New Source System Issue
Hi
We are trying to connect new Source System to BW. It is ECC 5.0.
When I try to activate the Source System, it generates the following error:
<b>EDI: Partner profile not available
Entry in inbound table not found
Entry in outbound table not found
Entry in outbound table not found</b>
I checked WE20, it looks good. This is very similar to the current R/3 System (4.6). I was able to REPLICATE the DATASOURCE with no issues.
Can you please let me know, how this could be resolved.
Regards,
GPK.
Hi Guru's
The OSS note mentioned was a good one. I did check that OSS to ensure we were on track. There was no loop hole i got in regards to this issue.
I cannot say why it worked for me but I could tell what I did.
1. Deleted the source system, I creted.
2. Created the Source System back again.
3. It worked, but the only difference I noted was that, the icon of the source system is like the BW and not like the r/3 icon. I don't know WHY??
Thank you all for your support and advices.
Regards,
GPK.
Similar Messages
-
New Source System Client for BW
Hi All,
Currently we have R/3 QAS Clint 102 connected to BW QAS. We want to get rid of this Client 102 and connect a new QAS Client 100 (same server but different Client) to BW QAS. I created a new Source System (QAS100) in BW QAS and did a restore.
My question: How do I get all the Source system dependent Objects like InfoSurces, InfoPackages etc for the new Client 100 in BW QAS? Please help me and I promse to generously reward points.
Thanks, very much in advance.
SriniHi A.H.P,
I am pretty sure this will resolve the issue. I will come back again and reward 10 points once we apply a working solution.
Thank you for a quick reply.
Srini -
Steps for creating new source system
Hi guys
We are on BI 7 and ECC 6 now...We are planning to get the data from other source systems (R/3 4.6)which are existed in different place.
Now my question is what are the steps to get the data from this new Source system and whats BI developer role for this...
Example: Inorder to establish the connection between BI and R/3 we need an RFC connection (Is this done by BASIS / BI )? If its BI , then what do I need to ask for ?
afterthat what are all the questions or points that I need to raise to the folks in the meeting...
Please advice
regardsHi
refer to this link below
http://help.sap.com/saphelp_nw04s/helpdata/en/ac/4a4e38493e4774e10000009b38f889/frameset.htm
Exactly this will be taken up by BASIS team so that at any time if we have any issues with RFCs like RFC connection failure we will not get any data to our targets.
Then we have to raise ticket to basis stating this failure -
How to delete old source system assignment and assign new source system.
Hi Experts,
I have bunch of datasource which are pointing to source system A (when I see it in RSA1). Recently all the datasources which are in source system A has been moved to source system B.
Now I have replicated all the datasources from the source system B. But in RSA1, still I am seeing the datasources which are pointing to sourcesytem A. I want this to be pointed to source system B.
Is there a way to do this?. I have searched in forum and found that this ned to be done manually. Do i need to do it for all the datflows? Is there any thing we can do when running BDLS?.
Please let me know if you need more inputs.
Thanks a lot for you suggessions. Eagerly waiting for valuable suggessions.
Thanks and Regards,
Saravanan Payani.Hi Anindya,
Thanks for your quick reply. I want to keep the data what ever there in the cube as of now. From now on I want to extract data from new source system.
Basis team ran the BDLS but i don't see any changes. Still my datasources are pointing to OLD source system.
Background : I have an infocube for which the datasourec is ZCRM_MKT_001, which is available at source system IRDCLNT001. Now the above datasource has been moved to new source system IRXCLNT001. As my datasource is moved to new source system, I want the data from the new source system.
My issue : But when i expand the data flow of the infocube in RSA1to the lowest node, against the datasource i can still see the source system as IRDCLNT001 (which is old) under 'Object Information' column. I want this to be pointed to my new source system that is IRXCLNT001.
Is there any way to arrive at this?.
Thanks for your time on this.
Thanks and Regards,
Saravanan Payani. -
About creating a new source system on BW pointing to an Oracle database
hi friends
i m facing problems when i
creating a new source system on BW in AIX pointing to an Oracle database, our bw oracle use 10idatabase ,and we want to connet to 9idatabase(Windows) to get data for BW
(1.) in /oracle/P01/102_64/network/admin tnsnames.ora I hava add
SJPT =
(DESCRIPTION =
(ADDRESS_LIST =
(ADDRESS = (PROTOCOL = TCP)(HOST = 68.16.211.177)(PORT = 1521))
(CONNECT_DATA =
(SERVICE_NAME = SJPT)
(2) and in etc/hosts I hava add
68.16.211.177 SJPT
(3) in p01adm> tnsping SJPT it is OK
(4)but when i
in BW RSA1 DATA SOURCE
create db connect:
DBMS: ORA
USER NAME: SAP
DB PASSWORD: SAP
[email protected]
i t give me the error message :
ORA-12154: TNS:could not resolve the connect identifier
please help meHI,my trans.log file is
4 ETW000 R3trans version 6.13 (release 700 - 20.02.06 - 16:15:00).
4 ETW000 unicode enabled version
4 ETW000 ===============================================
4 ETW000
4 ETW000 date&time : 13.11.2007 - 10:16:48
4 ETW000 control file: <no ctrlfile>
4 ETW000 R3trans was called as follows: R3trans -d
4 ETW000 trace at level 2 opened for a given file pointer
4 ETW000 [dev trc ,00000] Tue Nov 13 10:16:48 2007 81 0.000081
4 ETW000 [dev trc ,00000] db_con_init called 29 0.000110
4 ETW000 [dev trc ,00000] create_con (con_name=R/3) 50 0.000160
4 ETW000 [dev trc ,00000] Loading DB library '/usr/sap/P01/SYS/exe/run/dboraslib.o' ...
4 ETW000 43 0.000203
4 ETW000 [dev trc ,00000] load shared library (/usr/sap/P01/SYS/exe/run/dboraslib.o), hdl 0
4 ETW000 13346 0.013549
4 ETW000 [dev trc ,00000] Library '/usr/sap/P01/SYS/exe/run/dboraslib.o' loaded
4 ETW000 32 0.013581
4 ETW000 [dev trc ,00000] function DbSlExpFuns loaded from library /usr/sap/P01/SYS/exe/run/dboraslib.o
4 ETW000 35 0.013616
4 ETW000 [dev trc ,00000] Version of '/usr/sap/P01/SYS/exe/run/dboraslib.o' is "700.08", patchlevel (0.46)
4 ETW000 53 0.013669
4 ETW000 [dev trc ,00000] function dsql_db_init loaded from library /usr/sap/P01/SYS/exe/run/dboraslib.o
4 ETW000 34 0.013703
4 ETW000 [dev trc ,00000] function dbdd_exp_funs loaded from library /usr/sap/P01/SYS/exe/run/dboraslib.o
4 ETW000 53 0.013756
4 ETW000 [dev trc ,00000] New connection 0 created 23 0.013779
4 ETW000 [dev trc ,00000] 0: name = R/3, con_id = -000000001 state = DISCONNECTED, perm = YES, reco = NO , timeout = 000, con_max = 255, con_opt = 255, occ = NO
4 ETW000 39 0.013818
4 ETW000 [dev trc ,00000] db_con_connect (con_name=R/3) 45 0.013863
4 ETW000 [dev trc ,00000] find_con_by_name found the following connection for reuse:
4 ETW000 32 0.013895
4 ETW000 [dev trc ,00000] 0: name = R/3, con_id = 000000000 state = DISCONNECTED, perm = YES, reco = NO , timeout = 000, con_max = 255, con_opt = 255, occ = NO
4 ETW000 37 0.013932
4 ETW000 [dev trc ,00000] Got LIBPATH=/usr/lib:/lib:/usr/sap/P01/SYS/exe/run:/oracle/P01/102_64/lib from environment
4 ETW000 325 0.014257
4 ETW000 [dev trc ,00000] -->oci_initialize (con_hdl=0) 47 0.014304
4 ETW000 [dev trc ,00000] Client NLS settings: AMERICAN_AMERICA.UTF8 3234 0.017538
4 ETW000 [dev trc ,00000] Logon as OPS$-user to get SAPSR3's password 28 0.017566
4 ETW000 [dev trc ,00000] Connecting as /@P01 on connection 0 (nls_hdl 0) ... (dbsl 700 240106)
4 ETW000 34 0.017600
4 ETW000 [dev trc ,00000] Nls CharacterSet NationalCharSet C EnvHp ErrHp ErrHpBatch
4 ETW000 35 0.017635
4 ETW000 [dev trc ,00000] 0 UTF8 1 0x110f8b9c0 0x110fa3e38 0x110fa36e8
4 ETW000 36 0.017671
4 ETW000 [dev trc ,00000] Allocating service context handle for con_hdl=0 37 0.017708
4 ETW000 [dev trc ,00000] Allocating server context handle 24 0.017732
4 ETW000 [dev trc ,00000] Attaching to DB Server P01 (con_hdl=0,svchp=0x110f94398,svrhp=0x110fa6158)
4 ETW000 72 0.017804
4 ETW000 [dev trc ,00000] Assigning server context 0x110fa6158 to service context 0x110f94398
4 ETW000 36191 0.053995
4 ETW000 [dev trc ,00000] Allocating user session handle 73 0.054068
4 ETW000 [dev trc ,00000] Starting user session (con_hdl=0,svchp=0x110f94398,srvhp=0x110fa6158,usrhp=0x110f937a0)
4 ETW000 43 0.054111
4 ETW000 [dev trc ,00000] Assigning user session 0x110f937a0 to service context 0x110f94398
4 ETW000 10613 0.064724
4 ETW000 [dev trc ,00000] Now '/@P01' is connected (con_hdl 0, nls_hdl 0).
4 ETW000 964 0.065688
4 ETW000 [dbsloci. ,00000] *** ERROR => ORA-942 when accessing table SAPUSER
4 ETW000 1183 0.066871
4 ETW000 [dev trc ,00000] Disconnecting from connection 0 ... 73 0.066944
4 ETW000 [dev trc ,00000] Rolling back transaction ... 28 0.066972
4 ETW000 [dev trc ,00000] Closing user session (con_hdl=0,svchp=0x110f94398,usrhp=0x110f937a0)
4 ETW000 146 0.067118
4 ETW000 [dev trc ,00000] Now I'm disconnected from ORACLE 409 0.067527
4 ETW000 [dev trc ,00000] Try to connect with default password 23 0.067550
4 ETW000 [dev trc ,00000] Connecting as SAPSR3/<pwd>@P01 on connection 0 (nls_hdl 0) ... (dbsl 700 240106)
4 ETW000 34 0.067584
4 ETW000 [dev trc ,00000] Nls CharacterSet NationalCharSet C EnvHp ErrHp ErrHpBatch
4 ETW000 36 0.067620
4 ETW000 [dev trc ,00000] 0 UTF8 1 0x110f8b9c0 0x110fa3e38 0x110fa36e8
4 ETW000 36 0.067656
4 ETW000 [dev trc ,00000] Assigning username to user session 0x110f937a0 22 0.067678
4 ETW000 [dev trc ,00000] Assigning password to user session 0x110f937a0 41 0.067719
4 ETW000 [dev trc ,00000] Starting user session (con_hdl=0,svchp=0x110f94398,srvhp=0x110fa6158,usrhp=0x110f937a0)
4 ETW000 37 0.067756
4 ETW000 [dboci.c ,00000] *** ERROR => OCI-call 'OCISessionBegin' failed: rc = 1017
4 ETW000 33690 0.101446
4 ETW000 [dbsloci. ,00000] *** ERROR => CONNECT failed with sql error '1017'
4 ETW000 36 0.101482
4 ETW000 [dblink ,00431] ***LOG BY2=>sql error 1017 performing CON [dblink#3 @ 431]
4 ETW000 122 0.101604
4 ETW000 [dblink ,00431] ***LOG BY0=>ORA-01017: invalid username/password; logon denied [dblink#3 @ 431]
4 ETW000 34 0.101638
2EETW169 no connect possible: "DBMS = ORACLE --- dbs_ora_tnsname = 'P01'" -
Datasources . problem with the new Source System
Hi friends!
The ECC client were copy and now I have a new source system for this.
If I select source system / verify, the msg is: ok
In can read some data from the new ECC (ie: exchange rates updated), but I can not read any records using the datasources.
The replication in Bi were done, and the data in source system is ok.
-> What is wrong?
Thanks!Check the profile parameters in WE20,We21... and also check scc4
-
Migrate Dataservices source system to new source system type in BW 7.3
Hi All,
We have upgraded our BW system to 7.3. In our old 7.0 environment we have linked Data Services 4.0 as an external source system. Now in BW7.3 we would like to migrate the developments on the old source system to the new source system type.
Does anyone know if there is any migration tool which we can use for this?
Best regards,
F. GeldofHi Valerie,
Unfortunately i didn't find the answer yet. For the moment we have kept the old connection types to our DS environment.
Good luck!
Best regards,
F. Geldof -
Transport InfoSources to New Source System
Hi.
When implementing BW in our QA environment, all InfoSources, and their related InfoPackages, Transfer Rules, Update Rules, etc.) were created using a temporary R3 QAS source system mapping (ex.TMP). We are now removing this temporary client and I now need to change my InfoSources (along with customized Start Routines, InfoPackages, etc.) to point to a new QAS source system (ex. PRM).
Note that this new source system is already identified as a source system for BW and all DataSources created on TMP have been transported to PRM. Subsequently, all DataSources have been replicated from PRM to BW.
However, I'm having trouble on the BW end. I can't easily
transfer the InfoSources, etc. to the new source system. I've asked some BW / Basis folks and they suggest transporting the InfoPackages out-of and then back-into the BW QA client. Is this possible? Is there a better way to push my InfoSources, InfoPackages, etc. from the old source client (TMP) to the new one (PRM)? Thanks!Dear Dave
Please do not attempt to change the logical system name your self, as I feel that you have not tried it before.
This is some thing that your basis people have to do. Depending on the size of database this change can take from 2-24 hours (not exact times, but just some thing to show the magnitude of the task).
Good luck
/FZA
Message was edited by: Fariborz Zangoui -
BW: Connect to new source system via special transport
Hello everyone!
I have a BW system connected to an R/3 source system. I have made a copy of the source system. Now I want all my models to be connected to both source systems. I heard that this can be achieved via special transport (i.e. place all source system dependant objects into a special transport request to be imported back into my BW system, but with the new source system assignment). Does anyone have any documentation on how to do this?
Best Regards and Merry Xmas!
Luís Andrade.Hi Luis,
There are two parts,
1) If you want to transport all your objects from current R/3 system to newly created r/3 system then you can create a TR and use it in SCC4 transaction during client copy. In the same fashion you can use RSA1---> transport connection and use the TR for system copy. After that once you release this TR all the objects will move from one system to another.
2) But if you have already moved all the objects in source system but now you want them to replicate in BI then go to SAP BI system select your source system and then from the context menu choose replicate datsources option, it will fetch everything from respective source system in BI.
Regards,
Durgesh. -
Hello,
Our requirement is to load data from a different R3 client to which we dont have a connection yet.
The idea is to create a new connection but keep the existing one.
Is there any automated tool to do this? We would like to avoid the manual creation of all infosources and transformations from the new source system, but to copy them from the existing one.
We found that there is a tool for replacing the current source system with another one (BDLS), but we just want to create this new one in paralel with the current source.
Thanks!!
PabloHi,
what you can do is, create a transport request containing all source system related things like the infosource/datasource assignment, transfer rules... and import that transport back into your dev system. Before the import you should maintain the settings for source system after transport accordingly.
Siggi -
How to transfer all the transfer structure to new source system ?
Hello
I have created a new source system on my BW system with new RFC connection .
I want to replace all my old transfer structure with old source system to this new system .
can u plz let me know how can i do this ?
Regards,can u plz many help in this ?
-
Hi All,
I am trying to create a new source system in BW for the new R/3 client which is a copy of PRD.
So now new R/3 client is 200 and also PRD is 200. I did all necessary steps and i found difficulty when i am assigning logical system based on client. I found key is only client, so as PRD system is already mentioned with client 200 i am not able to create new entries and i hope this causing me error.
So by creating RFC destination directly in SM59 and when i tried to create it says PRD Client already available. Though i have specified new client server name.
Kindly advise.
This is quite urgent.
Thank You.
Best regards,
Bhuvana.hi,
it seems rfc connection between bw and r/3 not established properly, check with transaction sm59 (ask basis help if no authorization), choose r/3 source system rfc and menu test->authorization. check if user name and password, hostname/ip address are correct.
this doc 'bw r/3 connectivity' may useful http://help.sap.com/bp_biv235/BI_EN/BBLibrary/documentation/B84_BB_ConfigGuide_EN_DE.doc
hope this helps. -
New source system - same BI system - time estimate
Hello,
The project management of my current project has decided to create a new ECC QA system as copy from existing ECC QA with no data. The BI QA system will remain as it is.
How much work will this create for us in order to re-map the transfer structures in BI to the new system. Will I be able to use the same info sources (off course with new source system)? Any more work needs to be done?
We have about 8 info cubes including stock, sales, purchasing, PCA, loading data via 15 info sources + all masterdata..
Is this a quick and easy fix or a time consuming task?
Regards,
F CHello,
Yes, I agree. Just needed a second opinion! Thanks! This is a fresh installation so the amounts of data are quite small..
It should be possible to use the same info sources with some modification on source system and that's it.
Agree?
Regards,
F C -
Change Default Background User In BW When Creating New Source System
Hi all,
I would like to create a new Source System in RSA1.
In Source Systems > SAP > Create > Connection of source system to BW
the Default background user in BW is u201CALEREMOTEu201D.
How do I change this to another user?Just want to say thank you. I could fix a problem with your information.
I was searching to change the background user from ALEREMOTE to BWREMOTE as all our process chains were running on ALEREMOTE. -
Activating transfer rules for new source system
Hi
we are having 2 R/3 source system in BI. I had activated all the transfer rules with the first source system and now i have created a new source sytem connecting to a different R/3 client. I tried to change the transfer rules point to the new source system using the program RS_TRANSTRU_ACTIVATE_ALL giving the new source system and the infosource name. But i get the error "No Transfer Structure Selected" when i execute the prg.
how can i change the source system without creating the transfer rules for the new source but use the existing transfer rules and just change the source system assigned to it????
Regards
SujaiHi Sujai,
There are many cases when this program is used.
When the Trans rules get de-activated due to impact,we need to first replicate the data source and activate the TR using this program.This generally occurs during the data loads in prd.
It does not makes sense to transport it when there r no changes done to the TR.So simply,u can use this program to activate.
If the program does not work,then you are left with the transport option.
Thanks & Regards,
Suchitra.V
Maybe you are looking for
-
Error When Signing a Document (Using a new digital ID)
After designating a digital signature and attempting to save, I receive the following error: Creation of this signature could not be completed. Could not create appearance stream. I attempted to try this on another computer and still the same error.
-
Remote speakers via Airport Express no longer working on one iTunes instance
I have iTunes on my iPhone, Windows desktop, and Windows laptop. At one time they all connected to my Airport Express with remote speakers attached. At some point, after a version upgrade, my laptop no longer sees the remote speakers while the other
-
New Value fields created in existing opr struc problem in transport request
Hi, I have created new value fields in existing operating structure but system has now created any transport request for value field creation also for value field activation and later on operating concern generation on development environment. What i
-
How do I add "Save As" to the Pages drop down menu?
How do I add "Save As" to the Pages drop down menu?
-
Error Message; Wheel won't spin
When I try to open itunes on my computer, I get a message: "unknown error occurred (-50). I can't find any reference to this under support and have no idea what to do. To make matters worse, my spin wheel won't spin!!