Nexus - How to schedule a rollback
I have a Nexus 7000 that I'm trying to test a scheduled rollback on, but I cannot seem to find any command syntax that support this. I have NX-OS version 6.2x.
The checkpoint and rollback commands are nice, but no way to schedule a rollback.
Please help! Looking for any type of solution.
Thanks in advance,
Andy
Thanks Bilal. That solution seems to make sense; however, the job status shows a code of Failed (75). I cannot get any job to execute. I thought it was maybe my credentials but the aaa authentication statement I use works fine. I enabled the log file size in the scheduler to 1024, but there is no output when I issue a "show scheduler logfile".
I'm at a loss right now as to why it's not kicking any job off.
Similar Messages
-
How to schedule a concurrent request to run at a specified time/day?
Hi All,
How to schedule a concurrent request to run at a specified time/day (ex: Sunday 12pm)?
Thanks,
Chiru
Message was edited by:
Megastar_ChiruIs this to run periodically ?
During the request submission, click schedule, choose the specific days, and click on S = Sunday.
Change the start date on the date of the sunday you want to run, eg : 15-JUL-07 14:00:00, change the end date as well. -
How to schedule a report in background
could anybody inform me
how to schedule a report in background
if possible plz send the entire step by step process
thanx
regards
kals.HI,
Use transaction SM36
For step by step process refer this link...
http://help.sap.com/saphelp_bw30b/helpdata/en/c4/3a7f87505211d189550000e829fbbd/content.htm
Hope this helps!!
Cheers
Alfred -
Hi,
anyone can help me what transaction to be used and how to schedule a report program.
the exact requiremnet is like i have a report program which is to be scheduled at a partticular time to be run how can i do itHi,
Goto
SM36 tcode
and provide
Job Name , Job class
( depends on the priority whther A,B, or C).
and then choose
start condition
on the application tool bar
and then choose
Date/Time
button in the new window appeared.
Provide Schedule start data and time.
if you want to execute periodically then select
Periodic job
check box..
then SAVE button to be pressed to save the these settings.
then choose
STEP button
on the application toolbar and provide
Program name and variant name and lang ..
Press the SAVE button.
so program is scheduled to runn in BG mode at the specified time.
but while giving time we have to give server time not the system time
Thanks
Parvathi -
How to schedule the back job scheduling
how to schedule the back job for bdc , can we use it for both call transaction and session method . how to schedule the back job schedulinng for lsmw
hi,
Use t-code SM36 for scheduling.
<b>Do reward.</b> -
How to schedule the job to run evry Sunday at 12 P.M IST.
Hi Experts,
I want to schedule a job which will run evry Sunday at 12 P.M IST.
I have written the below script.
[code]BEGIN
SYS.DBMS_SCHEDULER.CREATE_JOB
job_name => 'SERVICE_SAL_FS.SAL_MESSAGE_BUFFER_PURGE_JOB'
,start_date => SYSTIMESTAMP
,repeat_interval => 'FREQ=WEEKLY; BYDAY=SUN; BYHOUR=12;BYMINUTE=0; BYSECOND=0;'
,end_date => NULL
,job_class => 'DEFAULT_JOB_CLASS'
,job_type => 'STORED_PROCEDURE'
,job_action => 'SERVICE_SAL_FS.SAL_MESSAGE_BUFFER_PURGE_PROC'
,comments => 'Run at 12 P.M.IST every Sunday'
,enabled => TRUE
END;[/code]
But the server in US.
[code]SELECT sysdate from Dual;
6/11/2013 3:58:58 AM
--But the time in India is 02:28 PM [/code]
How to convert the timezone to IST.
Please help me how to schedule the job to run evry Sunday at 12 P.M IST.
Thanks.Did you read DBMS_SCHEDULER docs:
The calendaring syntax does not allow you to specify a time zone. Instead the Scheduler retrieves the time zone from the start_date argument. If jobs must follow daylight savings adjustments you must make sure that you specify a region name for the time zone of the start_date. For example specifying the start_date time zone as 'US/Eastern' in New York will make sure that daylight saving adjustments are automatically applied. If instead the time zone of the start_date is set to an absolute offset, such as '-5:00', daylight savings adjustments are not followed and your job execution will be off by an hour half of the year.
When start_date is NULL, the Scheduler will determine the time zone for the repeat interval as follows:
It will check whether the session time zone is a region name. The session time zone can be set by either:
Issuing an ALTER SESSION statement, for example:
SQL> ALTER SESSION SET time_zone = 'Asia/Shanghai';
Setting the ORA_SDTZ environment variable.
If the session time zone is an absolute offset instead of a region name, the Scheduler will use the value of the DEFAULT_TIMEZONE Scheduler attribute. For more information, see the SET_SCHEDULER_ATTRIBUTE Procedure.
If the DEFAULT_TIMEZONE attribute is NULL, the Scheduler will use the time zone of systimestamp when the job or window is enabled.
SY. -
How to schedule a program in background after 5 or 10 sec
Hi All,
Can anyone tell me how to schedule a program after 5 or 10 sec in background after the transaction is completed.
It is not a custom transaction. I want to execute a Z program in background in a BADI
Regards
Yathish
Message was edited by:
Yathish GundlupetProgramattically? You can add this code to the end of your transaction(if it is custom, of course).
report zrich_0004 .
data: sdate type sy-datum,
stime type sy-uzeit,
l_valid,
ls_params like pri_params,
l_jobcount like tbtcjob-jobcount,
l_jobname like tbtcjob-jobname.
start-of-selection.
* Get Print Parameters
call function 'GET_PRINT_PARAMETERS'
exporting
no_dialog = 'X'
importing
valid = l_valid
out_parameters = ls_params.
* Open Job
l_jobname = 'THIS_JOB'.
call function 'JOB_OPEN'
exporting
jobname = l_jobname
importing
jobcount = l_jobcount.
* Submit report to job
submit <your_program_name
via job l_jobname
number l_jobcount
to sap-spool without spool dynpro
spool parameters ls_params
and return.
* Kick job off 10 seconds from now.
sdate = sy-datum.
stime = sy-uzeit + 10.
* Schedule and close job.
call function 'JOB_CLOSE'
exporting
jobcount = l_jobcount
jobname = l_jobname
sdlstrtdt = sdate
sdlstrttm = stime
Regards,
RIch Heilman -
How to schedule a job in SAP CPS
Hi,
I am new to SAP CPS.
So please tell how to schedule a job in SAP CPS. And which kind of job cam be schedule means BAP report.
Thanks
AnurodhHi,
In the installation and administration guide you'll probably find some examples.
The Job Definition you need is SAP_AbapRun to run any ABAP.
You submit this, specify the parameters as desired, and scheduling information, and that should do the trick.
That is assuming you have already connected CPS to an SAP system.
Check the topics in the docs within the product and on SDN on:
- Connecting to an SAP system
- Submitting Jobs
- SAP_AbapRun
Regards,
Anton. -
How to schedule a job occurring time for 1 1/2 hour in sql server
how to schedule a job occurring time for 1 1/2 hour in sql server
Hi,
This is a known issue in the previous SQL Server version and has been fixed in SQL Server 2012. You should be able to set 90 minutes and the change would be saved in SQL Server 2012.
http://connect.microsoft.com/SQLServer/feedback/details/346786/ssms-does-not-support-job-schedule-frequencies-greater-than-60-minutes
Currently, you may schedule the job to occur every 1 hour or you may refer to the suggestion by Latheesh to get around this.
Thank you for your understanding.
Tracy Cai
TechNet Community Support -
How to schedule job to execute after 5 seconds gap using the program
Hi ALL,
How to schedule the program to run after 5 seconds to execute using JOB_OPEN,JOB_CLOSE,SUB_SUBMIT function modules in which parameter I should give this 5 secnods?
Regards
maheshHi,
You can use the import parameters of function module JOB_CLOSE
SDLSTRTDT & SDLSTRTTM
to pass the required start date and time (respectively) of your background job. That is, if you want the job to be scheduled and start at a fixed time (as in your case 5 seconds in the future), you can determine the start date and time as 5 seconds ahead of sy-uzeit and pass the resultant values to the mentioned importing parameters.
Cheers,
Aditya -
I have one package and in side that package i have 5 Procedure like
a;
b;
c;
I would like to run that Package every 2 hrs automatically , Please provide me the solution how to schedule this job ..and i would like to get the errors while executing those Procedures
thanks
MAASHHi,
You cannot run a package, you can only run a procedure in the package.
In Oracle 10g and up the recommended way to do this is using dbms_scheduler for example to run scott.pkg.a every two hours you would do
begin
dbms_scheduler.create_job('myjob',
job_type=>'plsql_block',
job_action=>'scott.pkg.a();',
repeat_interval=>'freq=hourly;interval=2;byminute=0',
enabled=>true);
end;
Errors and successful runs will be logged in all_scheduler_job_run_details.
For more info see the Scheduler documentation at
http://download.oracle.com/docs/cd/B19306_01/server.102/b14231/scheduse.htm (examples)
http://st-doc.us.oracle.com/11/111/appdev.111/b28419/d_sched.htm (reference documentation)
There is also a dedicated forum for dbms_scheduler questions here
Scheduler
Hope this helps,
Ravi. -
How to schedule job for APDs?
Hi All,
Does anyone have an idea how to schedule a job for APDs? There is a program called "RSAN_PROCESS_EXECUTE" and it can be scheduled, but it needs to be run with the specific APD. I will appreciate any help with points,
ThanksI don't know what you mean when you say " ....needs to be run with the specific APD", but you can use the program to execute your APD in process chain by creating a variant, if you want to manually schedule, you can do so as well, rsanbw-> display the APD and schedule Icon on the top menu bar, that will give you scheduling options.
thanks.
Wond -
How to schedule Job for data uploading from source to BI
Hi to all,
How to schedule Job for data uploading from source to BI,
Why we required and how we do it.
As I am fresher in BI, I need to know from bottom.
Regards
Pavneet RanaHi.
You can create [process chain |http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/502b2998-1017-2d10-1c8a-a57a35d52bc8?quicklink=index&overridelayout=true]for data loading pocess and schedule start process to any time/date etc ...
Regadrs. -
How to schedule job V3 unserialised Update job for Inventory
Hi gurus,
How to schedule job V3 unserialised Update job for Inventory management
What are the things need to be configured
Thank youHi,
In R/3 go to SBIW > Settings for Application-Specific DataSources (PI) > Logistics > Managing Extract Structures > Logistics Extraction Structures Customizing Cockpit
UIn this Screen you can define delta type, and the jog usign the control job option.
Regards,
Dani -
How to schedule a background Job based on events
Hi,
We are on 4.6 C.
We have a background job that has two ABAP programs.
We need to start the 2nd ABAP program only after the first one has run successfully.
If the second ABAP program does not run, the the job should have a status "FINISHED".
Help appreciated.
Thanks
MalaHi,
How to schedule a background Job based on events,please refer to the follow SAP help:
You can use events that have already been defined, or you can create new events for scheduling background jobs.
If you wish to use new events, do the following to implement the event scheduling:
Define and transport the event as a user event with transaction SM62.
You must define only event IDs; event arguments are not defined in the R/3 System. Instead, you specify event arguments when you schedule a job to wait for an event and when you trigger the event.
If you define a new event, you must also transport it to your production systems. The event transaction does not have a connection to the transport system. Instead, you must create a transport request for the event yourself.
Do this to transport an event:
Create a transport request.
Start the editor in the transport request and enter the following:
R3TR TABU <table name> where table name is BTCSEV for a system event ID, BTCUEV for a user event ID.
Press F2 with the cursor on the table name to call up the screen for specifying the table entries to transport. In this screen, enter the event IDs that you have created.
Save and release the transport request. Ensure that it is imported into your production system(s).
To trigger an event, add:
the function module BP_EVENT_RAISE to your ABAP program, or
the program SAPEVT to your external script, batch file, or program.
When your programs execute these keywords, an event will be triggered in the R/3 background processing system. The event-based scheduler is started immediately. It in turn starts all jobs that were waiting upon the event, subject to normal background processing restrictions, such as the requirement that the job has been released to start.
Schedule the jobs that are to run when your events are triggered.
You can schedule jobs for one-time start or to be started whenever an event is triggered.
Regards,
collysun
Maybe you are looking for
-
Placed pdf: missing text boxes
Simple-but-frustrating problem: When I place a pdf (generated by Acrobat X, vers.10.1.0) in InDesign CS4 (vers.6.0.6), my text boxes do not appear. Font is embedded and confirmed as activated (FontExplorer X Pro, vers.3.1). System = Leopard, 10.5.8.
-
My Skype to Go doesn't work.
I tried to use it that way how it was advised, I could speak, but I had to pay the same price, as without "skype to go". I did it four different times and it was the same. Please help me, how I can manage to use this (what would be really very goo
-
Upstream documentation link/details in SAP IS Oil and gas?
Hi I was looking for some documentation on upstream activities (Exploration and Production) in the SAP IS Oil solution. The below link provides me the path to my SAP Oil and gas but not anything on upstraem activities: http://help.sap.com/saphelp_oil
-
Compressor is breaking up video- Help!
I'm in a situation where we have serious deadlines... and the exported video from Compressor is unacceptable. I am importing video AVCHD video, which is interlaced, into Final Cut from a Sony HDR-S11. Here are my settings: Sequence Preset: Apple ProR
-
OIM: How to change user search results table?
Hello, My customer wants to change the search results table to add/delete columns or move around the existing columns. Is there a way to configure or customize this? If so how? Please let me know. Thanks