Newbie Doubt about the Use of AE

Hi all,
I have to create a clip for the luch of a product (around 2min30sec).
Do you suggest me to do "everything" inside AE or just some parts and then import it in Premiere?
I'm asking because I don't know if AE is designer for create 2-3min length clips or just smaller ones.
Thanks.

I'm not sure which iPhone launch video you're referring to, but the ones that I've seen would have some parts be cut in Premiere Pro first and then After Effects would be used for the motion graphics portions. The motion graphics might be created and then imported into Premiere Pro or the Premiere Pro project could be imported into After Effects for all the graphics after the edit has been locked.

Similar Messages

  • Doubt about the sizing in the CPH

    Hi gurus!
    I have the following doubt about the sizing in the CPH.  I'm going to implement the CCMS BI CONTENT, i read the Note 979581 - Installing and configuring the CCMS BI Content, but in the document called "IT Performance Reporting Using SAP NetWeaver Business Intelligence" you can see images in this link:
    http://www.servidor-imagenes.com/show-image.php?id=050236bd91654e16c94a559350611dff
    here said how I can calculate the sizing based in Data Record Size per each Metric stored, but in specific,  about the example: 20 systems, 17 CPH metrics. are included SCM, BI, ECC, SOLMAN in this 20 systems? And about the 17 CPH Metrics is talking about ratios? what's mean the CPH metrics?, How can I know what is my CPH metrics?
    I hope can help me
    Best Regards
    Ramon Sanchez

    this theme has been closed on our enterprise

  • Doubt about the distribution system

    I have a doubt about the distribution system.
    We have made a publication and download it and have it in our iPad. The client does not want tosell or that anyone other than its 15 commercial rest her ipad. How can we host it in those 15ipads?, Do I need any of the subscription programs adobe?
    Thanks!

    function(){return A.apply(null,[this].concat($A(arguments)))}
    function(){return A.apply(null,[this].concat($A(arguments)))}Matthew Laun wrote:
    Yeah... Someone did that yesterday with 70-something users all trying to get the updated folio at once, and it caused server outages. I've got a feeling we may modify the user agreement to limit this. Not saying for sure, just a word of caution.
    Matthew
    I don't understand this reply at all.  Many of us have been using acrobat.com in exactly this fashion, and I've posted about it many times; including a full review:
    http://forums.adobe.com/message/3853106#3853106
    Did Adobe not see this coming? How would you limit the download amount without gutting the functionality?  Would this apply to paid acrobat.com accounts as well?
    I'm about to upgrade my acrobat.com account this week to host more than 1 folio.  You need to clarify what you mean by 'modify the user agreement' ASAP.

  • About the use of "Cut" on Finder

    I'm very concerned about the use of "Cut" on Finder (Finder: Edit->Cut). I mean, when is it activated? What is its functionality?
    Sorry but I've never seen it activated!
    Very thanks in advance.

    Since Windows has a file cut/paste, at some point someone thought about including that in the Finder. It doesn't really fit into the MaxOS though, so it is normally disabled (probably because it was never finished). You can enable it by adding an entry to the Finder's .plist - see this MacOSXhints article.

  • Doubts about the advantages and disadvantages of BEx Analyzer

    Hi people!
    Do you know in specific. What are the advantages and disadvantages of BEx Analyzer?
    and Do you know the limitations and scope of the bex analyzer?
    Talking about the security issue. What kind of resticciones be applied to end-users to control information. Protecting system
    resources and the information that the user uses, not be manipulated.
    I hope you could answer my doubts
    Ramon
    Thanks

    Hi!
    The standard BEx BI 3.x tools, is no longer available with the SAP NetWeaver 7.0 BI tools; however, it is part of the SAP BI add-on installation that, by default, will install the BW 3.x tools along with the newer BI 7.0 tools.
    We want to prevent unauthorized download of data to excel sheets from users who have installed bex analyzer but are not authorized to do that. Certain users only have to access querys from web and shouldn't have to use reports from bex analyzer.
    The only accepted way to access reports for all users is by using web querys published in our intranet. But many users have bex analyzer installed and we don't want that an unauthorized user download data to a excel sheet via bex analyzer.
    I'm testing with one user with this roles, but bex web template and bex analyzer have similiar object authorizations, and i don't know if is possible prevent unauthorized download of data from excel sheets.
    Final users don't access to bex analyzer by rrmx transaction
    Until know i'm testing with this user roles:
    1. ZBW:BEX_WEB:RFC (for web templates)
    S_RFC:
    ACTVT:     16
    RFC_NAME:
    RFC1
    RSBOLAP_BICS
    RSBOLAP_BICS_CONSUMER
    RSBOLAP_BICS_PROVIDER
    RSBOLAP_BICS_PROVIDER_VAR
    RSOBJS_RFC_INTERFACE
    RSRCI_LOCAL_VIEW
    RSWRTEMPLATE
    SDIFRUNTIME
    SYST
    RFC_TYPE:  FUGR
    2. ZBW:BEX:RFC (for Bex Analyzer):
    ACTVT:     16 
    RFC_NAME:
    RSOBJS_RFC_INTERFACE
    RSR_XLS_RFC
    RZX0
    SDIFRUNTIME
    SM02
    SUNI
    SYST
    RFC_TYPE:  FUGR
    please take in count this points:
    1. Prevent unauthorized download of data to excel sheets from users that should have accees only querys from web not bex analyzer (very important this point)=
    2. what are the disadvantages of BEx Analyzer, if only if limited by excel...from other point like performance, workprocess with long runtimes, memory issues, for said something.
    I don't know if i'm going by good way.
    Somebody could help me?
    Ramon

  • Doubt about the settlement rule of the Production ORder

    The only default distribution rule allowed for a PP order is PP1 or PP2.  We would need to change that to allow settlement to multiple receivers as a default. If that is the case, we may want to look into a user exit to update the settlement rule during production order creation instead so that the G/L account is correct from the beginning.
    Currently when we create the production order, the settlement rule will default the below, I am not sure if a user exit is able to maintain the Source as 200 (Materials)?
    If yes, we can then add the second rule for Source 100 (Labor and Mfg) via the user exit as well.
    In this case, SAP will not prompt us error of settlement with 200%, as they are from difference Sources.
    now anybody can explain me about the User EXit we have to correct this

    any help on this.. please its very urgent
    thanks in advance

  • Clarification about the use of TABW1 fields

    hi...,
             can any one help me what is the use of below fields in table S012.
    TABW1     MC_TABW1   DEC     9 0     Delivery date variance 1 in days
    TABW2     MC_TABW2     DEC     9     0     Delivery date variance 2 in days
    TABW3     MC_TABW3     DEC     9     0     Delivery date variance 3 in days
    TABW4     MC_TABW4     DEC     9     0     Delivery date variance 4 in days
    TABW5     MC_TABW5     DEC     9     0
         Delivery date variance 5 in days
    Regards
    sam

    No ANS

  • Slight doubt about the downloading shown on Launchpad mac.

    hello folks!
    I have been worried about the downloading process shown in launchpad's first page is happening instead of second page like in lion! is it happening to you people too?

    It is in the first page.
    # 8
    http://support.apple.com/kb/HT5548

  • I have a doubt about The Single-Thread Rule

    The [url http://java.sun.com/docs/books/tutorial/uiswing/overview/threads.html#rule]Single Thread Rule states:
    Rule: Once a Swing component has been realized, all code that might affect or depend on the state of that component should be executed in the event-dispatching thread.
    I began to wonder about this because so much code seems to work just fine when it isn't executed in the event dispatching thread. Why are there exceptions? I went looking for some code which acted differently when executed on the event thread than when it was not. I found this
    http://forum.java.sun.com/thread.jsp?forum=57&thread=410423&message=1803725#1803725
    Now I started wondering why this was the case. What I found was that DefaultCaret adds a document listener to the document of the JTextComponent. In this listener, the insertUpdate() method specifically tests if it is running on the event dispatch thread and if it is, it updates the caret position.public void insertUpdate(DocumentEvent e) {
        if (async || SwingUtilities.isEventDispatchThread()) {
            // ... update the caret position ...
    }I then copied the code from DefaultCaret and made a MyCaret. I needed to tweek the code a little bit, but it ran. I removed the event thread test. It worked outside the event thread. There was a small difference in the results though. The textarea did not scroll all the way to the bottom. Almost, but not quite. I didn't test enough to make sure this was the only problem, but there was at least one problem.
    Now I started think about why this would be. The thought crossed my mind that the order of the events which were posted to the event queue were probably important. Sun found bugs when components were updated out of the event thread, so they essentially ignored events which weren't on the event thread and created the The Single-Thread Rule.
    A few days pass. I'm starting to wonder if Sun could have done a better job making Swing components thread safe. I also don't know that this specific case I found was the rule or the exception to the rule. But without insight into the design philosopy of Swing, I would have to examine all their components and see how they have written them and see if I can come up with a better design. That sound like a lot of work. Especially without getting paid for it.
    But wait a second, all you have to do is call the append() method of JTextArea on the event thread. If that is the case, why didn't they write the freakin component that way? Well, I'll try itclass MyTextArea extends JTextArea {
      public MyTextArea(int rows, int columns) { super(rows,columns); }
      public void append(final String text) {
        if (SwingUtilities.isEventDispatchThread()) super.append(text);
        else {
          SwingUtilities.invokeLater(new Runnable() {
            public void run() { myAppend(text); }
      private void myAppend(String text) { super.append(text); }
    }I change [url http://forum.java.sun.com/thread.jsp?forum=57&thread=410423&message=1803725#1803725]camickr's code to use a MyTextArea and it works fine without calling from the event thread. I've essentially moved The Single-Thread Rule to the component itself rather than relying on each and every one of the [url http://www.aboutlegacycoding.com/default.htm?AURL=%2FSurveys%2FSurvey6intro%2Easp]2.5 million Java programmers worldwide to use SwingUtilities.invaokeLater().
    Now for my question...
    Why didn't Sun do this?

    Swing is slow enough as it is. Lets not make it slower
    just
    because dense "programmers" don't know what they are
    doing.I agree with you in defending the current model, but aren't you a bit harsh there?!? ;-)
    Well, there are a number of not-so-dense programmers that expect such high-level components to be thread-safe. The question is worth asking whether Sun intentionally favor the explicit thread management for performance reasons, or whether this was an oversight.
    I'd go for the former (intentional) : indeed any GUI toolkit is inherently thread-based; there is always a distinction between the graphical thread(s) and the application threads - and the programmer always has to manage explicit thread creation to handle long-running event handlers without blocking the event dispatching thread. Extending thread concerns to the updating of components is therefore not a big move.
    So it seems fair that a core GUI toolkit does not hide thread issues (though to the best of my knowledge there is no such limitation in updating AWT components), or at least that's what Sun deemed.
    An ease-of-use-focused toolkit wrapping the core toolkit for thread-safety can be provided as a third-party product. Though I agree that wrapping the dozens of existing widgets and hundreds of methods is cumbersome - and the lack of such products probably shows it would have a low added value to trained developpers.
    Because your way is an extra method call and if
    statement, neither of which is necessary if you already know you
    are in the correct thread. Now count the number of methods
    which will need to be changed (and add up the extra cost).Indeed it's quite common to update several properties of several widgets in one bulk (when user clicks "OK", add a row to the table, change the title of the window, update status bar, re-enable all buttons, change some color,...).
    In this case explicit thread management doesn't spare one if but a dozen of redundant ifs!
    Note that there could have been if-less ways to cope for thread safety, such as creating a copy of the component's model when a change is made to a component, and switching the model only before paint() is called in the event-dispatching - of course coalescing all changes into the same "updated" model until paint() is called.
    But this would trade ease of use for redundant memory consumption, especially for some components with potentially huge models (JTree, JTable, JTextArea,...). And Swing appears to be already quite memory-greedy!

  • Doubt about the concept of HashSet and LinkedHashSet

    I read one of the SCJP 6 exam book, when talking about Set, it gives one definition:
    When using HashSet or LinkedHashSet, the objects you add to them must override hashCode(). If they don't override hashCode(), the default Object. hashCode() method will allow multiple objects that you might consider "meaningfully equal" to be added to your "no duplicates allowed" set.
    What I am getting confused is that IF the objects we add to them must override hashCode(), we must override equals() method also! Isn't it?
    Edited by: roamer on 2009?10?23? ??10:29

    jverd wrote:
    endasil wrote:
    When using HashSet or LinkedHashSet, the objects you add to them must override hashCode(). If they don't override hashCode(), the default Object. hashCode() method will allow multiple objects that you might consider "meaningfully equal" to be added to your "no duplicates allowed" set.This really is completely wrong. Duplicates being added to your set has nothing to do with not overriding hashCode, and everything to do with not overriding equals. No, if you override equals but not hashCode, you can get dupes. That is, two items that your equals method says are equal can make it into the Set.Sorry, to clarify, what I meant by that was that to avoid duplicates of meaningfully equal objects, you must override equals, and overriding hashCode is just a consequent of overriding equals (to maintain the equal objects have equal hashcodes invariant). Overriding hashCode alone will not, and cannot, prevent meaningfully equal duplicates if you don't first define meaningfully equal by overriding equals.
    In summary, it's wrong because
    1) You don't have to override hashCode() if you don't override equals (or rather, don't deviate from the default "two objects are equal if and only if they are the same object").
    2) If you have any other definition of meaningfully equal that you want enforced in a Set, you must override equals to correspond to that definition.
    3) If you override equals, you must override hashCode by the contract of hashCode and equals.
    That's why I was saying that the statement was completely wrong. It's taking a backwards approach.
    By not overriding equals, you're saying that no two separate instances can be meaningfully equal, so the default hashCode is fine. Yeah, I kind of figured for the statement to be meaningful, it is assumed that you have already overridden equals. Otherwise what's the point of even mentioning something two objects "meaningfully equal"?All this talk of "meaningfully equal" makes me think the opposite: that they haven't overridden equals, or haven't discussed it yet. Otherwise you could just say that the objects are equal, or are equal according to equals().
    I would question the authority of the source that said that.I would quesiton the source's ability to express himself clearly. :-)Yeah, maybe that's all it is. In that case, I suggest (to the OP) reading [Effective Java, Chapter 3|http://java.sun.com/developer/Books/effectivejava/Chapter3.pdf]. Best source I've seen for beginners to make sense of all this.
    Edited by: endasil on 26-Oct-2009 1:11 PM

  • About the use  range of Multicast fusion?

    “Multicast fusion”- My understanding is this:
    It is just suitable for a company which is using a video meeting,and  for some clients those are outside the firewall, for more  bandwidth saving,the company should use "Multicast fusion" instead of "Mulitcast" only.
    My company is a web site like youtube,for the "Large-scale Live broadcasts",whether  "Multicast fusion" is useless for us ?
    I am making a report about "Multicast", for this question,ask for help ,thank you everybody
    best wishes!

    Nigel,Thanks a lot.right now i am more clearly.but i still have some problems:
    The current situation is My Company is a videos share website(just like "youtube"),so   "Large-scale Live broadcasts" and “videos on demand”  are  the most concerned for us.
    1  "Large-scale Live broadcasts" ,currently we are using fmle + fms ,but we are considering to use  p2p for more Cost-effective.whether fms is more suitable for us?
    2 "videos on demand",we are using apache(http)+CDN,also we are considering to try to  use  p2p for more Cost-effective.for this case and also Because of many reasons,we won't turn to use rtmp/rtmfp, whether  the "Object Replication"  is the Main Solution in ActionScript?
    Combination of the above situation ,do you have some suggest for us,such as what service(lccs,fms) should we to be using, that more Cost-effective and More suitable for us。
    best whishes!

  • Hi about the use of my mouse

    Hi I'm using Bluetooth Mouse with my Macbook Pro. It's so wired, sometimes when I click the right button but it is the purpose of the left button, and sometimes it's right that click the right button and that's the right button purpose. How does that Come?

    Since Windows has a file cut/paste, at some point someone thought about including that in the Finder. It doesn't really fit into the MaxOS though, so it is normally disabled (probably because it was never finished). You can enable it by adding an entry to the Finder's .plist - see this MacOSXhints article.

  • One last doubt about the Verification Required message when trying to download anything.

    Hello guys, so this is the thing.
    Like a lot of people here I'm getting the annoying message "Verification Required: Before you can make purchases, you must tap Continue to sign in, then verify your payment info". OK right now my son is using my iPad and I setted my credit card payment info to None, so he can't purchase anything. He's just trying to install free apps like messengers, alarms, free games and other free stuff, but so far he only installed Yahoo Messenger, which is a free app like everybody knows. However we haven't be able to download anything else because that message which prevents to download anything. Also I'm in a new address and can't update my personal data because I have selected the None option in credit cards.
    So this is my doubt: If I checked None, it's suppossed I can't pay for anything, which is good to me right now because my son is ussing my iPad so, why I can't even download the free ones? I mean that's not logical to me.
    Why I can't navigate through the App Store getting free apps without this annoying message which prevents me to install even free apps?
    I just don't understand it.
    I hope anyone can help me.
    Best regards.

    Try 3 things -
    1. Double tap on the Home button, scroll through the appas until you get to the Apps Store one, press on it until the minus sign appears on it and then press of the minus sign. Go back to your Home page, selec the Apps store nd try again.
    2. Do a Reset [Hold the Home and Sleep/Wake buttons down together for 10 seconds or so (until the Apple logo appears) and then release. When the screen goes blank power On again in the normal way.] It is absolutely/appsolutely safe!
    3. Delete your card details in your Account details and try again.

  • Discussion About The Use Of Project Server 2013 Timesheet Custom Billing Categories (Post SP1 and April 2014 CU Install)

    In support of a consulting company using timesheet custom billing categories to designate project time as billable onsite, billable offsite, and non-billable, I've encountered a series of issues which appear to be associated with the custom billing category
    timesheet lines.  These issues cause timesheet users to get frustrated, and contribute to misalignment between project actuals and timesheet actuals.  We're in Single Entry Mode, no pre-population, SP1 and April 2014 CU Installed.
    I'll enumerate the issues here and pose the question to the community as to whether others are experiencing any/all of these things, and if so,  ask if any workarounds have been discovered.  We're working with Microsoft to validate these independently,
    but I am posing the questions to the community to gather additional information, and hopefully save some folks time in troubleshooting similar issues.
    1.When time is entered on an assignment into timesheet lines of multiple billing categories, only time entered since the last save is getting saved and ultimately sent, on timesheet submit, to the approval center.  Although the previously entered and
    saved time appears in the application interface when the timesheet is re-opened, only data since last save is actually saving to the server or processing through the approval center.  We believe this is the primary cause for timesheet and project actuals
    being out of alignment.
    2."_ Error Loading".  When assignments are added, deleted, or changed after a timesheet has been created, standard timesheet lines are added, deleted or changed (i.e. synchronize) with the assignments. However, for custom billing category
    timesheet lines, they do not change when the assignments change, and they aren’t removed if the assignment is removed.  We believe this causes secondary errors, like the "_Error Loading"  (and others as will be described below).
    3.When a timesheet with time in a non-standard billing category is deleted and recreated, time is arbitrarily moved to standard timesheet lines for the same assignment. If the task assignment is subsequently removed, the timesheet line causes the timesheet
    to break.
    4."Error Communicating with Server". When trying to submit a timesheet, a pop-up box appears indicating that there is an error communicating with the server.  This error appears because a timesheet line is no longer associated with a project.
    In order to submit the timesheet the orphaned timesheet line must be identified and manually removed. One technique we found which helps to identify an orphaned timesheet line is to select a task and submit task progress. Repeat for all timesheet lines until
    you get an error.  The timesheet line(s) with the error can be manually removed from the timesheet, fixing the error.
    5. Unable to Open Specific Timesheets without Error. There are certain scenarios when the "Remove Task" feature is used or an assignment is otherwise removed after creation of a timesheet with custom billing category lines, which causes orphaned
    timesheet lines. These orphaned lines can cause issues when trying to open a timesheet. The issue can appear when timesheets are in progress in multiple periods. In the problematic scenario, time is entered and submitted in one period and subsequently
    the task is 'removed' from another period before the PM processes the first approval request. Process governance can certainly help here, but improvement in the way synchronization occurs between project assignments and custom billing category timesheet lines
    would be great. The error can often be resolved by re-adding the assignment for the problematic timesheet user to the project (which creates a new assignment), and then allows you to open the timesheet.  Then time can be moved from the old timesheet
    line to the new timesheet line, and the old one can be removed.
    In 4 and 5, sometimes we can't open a timesheet without error, and other times we can open it but not submit it. We are not 100% clear on all the different causes for each. Each of these issues are suspected to be contributing the the misalignment of
    data between project actuals and timesheets, which can be a real problem for external projects for which time collected through timesheets are being used to generate invoices.
    Although these may seem like separate issues, warranting separate questions, I decided to post them together because they all seem to be related to synchronization of project assignments and timesheet lines for custom billing categories.
    Any thoughts or suggestions from the community would be appreciated.
    Best regards,
    Justin
    Justin Naughton

    There are many causes for each of the errors mention.  It would be best to put one issue to the forum at a time.  For example, some of these issues occur then tasks are deleted from projects but a timesheet has been submitted.   Depending
    on the scenario, some of these issues have been fixed with the latest service pack.
    Other issues are due to bad scheduling habits with the project managers and so first determining what they have done can help resolve some the issues.
    _error Loading, is because something is NULL in the data and the jave is choking when it build the form. Again, these may be because of delete tasks, resources, projects  or someone doing copying and pasting of rows.
    cheers!
    PS.  Train your PM to not COPY and PASTE rows in project schedules.  It can be done, but it can create problems.  There are over 500 fields and some have unique data and the copy paste creates havic.
    Michael Wharton, MVP, MBA, PMP, MCT, MCTS, MCSD, MCSE+I, MCDBA
    Website http://www.WhartonComputer.com
    Blog http://MyProjectExpert.com contains my field notes and SQL queries

  • Question about the use of asdoc

    I want to use asdoc to compile the flex SDK documentation myself. The reason is I need it in another format, and for a specific SDK (4.5.1).
    I simply cannot get it to run. Out of the box, what should the command line look like if I'm in the bin the bin folder? Everything I try just keeps throwing errors.

    1002099 wrote:
    +"When an application completes, you need to close any connections that you have created. Failure to close a connection can cause resources not to be released by the JMS provider. Closing a connection also closes its sessions and their message producers and message consumers.+
    +queueConnection.close();+
    +topicConnection.close();+
    +Before your application can consume messages, you must call the connection's start method; for details, see Section 3.5, "Message Consumers." If you want to stop message delivery temporarily without closing the connection, you call the stop method."+
    Should I close the connection as the last paragraph say?. If so, I don't know how to do it without lose the service, because if I call "close" method on the connection and immediatelyi start it, i will lose all my consumers and producers for a little time.
    You should close a connection when you have no further use for it as this will release resources.
    You must start a connection if you want to receive messages from it.
    Most applications don't use stop(). However if your application needs to temporarily pause delivery of messages (to the application) for some reason, call stop(). When your application wants delivery of messages (to the application) to restart, call start() again.
    Nigel

Maybe you are looking for

  • Release Management and Azure Hosted Build Agents

    Good day, I configured Release Management as follows: http://intovsts.net/2014/11/06/connect-visual-studio-release-management-to-visual-studio-online-and-microsoft-azure/ In this material mentioned that it is for VS Online (which I don't use)... Howe

  • How to make JOB CONTROL setting for delta extraction in Production system .

    Hello All, We are in the process to transport our development to PD server in BI . We have transported the data sources to ECC production and now we are filling the setup table for " SD BILLING BW " . After filling Setup table data in full mode throu

  • Menu is missing in Easy Access

    Hi Friends, In our system recently we uploaded CRM5.2. It is working fine. When I go to easy access under maser data, Bp and under BP BP - Maintain Business Partner ,BPH - Maintain Group Hierarchy ,CRMD_ORDER_BP - Business Partner Cockpit are missing

  • Configurator crashes Photoshop CS5

    I downloaded and installed Configurator this morning, then built a simple tools palette to test it. I installed the palette in Photoshop CS5's Panels folder, as instructed by Configurator. Then I restarted Photoshop, and it crashed three seconds late

  • Problem with lib32-gtk

    Hi. I swear I did a lot of research before posting. I saw that bug reports for outdated packages shouldn't be filed, but I have not found the lib32-package site to flag as outdated, since it's in the [community] repo. The point is that gtk2 is versio