and called but the automated system is not doing too much to help me find my answer. I want to switch the plan to my new phone, since I am no longer in possession of my old phone and I don't really want anyone else to be able to gain anything more at my expense.
Thank you in advance,
Samantha
Also, I apologize but Apple automatically placed this question into the AppleTV forum. I know that is not the place for this.Apple Store Customer Service at 1-800-676-2775 or visit online Help for more information.
To contact product and tech support visit online support site.
We cannot help here. We are just users like you. -
How can I create a new Care Plan with one or more care tasks
Hello,
I'm working on a Dutch website in the HealthVault Environment. I got difficulties in creating and updating a careplan with care tasks. Most likely it's due to lack of knowledge...
Following code works fine:
CarePlan plan = new CarePlan();
plan.Name = "test";
this.PersonInfo.SelectedRecord.NewItem(plan);
It creates a plan called [test]. But I don't know how to create a plan with one or more tasks in it: the tasks property is read only.
https://msdn.microsoft.com/en-us/library/microsoft.health.itemtypes.careplan.tasks.aspx
Half a year ago I was able to add an example of a careplan, which was a feature of the dev tools, but for some reason that's not possible anymore.
https://developer.healthvault.com/DataTypes/Overview?TypeId=415c95e0-0533-4d9c-ac73-91dc5031186c
So my question is, how can I add a new care plan with a task like the example from the HealthVault dev tools:
<tasks>
<task>
<name>
<text>Run 100 miles</text>
</name>
<description>Run 100 miles in 6 months</description>
<start-date>
<structured>
<date>
<y>2013</y>
<m>12</m>
<d>1</d>
</date>
</structured>
</start-date>
<end-date>
<structured>
<date>
<y>2014</y>
<m>6</m>
<d>1</d>
</date>
</structured>
</end-date>
<target-completion-date>
<structured>
<date>
<y>2014</y>
<m>12</m>
<d>31</d>
</date>
</structured>
</target-completion-date>
<sequence-number>279128532</sequence-number>
<recurrence>
<interval>
<text>Once</text>
</interval>
<times-in-interval>10</times-in-interval>
</recurrence>
<reference-id>p01vil21ckg7k2346y1g60337mmi20sg564l321l8pmpqev39n302572sewu76lh9019s3993e02924</reference-id>
</task>
</tasks>
Any help is welcome
WilfredHi Wilfred,
Have you tried this?
CarePlan plan = new CarePlan();
plan.Name = "test";
plan.Tasks.Add(someTask)
If you have a task list already, you would need to enumerate through it and add one by one...
foreach (var task in existingList)
plan.Tasks.Add(task) -
Hi there, traveling through Italy with my iPad. Purchased a unlimited prepaid data plan with Italian carrier WIND. Has been working excellent, but when I try to download a new episode of Game of Thrones, I get an error message which says that I have to connect to a wi fi network or download the episode on my MacBook. Why can't I download using the microsim and prepaid data plan? Any help will be great thank you!
Unfortunately downloads larger than 20mbps require wifi due to most carriers having data limits. This "requirement" keeps people who are not familiar with data and what takes up a lot of data from going over.
-
Creating a planned order with error "Material requires configuration"
Dear All,
I am facing a problem for creation of a planned order with error "Material requires configuration".
To follow the note 180317, I change Account Assignment Category to "U" (Unknown).
However, the system still does display the same error.
Could you please help provide possible solution for this?
Regards,
PhongSee also the following blog post:
Configurable planned order for material variants: Exception "53: No BOM explosion due to missing configuration"
BR
Caetano
Maybe you are looking for
-
Help please how do I install Apps from my old Apple ID ?
Hi I have two Apple ID wold like to install an Apps from my old Apple ID. Please help
-
WebLogic Server: 10.3.6.0 "no load" WLSGroupImpl in Subject?
reamlberr <realm> <sec:authentication-provider xsi:type="wls:open-ldap-authenticatorType"> <sec:name>ldapClaro</sec:name> <sec:control-flag>SUFFICIENT</sec:control-flag> <wls:host>XXX.XXX.XXX.XXX</wls:host> <wl
-
White screen when I turn on the computer
My Macbook Pro would not let me click on anything so I restarted my computer by holding down the power button, but then it stayed at a white screen for awhile, then turned to a blue screen before my login screen poped up. It let me log in but then wo
-
How to create diagonal variable line pattern in CS6?
Hi guys I'm on the brink of insanity with creating my diagonal line pattern. I've tried everything I can think of but the pattern is an absolute mess! I want to create a diagonal line pattern but I want the lines not to be uniform. Basically I've mad
-
After using Firefox for a while, when I open a new tab text does not appear, instead for each letter there is a blank box.