Next inspection date in the Batch Determination Screen

Hi Gurus,
I am having problems with some user requirements because I am an abaper and I think this needs some SD expertice. Users want to see the "Next inspection date" of the batch (field QNDAT) when they do the batch determination of a delivery (Batch Split --> Batch determination). They want to see a new column in the screen, right next to the "Characteristic sort" field. I think that to put a new column in that standard screen is not possible. So I suggest to change the contents of the existing characteristic sort. And there is where I do not know how to do that. It is possible at all to have the next inspection date as a characteristic of the batch and then use it to sort?
Any help would be really appreciated.
Regards.

Hi,
Yes you can use next inspection date as a characteristics and sort the batches based on that.
Inform the user to add this characteristics (LOBM_QNDAT) in the material batch class and batch selection class using transaction code CL02.
Then in SPRO, using transaction code CU71, in the sort rule add this field as characteristics (LOBM_QNDAT).By this way the system will sort the batches based on next inspection date as parameter.
Note that the user needs to fill-in the next inspection date in all the batches in order for the sort rule to work properly.
Regards,

Similar Messages

  • Add the " expired date" in the batch determination

    Dear Guru
    we are to do the batch determination in the sales order,
    I want to know is it possible to add the " expired date" in the "batch determination" ?
    Thanks.

    If you want to add the Expiry Date then you can maintain the same in Batch Characteristics as Expired Date while creation of Batch.
    Also maintain in the Material Master Record > Plant Date / Storage 1 > Shelf Life Data  - Min. Rem. Shelf Life & Total Shelf Life.
    Best Regards,
    Ankur

  • Next inspection date is not updated in batch / prposed at the time of UD

    Hi
    I have configurted the system for retest of batches, the system successfully creates the inspection lot but when does not propose next inspection date at the time of UD nor it updates in Batch Master.
    I entered inspection interval days in QM View, the system entered the first inspection date correctly. Also Batch Restriction is working properly.
    Kindly help.
    regards
    Mobashir

    Hi Shaymal & VRMP
    I have checked the system, the only problem I am facing is that the system does not show next inspection date dialog box at the time of UD where I can see the next inspection date being set by the system
    Say, I use QA07 (Triggered Manually) on 19.jan.08. The Next inspection date was 26.jan.08 and Initial Run in Days was 10 (days), the system created inspection lot on 19.jan.08 successfully. At the time of UD it automatically set 29.jan.08 as the next inspection date (i.e. 19.jan.08 + 10 days)  istead of 06. Feb.08 (i.e. 26.jan.08 + 10 days) without showing dialog box / suggesting next inspectino date. 
    regards
    Mobashir
    Edited by: Muhammad Mobashir on Jan 19, 2009 7:11 AM

  • Batch determination with condition next inspection date is =10

    Hi,
    I want to configure the batch determination in such a way that if next inspection date is <=10 then the batch should not consider in the batch determination at the time of creation of process order, only those batchs should conside whose next inspection date is more 10 days.
    can anyone suggest ,any solution on this .
    Thanks
    HS

    Hi Shaymal & VRMP
    I have checked the system, the only problem I am facing is that the system does not show next inspection date dialog box at the time of UD where I can see the next inspection date being set by the system
    Say, I use QA07 (Triggered Manually) on 19.jan.08. The Next inspection date was 26.jan.08 and Initial Run in Days was 10 (days), the system created inspection lot on 19.jan.08 successfully. At the time of UD it automatically set 29.jan.08 as the next inspection date (i.e. 19.jan.08 + 10 days)  istead of 06. Feb.08 (i.e. 26.jan.08 + 10 days) without showing dialog box / suggesting next inspectino date. 
    regards
    Mobashir
    Edited by: Muhammad Mobashir on Jan 19, 2009 7:11 AM

  • Automatic inspection lot creation  upon reaching the next inspection date

    Hi qm experts,
    I have this scenario; my client wants to make an automatic inspection lot creation as well as posting to quality inspection stock of certain materials upon reaching its next inspection date defined in the msc2n transaction; how shall i make the inspection set-up of this materials??Thanks
    Regards,
    Matildo, Edsel F.
    QM Consultant

    Ok, you have me confused.  You want to do this as a one time thing?  I thought you want it to look every day, or every week, for batches that have reached their next inspection date?
    If its a one time thing, then yes, just run QA07 one time.  It only looks at unrestricted inventory.  Do not set up any parameters in the bottom half of the screen for expiration date.  If you do, any of those that have reached expiration date will be moved to blocked stock and no inspection lots created.
    If you want this to run regularly, you, or someone, needs to use QA05 to set up the batch job to run on a regular basis witht the approriate "days" value for how often your running it and how far in advance of the inspection date you want lots created.  And of course tick on "to inspection stock".
    There is no "automatic creation" as I think your thinking.  You either run QA07 once a day, or once a week or as often as you want to.  OR you set it up in a batch job (QA05) to be run once a day, once a week or as often as you want to.
    When the batch job is running, it 'appears' that the lots get created automatically.  But it is the QA07 program being run in batch that is creating them.
    Craig

  • Report to get next inspection date from msc2n

    Dear All ,
    I am trying to create a report for materials batches and the next inspection dates in msc2n . Is there a report of this type available in standard SAP ?
    Secondly
    From msc2n it gives the field as QNDAT in table MCHA . However I notice that when the dates in msc2n are manually changed or many other times the fields QNDAT in MCHA are completely blank . I have how ever noticed that the field QNDAT in MCH1 gives all the next inspection dates . How ever it is not mentioned in msc2n > How could this be explained .
    Ram~

    Hello Ram,
    No there is no such STD trx available that can give you your desire list for 'Next Inspection data'.
    Regards,
    Shyamal
    Edited by: Shyamal Joshi on Dec 23, 2008 11:48 AM
    Yes As correctly suggested by Ashok the table is MCH1, from where you can find all the details you need. along with the changed (Updated record) through MSC2N.
    Edited by: Shyamal Joshi on Dec 23, 2008 2:24 PM
    Dear Ram,
    BMBC will not help you to see the 'Next Inspection Date' in list form for all the batches in one screen. You will need to go to the Batch detail Change-Display for each batch to meet the requirement. While the table MCH1 is 100% satisfactory one for your requirement.

  • Deactivate creation of new next inspection date on re-GR

    Our user created GR (MIGO) against a PO and subsequently a new batch with a next inspection date was created based on inspection interval set to 730 days.
    The user agin after a few days did GR against the same PO and the next inspection date was again calculated based on this GR date and the interval. We do not want this re-assignment of the next inspection date once it has been set. Please help.
    Mrunal

    The problem is a user error.
    When you receipt a material that has a shelf life requirement, you must enter in the production date, (manufacture date), in the GR.  If you don't, it will default in the current date and usse that to calculate the expiration date.
    On the second receipt, the same thing will happen.  If the same batch is specified, if I remember correctly, the system should give a message that "batch has already been receieved" or some kind of warning.  For the production date, I believe it will still default in the current date.  I think there is another warning that the expiration date will be recalculated and a "do you want to continue" question.  If they blow through all these warnings, the system takes the new manufacture date and recalculates the new expiration date.  To the best of my knowledge you can't change this.  The users must be trained to ALWAYS enter in the correct prodcution date. 
    FF

  • Next inspection date

    "Inspection interval" is defined in the QM view of Material Master, and the system is calculating the Next inspection date from mfg. date automatically, and feeding it automatically in the relevant field in the Batch.
    Hence, we need to change u201CNext inspection dateu201D manually for each previous batch if it is revised on the basis of stability, which is practically vary difficult.
    Requirement: Retest period shall be revised if changed updated in material master for inspection interval.
    AYK

    Dear AYK
    From your post it appears that you have Batch Management activated lready and QM functionality you are trying to activate subsequently.
    I think you need to make use  of Recurring inspection for Batches with Shelf Life Expiry Date (SLED) then only this functionality will work in totality. For this purpose in QM view add Inspection interval period alongwith SLED data
    You can use Trigger manually ( T.code QA07) or Job planning ( T.code QA05) for this purpose.
    Incase you just want to update next Inspection, you need to do one by one OR make LSMW for same.
    Hope this will give you clue
    Regards
    GIRISH

  • Variable Next inspection date

    Hello Forum,
    I am working on a requirement of Variable Next inspection date. First time the next inspection time line is after 6 months and 2nd time it should be triggered after 4 months and subsequent one at each month .  There is only single field as Inspection interval in the material master. After looking superficially it looks to me that we can realise this through the exit QEVA0003.
    But before designing in detail using this  exit I would like to understand whether we can achieve this with any other standard SAP functionality -. Bespoke development and exits are the last thing I like to suggest to clients if we have standards SAP way to do the same thing .
    Regards
    Kaushik

    You are correct.
    The customer exit 'QEVA0003' inputs the next inspection date of batch master.
    User can change the next inspection date at transaction MSC2N or MSC5N in SAP standard.
    But if you have variable interval for recurring inspection and want to assign next inspection date automatically, you should implement the exit 'QEVA0003'.
    Regards
    Luke

  • Next Inspection Date in case of Mov. Type: 309

    Hi,
    During Transfer posting using Mov. Type: 309, (Inspection Type: 08) the Next Inspection Date is coming as per our logic of UD Date + 365 (Inspection Interval maintained in Material Mst.).
    But our requirement if that, the Next Inspection Date in case of transferred material must be same as from which transfer has been done.
    e.g. suppose material ABC is received with GR (Mov. Type:101) and its Its Next Inspection date is coming as 01/01/2012 (as its UD was done on 01/01/2011 + 365 (Inspection Interval maintained in Mtrl Mst).
    When we transfer this material to XYZ (with Mov. Type:309), its Next Inspection Date is required that of ABC (01/01/2012). But, as per present logic it is coming UD Date + 365 Days = 23/01/2012 (i.e. if UD is performed on 23/01/2011).
    How can I do that ?
    Thanx
    Vivek

    My guess is your batch level is at the plant level.  If the batch level is changed to material level or client level, this problem would go away.  This can have major impacts in other areas so it must be carefully considered.  But if this your requirement, it sounds like you might be at the wrong batch level right now.
    FF

  • How to make the batch determination process automatic

    hi
    ive maintainde my raw material for batch determination. but the thing is. when i create a production order.
    the material with batch is not pulling out batch automatically.i ahve to select the material and go to the bottom if the screena and select the batch determination. then its working.
    can i automate this.
    i mean when i create a production order.it automatically pulls out a batch. with out me doing the batch determination.

    Dear deepu,
    to do automatic batch determination set the Batch Entry field in material master to 3 for all batch manged materials. After this create and release the order, system will determine the batches automaticaly. Since u r alreeady using manual determination all other settings remain same. Just u need to change in material master
    sree

  • How to set start of cycle/next planned date at the Maintenance Item level??

    Hi All,
    We are uploading a bulk of Strategy Maintenance Plans into the system. Each plan has multiple maintenance items and each maintenance item in a plan having different next due dates. Now if we set the Start of cycle at the Maintenance Plan level, then the next due dates of the maintenance items in that plan would be calculated on the basis on Start of Cycle (Common for all) and frequency as set in MPackages in an item Task list. Since each Maintenance item may have different Frequency and next due date, generating a call object while scheduling the plan correctly to satisfy at the Maintenance item level is not seeming possible.
    Can someone please suggest as to how do I set the Start of cycle or say Next Planned Date or Last Scheduled date at the Maintenance Item level either through configuration or programmatically.We are working on an SAP 4.6C version.It is urgent!!!

    hi
    i think specifying start of the cycle for each maintenance level is not possible ,since start of the cycle refers to maintenance plan only .
    for SAP standard kindly refer the following [link|http://help.sap.com/saphelp_46c/helpdata/en/94/43a968abc011d395bd00a0c93029cf/content.htm]
    it is better to create one maintenance item per maintenance plan,if you want to control each maintenance item independently
    regards
    thyagarajan

  • Input data to the standard SAP screen .

    How to input data to the standard SAP screen . ?
    i am using BADI HRHAP00_ENHANCE_FREE to add some functionality to the screen of transaction PHAP_CREATE.
    =================================
    i am calling this FM 'F4IF_INT_TABLE_VALUE_REQUEST'
    in the BADI and i have to update the fields in the screen of the main program which is calling this BADI (HRHAP00_ENHANCE_FREE).
    This BADI is called at the button click .
    ZOBJECT_TABLE is a Z- table with values out which we have to select the value.
    and the value should be filled in the screen field as we select the record from the help.
    ====================================
    the screen is SAPLHRHAP_UI_DOCUMENT -
    SCREEN  3100
    The elements doesnt even have parameter ids .
    please suggest me how can it be done
    thanks in advance .
    Naval Bhatt

    Hi,
    I have solved the problem and my work is done properly.

  • Is it possible to see next due date in the table.

    Hi everybody,
    I would like to know one information regarding next due date.  We are having one requirement we want to know the next due date in the table.  Actually we are able to get the same in FBL1N.  But it is generating at the time report generation because it is storing in the structure. 
    Is there any solution is available to see the same in any table.
    Thanks in advance.
    regards.
    Chandra Sekhar

    Hi
    Thanks for your reply.  By generating custom report, I can get the information.  Actually I want to know by considering the payment terms in the transaction data, whether the payment date is storing by system in any table or not.
    Thanks in advance if you are providing the information.
    regards.

  • To enter planing data in the same input screen in the same time ?

    Dear Consultants,
    I have prepared a general input screen in BPS.
    Is it possiple to enter planing data in the same input screen in the same time ?
    Or does it lock the all infocube while someone entering plan data?
    Regards
    Mehmet

    Hi Mehmet,
    1.To control lock mechanism(Data Slicing) via auhorization is not possible, as it is different concept.
    2. Yes,it is  possible to enter plan data in the same time in to the same cube with the same data input screen, if the characterstic company is at header level, in the layout.
    ****Pls assign points if info is useful***
    Reagrds
    CSM Reddy

Maybe you are looking for

  • Help with PSF image control 2d convolution

    Hi! I have a problem maybe you guys can help me, im not a good coder. I have to make a vi (labview 7.1) that can open a jpg image, show it , then with a slider change the PSF (Point Spread Function) basicly controlling the blurryness and show how it

  • Which is better API Frame work or WebServices

    Dear All, We are planning to make a design for Open architecture to communicate four of our products which are previously designed independently. So we need to establish an interaction between one product with the other project up on their requiremen

  • Is possible Reset the reverse document ?

    I ask it because the system showed me >> u2018Resetting this reverse document is not possibleu201D

  • Crystal 2008 printing partial pages

    When printing from the Crystal 2008 Report Viewer, some printers do not print the entire pages (approximately 1/8 of each page prints).  When printing directly to the printer, the entire page prints. I have version 12.0.1100.0 of the Report Viewer. 

  • 6120C, email getting stuck in outbox

    Hi, Until the end of last week I could send emails fine; then looking today I had half a dozen, all stuck in the outbox! When I try to manually send them, they just sit there.... staying in the outbox, flagged as 'Queued'. Anyway, I have two email ac