New updated EPG? (From the old one).

Hi,
DS just posted this in another thread -
"The EPG used to last for 2 weeks, now it appears to update every 4 hours".
This looks like a step in the right direction!
Does anyone else know about this?
Rank - Mostly Harmless.

guilbo wrote:
DS wrote:
Download Time:3/15/2011 7:47:00AM
Next Update Time:3/15/2011 11:46:46PM
23:46:46
07:47:00
------------15:59:46
Hi Guilbo
I'm very tired and extremely confused
Help me out....
"Download Time:3/15/2011 7:47:00AM" -
I'm I correct to guess that this was when my box was switched on?
or note the mins (47), when the main EPG update was d/loaded?
Then the box displayed this earlier  -    "Next Update Time:3/15/2011 11:46:46PM" (hence my confusion)
And after the above time, changed to-"Next Update Time:3/16/2011 3:46:29AM" (almost 4 hours between them)
edit. Guilbo, just noticed your edit. Must admit, knew about the 2 weeks but never noticed the 4 hour Next Update Time.
-+-No longer a forum member-+-

Similar Messages

Maybe you are looking for

  • How can I use 3D function in Photoshop CS6 (student package)?

    Please let me know how can I use 3D function in Photoshop CS6 (student package)? Thanks,

  • BT Infintiy lack of speed

    My broadband speed has dropped drastically oner the last week! Just done three speed tests the highest was 1.69mbps. It was in the region of 76mbps. Apart from the usual suspects all of which I have checked what other reasons could there be for such

  • How can I view a PDF file on my IPad? I only get the first page.

    How can I view a PDF file from my Ipad, both in email and Internet links? I only get the first page.

  • Acting Up Action

    Hi , Can somebody tell me about acting up action. What will be infotypes to be maintained. secondly i have a confusion which i tried to solve through sdn threads but yet not mu ch clear that during organisational re assignment is it neccessary for pe

  • Get the first and the last date of a week

    Hi all I need to get the first and the last date of a specific week. I need a function that returns two date passing it just one date. The function has to calculate the first and the last date of the week of the argument date. hope to be clear regard