New scenario - pipe line material - steam

hai friends .
Please guide ..Client wants to capture activity type "per MT" . please  inform in case this activity is created, how we can capture the quantity confirmation . Normally machine hours is used.
2. Can we take material type PIPE as BOM component. Here different water consumptions are taken for the FG material costing.
3. How steam and power consumptions are posted between plant to plant.

HI RS
you can maintain steam consumption  in standard value key and activity in work center. and if u are working in the REM scenario then you can define the consumption of steam per Mt basis in routing.siliarly activity can be assigned to in cost center tab and can be taken in to cost estimate.
plz revert if it works
Regards
Anupam Sharma

Similar Messages

  • Pipe Line Material Scenario- interesting

    Hi Gurus,
    I have a very genuine scenario but not getting any SAP standard solution.
    Scenario is, my plant A (power plant) is producing material POWER as FERT  and my another plant B  consuming ELECTRICITY as pipe line material. So having two plants (different company code) & two material codes.
    Now I can consume ELECTRICITY as pipe line material in production order as non stock material and invoice is generating which I can forward that to my Power Plant but in Plant A which is producing POWER I donu2019t have means to reduce Stock.
    My Q is
    How can I consume or reduce stock in plant A? With reference of invoice is it possible?
    It looks me genuine situation of Customer and vendor where, customer is having Pipe line material in its R/3 and Vendor is declared it as finished product in its R/3. So isnu2019t we have any standard process to address this business situation.
    thanks in advance

    Hi,
    Refer the thread in which the sap experts discussed on the similar issue in detail, after going thro this  hope you will understand easily how you should map your scenario
    Re : Power and steam
    Pipe Line Material Creation
    Re : How to consider Power and Steam in power plants and paper mills
    ch pavan

  • Pipe Line Material Creation

    HI
    can we creatte process order for pipe line material for example electricity/steam. and can we create pipe line material without info record mean without any vender detail.
    Regards

    Dear Mr.R.Brahmankar,
    This is my problem also i will explain you  the scenario
    In Industrial Battery manufacturing The electrolyte is a material  (Like Potassium Hydroxide and sulphuric acid )which  are produced with  a certain concentration% in acid reactors in-house and used in Battery manufacturing heavily.
    We have assigned these materials thru Activity types in-spite of the requirement of pipe line material. Can we assign this materials which are produced in house (but Category similar to pipe line materials)as pipe line materials in BOM and what would be the Impact on the system.
    Pavan

  • Production order with pipe line material

    Production ordre created and got confirmed  and found pipe line materials got stuck in COGI and on analysis found in that specific ordrer ordre pipe line material are not activated with special stock key indicator i.e. 4.
    Due to this it got stuck in cogi and for the same material created an order and found there is a allocation and  activated with special stock key indicator i.e. 4.
    Help me to resolve the existing Goods issue from COGI and cause of not activated with special stock key indicator i.e. 4. in production order.

    Dear ,
    did the pipe line material is showing in  production reservation  as one of the BOM compoenent?
    If it is the case , then cancel the confirmation in CO13 and try to connfirm the operation with Clear Reservation Option .
    Refer the below thread which may help you to figure out the issue :
    Re : How to consider Power and Steam in power plants and paper mills
    Re : Power and steam
    Regards
    JH

  • QM for Pipe line Material

    Hi Experts
    Scenario: We have water as Pipe line material. We have activated 89 inspection type & user is creating manual Inspection lot for the same.
    Since this is a Pipe line material, there will not be any PO, GR so no inspection lot at GR. We do the GI with 201-P against the cost centre & vendor.
    So my requirement is that, can it be possible to somehow create the inspection lot at the time of above GI OR
    Any other way to create the inspection lot apart from creating it manually by Inspection type 89?
    Looking forward for the favourable reply
    Thanks
    Sachin

    Hi Sachin,
    For 201-P u can have GI inspection type 02.Again it is not a stock relevant like 89.
    Regards,
    Nitin

  • Pipe line material - complete process

    Hi,
    Can anyone provide me the complete process for pipe line material..
    ie. frm mmr to invoice setlement.
    thanks in advance..

    Hi,
    For Pipeline Process,
    1. Create Pipeline Material under material type PIPE
    2. You need to maintain the Pipeline Info Record in ME11. Here maintain the Prices and Tax Code mandatory
    Also in SPRO > Enterprise Structure > Assignment > Materials Management > Assign standard purchasing organization to plant
    There will not be any PO and GR Process for Pipeline materials. We consider that materials are available via Pipes in our plant and we have tp directly book consumption and then settlement of the same.
    If Stock is directly consumed from Pipeline Stock via 201 P or 261 P via transaction MB1A or MIGO then following FI Entry will appear;
    (GBB-VBR) Consumption Account - Dr
    (KON) Pipeline Liabilities - Cr
    Now do Pipeline Settlement in MRKO. Here you can not change the Invoice Value. Here following FI Entry will appear;
    Vendor Account - Cr
    Pipeline Liabilities - Dr
    Prerequisite for MRKO: -
    - Maintain condition record for output type KONS in MRM1
    Then take printout of the Settlement Document in MR91.
    Also refer following link;
    [Pipeline Handling 1|http://help.sap.com/saphelp_46c/helpdata/en/fd/45c3fe9d6411d189b60000e829fbbd/content.htm]
    [Pipeline Handling 2|http://help.sap.com/saphelp_erp2005/helpdata/en/4d/2b926443ad11d189410000e829fbbd/frameset.htm]

  • Pipe line material not inventorized

    Hi,
    While running pipeline scenario , when i did GI with Mvt 201 P...System allowed me to do this transaction...
    As i do not have any stock for this Material "X" (Material type as PIPE). Then how did system allowed me to issue this material...
    I know PIPELINE materials are not inventorized, but my question is WHY system did not asked that stock is not maintained for this material.
    There should be some logic behind that?
    Utsa

    Hi Utsav,
    Read documentation available on sap help website for clarifications.
    >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/4d/4b9036dfe4b703e10000009b38f889/frameset.htm
    >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
    Pipeline Handling  
    Use
    A pipeline material is a material that flows directly into the production process from a pipeline (for example, oil), from a pipe (for example, tap water), or from another similar source (for example, electricity).
    A material from the pipeline is always available; i.e. it can be withdrawn from the pipeline at any time and in any quantity.
    Depending on the system configuration, a material can be withdrawn only from the pipeline or, in addition to the pipeline, normal stocks of the material can also be managed.
    Materials with Material Type PIPE
    Pipeline handling is mandatory for materials with material type PIPE; i.e. only withdrawals from the pipeline can be posted for these materials.
    These materials have the following characteristics:
    They are neither procured nor planned. They can be withdrawn from the pipeline at any time and in any quantity.
    They are not stored or kept in stock. No physical inventory is taken.
    Pipeline movements are mandatory in all valuation areas; i.e. no other goods movements may be posted.
    Other Material Types
    For each material type, you can specify in the valuation area whether pipeline movements are:
    Mandatory
    Allowed
    If pipeline movements are not mandatory but allowed, the material can be kept in stock and both pipeline and other movements can be posted.
    A material of this type can be withdrawn from your companyu2019s own stock, from consignment stock, or from the pipeline.
    Activities
    Pipeline Withdrawal
    You can enter a pipeline withdrawal for an order or for a cost center. Pipeline withdrawals differ from other goods movements in that they are entered with the special stock indicator P.
    The withdrawal is valuated at the price defined in the pipeline info record.
    A withdrawal from the pipeline results in the following updates in the system:
    The pipeline withdrawal results in a vendor liability that must be settled periodically in a similar way to the management of consignment stocks. In the standard system the same account is used for both pipeline and consignment liabilities, but a different pipeline liabilities account can be defined in Customizing.
    A consumption history is kept.
    The pipeline withdrawal has no effect on existing warehouse stock or on the availability of the material.
    Posting Goods Issue from the Pipeline  
    A withdrawal from the pipeline is posted as follows:
    From the Inventory Management menu, choose Goods movement ® Goods issue.
    Maintain the data on the initial screen. Choose Movement type ® Consumption ® To cost center (or To order, To network, All account assignments) ® From pipeline (Movement types : 201 P, 261 P, 281 P, or 291 P)
    On the collective entry screen, enter the account assignment. Enter the items.
    You do not have to enter the vendor as this will be found automatically by the system.
    If more than one vendor is possible, a pop-up window appears with a list of pipeline vendors, from which you can select the vendor you require.
    Post the goods movement.
    Updates
    A withdrawal from the pipeline results in the following updates in the system:
    The pipeline withdrawal results in a vendor liability that must be settled periodically in a similar way to the management of consignment stocks.
    A consumption history is kept.
    The pipeline withdrawal has no effect on existing warehouse stock or on the availability of the material.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/4d/4b9036dfe4b703e10000009b38f889/frameset.htm
    regards,
    Uzair
    Edited by: Mohd Uzair Hussain on Jun 22, 2009 11:01 AM
    Edited by: Mohd Uzair Hussain on Jun 22, 2009 11:02 AM

  • Pipe line material

    Hi all
       Am attaching material type pipeline in sub contracting BOM.So, when am taking GR (MVT Type 101) for sub contracting part number, system is issuing message the mesaage is
                             Components cannot be withdrawn from special stock P
      Kindly guide me to solve the above error
    Thanks & Regards
    P.Srinivasan

    For M/T 101, 'P' stock is not included in possible stock indicators. Try using m/t 201 to GR the material.
    201 Goods receipt for a cost center
          The goods can only be withdrawn from unrestricted-use stock.
          Possible special stock indicators:
              o K: Goods withdrawal from
              o consignment stock
              o P: Goods withdrawal from pipeline
          If you have withdrawals from consignment stock and from pipeline, payables to suppliers ensue.
    For details about M/Types, check SAP help at http://help.sap.com/saphelp_40b/helpdata/ru/fc/6cec6eb435d1118b3f0060b03ca329/content.htm

  • PO For PIPE Line

    Dear All,
    I have a pipe line material. Now for this how to raise a PO.
    Steps invloved in PO.
    Regards,
    Pardeep Malik

    Hi,
    1. You can create a material with PIPE material type or else you can use any material type but that should allow pipeline process.
    2. You should have Inforecord for the material with valid conditions, price will pick only from inforecord.
    3. If requied you can maintains ource list or else you can select during goods issue.
    4. From the Inventory Management menu, choose Goods movement ® Goods issue.
    Maintain the data on the initial screen. Choose Movement type ® Consumption ® To cost center (or To order, To network, All account assignments) ® From pipeline (Movement types : 201 P, 261 P, 281 P, or 291 P)
    5. On the collective entry screen, enter the account assignment. Enter the items.
    You do not have to enter the vendor as this will be found automatically by the system.
    If more than one vendor is possible, a pop-up window appears with a list of pipeline vendors, from which you can select the vendor you require.
    Post the goods movement.
    Regards,
    Prabu

  • Logic to retrieve batch number in batch split scenario for a material

    Hi All!
    LIPS-CHARG gives the batch number for a material in normal scenario.But in batch split scenario for a material what should be the logic to retrieve the field batch number based on POSNR,VBELN and UECHA in LIPS.
    UECHA corresponds to higher level item of a batch.
    I had been given the following logic to do the same but it is not pulling any values inspite of a batch split available for the material.The logic is
    Select lips-charg (batch number) where  lips-posnr = lips-uecha ( higher level item batch)
    Please advise
    Regards
    Praneeth

    Hi Praneeth,
    The way LIPS records are in a batch split scenario is that let us say you have a delivery with one line item 00010. Now if this splits into two batch split items, then you will find in LIPS 3 records, one with line item 00010, one with 90001 and another with 90002. Both 90001 and 90002 will have a UECHA of 00010, whereas for 00010, this field will be blank. So the logic is to create two internal tables one where UECHA is blank and another where it is not blank and use it.
    SELECT * FROM LIPS
             INTO TABLE I_LIPS
            WHERE VBELN = P_VBLEN.
    I_LIPS_TEMP[] = I_LIPS[].
    DELETE I_LIPS_TEMP WHERE UECHA IS INITIAL.
    *-- This table will not have only the batch split items not the main items.
    LOOP AT I_LIPS WHERE UECHA IS INITIAL.
    *-- loop at the main items.
      IF I_LIPS-CHARG IS INITIAL.
    *-- batch is not there on the main item, see if it is there on any batch split items.
        READ TABLE I_LIPS_TEMP WITH KEY UECHA = I_LIPS-POSNR.
         do whatever
      ENDIF.
    ..... do whatever
    ENDLOOP.

  • How to add new price break lines to existing PO quotations?

    Hi,
    I am using a custom interface (to insert quotations data into PO headers/lines interface tables) and PO documents open interface to create PO Quotations in Oracle.
    I need to modify this interface to:
    1. Update existing price break lines for a quotation line.
    2. Add new price break lines to existing quotation line(which may/may not have exsiting price break lines).
    Please let me know:
    1. What modifications need to be done to the existing code.
    2. What values needs to be passed to the action columns in PO_HEADERS_INTERFACE and PO_LINES_INTERFACE for above scenarios?
    Any ideas/help will be appreciated.
    Thanks
    Imran

    Hi Imran,
    I have done a similar exercise for BPA price breakup.. Let me know if you need that as reference. I can share that :).. Please provide your personal mail id..
    Regards,
    S.P DASH

  • New scenarios to work

    Hi All,
    I completed all basic concepts in sd. I am looking for some scenarios to work.Can i get some help on this.....
    Rgds,
    Pavan.

    HI
    Pavan just make a search you will get a lot of new scenarios
    Try to find the answers for your query by searching in the forum using the SEARCH option.
    I am confident that you will be getting a lot of resources and answers and even more replies
    which will already helped in solving the issue and also definitely they will give you broad understanding of the topic.
    And also check the WIKI section of this forum there are valuable notes, configurations,etc.
    check this link for wiki section.
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/erplo/main
    https://wiki.sdn.sap.com/wiki/display/ERPLO/ERP+SD
    Don't Post Basic Questions
    SEARCH before posting a questions.
    Don't use ALL-CAPITALS in subject line and sms text english
    Give a meaningful subject line.
    Don't Answer Basic Questions
    regards
    PRASHANTH

  • NEW GL - Profit center - material procurement by branch and payment by Hea

    Hi,
    Business scenario : NEW GL is active , Material are received by A profit center and the payment will be done by another B profit center.
    Could you let me know the NEW GL splitting function on the above business process.
    With regards,
    Babu

    Hi ,
    Go to
    Step 1:- Create new Business transaction variant : Define Business Transaction Variants -IMG>Financial Accounting (New)>General Ledger Accounting (New)>Business Transactions>Document Splitting>Extended Document Splitting>Define Business Transaction Variants
    Step 2 :-Define Document Splitting Rule :IMG>Financial Accounting (New)>General Ledger Accounting (New)>Business Transactions>Document Splitting>Extended Document Splitting>Define Document Splitting Rule You will assign  Transaction Variant and save
    Provide Item Category u2013 20000 u2013 Expense (because we are splitting Cash Account or Balance Sheet Account by these Expense Accounts) ,
    Double Click on Base Item Categories   Folder ,Select New Entries Button
    Provide Cat. u2013 04000 u2013 Cash Account and Select Automatically Split Check Box (Because Cash is spitted to two expenses Account according to the profit Center) ,Click on Save   Button
    Provide the fields as given below
    Provide Item Category u2013 01100 u2013 Company Code Clearing (This Step is done to split the documents in particular to the Company Code Clearing),Click on Save   Button
    Double Click on Base Item Categories   Folder and Select New Entries Button
    Note: Provide both the Categories Cash Account and Expenses, which is be spitted in Company Code Clearing
    Provide Cat. u2013 04000 u2013 Cash Account
    Provide Cat. u2013 20000 u2013 Expenses
    Select automatically split Check box, because we are splitting these item categories in particular to the Company Code Clearing.Click on Save   Button
    Thanks,
    Raviteja

  • Unable to see pipe line steps in the SXMB_MONI

    HI,
    i have done the development and quality work for my p i7.1
    i was testing the messages in the Quality System.
    So i went to SXMB_MONI to see the messages.
    After double clicking on the  successfully processed message, it shows
    pipe line steps.
    in that I am able to see
    1.inbound message(CENTRAL)
    2.XML Validation inbound channel Request
    3. call adapter
    4. Response
    but i am unable to see
    1. Receiver Determination
    2. Interface Determination
    3. Receiver Grouping
    4. Request Message Mapping
    5. Technical Routing
    whereas  in the develoment system i am able to see the above all.
    is there any configuration i have to do in the SXMB_ADM?

    can i know that   Configuration objects were created/ imported by using transport mechanisum?
    if created ,
    check the cache status and re activated those objects whatever u r posted in thread.
    if transported :
    u ll follow ,whatever posted by Earlier

  • Print out of Schedule Lines & Material reqt at subcontractor end.

    Hi experts,
    Presently we are using ME9E report for taking print out of scheduling agreement.  In scheduling agreement, material wise / date wise R.M requirement at Subcontractor end is displayed as well as schedule lines material wise / date wise is displayed. 
    We do not find it user friendly.  We are searching for following reports :
    1. Datewise / Material wise requirement of R.M at subcontractor end should be displayed separately.
    2. Schedule line qty date wise / material wise  should be displayed separately.
    Solutions / Suggestions will be highly appreciated.
    Regards,
    ( Rajneesh Gulati )

    hi,
    pl go with Y program