Nm-nam - Failed to generate scheduled report
Hello,
I am using an nm-nam in a 3845 running v3.6(1b)and I receive this error: Failed to generate scheduled report for report Top Conversations when I try to run a scheduled report at a specific time of the day. I am using the external dns name of the mx record for the mail server. I receive a test email message but I do not receive the scheduled report.
thanks
Here is the URL for the Creating and Viewing Reports for the NAM
Follow the guide it may help you
http://www.cisco.com/en/US/docs/net_mgmt/network_analysis_module_software/3.5/user/guide/report.html">http://www.cisco.com/en/US/docs/net_mgmt/network_analysis_module_software/3.5/user/guide/report.html
Similar Messages
-
File Server Resource Manager 2012 - Fails to generate storage report - Event ID: 8242 and 602
Installed file server resource manager roll on new 2012 file server. When I attempt to run a dup report on the local volume, I received an error message: "the report generation task failed with the following errors: Error generating report
job with task name". "
Event ID 8242 and 602 are logged in the event viewer.
Log Name: Application
Source: SRMSVC
Date: 6/24/2013 11:11:03 AM
Event ID: 8242
Task Category: None
Level: Error
Keywords: Classic
User: N/A
Computer: xxxxxxxxxxxxxxxxx
Description:
Reporting or classification consumer '' has failed.
Event Xml:
<Event xmlns="http://schemas.microsoft.com/win/2004/08/events/event">
<System>
<Provider Name="SRMSVC" />
<EventID Qualifiers="32772">8242</EventID>
<Level>2</Level>
<Task>0</Task>
<Keywords>0x80000000000000</Keywords>
<TimeCreated SystemTime="2013-06-24T16:11:03.000000000Z" />
<EventRecordID>1276</EventRecordID>
<Channel>Application</Channel>
<Computer>xxxxxxxxxx</Computer>
<Security />
</System>
<EventData>
<Data>
</Data>
<Data>
Error-specific details:
Error: (0x80131501) Unknown error</Data>
<Binary>2D20436F64653A20434E534D4D4F444330303030303234332D2043616C6C3A20434E534D4D4F444330303030303231322D205049443A202030303030333036302D205449443A202030303030333734382D20434D443A2020433A5C57696E646F77735C73797374656D33325C73726D686F73742E657865202D20557365723A204E616D653A204E5420415554484F524954595C53595354454D2C205349443A532D312D352D313820</Binary>
</EventData>
</Event>
Log Name: Application
Source: SRMREPORTS
Date: 6/24/2013 11:11:03 AM
Event ID: 602
Task Category: None
Level: Error
Keywords: Classic
User: N/A
Computer: xxxxxxxxxxxxxxxxxxxx
Description:
Error generating report job with the task name ''.
Context:
- Exception encountered = System error.
Event Xml:
<Event xmlns="http://schemas.microsoft.com/win/2004/08/events/event">
<System>
<Provider Name="SRMREPORTS" />
<EventID Qualifiers="0">602</EventID>
<Level>2</Level>
<Task>0</Task>
<Keywords>0x80000000000000</Keywords>
<TimeCreated SystemTime="2013-06-24T16:11:03.000000000Z" />
<EventRecordID>1277</EventRecordID>
<Channel>Application</Channel>
<Computer>xxxxxx</Computer>
<Security />
</System>
<EventData>
<Data>Error generating report job with the task name ''.
Context:
- Exception encountered = System error.
</Data>
</EventData>
</Event>
When I click on schedule a new report task, I get an error "Class not registered".
nadaHi,
When we schedule a new job, we add a scheduled task to the c:\windows\tasks folder.
The scheduled task will contain the following command line
"c:\WINDOWS\system32\storrept.exe reports generate /scheduled /Task:"FSRM_Report_Task{GUID.......}"
There is also a folder on the system drive
C:\StorageReports\Scheduled
We Also store information in the system volume information folder in the following files:
c:\system Volume Information\SRM\Settings\ReportSettings.xml (we use .old and .alt extentions}
c:\system Volume Information\SRM\reports\reportX.xml (where X = an incrementing number set, in writing to these files, we also use .old and .alt extentions}
When experiencing issues relating to scheduled report jobs, you will want to examine these files and check for NTFS permissions issues on these locations also.
Make sure you check the volume that you will be running the report on.
TechNet Subscriber Support in forum |If you have any feedback on our support, please contact [email protected] -
How to get custom file name in manually generated SSRS report
Hi,
I am creating a SSRS report which would be executed by User manually through ReportServer URL.User would be generating the SSRS report for different Customer ID based on ad-hoc basis.
I am passing CustomerID as input parameter to the report. Is there any way to get the manually generated SSRS report name as 'Report_CustomerID_TodayDate.xls'. Please let me know.
E.g.If User is generating report for Customer ID 123 today then report name should be 'Report_123_07092013.xls'
Thanks for your help in advance.
Thanks,
AbhiyantaHi Amar,
If possible Can you please provide the custom code to rename the exported file in SSRS.
Thanks in advance,
Regards,
Jagan -
Differentiate between report and generated scheduled report - report list
How do I differentiate between a (.rpt) report and a (scheduled generated report) from this report (.rpt with data) when I list all the reports on the server.
I need this information because when I view the scheduled report, I do not need to set the parameters via the crystal viewer.
Thanks in advance.
JMTed.
I am not sure why the scheduled report is saying si_instance=false.
So I scheduled the sample report - Drilldown and named the scheduled instance as "DrilldownInstance",
it created two info objects. One has SI_INSTANCE = true and the other has SI_INSTANCE = false!!!!!
select * from CI_INFOOBJECTS
where
SI_PROGID = 'CrystalEnterprise.Report'
and SI_KIND = 'CrystalReport'
and si_name LIKE '%DrilldownInstance%'
I presume it should have only created one object, and set si_instance=true
Thanks,
JM
P.S
Sorry to be a bother! but this is driving me nuts!
Edited by: jam mend on Jan 20, 2009 9:07 PM -
Calibration Executive fails to generate pdf reports
I have Calibration Executive 3.4.1 and it has stopped generating pdf, word, or excel reports. It still generates text and html reports. I reinstalled cal exec and made sure it as all the current updates. The only thing we changed lately was installing DAQmx-9.4. I rolled that back to DAQmx-9.3 which did not help. If the default report is set to pdf, no report gets generated. It also will not open any report done earlier. It give an error message stating the path is incorrect of the file is corrupted. The path is correct and the old pdf open just fine using Adobe (ver 8 standard). Has anyone experienced anything similar or has any advice as to what to look at next. Thanks for any help!!
Solved!
Go to Solution.Solution: the latest revision of JAVA was corrupted causing the error. Removal and re-installing a clean version of JAVA corrected the problem.
-
Generate Scheduled Report From MDM
Hi Experts
Any Idea on how we can create Report from MDM Data either using Data Manager or Syndication.
I know about the Export option available here but that will not help me.
I need to provide Reports with Specific Fields to end users with some validations also.
If require I can use Java coding or EP to create such report. Please advice.
RegardsHello,
Reports by default are not supported by SAP MDM.
You will have to used JAVA API for the same.
[Java Doc |http://help.sap.com/javadocs/MDM71/index.html]
This code will be developed using NetWeaver Developer Studio (NWDS).
Once you have your reporting logic bulit, you can deploy the code on EP, and assign to in iView with authorization.
Regards,
Abhishek -
Dear support,
I fail to generate AWR report on Oracle RAC environmnet with the following error. Kindly advise on this issue
SQL> connect /as sysdba
Connected.
SQL> @awrrpt.sql
Current Instance
~~~~~~~~~~~~~~~~
DB Id DB Name Inst Num Instance
975288211 CMSHA 1 CMSHA1
Specify the Report Type
~~~~~~~~~~~~~~~~~~~~~~~
Would you like an HTML report, or a plain text report?
Enter 'html' for an HTML report, or 'text' for plain text
Defaults to 'html'
Enter value for report_type: html
Type Specified: html
Instances in this Workload Repository schema
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Using 975288211 for database Id
Using 1 for instance number
declare
ERROR at line 1:
ORA-20200: Database/Instance 975288211/1 does not exist in
DBA_HIST_DATABASE_INSTANCE
ORA-06512: at line 23hey ,
I try the manual create snapshot but still getting below error. kindly advise .thanks
Sourcing /oracle/.profile-EIS.....
-bash-3.00$ sqlplus " / as sysdba"
SQL*Plus: Release 10.2.0.4.0 - Production on Fri Sep 18 22:51:58 2009
Copyright (c) 1982, 2007, Oracle. All Rights Reserved.
Connected to:
Oracle Database 10g Enterprise Edition Release 10.2.0.4.0 - 64bit Production
With the Partitioning, Real Application Clusters, OLAP, Data Mining
and Real Application Testing options
SQL> begin
2 DBMS_WORKLOAD_REPOSITORY.CREATE_SNAPSHOT ();
3 end;
4 /
begin
ERROR at line 1:
ORA-13509: error encountered during updates to a AWR table
ORA-02291: integrity constraint (ORA-02291: integrity constraint
(SYS.WRM$_SNAPSHOT_FK) violated - parent key not found
.) violated - parent key not found
ORA-06512: at "SYS.DBMS_WORKLOAD_REPOSITORY", line 10
ORA-06512: at "SYS.DBMS_WORKLOAD_REPOSITORY", line 33
ORA-06512: at line 2 -
Report fails to generate on Crystal Reports Server
Post Author: cmilkosk
CA Forum: General
Hello all!
I have a case open with BO on generating a report from a Crystal Reports Server (CRS). The report works fine when running in Crystal Reports on my PC, but after I send it to the Crystal Reports Server, it fails with a message like:"Failed to open the connection.
C:\Program Files\Business Objects\BusinessObjects Enterprise 11.5\Data\procSched\metrixdb.reportjobserver\~tmp9bc512965895e0.rpt"This error appears to be telling you that it is trying to connect to
the CRS's reportjobserver process and having a problem, but the service is up according to the Central Config Manager. I tried starting and stopping it, but it didn't make a difference. This happens for different reports sent to the server. One common thing that I've noticed is that the reports that connect to the CRS's local SQL Server 2005 database are the ones that are failing. So, my CRS resides on the same host as the SQL Server 2005 database (which also houses the CRS SQL DB). Interestingly, reports scheduled that connect to a remote SQL Server 2000 database work fine. It could be the simplest report that I am running off of the CRS/SQL Server 2005 host, and it still fails every time. Tech support so far hasn't been much of a help. They suggested that I upgrade my Crystal Reports software on my PC to R2, but that didn't fix the problem.Has anyone had any trouble like this before? If so, have you found out what the cause was?I'm beginning to wonder if it is related to SQL Server 2005 or potentially just that it is connecting to a local database.Note - my CRS's software version appears to be 11.5.3.438. I'm not sure if I am running CRS R1 or R2 (how can you tell?).Anyone have any ideas?Thanks,ChrisPost Author: cmilkosk
CA Forum: General
Anyone have any ideas? Tech Support doesn't seem to be helping much. Chris -
Scheduled Report Failing - Don't Know Why
I'm trying to re-create a scheduled report on CMC that had gotten deleted. It ran before (sometimes multiple times...) but at least it ran. I'm duplicating all the settings for this report based on how they were before, but every time I try to get the report to run, it fails.
I don't know enough about this to be able to embed any kind of error messages in the e-mail notifications we get. All I know is that no matter what I change/tweak/adjust, we get an email saying "This report has failed to run."
What kinds of things should I be looking at to troubleshoot? I know the report itself is fine, as users can view it normally (as in, through other viewers). There's definitely something specific to the scheduling process that is not correct, but I don't know what to look at.
Here is how the scheduling is currently configured:
Schedule > Main Tab
-Run Weekly, Tues - Sat
-Start Date: 10/01/08, 8:30 AM (I originally set this up yesterday, so today at 8:30 should have been the first time it ran, but instead it failed)
-End Date: 10/01/18, 12:00 AM
-Number of retries allowed: 0
-Retry interval in seconds: 1800
Schedule > Notification
-Email notification based on: a job has failed to run
-Message: Report failed to run. Scheduled Report: %SI_NAME% - %SI_STARTTIME% What other codes can we put in this message, BTW? I've been trying to look for something to return error codes, but %SI_OUTCOME%, %SI_STATUSINFO%, and %SI_ALERT_MESSAGE% don't display anything, they just print on the email
Schedule > Destination
-Destination: Email (SMTP)
-Clean up instance after scheduling is checked
-We have "Set the values to be used at schedule time here:" populated with our list of email addresses for recipients
-Attach object instance to email message is checked
-Specified file name: %SI_NAME%%SI_STARTTIME%.%EXT%
-Add extension is checked
Schedule > Format
-Format: Microsoft Excel (Still fails if we choose Excel Data Only or Adobe Acrobat)
-Use options saved with report is checked (Still fails if we deselect this)
Schedule > Schedule For
-Schedule only for myself.
Could really use some help here, as I don't know what in the world could be causing this to fail. Thanks in advance.First thing is to forget all the complex configs and just try to schedule the report to run once now, no alerts, no notifications, no nothing.
Does that work?
Then you can build up the schedule, to see where the problem is coming from.
Sincerely,
Ted Ueda -
Report about scheduled reports with status failed
hi All,
I would like to schedule report with information which reports in SAP BO (which I could find in Instance Manager in CMC) did not refreshed (failed status). Do you know where this data are stored?
Thank you for your help.Hi Konrad,
Query builder is an application which gets deployed when you deploy the BO applications like CMC/BILaunchPad.
The name of the application is AdminTools. You can check with your admin/deployment team if you have it deployed.
You would be exceuting the below url to access the application
http://<servername>:<port>/AdminTools
The name is case sensitive so follow the same case.
It would be best to run your queries in AdminTools application rather than running those directly on CMS tables though management studio. Running queries directly on CMS databse tables is not recommended.
Thanks,
Prithvi -
Schedule reports fail - CrystalEnterprise.Smtp
We have scheduled a report to run for all corporate employees. When the schedule runs, here is what happens.
- Report run and is marked in the running state
- Report moves to pending state in history but the email is sent to recip.
- Report moves back to running state
- Report moves to pending state and again the email is sent
- Report moves to running state
- Report moves to failed but again the email is sent
In all, each recip gets three copies of the report and finally the report is marked failed.
The same report can be scheduled to addresses not hosted on our domain and only one copy is sent and the report instance is marked successful.
When the report fails, I get the following error : recipient error. []: [CrystalEnterprise.Smtp]
Any help would be appreciated,
ChrisHi John,
I have the SMTP address with the ports and we have our mail server.
As per admin guide, what would be the user for the destination ?
User Name
Provide the Job Server with a user name that has permission to send email
and attachments through the SMTP server.
Password
Provide the Job Server with the password for the SMTP server.
Can i just leave the user name and password so that the users email will be taken ?
Please refer to SAP Note 455140 to configure the SMTP plug-in to send emails. However there is no section in SAPconnect to enable you to add a user and password as a means of authentication. You will have to enter the IP address of your sending SAP application server to your mail server as a means of authentication to enable emails to be correctly relayed to your mail server.
Hope this helps
Michael -
Scheduled report with sub-reports (Encapsulating page failed).
Hello Everyone
I am fairly new to reporting and SAP.
I do have a main schedule report containing 4 sub-reports in the sections and 1 sub-report in the page header.
The report runs fine in the Infoview development folder, But whenever its deployed in system_testing folder, it doesn't open and gives the following error:
"ERROR IN FILE XXX:Encapsulating page failed."
I talked to DBA to change the permission for the user, but they don't agree. since its a scheduled report, user can only access the instance of the report, not to run it.
How can I make sure that the sub-reports don't run when user opens the report.
I appreciate any help in advance
Thanks and regards
MJHi All,
We have been facing the "Encapsulating page failed " error sporadic in our Crystal reports. It is not happening always.
We have tried with different user accounts, it did not help much. Also tried various suggestion from the following SAP Notes:
1536964 - Encapsulating page failed - The error change to Database error when the preference is changes
1211088 - Error message "Encapsulating Page Failed" - This is not the case with our reports, we still have some reports facing the same error without an subreports in it
1543412 - Infoview warning: "Error in File xxx : Encapsulating page failed - tried implementing the recommendation , but no help
1900672 - Error: Encapsulating page failed while viewing Crystal Reports based on stored procedures in BOXI 3.1 -- Our reports are not based on stored procedures.
We have faced this error in many different version of BOXI 3.1 like SP4.1, SP7.1, SP7.2. But the behaviour is similar. We have a clustered machine with 2 BOE servers and 2 Tomcat servers.
I have tried activating E2E tracing, but I really couldn't understand the reason for error from the logs. Our reports connect to datasource using webservices.
some information from the error traces.
Verkapseln der Seite nicht möglich.. Internal error: CrpeMgrPEEncapsulatePageEx
I would like someone to help me troubleshoot the problem. I can share the logs if needed. Please direct me to the correct forum if this is outdated.
Regards,
Prarthana -
Hi,
We have made a custom report for UCCX8.5, which we'd like to schedule. This report can only show the details of one CSQ, by selecting a CSQ filter. Because of this we'll need to schedule a new task for every CSQ. Here the issue arises: when I look at the scheduled reports overview, all reports have the same name: The name of the report. This makes it impossible to see which scheduled report is which. So it'll be really hard to delete or add one later.
Is there a way to change the name of the scheduled report task?
Regards,
Ruud van StrijpThis is one of a few scheduler-related limitations of the HRC. Another is that the machine running the client must be running and actively logged in for the system tray-based (i.e. not a windows service) scheduler app to trigger.
My advise on this one is to upgrade to the latest 9.0 build where you can switch from the legacy HRC client to the new Unified Intelligence Center (CUIC) reporting engine. This is a browser-based UI and was ported over from UCCE so now both products have the same reporting engine. As luck would have it, you can name the schedule when you create it with CUIC:
http://www.cisco.com/en/US/docs/voice_ip_comm/cust_contact/contact_center/intelligence_suite/intelligence_suite_902/user/guide/CUIC_BK_R4B100EB_00_reporting-app-user-guide-902_chapter_01000.html
With that said, you'll have to redo your custom report by spinning up a lab instance of CUIC Premium (not bundled with CCX) so you can create the report definition. Once you have that, you can import it into the embedded CUIC Standard instance on CCX and be good to go. The SQL stored procedure process remains unchanged.
In case you're inclined to dismiss this advice, note that HRC is EoL. In 9.0 you can pick one or the other but it's gone entirely in 10.0; CUIC only. So, it's only a matter of time before you have to cross this bridge anyways.
Please remember to rate helpful responses and identify helpful or correct answers. -
Scheduled report is failing to be triggered via email in SCOM 2007 R2.
Hi All,
I have this strange issue. I have created a scheduled report from the SCOM reporting. It is a default report which comes in SCOM, It is the Most common alerts available in the Microsoft generic report library.
I also have the SMTP server configured in the Reporting services configuration manager as in the below screenshot.
The email relay server mentioned in that its self is used for our SCOM Alert email subscription as well and it works fine.
When i schedule the report and when it tries to send the report it gives the below error, Saying that "at least Senders / From field is missing or empty"
As you see i have mentioned a from / senders email address, But i still get that error.
I checked the RMS event logs but there are no related events for this issue.
Does any one have an idea on this ?
Gautam.75801Make sure that the following
1.Verify that the Report Server Windows service has Send As permissions on the SMTP server.
2.In Sender Address of Reporting Services Configuration tool, enter the name an account that has permission to send e-mail from the SMTP server.
3. Moreover, check the event log of SQL reporting server
Roger -
Can we enable Database Name box while scheduling report
Hi, I am boxi administrator and I am working on a unique client requirement. I don't know if it needs to be in administration forum or crystal reports. we are using crystal reports and We are on boxi R2 SP3 on IIS.
We have 8 DB servers for load balancing ( look www.intersystems.com for details of how). We want to publish report in BOXI and user will then schedule report. We don't want multiple copies as it will be difficult to maintain at several places. So please rule out the possibility of 8 copies of same Crystal report connected to each 8 DB servers.
When user schedules report then we want to load balance the DB servers i.e. we have defined 8 ODBC connections on each application servers and want to use all ODBC ( DB) for each report. When we schedule reports then I see server name and Database name is disabled in Database logon properties.
Please let me know if this is possible. We will be using standard infoview to schedule reports.
Thanks,This is not feasible. I figured out one option that is using Virtual IP with Load balancer. We can load balance ODBC using this. This is tested in another project of state govt.
Thanks,
Maybe you are looking for
-
Links in Reflow are converted to lowercase
URL links in Edge Reflow are converted to lowercase and attempts to restore upper and lower case are overridden by the program. Other than changing the html code in Dreamweaver is there a fix for this or is it a bug?
-
How do you enable the built-in predictive text feature?
Built-in predictive text appears in the new features list, but I don't see an obvious way to access it. Help?
-
Hi there, I have 2 monitors hooked up and I want to run my flash exe file (with a fullscreen FScommand) on Screen 2 instead of Screen 1 without changing the display settings. Does anybody know how to do that? Thanks!
-
Having trouble using Xrite i1 Display Pro after upgrading to Mavericks. I'm a photog and monitor calibration is essencial. Any ideas? Thanks!
-
I would like to change the name of my Wi-Fi network through my router. I know how to do this, but when I try to connect to the new network with my i-phone, it says unable. When I change the name back to the original name, everything works ok. Any ide