No Adjustment account found for cost element

Dear Gurus,
I am getting Three errors  msg "No Adjustment account found for cost element" when i try to run the conformation of production order create  ( T Code : C015 )"  and I am not able to save the record . like
1 ).No adjustment account found for cost element
Message no. K5112
Diagnosis
Neither standard account determination nor the enhanced function found an adjustment account for the reconciliation posting.
System Response
No adjustment account could be determined for cost element  in company code XXXX
Procedure
Maintain the standard or enhanced account determination. Information on maintenance can be found in the program documentation.
Execute
2) . No adjustment account found for cost element XXXXXXXX
Message no. K5112
Diagnosis
Neither standard account determination nor the enhanced function found an adjustment account for the reconciliation posting.
System Response
No adjustment account could be determined for cost element XXXXXXX in company code XXXX.
Procedure
Maintain the standard or enhanced account determination. Information on maintenance can be found in the program documentation.
Execute
3 ) No account is specified in item 0000000002
Message no. F5670
Diagnosis
No account was specified for account type "S" in item "0000000002" of the FI/CO document.
System Response
The Financial Accounting program cannot process the document.
Procedure
A system error has probably occurred in the application you called up. Check the data transferred to item "0000000002" of the FI/CO document.
Could anyone please help me with this.
Regards
SAP CO

Hi,
iam not able to understand of this  SAP Notes: 531606 and 1027645
Could you pl give me full details for come out this problem.
Regards
SAP CO

Similar Messages

  • KB15N_No adjustment account found for cost element Message no. K5112

    When I am trying to post Manual Cost Allocation through TC KB15N with the following input data I am getting the following error message and the same could not be posted.  Kindly advise.
    Screen Variant used: 01 SAP Cost Center
    Input Type: List Entry
    Item No.1
    Sender Cost Center : 3402100942
    Cost Element: 6200001
    Amount : 62,201.56
    Receiving Cost Center: 3405100945
    First four digits represent profit center code.  If first four digits are equal the above error is not coming. But posting is needed with different profit centers.
    No adjustment account found for cost element
    Message no. K5112
    Diagnosis
    Neither standard account determination nor the enhanced function found an adjustment account for the reconciliation posting.
    System Response
    No adjustment account could be determined for cost element  in company code SCCL.
    Procedure
    Maintain the standard or enhanced account determination for transaction KAMV. Information on maintenance can be found in the program documentation.
    Execute

    Hi all,
    I face the issue like this but with transaction KOAP - Plan settlement
    But, the problem is that, I do not active reconciliation ledger, so I do not maintain any thing relate to reconciation ledger or adjustment posting? I can do transaction "actual settlement"  without error
    So, How this error come to me?
    And how I can fix it?
    Thanks all!

  • Which PnL GL Accounts should have cost elements created for??

    Dear Sap FICO Experts,
    I am confused that which profit and loss GL Accounts should have cost elements created.
    Some suggested that Price Differences, Cost of Goods Sold, Revaluation of inventory and change in WIP GL Accounts should not  have Cost elements created, and some have the other opinions. Kindly let me know the reason if you suggest that for particular accounts, cost elements should be created.
    Best Regards.

    Hi
    As per my knowledge not all P&L accounts are created as cost elements.
    All expenses realted GL accoutns are created as cost element category 01
    All revenue related GL accounts are created as cost element category 11
    Al sales deductions related GL accounts are created  as cost element category 12.
    The above given are some of the categories of cost elements we can create in SAP.
    Thanks & regards,
    Anantha Prakash

  • BEx:Hierarchies in DIM and FAC are different for Cost Element

    Hi Experts,
    Whenever we execute a report we are getting a warning message as "Hierarchies in DIM and FAC are different for Cost Element", but in report level we are not maintaining hierarchy properties for Cost Element.
    We have executed Master Data tests in RSRV also and still the problem.
    Is any other to do to get rid of this warning message?
    Thanks in Advance.
    Regards,
    RAO.

    Hi all,
    I face the issue like this but with transaction KOAP - Plan settlement
    But, the problem is that, I do not active reconciliation ledger, so I do not maintain any thing relate to reconciation ledger or adjustment posting? I can do transaction "actual settlement"  without error
    So, How this error come to me?
    And how I can fix it?
    Thanks all!

  • J2iun error  "No accounts found for plant IEQPD07' where PD07 is the plant.

    22.05.2009
    Hi friends when i execute j2uin i get the error 'No accounts found for plant IEQPD07'  Message no. 8I080
    PD07 is my plant. Putting this up after searching this forum.
    Looking forward to helpful tips.
    Regards,
    Uday

    Hi
    Please check whether any GL accounts has been updated in the Excise configuration for the combination of Excise transaction type and chart of accounts.
    Regards,
    Lakshmanan Krishnan

  • Copy Detailed planning for cost elements in CJ9BS

    hi PS gurus,
    What is the purpose of selecting this option (Copy Detailed planning for cost elements)? What does it do?
    Many ThanKs
    MM

    Hi,
    In case you have done detailed planning for your project you can specify whether you want to copy the detailed planning data using this check box.Planning done using cost elements is called detailed planning in PS. CJR2 is the transaction to do that. For more details you can hit F1 on the field and check.
    Regards,
    Gokul

  • Selection variant for cost element GROUPS

    Community!
    Is there a way to create a selection variant for cost element groups? Through customizing I can only create them for cost elements but not for groups!
    Thanks,
    Bjoern

    Ashok,
    thanks for your reply but I am looking for a way to create a variant for groups!!!!!
    The help just depicts how to create variants for cost elements. You actually do have the feature to display all cost elements from <u>one</u> group within the collective processing but I would need to select many different groups, which is just not possible.
    Therefore I would like to create a variant of cost element <b>groups</b>!!!!!
    Regards,
    bjoern

  • Value BLANK/SPACE not valid for cost element "Fund"

    Hi!
    We use funds management in our solution. It has worked fine in development but when doing the module tests we get the following error when creating a shopping cart:
    Value BLANK/SPACE not valid for cost element "Fund"
    When creating a PR in backend we do not get an error. So it should not be a problem in funds management.
    Everything works fine when using BBPSC01 (central)
    Any ideas?
    Sincerely
    Anders
    Edited by: Anders Öhrling on Sep 29, 2008 11:33 AM

    Ple provide the solution for Problem Resolve.

  • There are values for cost element 80000 that are not assigned to any line I

    Hi,
    While calulating WIP I am getting below error:
    There are values for cost element 80000 that are not assigned to any line ID
    Message no. KJ161
    Diagnosis
    Not all values for the cost element are assigned to a line ID.
    Procedure
    Assign the cost element to a line ID. If you don't want to include the cost element in results analysis, assign it to a line ID of category N.
    You can access a detailed list of unassigned cost elements as follows: Start results analysis in the individual processing mode (transaction KKA1, KKA2, or KKA3). Select the field Full log. Execute the function. On the next screen, choose Logs -> Parameter List in the menu. A list is generated. The unassigned values are shown at the end of the list.
    If cost element "+++++++++" was shown in the message, this is because in the assignment of costs and revenues to line IDs, you have not used a cost element other than the full masking "+++++++++". In this case a presummarization eliminates the information on the cost element.
    Cost Element 80000 is of type 43 Internal activity allocation, I have Masked this in OKGB as below:
    Controlling Area = FLGP
    RA Version = 0
    Masked Cost Element = 000008++++
    Masked Cost Center = ++++++++++
    Masked Activity Type = +++++
    ReqToCap= COS (Secondary Cost)
    I have Configure OKGA also but still system is giving error.
    Please help me to understand.
    Regards,
    Vivek

    I was wondering if you could help me I am trying to configure the RA key for Refurb orders and when I go into txn OKGB for the Assignment of C/E for WIP there is sample config already there which I copied.  But I am having difficulty getting the KK1A to work I am getting the message as outlined above.  Could you explain how this OKGB works and how to configure it a bit more fully.  In my sample config there is a ReqTOCap section and in it there are letters like ABR, EK, FK, EL what do they mean.  This is a screen shot of it.  I am not sure how to go about this entirely so any light you could shed would be greatly appreciated.  Can you suggest a good resource or documentation you may have, would be greatly appreciated.

  • CO-PA: COGS accounts created as cost elements

    hello,
    I have a question regarding COGS accounts, being created as cost elements. This was not causing problems, because client was using real internal orders for profit analysis. In the next phase of project, during implementation of costing based CO-PA, now I have problem, because of this situation, because I can not delete created cost elements  (only possible at the beginning of the new fiscal year) , and the system asks for cost object assignment during GI creation. I was considering OKB9 assignment, but I think this will cause double values in CO-PA. Maybe temporary solution, by using real internal orders till the end of the year, and then deleting existing cost elements for COGS accounts, could work?
    Please, advise what to do to solve this situation.
    Thanks in advance,
    Dusko

    Hope you are not using account based COPA
    To avoid double values in COPA, you can do one of two things,
    1) after the costs are transferred to the internal order, you can just keep them there without doing settlement, let the users know that there will be under absorption for the internal order.
    2) If the users are not willing to have under absorption in the internal order, you can transfer the costs to a value feild in COPA which is not reflected in the report in KE30 (Remember that you may loose one value feild in COPA this way)
    Both make no effect on KE30 report as data will be transfered to COPA at the time of billing
    Br Naveen

  • Default account assignment in cost element creation

    hi,
    in the cost element creation transaction (KA01) I need the default account assignment to be the WBS element. but in the transaction only cost center and order is showing as dafault account assignment, how can I include the WBS as cost object?
    Thanks
    Edited by: gayani premawardena on Sep 3, 2010 12:24 PM

    Hi
    If you are aware of FI substitution or validation, it works the same way
    1. Go to OKC9 and click on New entries
    2. Enter your contr area and choose Event = Line Item and Save.. It would ask for a transport request
    3. Now click on the magnifying lens icon, then drill down on cost accounting > Line Item. Now click on Create Substitution icon and give it a name
    4. Now click on Create Step and write your substitution by choosing fields from the COBL structure
    It should like like, Prerequisites: IF COBL - BUKRS = XXXX and Cost Ele = YYYY,
    Action to be taken if Pre-req is met - Substitute WBS = ZZZZ
    Regards
    Ajay M

  • G/L  account number vs Cost Element

    Hello Friends,
    I need your help to know the diffrence between G/L Account and Cost Element.Do they consist of the same numbers and/or  text.I am a non functional guy and i need to get the order numebrs from Table A which has G/L Acct number and Table B which has Cost Element and i have to  filter where G/L acct numb and Cost Element are the same.So please advise.
    Thanks in advance.

    hi
    cost elements are like materail costs, personnel costs, energy costs... where a corresponding GL account exists in FI..to allow costs to flow...
    When cost element carriers cost between FI and CO they are called Primary, the link is established GL A/c = Cost element(Primary). A question may arise as to whether all GL accounts are cost element, it again depends upon the business requirement,
    assign points if useful
    srilakshmi

  • G/L Account determination for cost center

    Hi,
           When we issue the material with movement type 201 or when we do 202, we enter the cost center in the MB1A,  then  ref. to this cost center how to determine which G/L account is updated,   and if we want to know how much is total goods issue is done for a particular cost center which g/l  account to be check.
    regards,
      zafar

    system check the setting in Define Account Grouping for Movement Types
    for movement type
    201 what is account modifier its VBR
    then it check material number and takes valuation class
    then  it goes to OBYC and check the gl account under GBB
    and looks for Gl account for VBR and valuation clases
    and pick up the Gl accoun
    hope its clear now
    and in case of PO
    the logic for gl account determination for account assigned po is as below
    for cost center u give K
    for this K it goes in Maintain Account Assignment Categories and check what is Acct modification it is generally VBR
    then it check if u have given material number and takes valuation class and if material ordered is with out material code then valuation class is blank
    then it goes to OBYC and check the gl account under GBB
    and looks for Gl account for VBR and valuation clases in case on manteria number
    or VBr and Blank entry for valuation class
    and pick up the Gl account
    Hope now its clear

  • Duplicate Entries For Cost Elements

    Hi All,
    We have a situation in which in a particular inventory org duplicate entries of a cost elements have got created. eg: Material Cost Element has appeared twice or thrice for an item, similarly material overhead, resource etc. due to which the item cost has shoot up.
    Can someone please suggest what could be the possible reason for the same? Its lil urgent.
    Thanks!!!

    Dear
    Can please confirm  wether this depdends are for any MTO order ? I mean you have Sales Order for FERT with MTO item categoery and running MRP  in MD02 .In that case whether , it is generating multiple similar MRP  elements.
    Basically , this is happen based on the Planning Horizon as well as Re-schedule horizon kept into OPPQ /MRP relevent paramentrs/OPPR in case of MRP group  .If your firm reciept like Production Order are boyond the planning horizon during your MRP run , demnad will be re-considerde to create Planned order .So chek the PH/Rescheduling horizon .So keep bit larger Re-scheduling Horzon .
    Refer our earlier posting :  new planned orders on next  MRP run
    Other possibilites can  be explored in the SAP notes  from sales stand point : SAP Note : 744305/744484/80891
    Regards
    JH
    Edited by: Jiaul Haque on Nov 22, 2010 1:13 PM

  • SAP Standard Report for Cost Element Category

    Hi All,
    I just wanted to know that if there are any report(s) involving Cost element categories. Say for example, if the cost element category is provided the report fetches the cost elements associated with the category and the documents posted.
    Thanks and Regards,
    Gnanasambanthan.V

    Hi,
    There is no standard report based on cost element category, but of course, you can use, for example, KSB5 and give the selection of the cost elements you want to present. I presume, you have different number range for each category and it could be easily distinguished in the selection screen.
    Regards,
    Eli

Maybe you are looking for