New release strategy should not trgger for PO released with old Rel Strategy

Hi All,
Please suggest. Po has been fully released with Release Strtgy V1 XX. Now I m replacing release strategy  XX with ZZ. If I change any po which has old rel str XX , system will reset new release strategy as in config changeability indicator 4 maintained.
But requirement is if there is  any change or value decreasing in fully released Pos with old strategy  it should not retrigger new release strategy. If value Increases then New strategy should retrigger.
Please help me on this.
regards,
Rohit

HI Rohit
A reset of the release strategy only takes place if
       -  the changeability of the release indicator is set to '4' in
          case of a purchase requisition and '4' or '6' in case of
          another purchasing document (purchase order, request for
          quotation, contract, scheduling agreement),
       -  the document is still subject to the previous release
          strategy,
       -  the new TOTAL NET ORDER VALUE is higher than the old one.
The most important thing to consider in to avoid changes to release strategy customizing once the release strategy is used.
The commom steps are:
1- make sure all of the old POs should have been released.
2- don't delete/change the original release strategy. create a new release strategy with copy function, then the old release strategy will not be replaced.
3- if you delete the original release strategy and add a new release strategy which the characteristics in classification is same as old release strategy then the PO (have been approved) will be replaced with the new release strategy.
Kind regards,
Lorraine

Similar Messages

  • PIR should not consume for the SubReq

    Hi Guru's,
    Please help me how to configure the planning strategy for my below requirement.
    Currently i am procuring a HALB material thru subcontracting. This HALB is having BOM components. I need to send the BOM components to the vendor for assembly.
    The BOM components will be used in some other HALB also. My requirement is, the BOM components should not consume for the subcontracting requirements, it needs to consume for in house production only.
    The subcon requirement needs to generate the dependent requirements only, it should consume the PIR.
    Currently i am using the planning strategy 70, requirement type VSFB. In this, PIR is consuming for the SubReq.
    Please suggest me the suitable planning strategy for this scenario.
    Thanks & Regards,
    V. Suresh

    Suresh,
    I am curious why you would not want SubReq. It is also a different kind of dependent requirement. Also it seems yo are supplying the components to your vendor. So it makes sense that your forecast is consumed by dependent requirements so that planning is effective.
    If for any reason you do not want to supply components to vendor then it would be best to mark such components as vendor provided. In such cases it would not consume your forecast (PIR). Hope this gives some new perspective.
    Thanks,
    Ram

  • PO should not go for approval if it is from a contract

    Dear Gurus,
    This company wants to approve the contract but the POs created from that contract should not go for approval again. Please give an idea to achieve this requirement?
    Thanks,
    Chameendri

    Hi,
    We need to define Contract under characteristics of PO approval process goto SPRO > Materials Management > Purchase Order > Release Procedure fro Purchase Orders > Edit Class
    Enter Class : for example POREL , class type 032 > Char tab
    Enter POCONTRACT under characteristics
    Enter Contract Number  under description
    Enter CHAR under Data Type
    Enter 10 under No.of characters and 0 under decimal places
    Then go to PO release strategy > Classification
    Enter Contract Number under characteristic Description and Value leave it blank
    this is what we did in our company and it is working fine.
    POs created with referece to approved contract is not triggering to approval process again.
    I dont know whether you are still waiting for the answer.
    Please try and let us know the results, if it works.
    Thanks.
    Udaya

  • Without standard release confirmation should not allow in process order

    Our clients need is that without standard release confirmation should not allow in process order.
    We are using CORK,cor6 and MB31 My need is to apply user exit in all cases.
    I got input from sdn User exit:-PPCO0006 Function module Exit_SAPLCOZF_003
    INCLUDE ZXCO1U06
    I need to activate this only during confirmation.ie confirmation to be avoided if cost is not released.
    Regards,
    Pert

    Hi,
    You are right. For preventing confirmation in case std cost estimate release is not available you need to do enhancement. You can check for following exit along with exit which you mentioned in your post :
    Enhancement     CONFPI05
    EXIT_SAPLCORF_405 - Process Ord. Conf.: Cust.-Specific Enhancements when Saving
    INCLUDE ZXCOFU10
    Check either of the enhancements which may fulfill your business requirement.
    Regards,
    Tejas

  • Schedule line should not generate until SA release

    Dear All,
    We want when we run MRP against schedule agreement then "Schedule line should not generate until SA release"
    Abhinay

    HI Abhinay Sachan ,
    Bascially when we run the MRP the system generate the Schedule Lines for that  schedule line we are doing release .....
    If you have SA for a particular materail system gives the Error or warrning message based on the setting what we made...if it is error sysetm won't allow other wise it is warrning meaasge means we can cretae the PR for the particular materail i hope i wll help you
    Regards
    Murugan J

  • Line item not relevant for payment release

    Dear Expert,
    When I select payment block : 'Payment Request' in FB60. Error Message appear "Line item not relevant for payment release".
    I also have set payment block in master vendor and  OBB8.
    Can you tell me why the error message still appear?
    Kindly need your help
    Thanks and Regards,
    YL

    Do you have any workflow variant in place?
    Moreover, when you have already set the Payment block at Master level, you need not to fix it in transaction level.
    Vendor itself will not get paid until unless you remove the block option
    Thanks

  • V4.0 won't start. crashes each time. Had to go back to previous version. Version 4 is just not ready for general release, it is massively messed up. The online fixes here had no effect whatsoever. VERY DISSAPOINTED

    tried automatic upgrade from within 3.6.. did not work..crashed upon re-start. tried remove program completely for a fresh install..same thing crash upon V4.0 start up....
    Reinstalled 3.6.15...
    4.0 is NOT READY for general release. Tried the fixes as suggested here, but they were useless and no help what-so-ever.
    Very dissapointing, as I've been using Firefox as my only browser since it was introduced years ago.. this may be the end of the line....VERY DISSAPOINTED

    tried automatic upgrade from within 3.6.. did not work..crashed upon re-start. tried remove program completely for a fresh install..same thing crash upon V4.0 start up....
    Reinstalled 3.6.15...
    4.0 is NOT READY for general release. Tried the fixes as suggested here, but they were useless and no help what-so-ever.
    Very dissapointing, as I've been using Firefox as my only browser since it was introduced years ago.. this may be the end of the line....VERY DISSAPOINTED

  • My new iPhone 5S will not ring for incoming calls.  It vibrates. I've tried suggested tips for iPhone 4 but it doesn't work for 5S.  Please help!!

    Can anyone help.  My new iPhone 5S does not ring for incoming calls.  It vibrates.  How can I get ringer to work?

    Hello lyngos,
    Thanks for using Apple Support Communities.
    For more information on this, take a look at:
    iPhone: No sound or distorted sound from speaker
    http://support.apple.com/kb/TS2802
    If an audio issue occurs when using a specific application, try testing other applications to see if the issue persists.
    If the iPhone is paired with a Bluetooth headset or car kit:
    Try turning off Bluetooth.
    If you experience difficulties with the Bluetooth feature, follow these troubleshooting steps.
    Restart the iPhone.
    If restarting doesn't fix the issue, ensure that your iPhone is updated to the latest version of iOS.
    Best of luck,
    Mario

  • With out goods issue for order system should not allow for order confirmati

    Dear all
    with out goods issue system should not allow for order/operation confirmation.
    how it is possible.
    Regrads
    Srinivas

    Dear ,
    In some cases we required to do confirmation or TECO without GI .
    We can change it as per req using user exit
    Regards,
    Ishwar

  • How do I call the subvi in parallel with main VI. Main vi should not wait for the subvi

    I have a subvi which takes the parameters like port name, transmit rate, message to transmit over serial port and Start/stop flag. This subvi calls VISA write vi in a loop continuously, till the Start/Stop flag is false, to write a message to serial port at a mentioned transmit rate. This subvi will be called from another VI. Actual intension is to transmit different messages to different ports continuously and stop them when required. In this senario, please provide solution for below points:
    1. How do I call the subvi in parallel with main VI. Main vi should not wait for the subvi.
    2. How does main vi can control already running subvi in parallel to it. In the above example I would like to start the subvi from main vi when start\stop flag is true and would like to stop it when the flag is false.
    3. How do I call the subVI with one set of parameters from main vi, when same subVI is running with other set of parameters already from main vi(subvi being called in a case with different set of parameters each time when the case is called). Means, how do I keep track of reentrant subvi (different calls to same vi)from the same main vi.

    Hi Dharani24,
    Try if these are helpful,
    http://digital.ni.com/public.nsf/allkb/DB92C44E7D4D8A1B862577CB007D9C45
    http://zone.ni.com/reference/en-XX/help/371361J-01/lvconcepts/asynchronous_vi_calls/
    http://zone.ni.com/reference/en-XX/help/371361J-01/lvconcepts/reentrancy/
    Thanks
    uday,
    Please Mark the solution as accepted if your problem is solved and help author by clicking on kudoes
    Certified LabVIEW Associate Developer (CLAD) Using LV13

  • Without result recording closing system should not allow for usage decesion

    Hi
    without result recording closing system should not allow for usage decision.I think it is possible through user status. Please tell the procedure .
    Thanks and regards,
    vairavan

    Dear vairavan,
    You can check for the authorisation object.I can't remember that authoriation object right now.But surely you can restrict that with authorisation object.
    Anyone knows the authoristaion object.
    Regards,
    Sunil Patil

  • Which mac mini should i go for: the one with AMD graphic card or Intel. I meanly going to use it for hometheater and HD movies.

    which mac mini should i go for: the one with AMD graphic card or Intel. I meanly going to use this for hometheater and HD movies.

    Intel HD 3000 graphics card can easily handle HD movies up to 1080p. But if you are looking at higher resolutions possibly 4k or 8k that are being released this summer in new TV's, I would go with the AMD card. The AMD card would be good for video and picture applications and also games. But if this is strictly to power your 1080p home theater setup then the choice is obviously the Intel HD 3000.

  • Project Commitment Cost not visible for Purchase Orders with Item Categry Q

    Hello All
    I have a problem. My project commitment cost is not visible for PO's with Item Category Q. I assume that as the stock can be issued against any WBS elements I might not be able to see the cost against a single WBS element. But the cost should get recorded against the project right? If so where can I see it?
    Request your help with this problem
    Regards
    Renjith

    Hello
    Could you please explain how to maintain that?
    Best Regards
    Renjith

  • Should I wait for the release of FF 4 to install on my new laptop?

    I have a 3.x version of FF on my "old" laptop, but I bought a new laptop a couple of weeks ago and want to install FF4 on it. Q: should I wait for the full release of FF 4 to install on the new machine, or would it be "better" to download FF 3.x first?

    Personally I would use the Firefox 4 release candidate.
    The current Firefox 4 release candidate will become the official Firefox 4 release providing no bugs are found that force a new version to be created. If there is a second release candidate, those using the first release candidate will automatically be updated to the latest version. It is still undergoing quality assurance testing but so far no showstopper bugs have been found.

  • Can't update to ios7 on ipod touch 4th generation on this ipod. had facetime but now it requires ios7 so i have it no more and used it a lot with family. would have to buy new ipod. apple should not take away the capabilities you have already paid for

    found out i can't update ipod touch 4th generation to ios7 which is now required to use facetime. have used facetime for several years with family now can't use. Apple should not take away the capabilities you already have paid for!!

    No correct, you do not need iOS for FaceTime. You only needed to update to iOS 6.1.6.
    Unable to make or receive FaceTime calls after April 16, 2014
    If you are having problems:
    iOS: Troubleshooting FaceTime                  

Maybe you are looking for

  • Event Handler/Cr​eate User Event bug

    This is a problem I've run into a few times on my system (Win2k) so I finally went back and reproduced it step by step since it wasn't too hard. It causes LabVIEW to crash and exit without saving. - Create an Event Handler - Place 'Register Events',

  • Problem with posting parked invoices

    We created a few vendor invoices through MIRO and parked them.   When we tried to post these invoices using FBV0, the system gives us an error message saying the Document does not net to zero.  All the invoices have the same error message.    We chec

  • XML Report with EXCEL output errors out intermittently

    Hi Gurus, We have a custom XML report running for a particular user for whom it is failing intermittently. The program does not return any error in log file. I also checked the OPP log file but coud not find any issues / errors. But Standard manager

  • Pick list- Re-print

    hi- I have already printed a pick list for delivery. Accidently the Document got shredded. I want to print the Pick list again. Any suggestions. Steps: I did go to VL02n and try to use the functionality Picking out at header level, but the area is gr

  • Major Plugin Bug Passing Boolean Parameters via JavaScript

    Calling an applet method that sets a boolean property fails under IE with the 1.3.1 Plugin. Method signature in a public object contained by the applet is: public void setShowTitle(boolean newVal) Attempting the following javascript in an HTML page f