Hello,
I created a new subscreen in the Material Master.
I can do depends on plan Subscreen?
Thanks.

This subscreen should only work for a plant (For example 7000).  If the plant is different should not be displayed. It´s not possible?
Could do with an exit?
Thanks
Edited by: zivan_xix on Jul 29, 2010 10:29 AM

Similar Messages

  • Purchase of Raw Mat by New Plant (CoCd New) from Old Plant (CoCd Old), STO?

    Dear all
    Our HQ which has an operating Plant A belonged to Company Code (CoCd) A,has acquired Plant B belonged to Company Code B.
    And due to the supply change management issue and strategic business location, HQ has decided to move both Plant A and Plant B into a new location (both Plant A and B are located quite far from each other) and these 2 plants are going to be consolidated into a new Plant C with new Company Code C. And CoCd A and B will then cease to operate.
    Now, due to the legal requirements, CoCd C will need to purchase all the raw materials from both CoCd A and CoCd B respectively at a different date due to the plant move.
    Previously, I have come out with the solutions
    1. Extend the material codes of Plant A & B to Plant C. Extend the SLOC as well.
    2. Plant C will create normal PO to buy from Plant A, with vendor = Plant A. Price will take from Supplying Plant A.
    3. Plant C will perform GR reference to this PO. Here the Stock Account of Plant C will be Debit.
    4. To reduce Stock Account of Plant A, perform GI to Scrap. Then FICO will do double entry to bring the value to Customer Account which is Plant C.
    5. Since we do not PGI or touch on SD, there is no billing doc and manual customer invoice has to be done.
    However, on 2nd thought, I think of to use Stock Transport Order. However, there are a few types of Stock Transport Order in SAP HELP:
    1. STO between Plants with 1 step
    2. STO between Plants with 2 steps
    3. STO with SD delivery
    4. STO without Delivery
    5. STO with SD delivery and billing.
    We are running against time and would prefer not to touch on anything in SD to do STO. And we do not need to monitor the Stock Transit as physical plant move will take place first, that make STO in PLant with 2 steps no applicable.
    Requirement:
    1. PO raised must take the standard price in Material Master of the supplying plant.
    2. It involves buying of stocks of 1 new plant C from the old plant A & B at the respective time. Accoutning document and relevant posting must be audited for legal purpose.
    3. If possible, we prefer not to touch on SD or the complicated solution to achieve this purpose.
    I have read a lot about the above 5 types of STO but I am unsure which one is best suit me. Please advise.
    Thanks.

    I just tested with Option 4: Create STO without SD Delivery.
    However, in the PO itself, it does not even have the INVOICE TAB at the item level. How am I going to perform Invoice Verfication to put the 17 % input tax which is very important?
    However, I have proceded with my testing for STO without Delivery
    1. Create PO with UB Doc Type and Item Category U, supply plant = Plant A. However, there is no Invoice Tab at the item.
    2. Perform GI reference PO, MVT 351. Here due to come missing config, I have done the following:
         a.Company Clearing Account
         b.Create customer master  CoCd CN10
         c.Create vendor master for CoCd CN50
         d.Account type D is not defined for document type WA. Go to OBA7 to tick Customer.
         e.Account type K is not defined for document type WA. Go to OBA7 to tick Vendor
        1 Material doc with 2 accounting doc generated, each for CoCd C and CoCd A
    4. Perform GR referenc ePO, MVT 101.
        1 Material doc generated with no accounting doc.
    5. MMBE Stock Overview, stock quantity of Plant A is now transferred to new plant C.
    There is no way I can do invoice as in MIRO, it said my PO contains no item.
    I desperately need my perform STO to have
    (a) Invoice Verification to capture input tax 17%
    (b) Delivery Cost maintained.
    I do not want to complicate the material master maintenance of the sales view of all my 16000 raw materials. That is why I prefer not to go for STO with SD DElivery.
    Can anyone please advise?
    Edited by: Daimos on Sep 4, 2009 12:49 PM

  • Enhancement for ME21N & ME22N new subscreen

    Hi all,
    I'm looking to ad a new subscreen using definition ME_GUI_PO_CUST. I looked at the example CL_EXM_IM_ME_GUI_PO_CUST to understand how it works. Do you know why in the example the include "LMEVIEWSF01" is used? How the logic in the PBA and PAI works with the new subscreen? And where to put the new logic?
    Thanks.

    DONE THROUGH USER EXIT

  • How to add new subscreen & fields to ME51N

    Hi Experts,
    How to add new subscreen and to add new fields at item level, maybe someone have done this before and maybe can guide me...
    Thank You.

    someone have experience on this? so can you guide me... tq

  • How to add new subscreen to tr.il01/2/3?

    Hi friends,
    I developed new subscreen using userexit 'ITOB0001' and screen exit 'SAPLITO0' screen number 1000 type subscreen
    but I don't know how to add this sub screen to il01.
    Please explain how to add this subscreen to il01....
    thanks in adv.

    Hi,
         for adding the sub screen to the transactions. It has to be done in the SPRO. Ask your functional consultant to configure.
    I have done this for quality notification QM01 . After creating the sub screen , in the SPRO
    I am giving for quality notififcation u chk the same for IL01
    SPRO>Quality management>Notification --> Overview of notification types --> Select the notification & 90 give the customer specific screen area
    Subscreen Number for Customer Screen Area "Notif. Header"
    Specifies the customer screen area that you can activate on the main notification screen using the SAP enhancement if you are working with the screen area '090' (customer subscreen (one screen/NTyp)).
    Cheers

  • Set up new sales org/plant but without using Finance - is this possible?

    Hi,
    I was asked if the following is possible.
    Set up a new sales org/plant but without using Finance.
    It should be possible to create purchase order with goods in
    and sales orders with delivery and goods issue.
    But the invoice will be done in an external system.
    So, all what has to do with finance will be done in an external system
    also the goods in/goods out values.
    So the stock and stock movements should be visible in SAP, but the values for this stock
    will be posted in the external system manually.
    So the question is: Is it possible to set up a new sales org/plant
    but without using Finance?
    Thanks
    Regarfds
    Dieter

    Hi,
    really nobody has a hint?
    Most important: the stock movements should only consider only quantity no values?
    Isn´t there any way to say for a certain material it only consider quantities but no values?
    Regards
    Dieter

  • Adding a subscreen in Plant data/stor. 1u0094 tab in Material master

    Hi All,
      I need to add a subscreen in material master Plant data/stor. 1 tab. Please let me know if its posible.
    Warehouse management requires a primary bin and 4 alternative bin locations to be added to the material master. Four custom fields will be added in addition to the standard primary storage bin location field. These fields will be held at the branch/storage location level. 
    For this I enhanced MARD table with a structure contains 4 fields.
    •     A sub-screen should be added to the “Plant data/stor. 1” tab. “Alternative Bin Information” section should hold the additional four fields.
    I want to add a sun screen under General data. This sub screen contains 4 fields for alternative storage bins.
    Regards,
    Venkat.

    Hi,
        Hi,
    u'll have to do the following:
    1. copy the std func group MGD1 to ZMGD1....include all ur custom screen and make sure u hav written the PBO and PAI .
    Best way would be copy any standard screen and then making any change there like modifying the label.
    2. next step is copying the screen sequence ( logistics-material master-configuring the material master)....01 to z1 and then assigninng all ur new program and screen name in this custom screen seq ...
    and u can assign this custom screen seq to diff material type....
    there is a bit of SPRO involved in this...
    and check the BADI BADI_MATERIAL_REF.
    <b>REWARD POINTS</b>
    rEGARDS

  • Do not carry out new pricing when plant change in sales order

    Hi,
    I have one z field in additional data tab in sales order. This field store the original plant if anyone has changed plant in Sales order. My requirement is to trigger the pricing in sales order with this old plant. I am not getting any exit for this.
    Suggest me the solution.

    Hi
    In the comments for the subroutine, it says:
    *       Parameter new_pricing controls the new pricing in the calling *
    *       form. It can be filled according the the allowed values       *
    *       of domain KNPRS (Pricing type), for example:                  *
    *       ' ' = no new pricing                                          *
    *       B   = Carry out new pricing                                   *
    *       C   = Copy manual pricing elements and redetermine the others
    So, you must write:
    If VBAP_WERKS NE *VBAP_WERKS.
      new_pricing = 'B'.
    Endif.
    Regards
    Eduardo
    Edited by: E_Hinojosa on Aug 25, 2011 8:21 AM

  • Customer master extending to new CC and plant

    Hi
    I have 100 customers existed under 1000 company code and 1000 plant.
    Now i want extended to same 100 customers to new entity - 1200 company code and 1200 plant.
    for this which transaction & steps i can use. can any one help me
    thanks
    satish

    HI,
    If the sales area is the same then,
    in SPRO assign,Enterprise Structure>Assignment->Sales and Distribution
    1.Sales Organization-Distribution Channel-Plant and later
    2.Use XD01 to extend the customers.

  • Set new smartforms for Plant

    Hi All,
    I have new plant, When  I create new smartform, but a don know how to assigned new form to that plant ?
    Please help me do it !

    I have function in package on database which is param is String and return value is also String(VARCHAR2).
    That function calculate some field on db and return a result.That is OK
    I made VO in my AM.
    "SELECT package_name.func_name("string") from dual" and that is OK also.
    When I start that module I recive valid result from database based on string which I passed to function.
    And that works fine.
    Question :
    How can I change value or how can I set new value for the package_name.func_name(variable) in VO
    during runtime in my application ? ^^^^^^^^
    JDeveloper 9.0.3.988 1. When using stored procedures it would be better to use it in following way:
    Connection conn = //get it some how
    CallableStatement cs = conn.prepareCall("{call myPackage.do_something(?)}");
    cs.registerOutParameter(1, java.sql.Types.VARCHAR);
    cs.execute();
    2. You could parameterize it like this:
    CallableStatement cs = conn.prepareCall("{call " + packageName "." + funcName + "(?)}");
    cs.registerOutParameter(1, java.sql.Types.VARCHAR);
    cs.setString(1,"someString");
    cs.execute();
    String result = cs.getString(1);
    where packageName and funcName are defined elsewhere
    --hery

  • LSMW for extending materials to new set of plants

    Hello All,
    Our requirement is to extend some hundreds of materials to a set of few plants. Can this be done in LSMW? Or should BDC be used??
    Please elaborate on this.
    Regards
    Mahesh

    Hi Girish,
    How can I extend materials to a new plant and Sales Org.  through LSMW?
    I use the Standard Batch Object 0020, program RMDATIND for creating new Materials the first time (this qworks fine), but there is no option 'Extend to existing material'  or there is no field called Reference Material...
    Maybe it is because we use internal numbering of the new Materials that makes it unpossible to extend materials to existing material-numbers?
    Thank you, regards, Walter.

  • How to: not to carry new pricing when plant is change

    Hi,
    How can I prevent the system from carrying out new pricing when the plant is changed.
    Also,
    I have a quotation in which users can change the prices, I want to finalize the pricing in the quotation and have my sales order with fixed pricing. What is the best way to do this.
    Thanks.

    Hi,
    Try this user exit.
    Include: MV45AFZB
    USEREXIT_NEW_PRICING_VBAP
    This userexit can be used to perform new pricing, dependant   *
          on the change of datafields.                                  *
          This routine is not called, when the material number has been *
          changed.                                                      *
          Available data-fields:                                        *
            vbak - header data                                          *
            vbap - item data     (changed)                              *
            *vbap - item data (old, before the change)                  *
          Parameter new_pricing controls the new pricing in the calling *
          form. It can be filled according the the allowed values       *
          of domain KNPRS (Pricing type), for example:                  *
          ' ' = no new pricing                                          *
          B   = Carry out new pricing                                   *
          C   = Copy manual pricing elements and redetermine the others
    It should work for you.
    Reward points if it works for you.
    Rajesh S.

  • New Zmovement type, plant , company code

    Hi friends
    Some time back somebody has created a new Zmovement type, now if i want to know from which standard movement type it has been copied and created,how to trace the same
    Also the same case for new plant,company code
    Regards
    Amuthan M
    Edited by: Amuthan M on Oct 13, 2008 10:08 AM

    hi ,
    check the description of the zmov type in DE language..from here, get to browse to translate it in english so from here u can have a link where it is originally copied...
    think out of the box...
    cheers
    she

  • Extenstion all relevent areas to new newly created plant

    Hi All
    Can any body help me in giving steps to be followed for newly created palnts for the existing configuration. This i need for my client urgently.My email ID [email protected]
    thanks in advance
    ram

    Dear Ram,
    In IMG under
    Enterprise Structure -> Definition -> Logistics General -> Define Copy Check Delete Plant
    Enterprise Structure -> Assignment -> Logistics General -> Assign Business Area to Plant/Valuation Area and Division
    Enterprise Structure -> Assignment -> Materials Management -> Assign Purchasing Organisation to Plant
    Also, visit:
    http://www.sap-img.com/materials/procedures-for-copying-one-plant-to-another.htm
    http://www.sapscene.com/sapscene/creating_plants.htm
    Regards,
    Naveen.

  • New subscreen in TM03

    I want to add new fields and a button to transaction TM03, and the ideal is to use a new tab in the existing tabstrip and change the menu bar. How can I do that?
    Thanks in advance,
    Daniel

    u need to do using screen exit. first see what fields need to be added..Add them to the corresponding database table...now add the fields to the tab strip and write appropriate code to update fields in the database.

Maybe you are looking for

  • MULTIPLE ACCOUNT ASSIGNMENT IN SERVICE PO

    Hello Experts,    I've created service PO with multiple account assignment. This PO contains manually entered condition at header level.Issue is that for multiple A/C assignment, I'm getting message " No delivery Cost can be posted in case of multipl

  • I got a mouse issue with Photoshop.

    When trying to use the brush or any tool, the tool doesn't Hold   drag. Clicking and holding to use the brush only creates the initial mark (dot). I have a MacBook Air and Photoshop Elements 11. I searched on the internet and people say its got to do

  • Major Mail Issue

    recently every time that i try to attach a file to a e-mail my whole system will crash no KP nothing like that. the mouse is the only thing that will move on my screen my clock stops and that is when i know i have to restart the system Does anyone el

  • How to install Just the 64bit Version?

    I got 32GB of RAM and WIN 7 64bit ENT ED. so why would I want to waist my HDD space with a 32bit version. I only use 32bit if its only available in 32bit. Some advanced options would be nice in the Application Manager

  • Java 1.5.0_17 core dumps