"No Availability Check Can Be Carried Out"

Q.- In which all business situations we can get an error message - "No Availability Check Can Be Carried Out" except Material is blocked by another user?
Please replay as early as possible.
Thanks and Best Regards,
Amol
Edited by: amwsapsd on Aug 25, 2010 8:06 AM

It will Pop -up the same Message in case if the Order , Delivery note & Reservation of Material is Processing.
You can then block the relevant Transaction as per the requirements.
Best Regards,
Ankur

Similar Messages

  • No Availabilty Check can be carried out

    Dear All,
    While do the availablity check for material, I face an error :- "No Availability Check can be carried out for Material XYZ".
    As per my opinion,if this material is blocked with some sales transactions like Sales orders & Delivery,it will show the same.
    How to rectify this problem and why it is coming ? Kindly Elaborate.
    Best Regards,
    Ankur

    Hi
    First of all No Availability Check can be carried out for Material XYZ
    This is not a error message and it is a information message
    This comes while sales order creation because
    Say Material X plant 1000 and user A is entering a sales order and hes has not finished sales order creation still in VA01 transaction only
    Say the available qty for thar material is 25 units and user A has put 20 units and has not pressed enter
    Now user B creates another sales order for  same Material X and same plant 1000  say for 15 units
    Now for user B the system will throw this message No Availability Check can be carried out for Material for material X
    Because the system doesnot know at the time of user B craeting sales, what is going to the order of user A and it cannot do Availabilty Check for two sales orders simultaneously for the same material in same plant
    To control this only , define material block for users in we have  Availability Check in sd--basic fns in img
    Once the user A comes out VA01 t code and pressed enter for that material the system then can do Availability Check  for user B or otherwise settings are reqd define material block for users in we have  Availability Check in sd--basic fns in img
    Regards
    Raja

  • Tax can't carry out for some material and Cusomter

    Hi,
         We found the following two material at Customer(2811165) can't carry out the VAT for create sales order. But the Tax can carry out for the other customer. The customer(2811165) can carry out the VAT for other material sales order. I checked the customer and material the Contry code(KR) and Tax classification(1) is correct and normal. It is only the two material for the special customer can't get the VAT. I check the pricing analysis. The follwoing is the log. Pls help check it.Thanks.
    The mateials:
          KTPJC001-02
          KF-8005-0XXXXXXXXX
    The following is the log:
    Access Message Description
    08 010 Access not executed (Requirement 008 not fulfilled)
    10 010 Access not executed (Requirement 007 not fulfilled)
    20 010 Access not executed (Requirement 008 not fulfilled)
    Best Regards
    Park

    Dear Park
    It seems you have assigned Routine 008 for the table which has the combination of some description and applicable to domestic.  For the same combination, in VK13 / UTXJ, you have maintained a tax code for a domestic customer and you are trying to create a domestic sale order.  Actually routine 008 is meant for Exports and hence the problem.
    If my understanding is correct, Go to V/07, select the condition type JIND and click on "Accesses".  There check whether any routine is maintained under the tab "Requirement".   If so,  just remove  those routines and retry your process.
    thanks
    G. Lakshmipathi

  • Order can not carry out revenues

    Hi Experts ,
                      I was trying to release production order and got message no valuation variant is assigned . Even after assigning it in opn2 and reading PP master data it is showing same error .
    Also while doing goods receipt ( MB1A ) I am getting error : Order 600003045 can not carry out revenues .
    Please guide
    Thanks
    Neal

    Hi neal
    As per controlling config. Planed cost has to be calculated during release are create of prod order. For that you have to assign costing carriant in OPL8. both for Plan and actual . in standard SAP PPP! is costing variant for plan and PPP2 is costing variant for actual.
    For this costing cariant you have to assign costing type and valuation variant.
    Please do it SPRO-Production-SFC-Integration-Order costing
    Do these setting.
    Standard valuation variant for PPP1 is 006 and for PPP2 is 007.
    Regards
    J. Saravan

  • Whether MRP can be carried out for work scheduling GR. 20 i.e. work to orde

    Dear Experts,
    Whether MRP can be carried out for work scheduling GR. 20 i.e. work to order.
    mahendra

    Hi MShirodkar,
    Yes, s and it specifies the time needed to process the material in the operations at the different work centers.
    The GR processing time depends on the order quantity.
    The GR processing time is required to calculate the lot size dependent in-house production time. The system then uses the in-house production time to determine the planned dates for planned orders in materials planning.
    You can define work scheduling times in the material master record in one of two ways.
    Either you enter the in-house production time. If required, you can get the system to update this value from the routing.
    Or you enter the setup, teardown, processing, and interoperation times. If you maintain these values, the system determines the in-house production time on the basis of lot size.
    I hope it clears you doubt any queries please revert me back.
    Regards,
    Madhu.G

  • Can I carry out the persistence and ORM tasks using EclipseLink?

    Can I carry out the persistence and ORM tasks using EclipseLink (without TopLink or Hibernate) ?
    Is the EclipseLink a free tool and no license fee?
    How about TopLink Essentials?
    Edited by: junez on 18-Nov-2009 05:51

    junez wrote:
    Can I carry out the persistence and ORM tasks using EclipseLink (without TopLink or Hibernate) ?
    Is the EclipseLink a free tool and no license fee?And yes, EclipseLink is an open source project so there are no license fees. However, Oracle does redistribute EclipseLink as part of the Oracle TopLink product and therefore customers are able to access support for EclipseLink through Oracle support.
    --Shaun                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               

  • Availability checking - How Avail check can see the Reservat linked to a SO

    Hii there,
    We have the following issue. When we create a Sales Order, we want to reserve the stock so that when another Sales Order for the same material is created, the standard Material Availability check will know the 1st SO has x amount of stock already reserved.
    We are running the standard BAPI - BAPI_MATERIAL_AVAILABILITY and using the Availabilty checking rule assinged in the Material Master and the Scope of check from Transaction OPJJ, but we are not able to force the Avail Check to acknowledge the Reservation created for the Sales Order.
    The standard Reservation check on the Scope of check is only for manually created Material Reservations but we are creating ours linked to a Sales Order (movement ype 231) and although you can see the Reservation in the RESB table, the Avail check does not take this reservation into consideration.
    Any ideas would be greatly appreciated.
    Thanks.
    Owen

    When we create a Sales Order, we want to reserve the stock
    1)  Go to material master and check what availability check is maintained.  Most probably, it should have been 02
    2)  Next go to OVZ9, select the combination 02 => A and execute.  There tick the box for "Include sales reqmts". and save
    3)  Now create a sale order and update the forum how it works
    thanks
    G. Lakshmipathi

  • Availability Check & MRP

    Dear All,
    I need your inputs in the following scenarios:
    a) Availability Check
    b) MRP
    I know some details about customizing these from SD Point of view(IMG>SD>Basic Functions).
    I need to understand logically why and where these are used in SD Flow / SD Module.
    Kindly give your suggestions to understand these in a better way.
    I would be greatful to you if you can provide me the links or sources wherein I get the information regarding these.
    Regards,
    Raj Kumar Reddy,
    SAP-SD Consultant.

    Dear SD
    a)  Availability Check
    When you enter a sales order, you can only confirm the delivery of the goods for the required delivery date if the goods are available for all the necessary processing activities which take place before delivery:
    The shipping department must ensure that freight forwarding or another shipping company is advised early enough so that sufficient time remains for packing and loading to be carried out. An availability check can be carried out on the deadline date for availability for the goods.
    The procurement department must ensure that the production and purchasing departments are advised of inadequate stock quantities so that goods can either be produced punctually or ordered. Sales transfers the information on materials ordered as requirements to material requirements planning. Requirements are planned outward movements of stock. The transfer of requirements informs production that goods must be produced, or advises purchasing that purchase requisitions have been created for which purchase orders must be created and sent to the suppliers. An availability check can only be carried out if these requirements are transferred.
    b)  MRP
    The main function of material requirements planning is to guarantee material availability, that is, it is used to procure or produce the requirement quantities on time both for internal purposes and for sales and distribution. This process involves the monitoring of stocks and, in particular, the automatic creation of procurement proposals for purchasing and production.
    In doing so, MRP tries to strike the best balance possible between
    optimizing the service level and
    minimizing costs and capital lockup.
    The MRP component (PP-MRP) assists and relieves MRP controllers in their area of responsibility. The MRP controller is responsible for all activities related to specifying the type, quantity, and time of the requirements, in addition to calculating when and for what quantity an order proposal has to be created to cover these requirements. The MRP controller needs all the information on stocks, stock reservations, and stocks on order to calculate quantities, and also needs information on lead times and procurement times to calculate dates. The MRP controller defines a suitable MRP and lot-sizing procedure for each material to determine procurement proposals.
    Thanks
    G. Lakshmipathi

  • Availability check in Production order at WM Level

    Hi Gurus,
    Some body explain how the availability check can be carried out at WM level for the components for the Production order.
    Components are WM Managed. supply areas are maintained for the back flushing.
    is there any possibility with Standard function or only way to implement this Enhancements?
    Regards,
    Manick.
    Edited by: Manickavasaham S on Aug 14, 2010 1:13 PM

    Hi,
    More specifically for ex.
    Header Mat   A
    Component 1 : B  supplyarea 123
    Component 2  C  Supply area 246
    if the components should be back flushed from supply area '
    component B i have 200 pcs in stock in supply area 123, there are 4 production orders each of 40 pcs.
    when creating the production order system should check the stock of Supply area for creating the TR automatically. If new order is created for 20pcs. Then for B' i have a stock of 40 pcs in the supply area additional. system should not create the TR in this case for the component 'B'.
    Manick.

  • Availability check & TOR

    hi
    can anyone   tell me whether availability check is first or TOR.  Explain in one scenario.
    please urgent
    regards
    murali

    hi,
    Availability Check & TOR configuration is done hand in hand..
    To confirm the quantities for a particular line item in the sales order on particular day system carried out transfer of requirements (TOR) & AVAILABILITY check, so has to confirm the quantity on particular day as system should know what are there requirement of the sale order and delivery with MRP then system carries out availability check function, to confirm the quantity on particular day. Depending upon the IMG setting system carries out availability check function based on 3 methods:
    A) Availability Check with ATP logic or against planning:
    In ATP logic systems ATP Qty while carrying out availability check function for
    Particular line item (ATP qty=warehouse stock +planned receipts-planned issues)
    Planned Receipts: EX: - purchase requisitions, purchase orders, stock in transfer, stock at inspection etc.
    Planned Issues: - EX: - open sales order & open delivers
    B) Availability check against product allocation:
    Availability check can be carried out against product allocations in which system automatically restrict the user to confirm the quantity beyond reserved quantities per particular customer. EX: - Availability qty =100, existing orders=10, then system automatically distributes to items evenly to the sales order.
    C) Rule based Availability check:
    Rule based availability check can be carried out based on the business transaction.
    EX: - For normal sales order system has to carry out availability check for special sales order ex: - cash sales and rush order systems need not to be carry out availability check,
    In rule based availability check system in which system carried out Global availability to promise in all plants. In this check system transfers the requirements to APO system where GATP takes place and the result of the availability check transferred to R/3 system. This process takes place with the transaction code CIF(central inter face) inR/3.After carrying out availability check function system proposes(by using ATP logic) default values of ATP check result to the user in a dialog box, in which system gives the choice to the user to take the decision in contest of insufficient stock.
    a) One time delivery:
    If the user chooses one time delivery and the order Quantity is 100 units system confirms 50 units then systems automatically confirms as a zero. If the user saves the document with the zero confirm qty then system trace the sales order as aback order (V_RA), which can be confirmed later by RESCHEDULLING (V_V2).
    b) Complete Delivery:
    If order Qty=100, Availability stock = 50, system says that remaining can be given after one week. Then if the user selects this option then system push up existing confirmed qty to after one week and the total qty can be confirmed after one week only.
    c) Delivery Proposal:
    If order qty=100, system confirms 50, and remaining 50 can be confirmed after one week. If the user chooses this option then system confirms 50 Qty today allows the user to delivery 50 quantities today remaining 50 can be delivered after one week.
    CONFIGURATION SETTINGS FOR TOR:
    Define Requirement Class:
    Path:  SImg & Availability Check Basic functions D  & Transfer of  Define Requirement classes Transfer of requirements requirements
    Requirement classes control MRP, Requirement consumption, strategy, relevance for planned. It specifics whether the availability check & TOR to be Called out for transactions. Ex: Sales Order
    It determines whether requirements relevant for MRP or not, the allocation indicator from the sales view which controls the settlement of customers requirements with planned independent requirements. It determines the item b to be settled as an availability heck. Assignment, the settlement profiles the results analysis key. The TOR and Availability check functions are globally controlled using the requirement class for all the Sales documents. The values from the Requirements class are transferred to scheduled the of the sales documents class are transferred to scheduled the of the sales document default values and can be over written there.
    Define Requirements Classes:
    Requirement class defines whether the system has to carry out availability check based on the STP Qty. Ex:
    Define Requirement Types:
    Here we define requirement type, Ex: and Assign to Requirement class that we defined in the promote step.
    Determination of Requirement types using Transaction:
    Requirement type is going to be determined for sales document by following a search strategy. .
    First System checks strategy group in MRP3 view if it trend requirement type then system takes from it, otherwise.
    It will go to MRP group in MRP1 view, otherwise
    It will check to Material type, otherwise
    It will go to item Category + MRP type, otherwise
    It will go to Item category only, otherwise
    Finally system determines the transaction b not relevant for TOR & Availability check.
    Choose Item category TAN+MRP type PD=Requirement type =0
    Define Procedure for each schedule the category:
    Here we define respective schedule the category of the sales documents, whether an availability check and TOR should be carried out. This setting is relevant for sales documents only. It is fine tuning of availability check for sales documents TOR & Availability check function can be activated at sales order level those are proposed in to schedule line category level. If u wants to deactivate TOR availability check function at schedule the category level and want to deactivate at requirement class level it b impossible.
    Ex: If u wants to check availability w/o transferring the requirement we can use it.
    Choose schedule line category CP & Activate Availability check, requirement & Product Allocation
    Block Quantity confirmation in delivery Blocks:-
    When we transfer requirements to MRP then confirmed quantities is also reserved for confirmed sales documents, if transaction is blocked for delivery the reserved quantities are also blocked so that the conformed quantities cannot be used by any other purpose. So has to avoid this situation we can block the transfer of requirements(TOR) for delivery blocks, in this case requirements transferred to MRP but will not be reserved, that will be cleared once we save the documents then system shows confirmed qty as zero.
    When we remove the delivery block then system automatically carries out availability check & confirms the qty.
    A) Deliveries: Blocking region for sales Area:
    Here we define blocking regions for TOR ex:-credit limits
    B) Reasons for scope of delivery blocks: TOR. Block:
    Ex: - 01 credit limits-check confirmation block.
    Maintain Requirements for TOR:-
    Here we can define our own requirement with the help of ABAPer for TOR
    Ex: - a) 102- prevent reservation in the event of credit block
    b) 102-purchase requisitions.
    System doesn’t create purchase requisitions for sales order line items if it has a credit limit.
    Availability check:
    Configuration setting:-
    Availability check with ATP logic or against planning:-
    Define checking group:
    Checking group define what kind of requirement record system use to create when sales order & deliveries are processed for this material. We can create 2 kinds of requirements records
    Individual requirement records: that means system creates requirement record for each S&D document.
    Summarized requirement Records: That means system creates requirement records under certain condition in the material master record. There are 2 type of summarized requirement record:
    Summarized requirement records for each day.
    Summarized requirement records for each week
    Define checking Action;
    Here we define 01- daily requirement -B 02- Individual requirements -A
    Where b-total record per day
    A-single record per day
    B) Define material Block for other users:
    When 2 users tries to confirm the quantities for the sales order for same material at a time system will be confused to confirm the quantities both sales orders. So has to avoid this kind of situation we can block the materials from confirming the quantities for 2 users at a check, check block
    C) Define checking group default values:
    Checking group is going to be determined depending upon the material type & plant.
    -Go to new entries, specify material type, ex;-FERT
    & plant = checking group of availability check: 02
    D) Carry out for Availability check:
    Here we define checking rule for the Availability check & allocate them to the checking group. The checking rules specify the scope of the availability check. For a respective transaction, means which planned receipts & planned issues systems has to taken into consideration and also it determines whether system has to take RLT into consideration.
    Action:
    *Select checking group of availability check-02, checking rule=01
    *Go to details icon, & check which planned receipts & planned issues system has taken into consideration for availability check
    *save it, exit.
    E) Define procedure by Requirement class:
    Here we define requirement class whether on availability check & TOR should be carried out the setting that we carries out at requirement class level they are at global level. There settings automatically copied into define from of requirement class and vice versa.
    Action:
    *Choose requirement class: 041 & check availability check & TOR (requirement)
    F) Define procedure for each schedule line category:
    Here we carry out fine tuning setting for availability check at schedule line category level. Here we define whether system has to carry out Availability check for particular transaction.
    Ex:- if we want to implement a availability check w/o TOR for a particular transaction. According to settings at requirement class level TOR & availability check function activate & those setting will be copied into the schedule time category by default, so that at schedule line category level we deactivated TOR
    G) Determine procedure for each Delivery Item category:
    H) Checking group for updating back orders:
    CHAN

  • Availability check for Make to stock and Make to Order

    Dear All,
    Client is selling   Make to stock and make to Order material.
    How and what settings need to do for Avaialbility check.or we can use standard one.
    I hope in case of Make to Order availability check may not happen.
    Please correct me.
    Thanks in advance.
    Regards,
    Shrikant

    hi,
    yes for make to order we dont have AvChk.  for make to stock items u need to follow the
    below configuration.
    Availability check
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how u2013 confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) u2013 planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics u2013 sales & distribution u2013 sales u2013 environment u2013 availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks u2013
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups u2013
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above u2013 checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing u2013
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out u2013
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups u2013
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 u2013 summarized requirements and 02 u2013 individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users u2013 the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check u2013 in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under u2013
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order u2013 is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    regards
    anand

  • Re : Availability check in third party

    Hi
          While creating sales order for third party scenatio a availability check is automatically carried out. But for noraml sales processes if stock is there it does nor check availability. I want to know how to avoid the availability check in third-party scenario. I checked BANS and NORM. Item category(TAN and TAS) also i checked. I coun't found any changes.
    How to solve this.
    Thanks Anto

    Dear Antony,
    Availability Check in Sale order will be controlled in the sale order by the following..
    1. You can control the Availabilty check in sale order by means of the Requirement Class
    2. You cn fine tune (i.e., either you want to Switch ON it or OFF) the Availability Check in Sale order by using Schedule line Category.
    Rquirement Class: TCode : OVZG
    Here you do need to check the indicator AvC(Availability Check). If you checked this indicator which will carry out Availability check in Sale order.
    Rquirement Type will be assigned to Requirement Class using the transaction OVZH.
    You can find out which requirement type has been used in Sale order - in Procurement Tab at Overview screen.
    In VOV6(Schedule line Configuration) - there will be an indicator Availability check. This indicator will be used either to Switch ON/OFF Availability Check in Sale Order.
    Ex:
    Say in Req. Class - you have checked the AvC indicator, but for your schedule line you do not check the Availiability check indicator - then you can not carry out Availability Check in Sale Order.
    i.e,Availability Check box should be checked in both places. Then only, you can carry out Availability check in Sale order.
    In your case, it must be checked in either of the above mentioned palces.
    Because, then only you can carry out Availability Check in Sale order..
    Hope it may help you.
    Thanks,
    Venkatesh.S.P

  • Set Availability Check to Exclude Planned Order

    Hi All,
    anyone know how to set the availability check so it will not include the planned order in the calculation ?
    I find one setting in SPRO, the path is :
    Sales & distribution ==>  Basic functions ==> availability check and Transfer of Requirements ==> Availability Check  ==> Availability Check with ATP Logic or Against Planning ==> Carry Out Control for Availability Check
    select one of the record, and update filed "Incl. Planned Orders".
    I've uncheck that field, but I can't get the appropriate result. When I create a new sales order, the availability check still take the planned order I created before into account.
    The problem is, my user want to prevent creating delivery before the goods are already put in the stock. So the planned order should not be considered in the availblity check.
    Thank you in advance
    Rudy

    Hi Rudy,
    Concept of availability check is to verify if the stock is available at the time of creation of sales order. If available, when it can be ready for delivery (as Packing, arranging for transportation, etc may have lead time) & if not available, when it would be available considering Packing, arranging for transportation, etc lead time.
    Availability check whether material is available on required delivery date (backward scheduling) or not. If not available on required delivery date, system will propose next available date (forward scheduling)
    1.     Define Checking Groups
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Checking Groups
    You define checking groups with which you specify the type of requirements records the system is to create when processing sales orders or deliveries
    2. Define Material Block for Other Users
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Material Block for Other Users.
    3 .Define Checking Groups Default Value
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Checking Groups Default Value.
    4. Carry out Control for Availability Check
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Carry Out Control for Availability Check.
    5. Define Procedure by Requirements Class
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Procedure by Requirements Class.
    6. Define Procedure for Each Schedule Line Category
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Procedure for Each Schedule Line Category.
    7. Determine Procedure for Each Delivery Item Category
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Determine Procedure for Each Delivery Item Category.
    8. Checking Rule for Updating Backorders
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Checking Rule for Updating Backorders.
    9. Define Default Settings
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Default Settings.
    Availability checks
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how – confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) – planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics – sales & distribution – sales – environment – availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks –
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups –
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above – checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing –
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out –
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups –
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 – summarized requirements and 02 – individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users – the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check – in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under –
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order – is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    Please Reward If Helpful,
    Thanks and Regards,
    Sateesh.Kandula

  • What is availability check concept  how it is used in SAP

    hi friends,
    i don't know what is availity check,how is it used and how it should be configured,please help me.

    Availability Check in Sales and Distribution Processing 
    There are three types of availability check:
    •     Check on the basis of the ATP quantities
    •     Check against product allocation
    •     Check against planning
    In Customizing, you determine whether an availability check is to be carried out against the ATP quanitity or against planning. The check against product allocations is controlled in the material master and elsewhere in the system.
    Check on the Basis of the ATP Quantities
    The ATP quantity (ATP = Available To Promise) is calculated from the warehouse stock, the planned inward movements of stock (production orders, purchase orders, planned orders) and the planned outward movements of stock (sales orders, deliveries, reservations). This type of check is performed dynamically for each transaction, taking into account the relevant stock and planned goods movements with or without replenishment lead time. Planned independent requirements are not taken into account here.
    Check against Product Allocation
    Product allocation facilitates period-based distribution of products for certain customers or regions. As of Release 3.0F, you can carry out an availability check against product allocation. This ensures, for example, that when production is low, the first customer does not get the full amount, resulting in following sales orders not being confirmed or being confirmed far too late.
    Check against planning
    The check against planning is performed against independent requirements which are usually created for an ‘anonymous’ market rather than being customer-specific (for example, in the strategy ‘Planning without assembly’, when production occurs only up to the stocking level). The planned independent requirements result from demand program planning and are used for planning expected sales quantities independent of orders
    Controlling the Availability Check in Sales and Distribution Processing 
    You control the availability check using general and SD-specific control features.
    General Control Features
    The following control elements need to be maintained in Customizing and in the material master record:
    •     Strategy group
    The allowed planning strategies (main strategy and further possible strategies) are combined in the strategy group. As of Release 3.0, the strategy group is specified in the material master record in the MRP 1 Screen. In Customizing, strategy groups are assigned, dependent on plant, to MRP groups. If the strategy group is missing in the material master record, it is determined on the basis of the MRP group, if it has been maintained.
    Up to Release 3.0, the strategy group is determined on the basis of the MRP group
    •     MRP group
    The MRP group combines materials from the point of view of material requirements planning. This enables you to control planning for these materials in a particular way using, for example, the strategy group, consumption mode and planning period. You enter the MRP group in the material master in the MRP 1 screen. The strategy group is determined from the MRP group.
    •     Planning Strategy
    The planning strategy specifies the requirements type for planning and customer requirements. This represents the decisive control feature for the interaction between Production Planning and Sales and Distribution.
    •     MRP type and item category
    If no requirements type is found using the planning strategy, the system tries to determine a corresponding requirements type on the basis of the MRP type and the item category.
    Until 3.0C, determination of the requirements type via planning strategy has taken priority. This is not always the best option, however, as the following example will show. A requirements type is determined for a material, which causes availability to be checked against planning. In consignment stock processing, however, availability should be checked against stock. Until 3.0C the availability check had to be deactivated in these cases. As of Release 3.0C, you can determine how the requirements type is to be determined for each transaction by maintaining the Source field in Determination of requirement types using transaction in Customizing.
    •     Requirements type
    The various requirements are identified by their requirements type. The requirements type refers to the requirements class and its control features.
    •     Requirements Class
    The requirements class contains all control features for planning such as relevance for planning, requirements planning strategy and requirements consumption strategy. In addition, it is specified at a global level whether an availability check is to take place for the material in the sales and distribution documents on the basis of the ATP quantity (ATP = available to promise) and whether requirements are to be passed on. A finer degree of control can be obtained for sales documents using the schedule line category.
    Control Features Specific to Sales and Distribution
    The following SD-specific control features need to be maintained in Customizing:
    •     Checking group
    The checking group controls whether the system is to create indivdual or collective requirements in sales and shipping processing. In addition, a material block for the availability check with transfer of requirements can be set here. The checking group can also be used to deactivate the availability check. This option was created especially for the assembly order so that when the bill of material is exploded in the assembly order, the individual components, if necessary, can be classified as non-critical parts as far as procurement is concerned.
    The checking group specifies in combination with the checking rule the scope of the availability check. It is proposed in the material master record on the basis of the material type and the plant, and copied into the sales and distribution documents.
    •     Checking Rule
    You use the checking rule to control the scope of the availability check for each transaction in sales and distribution. You also specify whether the check should be carried out including or excluding replenishment lead time. The individual checking rules define by transaction, which stock and inward and outward movement of goods should be taken into account for the availability check.
    •     Schedule line category
    You can control with the schedule line category whether an availability check and transfer of requirements should be carried out in the sales documents. The possible settings for this at schedule line level are dependent on the settings in the requirements class which is determined from the requirements type of the material.
    •     Delivery item category
    The delivery item category can be used to control whether an availability check takes place in deliveries.
    Prerequisites
    An availability check can only be carried out if the following prerequisites have been fulfilled:
    •     The control elements described above for the availability check must be maintained in Customizing for Sales and the relevant assignments made to the sales transactions
    •     The availability check must be switched on at requirements class level and - for the availability check in the sales documents - at schedule line category level
    •     A requirements type must exist by which the requirements class can be found
    •     A plant must be defined. It can either be proposed from the customer or material master record or can be entered manually in the document.
    •     A checking group must be defined in the material master record on the Sales/plant data screen in the Availability check field
    Timing of the Availability Check in Sales and Distribution Processing 
    When you create an order, the system determines the required materail availability date on the basis of the customer’s requested delivery date. On this date, you must begin picking, packing, labeling, and loading the goods. Therefore, this is the date of significance for requirements planning on which the availability should be checked.
    The following data is required for determining this date:
    •     Route from the shipping point to the ship-to party location
    •     Shipping point from which the goods are issued
    •     Loading group from the material master record
    •     Weight group determined from the order using the order quantity
    Scheduling
    This data, which you have already entered in the system, means that scheduling can occur automatically. Since scheduling is carried out backwards from the requested delivery date, it is also called backward scheduling. If backward scheduling determines that the preparation for the shipping activities should have been started already to meet the customer's requested delivery date, the system then starts forward scheduling automatically from the current date.
    Scope of the Availability Check in Sales and Distribution Processing 
    The following elements can be included in the availability check:
    •     Stock
    o     safety stock
    o     stock in transfer
    o     quality inspection
    o     blocked stock
    •     Inward/Outward movement of goods
    o     purchase orders
    o     purchase requisitions
    o     planned orders
    o     production orders
    o     reservations
    o     dependent reservations
    o     dependent requirements
    o     sales requirements
    o     delivery requirements
    Requirements in sales and distribution (sales requirements and delivery requirements) result from all transactions which forward a requirement to Materials Management (MM) or to Production Planning (PP). For example, this could include sales orders or deliveries and quotations as well. Sales and distribution requirements reduce existing stock or inward movements of stock on the material availability date to ensure that other outward movement of stock elements cannot access the quantity reserved in this way.
    Requirements relevant for Sales and distribution are created in Sales and Distribution, whereas other elements in this list are created in Materials Management or in Production Planning.
    Defining the Elements to be Included in Check
    A checking rule is assigned to each transaction. This rule in combination with the checking group controls the scope of the availability check. You can use the checking rules in Customizing for Sales to specify for the various transactions which of the elements listed above should be included in the availability check.
    For trading goods it does not make sense to include planned or production orders, for example, in the availability check. However, for products manufactured by your company these orders should be included in the check.
    For transactions such as make-to-order production, consignment or returnable packaging processing that create special stock, the availability check is performed against special stock.
    If it is defined by the checking rules that both sales and delivery requirements are taken into account in the availability check in sales documents but only delivery requirements are taken into account in the availability check in deliveries, there is a danger that quantities reserved in the sales documents are considered to be available by the availability check in the deliveries. This can lead to sales documents becoming backlogged.
    Reactions to the Availability Check in Sales Documents 
    If the goods ordered by the customer are not available on the requested date, the system branches automatically during sales document processing to a further screen where delivery proposals are offered for selection. The system determines these proposals on the basis of the availability situation. This screen also provides you with information on the scope of the check, the current ATP quantity, and the availability situation across all plants.
    Availability Control
    On the Availability Control screen, you can choose between the following delivery proposals:
    •     One-time delivery on the requested delivery date
    In this section, the system checks whether the requested delivery date can be kept to. If stock of the material is available to make a delivery on the requested delivery date, the stock quantity is confirmed here. If there is no stock available, confirmed quantity zero is displayed.
    To copy this data into the sales document, select Edit One-time delivery.
    •     Complete delivery
    In this section, the system checks whether there will be sufficient stock for complete delivery at a later date:
    o     If there is sufficient stock available at a later date to cover the required quantity in the sales document, the system proposes the date here.
    o     If the system determines that complete delivery cannot be made at a later date, no date is proposed in this section.
    When availability is checked including replenishment lead time, the date which is proposed in this section is the date on which the replenishment lead time period ends if the stock before the end of replenishment lead time does not cover the order quantity.
    When availability is checked excluding replenishment lead time, the system bases its calculations on the stock and the planned inward movements of stock.
    To copy this data into the sales document, select Edit Complete delivery
    •     Delivery proposal
    In this section, the system checks whether and for which dates partial deliveries can be made. Partial deliveries are displayed for different dates. These dates are based on the planned inward and outward movements of stock.
    During an availability check which takes replenishment lead time into account, the date on which replenishment lead time ends is displayed if insufficient stock means that no partial deliveries can be made before replenishment lead time ends.
    During an availability check which does not take replenishment lead time into account, the system displays the dates on which partial deliveries can be made with the available stock.
    To copy this proposal into the sales document, select Edit Delivery proposal
    The dates displayed in the sections complete delivery and delivery proposal are determined from the material availability date using forward scheduling and represent actual delivery dates.
    Availability Across Plants
    You can display the availability situation in the various plants for which a material is maintained. To do this, proceed as follows:
    1.     Select Goto Other plants on the availability control screen.
    The dialog box Plant Selection appears. All plants for which the material is maintained are displayed.
    2.     Mark the plants in which you want to check availability and select Check plants.
    You reach the Availability Check: Overview screen. The requirements quantity and the quantity which could be confirmed as well as some additional information is displayed in a separate line for each plant you selected.
    3.     If you require detailed information on the availability check for a particular line, select the relevant line and select Edit Check availability.
    You reach the Date proposals dialog box where the detailed data is displayed.
    4.     You can select a plant with sufficient quantity for confirmation to be copied automatically into the Overview screen. Select the appropriate line and select Edit Copy plant.
    Using the user exit USEREXIT_PLANT_SELECTION in the Include LV03VFZZ you can make a preselection of the allowed plants. If you use this option, the Plant selection dialog box does not appear and the availability check is performed immediately for the allowed plants. If, on the basis of information resulting from the availability check, you want to deliver from a plant other than the one specified in the item, you must at present enter this plant manually in the item. In a later release, however, you will be able to select the plant directly from the list of plants.
    Displaying the ATP Quantities
    If you want to display the current ATP situation on the availability control screen, select Goto Availability overview.
    Displaying the Scope of the Check
    If you want to display the scope of the check (stock and inward/outward movements of goods taken into account during the availability check) from the availability control screen, select Goto Scope of check.
    Delivery Agreements in the Customer Master Record
    A customer may react in different ways to the fact that a complete delivery can not be provided for the required delivery date. You can define in the customer master record, the way a customer reacts to the inability to meet the requirements represented by the key data.
    •     The customer wants complete delivery of all items by the requested delivery date or at a later date.
    The complete delivery indicator is copied into the sales document from the customer master record. To find it, select Header Business data on an overview screen or a header screen. You find the indicator in the Shipping section.
    If the complete delivery indicator is set in the sales document, the individual items are automatically correlated when the document is saved if the schedule lines exist for various dates (that is, a delivery group is automatically created for the sales document items and the latest delivery date within this group becomes the group delivery date). For further information on delivery groups, see  Combining Sales Document Items for Delivery.
    •     The customer only allows a certain number of partial deliveries for each item.
    The partial delivery indicator and the number of partial deliveries are copied into the sales document item from the customer master record. To find the indicators:
    1.     Go to the Business Data screen for this item.
    2.     Select Edit Shipping details.
    The indicators are found in the Shipping section.
    Performing the Availability Check Again
    Usually, an availability check is only performed when a sales document is created. If quantities or dates are changed in the document and availability needs to be checked again, the check is performed again automatically . However, you can also initiate an availability check manually.
    Automatic Checks
    In the following situations, a new availability check is automatically carried out:
    •     Quantity change
    •     Date change (requested delivery date, material availability date)
    •     Change to the fixed data
    •     After new delivery scheduling (for example, the route or shipping point has been changed)
    •     Change of plant
    •     Change of storage location or batch
    •     Removal of blocks which affect requirements
    •     Removal of reasons for rejection
    Initiating a Check Manually
    In the sales document, you can initiate a new availability check manually. If you want to perform an availability check for all items in a sales document, select Sales document Check availability on the header screen. If you want to check availability for an individual item, select Edit Item availability.
    Fixing Quantities and Dates in Sales Documents 
    If the availability check for an item determines that the item cannot be delivered fully on the requested delivery date, and, as a result one or more schedule lines have to be created for later delivery dates, the customer can decide whether to accept these delivery dates and quantities.
    You can record the customer's decision either by setting an indicator in the Fixed date and qty field or by leaving this field blank. The field is displayed both on the schedule line overview screen and on the availability screen.
    Customer Accepts the Schedule Line Proposal
    If the customer accepts the schedule lines which are proposed by the system, mark the Fixed date and qty field. The system then transfers the requirements for the schedule lines to material requirements planning.
    Customer Requires Goods Earlier
    If the customer requires the goods earlier than the date that the system can confirm after the availability check, leave the Fixed date and qty field blank. The system then only passes on the requirements for the requested delivery date and does not take the quantities and dates confirmed by the system after the availability check into account. In this case, it is assumed that the requested delivery date can be kept to because, for example, additional production capacity may become free. The system only confirms the sales order once the entire order quantity can be delivered on the requested delivery date. In the subsequent delivery processing, the sales order is only considered to be completed when the entire order quantity has been delivered or when all partial delivery agreements have been fulfilled.
    A fixed item is considered to be completed once the entire confirmed quantity (which can be smaller than the originally requested order quantity)has been delivered. Therefore, it does not make sense to fix the confirmed quantity to 0 as the item is considered to be completed from the start.
    During rescheduling, the fixed quantities and dates are no longer taken into account.
    Blocking Confirmation of Quantities in Sales Documents 
    In Customizing, using Block transfer of requirements by delivery block, you can specify that certain delivery blocks in the sales document header also block the confirmation of order quantities.
    If you enter such a delivery block in a sales order header, the system confirms the available quantity to show you the delivery options. If you save the document, however, the confirmed quantities are not saved. Your company could block confirmation for a customer if this customer's credit worthiness was questionable. The sales order in this case is not only classed as unconfirmed, it is also blocked for delivery.
    Thus, no stock is reserved. The stock is still available for other customers. Although the order quantities are not confirmed, the system still transfers the requirements to material requirements planning. It is assumed that the delivery block will be removed at some point. The automatic transfer of requirements means that the order quantity can be confirmed at a later point in time
    Source: SAP Library
    Hope this is of some help.

  • Problem in availability check

    Hi guys,
    WE have the following requirement.  At the time of creation of production order, we have to activate the availability check before save.  We could configure such a way that, availability check is carried out while releasing the production order.  But if the quantity is increased after release, the order is getting saved without carrying out the availability check.  WE have to do either of the following two:
    1) making quantity field as not editable after releasing the production order or
    2) to enable availability check to be carried out after release and before saving the order.
    Is it possible to do the above?  If possible, what are the settings required. 
    Suggestions will be rewarded.
    chintu

    Hi,
      Availability check for a material is carried out only if the material is
      1.  A stock item
      2.  Not a phantom item
      3.  Not a bulk material.
    This can be carried out
    1. during order creation
    2. during order release
    3. when a created order is saved
    Availability check can be triggered either manually or automatically.
    For this we need to define in checking control(opjk)
    First define a checking group(ovz2) and checking rule and this
    must be assigned to checking scope.(opjj)
    In the checking scope(opjj) we should define
      1. which Mrp elements are to be considered during check
      2. which inventory categories are to be taken into account
      3. whether Replinishment lead time is to be taken into account or not
      4. whether check is also to be carried at storage location level.
      This checking rule must be linked to checking control(opjk)in which you can say
      1.No availability check for the material
      2.Availability check when saving the order
      3.What type of check is to be carried 
        whether ATP CHECK or Check against PIR quantities
      4. Whether order should be released or not if there is
         any missing parts. 
      For all your questions there is answer available in this answer.only
      you have to customise things in such a way  that your requirement  are met.
      To my knowledge a phantom material should not take part in check
      If it takes part in availability check , check whether the phantom assembly
      is allowed to take part in availability check in Define Explosion Types in
      customising.The indicator switchoff phantom assembly (02)must be active and
      this must be assigned in Bom item detail screen under general data.
      Reward points if helpful
      Regards,
      nandha

Maybe you are looking for

  • Play video behind apps with AirPlay to AppleTV

    When Yosemite was first spoken about by Apple, one of the stated "features" that excited me was that you would be able to stream video from your Mac in the background to AppleTV while still working on your normal apps in the foreground. You could wat

  • This is from naidu

    i am doing the split purchase order.  i have check in the administration . and the  in the purchase order in the logistics tab i have check the  split purchase  order . but the split order not showing in the  reports .

  • Is it possible to prioritize the items to synch?

    I have an 80GB video classic and far greater than 80GB of material that I want to synch. I love podcasts and have selected "3 most recent unplayed" as my selection criteria for podcasts. In addition, I have only selected some of my music playlists. I

  • Run-Time Error window doesn't have Retry and Ignore options

    Hi, The run-Time Error window usually have 4 bullets at the bottom part.  They all used to be enabled untill recently.  Somehow, I only have the Run Cleanup and Abort immediately bullets enabled.  Why are the Retry and Ignore disabled?  Is there an o

  • L197 Widescreen Monitor Problems

    Hi, I have purchsed a L197 widescreen monitor which has a 16:10 aspect ration and Im running it at its optimal resolution of 1440x900 but Im getting think black lines on the sides like it is running at 4:3. I have updated drivers and have played arou