No auto-detection of new projects in Workspace? Only Import possible?

I got the project sources for a new project from a friend. I extracted all the stuff in a subfolder of the Workspace of FlexBuilder
and expected that FlexBuilder will automatically recognize this new project and add it to the Flex navigator.
But this was not the case.
Is there really no auto-detection of new projects in Workspace?
Even no "refresh" or "Scan Workspace"?
The only way I found is an explicit "import".
Correct?
Peter

As far as I know, I don't think so, it's because the way Eclipse works, you know these so-called workspaces, for these Eclipse generates a lot of files for instance to keep track of changes in your files, so in a case you make a mistake and messed up with your code you could compare what you did wrong with local history, or for example to remember what files you left open in your last session and so on.

Similar Messages

  • After download and installation of PS PE12 I have problems starting the programm. After selecting video and new project nothing happens, only the colorbar below new project is showing

    New computer.
    After download and installation of PS PE12
    I have problems starting the programm, double clicking on the icon.
    After selecting video and new project nothing happens, only the colorbar below new project is showing, nothing happens.
    (expected was to activate the program and the sarting the PE12)
    PSE12 runs fine
    System:
    WIN8.1 / i7 /16GB RAM

    New computer.
    After download and installation of PS PE12
    I have problems starting the programm, double clicking on the icon.
    After selecting video and new project nothing happens, only the colorbar below new project is showing, nothing happens.
    (expected was to activate the program and the sarting the PE12)
    PSE12 runs fine
    System:
    WIN8.1 / i7 /16GB RAM

  • Out of memory on a new project with rushes only

    Just started a new project, media is ProRes 1080, prob 2hrs worth of rushes.
    When previewing the clips to log them in the browser I get an out of meory error after say 10 clips.
    Clips are slow to load into the viewer also.
    Anyone know of a remedy

    Check drive space, all hard drives should have at least 15% of their space free. I'd use the Log & Transfer with Canon's plugin installed, transcode into ProRes LT (it supports higher quality than the 5D records in, saves drive space, easier to work with in Timelines).

  • Is there a way to NOT have FCP7  auto create a new project at launch?

    I can't find it anywhere in User Preferences, but is there a setting somewhere in FCP that will open only the Browser and Viewer upon launching FCP7, and NOT generate a sequence/timeline and Canvas automatically?
    Unchecking "Bring all windows to front upon launch" doesn't do it. Neither does unchecking "open last project upon launch".
    I'm trying to get at launch, just the browser and Viewer, like you get when you close an open project, but don't shut down the application.
    I know you can hold down the OPTION key while double-clicking the FCP icon on the dock, and that does it, but is there a setting somewhere in FCP so you don't have to hold that key upon launch?
    Thanks.

    Hold the Option key while you launch the application.

  • PP 2014 8.1.0 When I "Save As" my project, quit and close, the new project freezes on launching

    iMac (Retina 5K, 27-inch, Late 2014)
    4 GHz Intel Core i7
    32 GB 1600 MHz DDR3
    AMD Radeon R9 M295X 4096 MB
    Mac OS Yosemite 10.10.1 (14B25)
    PP 2014 8.1.0
    Blackmagic 4K media working in 4K sequences.
    In my current project, I've been experiencing very strange crashes upon launching PP. Before ending my work for the day, I usually save my current project manually, and then do a "Save As" with tomorrow's date at the end, (projectname_2014-12-02) so I have a fresh copy to begin the next day and still have yesterday's as a backup. I then quit PP as normal. No issues. In other words, it closes just fine without any crashing or odd behavior.
    In the last week, a rather annoying issue has presented itself. Once in a while, that new project that I created with Save As, will not open. I opens to the point when I can see my bins and my timeline, but as I would expect it to begin propagating the timeline with media, I get the spinning beach ball. I can wait for hours, and the project never loads. I can go back to yesterdays project and open it just fine, but any project saved with Save As, very often seems to be corrupted.
    Except, that I can open it up fine on another machine. So it's not really corrupted. And it doesn't happen every time. Just most of the time in the last week or two.
    I've done the following troubleshooting several times. Restarted the computer. Repair disk permissions. Launch PP with the option key to clear preferences. Cleaned the media database. Tried launching the project with all media offline. Uninstalled and reinstalled PP. Booted from USB OS install drive and repaired permissions, repaired HD, and even reinstalled the OS (not a clean install, just over the top of the previous one).
    Once a Save As project won't open, it's done and I have to go back to yesterday's project.
    Now here's where it gets really weird. If I create a new project, and import one of the "won't open" projects, not just a sequence, but the whole project, it's fine. Which of course isn't entirely surprising.
    What *is* surprising is that after I save and close that new project with the old imported project in it, I can now go back and open all of the projects that would freeze on opening just minutes earlier.
    Everything is right as rain again. I'm glad I have a work around, but it's a little unnerving and random, not to mention time lost troubleshooting this bizarre one.
    Anyone else had any weird issues like this? Thanks for any thoughts.

    Attached is Dennis Linam’s Audition – “Log File” and “Log – Last File”
    Contact information Dennis [email protected]
    Previous contact information with your organization (DURIM):
    Dennis - i just finished my audition trial and bought the subscription the 2014 version.
    created by durin in Audition CS5.5, CS6 & CC - View the full discussion 
    DURIM - Okay.  I would expect the "Cache Warning" message because your default directories would not be the same as the ones in the settings file I generated.
    If you go back to the "7.0" directory and open the "Logs" folder, can you copy the "Audition Log.txt" file and send it as an attachment to [email protected]?  We'll take a look in that logfile and see if it gives us more information about why this is failing now.
    Also, do you have any other Adobe applications installed on this machine, such as Premiere Pro?  If so, do they launch as expected or fail as well?
    I do have the trial Pro version of Adobe reader, but I have not activated it, because I fear the same thing will happen did it. I cannot afford to activate the subscription for that product and take the chance of it not working either. I depend on those two programs religiously. Here is the files that you requested. I appreciate any help you can give me to get this audition program started
    Audition Log- file
    Ticks = 16       C:\Program Files (x86)\Common Files\Adobe\dynamiclink\7.0\dynamiclinkmanager.exe
    Sent from Windows Mail

  • Unable to import .doc or PDF documents to create a new project

    When trying to import a WORD document into RH 6.0 to create a
    new project, I am only able to proceed up to the Improt Word
    Document Wizard dialog "Covnersion Options". Clicking Next leads
    the program to start the import, however after a few seconds I get
    a message telling me that MS Word seems to not be responding.
    I alsow am unable to import PDF files. Here RH claims that
    the file type is is not supported or that the file is corrupted.
    I would really appreciate if somebody could explain to me
    what the problem is and how to troubleshoot it.
    Thanks!

    Hi prikol and welcome to the RH community. Can you let us
    have some more information please. What version of Word do you
    have? Has Word been installed after RH? Is this only happening on
    one project? Has it worked on other projects? Sorry for all the
    questions but if you can let us know the answers we can start to
    narrow down to the problem.

  • New project photos won't display.

    I imported some vacation photos into Aperture Version 3.1.3 yesterday. They were imported directly into a new project I created  After importing I could view the images and edit and delete.  12 hours later the project appears blank in that no thumbnails are displayed in either the project or in the Photos Library.  When I hold the cursor over the project folder it provides a count of the versions in the project folder but no images are displayed.  This has happened twice in 48 hours.  Fortunately the images are still on the SD cards.  Any guidance please?

    Did you check to see if there is a filter activated?

  • No Instruments in "New Project" window

    When I open GarageBand (2009) and the initial window opens, showing "New Project," "Learn to Play," etc. down the left column, I select New Project.  But only "Podcast" and "Movie" appear in the option field.  No instruments.  Aren't instruments supposed to appear there?
    Thanks-

    I don't have GarageBand 09, but the projects you should see in the "New Projects" panel, are stored in your System Library as templates. Check the folder
    /Library/Application Support/GarageBand/Templates/Projects/ in the System LIbrary. For GarageBand '11 I see the following templates:
    01. Piano.band
    06. Acoustic Instrument.band
    02. Electric Guitar.band
    07. Songwriting.band
    03. Voice.band
    08. Podcast.band
    04. Loops.band
    09. Movie.band
    05. Keyboard Collection.band
    So you should see at least Piano, Acoustic Instruments, Electric Guitar, Voice, etc.
    If these project tempates are missing, you could try to restore them from a backup.
    Regards
    Léonie

  • Best way to Create New projects in FM9 RH8?

    Hi, I just finished doing this exact project. I found that the
    discrepancies between my old style sheet and the new one caused
    strange font changes that I could not account for.
    Instead, I copied and pasted the css from the old project into the new
    RHStyleMappings.css file. I then saved the settings to a neutral place
    on the drive.
    Once this is done, I create a new project in RH8, do the project
    settings first, importing the settings into the new project.
    I then import the book by reference.
    This seems to work best.
    I still have some questions about this:
    What does the FM template have to do with it? Where does this come
    from? Can I link to any file, as long as it contains the most recent
    styles? Why does the .isf save this template? Since it does, does it
    also save the location of that template? If so, do I need checkmark
    the link every time I create a new project and import the settings?
    Finally, does the .isf file contain the RHSettings.css as well? Or
    does the .css need to be co-located with the .isf?
    I will probably find the answers out to most of these questions soon,
    but if you have ideas I would like to hear them.

    In reoply to my questions @ the Google TCS2 group, Ashish Gupta replied (he okayed this repost to here):
    ... Its completely true the CSS (even the non
    default CSS) used for mapping is also saved in the settings that you export
    and even the FM template used if any is also part of setting.isf file that
    you export!
    I would just like to talk about the possible usage of FM template
    1. It is used to import all the style define in the FM documents and apply
    that to any linked FM book/document
                It is equivalent to Importing Formats from the FM document used
    as template into the linked FM book/document
    but there is also a usage of this feature in an entirly different paradimn
    2. We can use any Document(which is part of the whole book we need to
    import/link or at least has all the FM styles used that will be used in the
    mapping) as template in project setting dialog and then all the styles used
    in the document will apper in the conversion setting dialog and you can use
    thes eto define all your mapping or setting for these styles
                This is a workaround to enable style mapping and settings
    mapping without linking/importing the actual document.
    the location of the template used is not saved rather the actual template
    document is saved in the setting.isf file
    so the anotomy of settings.isf file is it contains
       a. All the settings or mapping that we defined
       b. the CSS file used for mapping (default RHStyleMapping.css)
       c. The FM template used .
    and you need to check the check box after you import the .isf file if you
    want to apply this template on the Linked FM book/document or any Import in
    future !

  • Error auto-firing an approval workflow inside a project's workspace

    Hi all,
    I have activated the SS2010 Workflow in PWA site collection features in order to use an approval workflow in one of my project's workspace. I setup the workflow under "Project Documents" and select to auto-start upon an item's creation. However this doesn't happen and I always get an eventreceiver exception in Event log. It works as expected when I fire it manually. I am connected as the system account.
    Is this a known issue or is the log correct stating that a system account cannot trigger a workflow autostart (below)???
    Event log details:
    Error loading and running event receiver Microsoft.Office.Project.PWA.WSSEventReceivers.PSDBUpdater in Microsoft.Office.Project.Server.PWA,Version=14.0.0.0,Culture=neutral,PublicKeyToken=71e9bce111e9429c. Additional information is below.
    : Value cannot be null.
    Parameter name: s
    ULS related lines:
    02/28/2010 23:55:04.38  w3wp.exe (0x071C)                        0x15DC SharePoint Foundation          Workflow Infrastructure        b9vu Unexpected Declarative workflows cannot automatically start if the triggering action was performed by System Account. Canceling workflow auto-start. List Id: %s, Item Id: %d, Workflow Association Id: %s 
    02/28/2010 23:55:04.62  w3wp.exe (0x071C)                        0x15DC SharePoint Foundation          General                        6875 Critical Error loading and running event receiver Microsoft.Office.Project.PWA.WSSEventReceivers.PSDBUpdater in Microsoft.Office.Project.Server.PWA,Version=14.0.0.0,Culture=neutral,PublicKeyToken=71e9bce111e9429c. Additional information is below.  : Value cannot be null.  Parameter name: s 
    TIA,
    Tassos

    Tassos:
    You might have better response to this question here:
    http://social.technet.microsoft.com/Forums/en-US/project2010custprog/threads
    Gary Chefetz, MCITP, MCP, MVP msProjectExperts
    Project and Project ServerFAQs
    Project Server Help BLOG

  • Auto Save folder not being created with new project

    Just recently I've noticed that when I start a new project there is no auto save folder being created.  I have all preferences the same (auto save every 10 min with a max of 50 and save next to project files).  I have no idea why this started or what I can do to fix it. 

    So it seems to be working now.  I went back through other projects that have been open for some time and the most recent auto save file I could find for any of them was from Oct. 8th.  So auto save hasn't been working at all.  What I did was go into preferences and change the interval a little and the frequency from where I had had it since intial set up.  That seemed to have told it to turn it back on for some reason.  It's really weird.  I guess I'll just keep an eye on it, but people may want to check there folders just in case the same issue is happening.  I didn't realize it until today and it's been happening for a couple of weeks apparently. 

  • Drag drop photo import to aperture folder why auto new project folder appear .

    i do import photos from desktop  to folder that i want in the aperture libary  . as soon as i drag and drop photos automatically new peoject folder appear in the libabry as name untitled project.. why? i dont want that new project folder.  i try to delete that folder and my picture all automatically deleted from library.
    also if i try to delete photos from preject folder .. it completely deleted from master library .. picture will be lost.. why?
    i drag and move pictures to  brand  new album or folder .. then try to delete wanted project folder - master picture are all gone.
    now i have at least 30-40 of untitled project folder in the library ... pictrure are not movable i meant you can move but u still have to keep old project folder to avoid master picture can not be deleted ...
    someone help me? did i make myself clear?

    You might read the manual or the Help as this is all covered there.
    If you want to import to a specific project use the File -> Import option. You can select your destination there.
    Every photo in a Library is in a project. Projects are the basic building block of the Library. That's why.
    Folders don't contain photos. They can contain Projects or Albums. These contain photos. Albums don't contain the actual photos, just links to them. So if you add a photo to an Album and then delete the project... you delete the photo.
    Remember: you don't move photos to an Album, you add them.
    Regards
    TD

  • My Premiere Pro CS6 crashes everytime, i start a new project?

    Each time this is the message i get,
    "Sorry, a serious error has occurred that requires Adobe Premiere Pro to shut down. We will attempt to save your current project."
    Can someone help

    More information needed for someone to help... please click below and provide the requested information
    -Premiere Pro Video Editing Information FAQ http://forums.adobe.com/message/4200840
    What is your exact brand/model graphics adapter (ATI or nVidia or ???)
    What is your exact graphics adapter driver version?
    Have you gone to the vendor web site to check for a newer driver?
    For Windows, do NOT rely on Windows Update to have current driver information
    -you need to go direct to the vendor web site and check updates for yourself
    ATI Driver Autodetect http://support.amd.com/en-us/download/auto-detect-tool
    nVidia Driver Downloads http://www.nvidia.com/Download/index.aspx?lang=en-us

  • Error when I try to make a new project in Premiere 2014

    All of a sudden I start getting this error when I try to create and open a new project. Everytime!  Any suggestions?

    More information needed for someone to help... please click below and provide the requested information
    -Premiere Pro Video Editing Information FAQ http://forums.adobe.com/message/4200840
    What is your exact brand/model graphics adapter (ATI or nVidia or ???)
    •What is your exact graphics adapter driver version?
    •Have you gone to the vendor web site to check for a newer driver?
    •For Windows, do NOT rely on Windows Update to have current driver information
    •-you need to go direct to the vendor web site and check updates for yourself
    •nVidia Driver Downloads http://www.nvidia.com/Download/index.aspx?lang=en-us
    •ATI Driver Autodetect http://support.amd.com/en-us/download/auto-detect-tool

  • New library or new project?

    I Have just started using FCP X after using FCP 7 for many years. I went on a course of 3 days and came out more confused than ever. One mystery is this, the tutor said, "YOU MUST NEVER START A NEW PROJECT WITH 'FILE NEW PROJECT' YOU MUST START 'NEW LIBRARY' AND THEN IMPORT YOUR MEDIA AND ONLY  THEN CAN YOU START NEW PROJECT!" All well and good except last night I watched a good tutorial on FCP X hosted by a very good teacher and the first thing he said was, "To get started, go to file and start New Project, create an event and then import your media to this," I nearly fell over backwards in shock, because this seemed incredibly simple.Within 15 minutes of this tutorial I had learned more than 2 days sitting at a desk.
    Can anyone advise who is correct, my tutor from Mars or the YouTube tutorial? BTW all my projects start life from SD Cards with HD material on them, in this case some with 50 FPS and some with 30 FPS (action cam) it must all be finally exported in Pro Res LT 25P 1920 x 1080.

    FCP X when newly installed will by default give you one Library and one Event in that Library.
    You can add a Project to this default setup immediately.
    However, you can create new Libraries and an Event will be added, any Library will always have one Event. Try deleting the last one, it won't allow it.
    As Russ points out: Libraries are the main container in which Events reside. Events are where Projects go.
    Any Library can have new Events added in addition to the default.
    Any Event can have multiple Projects.
    Regarding the Timeline and Project settings:
    The first clip that is added to a blank Timeline dictates the Project settings based on the clip specs. eg a 50P 1920 x 1080 inserted clip creates a PAL HD 50P Project.
    You can override this auto select setup by manually creating a Project.
    When Exporting you can change to codec to ProRes LT regardless of the origin.
    Al

Maybe you are looking for