No control recipe created messge in PPPI

Dear gurus ,
I am trying different combinations of process instruction categories. But when i creating process order for some cobinations control recipe is not creating.
Error log is showing that "No control recipe is created"
Please reply can i see the exact reason for the not creating the recipe.
Thanks in advance .
Abhi

Hi Abhi,
Check In master Recipe ,in the PI Tab,There must be some PI category is assigned and in that PI Category,this PI Charactiristic has been assigned.
First goto that Phase of the Master Recipe and then goto PI tab and then find the PI category.
Regards,
R.Brahmankar

Similar Messages

  • Remove status "control recipe created"

    Hi
    I have a problem with a process order, this was canceled after confirmation and now i can't change to Tecnically complete because the status "Control Recipe Created" i can't remove. I verify the message status on CO54 and i don't have pending to be sent..
    How i can correct this?

    Hi,
    First send the control recipe to process control system through CO53. then delete the PI sheet as per the procedure mentioned below. Once done you can  change the status of process order to TECO..
    Control Recipe/PI sheet deletion procedure
    Thanks
    Kumar

  • Error in CO54 Control recipe.

    Dear Experts,
    I am not able to do TECO for process order as auto control recipe is being created,this is the status of my process order.
    I have created massage through T-Code CO57 with massage category PI_CRST, Process order number,but I don't know which control recipe I have to select so that the when I am doing massage posting through T-Code CO54, it is giving error massage that it can not be posted. I have tried some of the control recipe number from F4, in CO57, but again the system gives the error massage while proceeding with CO54.
    This is very critical as my client plant is nearly down as far as SAP is concerned.
    Please do the needful by giving the detail steps to over come this error as TECO for this process order is a must.
    Regards,
    Rajesh.

    Dear,
    The error given is as follows.
    2.Destination PI04 COCI_CONFIRM_MATERIAL_CONSUMPTION cannot process the message
    3.Message is not sent to and destination.
    This error is because of CO57 where I don't know to select which Control recipe along with process order number in CO57. I tried selecting some of the control recipe from F4, but was of no use.
    I just want to do TECO for the process order where status is control recipe created (which is being created automatically), so I am selecting Massage Category PI_CRST. But I don't know which control recipe to be selected along with Process order number for field Contol Recipe in CO57.
    Regards,
    Rajesh Prasad.

  • How to avoide the control recipe creation step and control recipe complete

    Hi
    in process order procedure has configured in our syayrm ...like
    orde creation,release,control recipe created at time orede release, then order conformation ,order inal conformation, control recipe comlete , order TECH., ...Like ths our order process configured..
    here we not useing any control recipe functions ... and control recipr complte ...so how to remove this step from order process...pls could any one guide inthis issue.
    Rgards
    HGVD

    Dear HGVD,
    Assuming there is only one order type(process order type) is used in both the manufacturing plants,then create plant specific
    production scheduling profile in CORY,for the plant 2000,assign the prod.schd.profile with the default order type and
    do not include the check box for generate control recipe and save the data,but in the same CORY,assign the same order
    type,with including the check box for generate control recipe.
    Check by this way and revert back.
    Regards
    Mangalraj.S

  • How to delete Control Recipe

    Hi ,
    Can Control Recipe can be deleted eventhough Incomplete.
    In our scenario sometimes control recipe is auto generate at the time of process order release.So some times due to circumstances order can not proceed further in this case that generated control recipe creates problem to make order TECO or delete.

    Dhaval,
    The standard practice is to manually trigger a Process message to the order, to have the status CRFI - Control recipe finished.
    Transaction CO57, to trigger manually a process message with message Category PI_CRST for the process order and Control reciepe combination.
    Use Transaction CO54 to send the Message to the process order.
    Regards,
    Prasobh

  • Control Recipe not created

    Hi PP Gurus,
              I have issue of Control recipe not created while creating the process order. So that log on PI generation/ ctrl recipe creation is empty. It is not possible to enter data for PI sheet as it is not generated while creating process order.
             Could you please suggest, what are the probable reasons which are leading to this issue?
    Thanks,
    Reddy

    Hi Pankaj,
            Thanks for your response. I have tested control recipe creation from the process order, before posting the issue. It seems few issues related to process instructions.
    I have got a solution for creating Control recipe and PI sheet by spending some time on this issue.
    I am closing this issue.
    Thanks,
    Reddy

  • Creating control recipe

    Can you plz let me know the reasons for not creating control recipe at the time process order.
    Thanks,
    SAP PQ

    Hi,
    All created orders may not convert into actual production all the time. Basically releasing is the final authorisation by the senior person by checking all capacities, materials etc. So after releasing of order only control recipe is generated.
    Regards,
    Suhas

  • XStep- creation of two control recipes

    Hi,
    I am using the Ecc 6.0 Enp 3.0
    I have created a Xtsep structure with parameters and checked. so errors found.
    XStep is copied into Routing. Production Order is created. during Control recipe generation, there are 2 control recipes are generated. first control recipe do not have Production Order header material and status.
    The second control recipe has the all details which are captured from XStep.
    Why First control recipe getting created.. am I doing something wroing in setup..
    Thanks,
    JK

    Why don't you just create a custom view object? There's even an example or 2 in the docs:
    http://docs.oracle.com/cd/E16162_01/web.1112/e16182/intro_tour.htm#CHDGDIEC (check out "View object on refcursor" example)
    Edit: you are aware that you can create a View Object based on more than one table?
    John

  • Control recipe destination not available in Process order

    Hi PP-PI Gurus,
    When i am sending the process maessages to destinations,i am getting the error"No control receipe destination available in process order".
    When we create master recipe using X-steps, there is no option to enter comtrol recipe destination. Infact we asssign the destination in X-step tree.
    When the control recipe is created for a process order using x-steps, the operations overview will not have the control recipe destination.
    When the status of the control recipe is sent to destination(PI02),the system throws the above error.
    Any help on  how to resolve this error.
    Thanks in advance.
    Mani

    Hi Dhavel,
    Whether it is PI_CRST or PI_CRST2 i am getting the same error message.
    When i am working with Conventional Characterestics based process instructions in my recipe, everything is working fine.
    When i use X-steps instead of process instructions in master recipe to create the control recipe, i am facing this error.
    So it is clear that , when we are using Execution steps(X-steps) to create PI sheet,there needs some extra settings.
    Any body working with X-steps in process order ,request your help please to resolve this issue.
    Mani.

  • Control Recipe Status

    Hi Everyone...
    Need your help urgently.
    When creating a process order; after i have only released the order and not saved it; a control recipe is created. Can anyone tell me what is the status of the control recipe at this juncture and how exactly is this getting this status.. technically any idea where this status is being assigned in the code? I checked with transaction CO53 for seeing this control recipe but it isn't here.. only once the process order is saved is it coming up here with Status displayed on the report as Created. So only after this does the status become created or when i release itself this control recipe gets created but since the process order is not saved it doesn't appear in CO53. Please help. Awaiting your replies on this.
    Thank you,Regards

    You can set this in customization for process order type that during release the control recipe is to be created or during the creation of the process order.
    Once the Control recipe is created until unless it is released it will not be visible in CO53, You have to go to the change mode of the process order and go to the list of control recipes and release it.
    When a Control recipe is created it gets the status of CRTD as of a process order and when it is released it will be with status released, when Completed it will be with Completed, during processing with status of In process.
    When you release the Control recipe it will be available in CO53 then you can process the PI sheet.
    Hope this may help you.

  • Control recipe

    dear experts,
    can anyone tell me about control recipe in process industry?
    WHAT'S THE FUNCTION OF CONTROL RECIPE IN pp-pi

    Hi Ganesh,
                           Control Recipe is an element that, assigned to a Master Recipe, will take part of a PI Sheet. It is used in Production Planning for Process Industries models.
    You create a control recipe by configuring process messages using general characteristics, under a cover of a process specification. The collection of process specification assigned to a destination generates a Controle Recipe, and could be sent to generate PI Sheet after a Process Order is released.
    In addition to the above reply, i would also like to discuss one issue related to Process industries-
    while doing TECO(technically complete), the system is showing an error message "System status CRCR is active (ORD 1000001)" and i am not able to do it successfully.
    Please come with valuable suggestions/advices.
    Immediate replies will be appreciated.
    Regards
    chandra
    Edited by: Saraswati chandra on Mar 7, 2011 8:36 AM

  • Control recipe and PI sheet creation creation

    HI frnds,
    Please explain me the configuration and  path of creating control recipe and PI sheet.
    thanks in advance
    Daniel

    HI,
    plz respond as earliest
    Daniel

  • Control Recipe and PI sheet

    Hi, All,
    Can I know what's the difference between master recipe and PI sheet? And what's difference between master recipe and control recipe?
    I know control recipe is generated from process order. What's the output of master receipe? But how to generate PI sheet? what's the PI sheet output?
    Thanks

    Hi,
    Master recipe will contain the Resources to be used and the duration of the process.
    Process order will generate control recipe. Control contains process Instructions.While creating / Releasing the process order control recipe will be created. It can be created automatically or manually. We shall discuss the manual creation.
    PI Sheet:
    process Instructions can be attached to the Master Recipe. Process Instructions assigned in master recipe will generate control recipe.
    Regards,
    Mohan

  • Control recipe and process messages

    Hi experts,
    When I create a control recipe and send to an external destination, is it going as an outbound IDoc from SAP to external system?.
    I have the same doubt about the process messages also. ie whether the process messages are coming from external system to SAP as inbound IDocs?
    Thanks in advance
    pradeep

    Hi Prathib,
    To realize data transfer between PP-PI and the control system, the SAP system provides the following alternative technologies:
    ·        Function modules
    ·        BAPIs (Business Application Programming Interfaces) that are defined as methods applied to SAP business objects and enable the standardized, object-oriented access to business functions in the SAP system. They are implemented as function modules, too.
    Follow the link below for further detail
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/12/3bc6f8504811d182c20000e829fbfe/frameset.htm
    Do let us knowi if you have any further query on the same
    Thanks
    Kaushik

  • Advantages of PI sheet and control recipe

    can u pls let me know the advantages of using Process instruction sheet and control recipe,
    and if it is not maintained , then what will be the reflection.
    thnx-rgds
    Amitabh

    Hi,
    Control recipe is used to send a proper destination or to the operator who has to input the data and confirm this action performed.
    control recipe will be sent back to the process order and instructions with data will be available. when creating a process order, control recipe will be created, which will contain the process instruction.
    To specify the PI that are to be generated in the processorder when control recipe is created  for the control recipe destination.
    There are 3 steps to be performed such as
    1) Define control recipe destinations
    2) Assign PI Categories
    3) Set process instructions to be gerated automatically
    Please let me know.
    Regards,
    Mohan R

Maybe you are looking for