No DataTarget found from InfoPackage Scheduler

Hi All,
I am trying to load flat file data into Info Cube from InfoPackage Scheduler in Production System. When i look the Data Target tab , it doesn't have the Data Target ( Info Cube ) eventhough my update rules are active from the infosource to Infocube.
I will appreciate for ur help and letme know how can i find my InfoCube under data target tab at InfoPackage Scheduler.
Points will be awarded.
Thanks,
Abhi

Hi Abhi,
Check this,
Go to Cube --> right click --> show Data Flow --> click the technical names On and see whether the flow is correct or not..
Create a new InfoPackage and try once again..
Hope this helps,
Thanks,
Sudhakar

Similar Messages

  • Exception from InfoPackage.Schedule BAPI

    Hi all,
    I'm working on a BW integration project, using the Staging BAPIs for the BIW from the .NET Connector. I have been able to create the InfoObjects, InfoCubes, etc... however I am running into a problem I just can't get around. I am trying to schedule an InfoPackage to upload data in a csv file on my workstation. However, when I call the Schedule BAPI (BAPI_IPAK_START), I get an exception that doesn't make much sense to me: "An upload from the client workstation in the background is not possible". I'm not using a background thread, so I'm a little confused where this comes from. If I schedule the package from the BW Administrator, it schedules and uploads with no problems. Does anyone have any idea where I may be going wrong here?
    Thanks,
    Steve

    I am also having the same problem. Can anyone help?
    The only difference is so far, I am only testing it from SAP GUI ( i.e calling BAPI functions from ABAP code)
    Message was edited by: Saurabh Gupta

  • Stop infopackage from background scheduling

    Hi experts,
    How to stop a delta infopackage from Background scheduling in info package options. I want to stop background scheduling
    and keep this infopackage in a process chain.I clicked on Start Data load immediately and saved. But when i again opened the infopackage by default it is on Background scheduling and is asking for cancel job after X runs.How to avoid this ?
    Bhadri M.

    You can kill the Job through SM37. IP if directly scheduled, the name would be BI_BTCH*. If you go tour Schedule Tab for your infopackage you can find the name of the Job.
    In SM37, just select the job and delete it.
    Please don't delete the job if its already Active. Delete it if its in the Released or Scheduled status.
    Then you can simply include your IP in you Process Chain and schedule the Process Chain to run daily.
    Regards
    Anujit Ghosh

  • Add authorization check in Infopackage Scheduler for option 6-ABAP Routine

    We want to add an authorization check in routine rssm_routines_maintain.    This is in the Infopackage scheduler in the Data Selection tab  under the column Type after selecting type=6(ABAP Routine).    This is a core modification.   We have checked with our Security team with traces and found nothing available to help us.
    Two questions:
    1) Is there any other way we can control who can create/change ABAP code by this method ?
    2) Does anyone see this causing problems if we were to make a change to the routine to add code to do an authorization check.
    Your help would be appreciated.
    Robert Begin,
    450-677-9411 or
    514-924-4311
    or email at [email protected]

    Hi Chandran,  we need to restrict a certain group of BW Developers from writing code in the abap routine (option 6 ) in the Infopackage of the Data Selection Tab in column Type.
    The concern is that if having access to write abap code, a person can practically do as heéshe pleases with ABAP code and it is a concern.
    Do you have any solution/suggestions to lock this down?
    Much appreciated,
    Regards,
    Robert.

  • SyncToy 2.1 Can't Find NAS Folder When Run From Task Scheduler

    I'm using SyncToy 2.1 to keep two WIN7 computers and a Synology DS414j NAS drive in sync. I have several folder pairs configured, some between the two PC's and three between one PC and the NAS drive. I have a task set up for automatic syncing. The problem
    is SyncToy can't find the destination folders on the NAS drive if it's run from Task Scheduler. If I run SyncToy manually, everything works fine. I've even tried opening the command prompt and running the exact same program Task Scheduler is running (SyncToyCmd.exe
    -R), and it works perfectly. But when Task Scheduler runs the task, it fails to find the NAS folders with the following error message:
    SYNC: 08/21/2014 14:12:26:140: *** Failed to execute folder pair Downloads to NAS. Could not locate folder \\DISKSTATION\Downloads\.
    I've been looking for days for a solution and have not found anyone with this problem. Any ideas?

    Hi Texxxas,
    Apparently the problem is not with SyncToy, it is with Task Scheduler. If you have had Task Scheduler work for you in the past, then I don't have an answer for that. I have never been able to get Task Scheduler to work correctly with SyncToy and a NAS drive.
    I have found that for some reason it works with USB external HDD's but will not work with a network connected hard drive. The same bug exists in Win8.1 as well. However, I have since found a third party task scheduler that works perfectly with SyncToy and
    my NAS drive. It is called System Scheduler by Splinterware. The free version only works when you are logged in but they have a paid version that runs as a service and will execute without being logged in. This has solved my problem.

  • Transaction code for infopackage scheduling

    Hi,
    Does any know what the standard transaction code is for infopackage scheduling (other than RSA1)? Is there any other option to by pass the RSA1 code and go to the infopackage directly to upload an external file to the infocube? Any input will be appreciated. Thanks.

    Hi,
    RSA1 is a standard TCODE for SAP-BI or BW.
    As far as my guesses, there was no standard transaction to run a Infopackage....
    Instead of using tht still if u need to scedule a package,
    1) If ur Infopackage is included in process chains, then u can goto RSPC to the same chain where the infopackage was included and there on the loading step if u rightclick-->display variant.....then it'll goto scheduler window..there u can start...
    2) If u have run the same package before anytime and u remember the date, u can goto RSMO and filter according to IP selections and u'll get all the packages run on tht day...
    If we execute with tht selection u'll get the monitor of the load..ther from the header tab...in the IP selction u can schedule the same without using RSA1..
    But RSA1 is the easy way to trace via data source..
    rgds,
    Edited by: Krishna Rao on Mar 26, 2009 2:48 AM
    Edited by: Krishna Rao on Mar 26, 2009 2:48 AM

  • Infopackage scheduler

    hi sap gurus,
         In the INFOPACKAGE ,scheduler (maintain infopackage Screen ) --->in the SCHEDULE TAB  -
    > i changed the option "START LOAD IMMIDIATELY" TO "START LOAD LATER IN BACKGROUND" by mistake .I am not able to revert back the option.
    can any body tell me how to change the option back to START LOAD IMMIDIATELY.please

    Copy the infopackage ID which starts with ZPAK_*. Then go to SE16, give the table name as RSSDBATCH -> give this infopackage id as the selection for log.object. Delete the corresponding entry from this table and the option START LOAD IMMEDIATELY will appear in the infopackage.
    Please assign pts if helpful.

  • What is the significance of create routines found in infopackage?

    hi all,
    Can anyone explain me with an example the significance of create routines found in infopackage - external data tab.
    And as well as writing an abap routine in the data selection tab of the info package.
    regds
    hari

    hi,
    if u want to load only particular values to the particular field... let s say example
    material colour = 'Red'
    by writing routine at infopackge in data selection tab u can achive this
    its just one example
    Check this thread...
    Flatfile renaming logic and upload date logic!
    thanks
    Message was edited by:

  • Running shell command from Java, but from Windows Schedule Task?

    I have a simple java program that will start a dos based program. The java program works great when I run it, but when I run it from the Windows Task Scheduler, the dox box that should pop up, does not. It is running because I can see it in the task manager but I can not see the command window.
    Any ideas how to show the command window from a java application that is ran from Windows Task Scheduler?
    Example program below. Runs fine by itself, should get a dos popup that issues the directory command, run it from the scheduler and it does not show the dos box. You can however see it in the Processes as CMD.exe.
    import java.io.IOException;
    public class Test {
          * @param args
         public static void main(String[] args) {
              try {
                   Runtime.getRuntime().exec("cmd /k start dir");
              } catch (IOException e) {
                   // TODO Auto-generated catch block
                   e.printStackTrace();
    }Now the my real program is quite a bit more complicated. It actually goes out and checks the status of an Oracle Database, if all the tablespaces are online, then the middle tier application is allowed to start. The middle tier application is started by my java application, and is comes up with a dos console which shows status and users connected to the database.

    Jag,
    Actually, the question of whether it works for me seems to depend on the version of the OS (or Oracle). On RedHat Linux (Oracle 8.1.6) it didn't work at all, but on Solaris (Oracle 9.0.2) it did. Here's the output from that run:
    SQL> /
    output of the command run:
    init.ora
    initDBPart9i.DBPSun01.ora
    initdw.ora
    lkDBPART9I
    orapw
    orapwDBPart9i
    spfileDBPart9i.ora
    Done
    PL/SQL procedure successfully completed.
    But, I did need to change a line of your code to this:
    Process p = Runtime.getRuntime().exec("/usr/bin/ls");
    your original was:
    Process p = Runtime.getRuntime().exec("ls");
    You might consider, if possible, use of some of the Java File classes instead of ls, as this might make things more predictable for you. There were some examples in oramag.com a few months ago, but they were pretty simple (you might not need them).
    Hope this helps,
    -Dan
    http://www.compuware.com/products/devpartner/db/oracle_debug.htm
    Debug PL/SQL and Java in the Oracle Database

  • How I run a shell script from the scheduler on 10.2.0.2.0 ?

    Hello Oracle People,
    I'd like to run a shell script from the Scheduler in my 10g database.
    Right now it is a simple shell script.
    Eventually it will wrap RMAN commands to back up my DB.
    I wrote a simple pl/sql script to create a job:
    -- cr_job10.sql
    BEGIN
    DBMS_SCHEDULER.CREATE_JOB (
    job_name => 'my_backup_job',
    job_type => 'EXECUTABLE',
    job_action => '/h/oracle/scripts/tst.sh',
    start_date => '06-SEP-07 5.33.00PM US/Pacific',
    repeat_interval => 'FREQ=DAILY',
    end_date => '08-SEP-07 4.00.00PM US/Pacific',
    enabled => TRUE,
    comments => 'My Backup Job');
    END;
    I see no errors when I run the above procedure.
    I checked DBA_SCHEDULER_JOBS and the job is in there.
    The scheduler, though, errors out with an error which I see in a trace file:
    /h/oracle/admin/orcl/bdump/orcl_j000_22396.trc
    Oracle Database 10g Enterprise Edition Release 10.2.0.2.0 - Production
    With the Partitioning, OLAP and Data Mining options
    ORACLE_HOME = /h/oracle/product/10r2
    System name: SunOS
    Node name: sol
    Release: 5.10
    Version: Generic_118855-14
    Machine: i86pc
    Instance name: orcl
    Redo thread mounted by this instance: 1
    Oracle process number: 15
    Unix process pid: 22396, image: oracle@sol (J000)
    *** ACTION NAME:(MY_BACKUP_JOB) 2007-09-06 17:33:00.175
    *** MODULE NAME:(DBMS_SCHEDULER) 2007-09-06 17:33:00.175
    *** SERVICE NAME:(SYS$USERS) 2007-09-06 17:33:00.175
    *** CLIENT ID:() 2007-09-06 17:33:00.175
    *** SESSION ID:(140.13520) 2007-09-06 17:33:00.175
    *** 2007-09-06 17:33:00.175
    ORA-12012: error on auto execute of job 53267
    ORA-27369: job of type EXECUTABLE failed with exit code: 274662
    I googled on this:
    ORA-27369: job of type EXECUTABLE failed with exit code: 274662
    Google returned only 1 hit.
    There, I see some evidence that I need to configure something inside
    of Oracle to run shell scripts from the scheduler, but possibly just
    for machines running windows. I'm running Solaris.
    Do any of you know what I need to configure inside of Oracle to
    run shell scripts from the scheduler?
    -Owen

    Hello people,
    I should have added this bit of information:
    "The script runs fine from oracle's crontab."
    "The script runs fine from a shell owned by oracle."
    I'm getting responses telling me to check my env variables and permissions
    which would be helpful to a UNIX novice.
    I have a feeling that no one is using the scheduler to run RMAN scripts.
    Tim Hall suggested I take a close look at these files:
    $ORACLE_HOME/rdbms/admin/externaljob.ora
    $ORACLE_HOME/bin/extJob
    Currently I'm setup like this:
    bash sol root /h/oracle/product/10r2/bin 31 #
    bash sol root /h/oracle/product/10r2/bin 31 # ll $ORACLE_HOME/rdbms/admin/externaljob.ora
    -rw-r--r-- 1 root dba 52 Sep 7 15:29 /h/oracle/product/10r2/rdbms/admin/externaljob.ora
    bash sol root /h/oracle/product/10r2/bin 32 #
    bash sol root /h/oracle/product/10r2/bin 32 # cat $ORACLE_HOME/rdbms/admin/externaljob.ora
    # externaljob.ora
    run_user = rman
    run_group = rman
    bash sol root /h/oracle/product/10r2/bin 33 #
    bash sol root /h/oracle/product/10r2/bin 33 #
    bash sol root /h/oracle/product/10r2/bin 33 #
    bash sol root /h/oracle/product/10r2/bin 33 # ll $ORACLE_HOME/bin/ext*
    -rwsr-x--- 1 rman dba 30388 Sep 21 2006 /h/oracle/product/10r2/bin/extjob*
    -rwsr-x--- 1 rman dba 30392 Sep 21 2006 /h/oracle/product/10r2/bin/extjobo*
    -rwsr-x--- 1 rman dba 34468 Sep 21 2006 /h/oracle/product/10r2/bin/extproc*
    -rwxr-xr-x 1 oracle dba 300 Sep 21 2006 /h/oracle/product/10r2/bin/extusrupgrade*
    bash sol root /h/oracle/product/10r2/bin 34 #
    bash sol root /h/oracle/product/10r2/bin 34 #
    bash sol root /h/oracle/product/10r2/bin 34 #
    On my system, the user 'nobody' has no shell so I cannot use nobody.
    I created a user named rman:
    bash sol root /h/oracle/product/10r2/bin 34 #
    bash sol root /h/oracle/product/10r2/bin 34 #
    bash sol root /h/oracle/product/10r2/bin 34 # su - rman
    Sun Microsystems Inc. SunOS 5.10 Generic January 2005
    $
    $ id
    uid=220(rman) gid=220(rman)
    $
    $
    $ date
    Fri Sep 7 16:30:03 PDT 2007
    $
    $
    Jared points out that rman needs access to extproc:
    $ ls -la /h/oracle/product/10r2/bin/extproc
    -rwsr-x--- 1 rman dba 34468 Sep 21 2006 /h/oracle/product/10r2/bin/extproc
    $
    $
    Here is a demo of rman running his script:
    bash sol root /h/oracle/product/10r2/bin 35 # su - rman
    Sun Microsystems Inc. SunOS 5.10 Generic January 2005
    $
    $
    $ ls
    scripts
    $
    $
    $ scripts/tst.sh
    $
    $
    $ cat scripts/tst.sh
    #! /bin/sh
    /usr/bin/date > /tmp/tst.sh.out.txt 2>&1 &
    exit 0
    $
    $
    $ cat /tmp/tst.sh.out.txt
    Fri Sep 7 16:31:23 PDT 2007
    $
    $ rm /tmp/tst.sh.out.txt
    $
    I am focused on this error:
    ORA-27369: job of type EXECUTABLE failed with exit code: 274662
    And I am focused on this exit code: 274662
    What does 274662 mean?
    If the Scheduler gives me an error like "274662" rather than some English,
    it's obvious to me the Scheduler is a POS and I should not use it.
    And of course,
    If I cannot run RMAN from Oracle Scheduler, I'll use cron.
    -Owen

  • How to schedule the Batch file to run from task scheduler

    Hello Everyone,
    I have a batch file which kills the wscript.exe process, I am doing this manually, I need to schedule this batch file to run from task scheduler whenever the process wscript.exe reaches to specific numbers,  i.e if the wscript.exe process count in task
    manager reaches to 30,  the task schedular should execute this batch file,
    Is there a way to do so.
    dibu

    Hi,
    àI need to schedule
    this batch file to run from task scheduler whenever the process wscript.exe reaches to specific numbers.
    As I know, it will not help you to achieve this target via Scheduled Task. When configure Scheduled Task, there
    seems no Trigger option that help you specify this condition (process counts reaches to specific numbers) to trigger the batch file.
    You could consider that improve this batch file. Adding the
    Check function to the script will be a better option. For script issue, you can post it in the
    Official Scripting Guys Forum. I believe we will get a better assistance there.
    If any update, please feel free to let me know.
    Best regards,
    Justin Gu

  • UCM Log in error : Error 404--Not Found From RFC 2068 Hypertext Transfer Pr

    i am not able to get ucm login page , admin and manage server is up and there is no error in logs . but iam getting below error in login page
    Error 404--Not Found
    From RFC 2068 Hypertext Transfer Protocol -- HTTP/1.1:
    10.4.5 404 Not Found
    The server has not found anything matching the Request-URI. No indication is given of whether the condition is temporary or permanent.
    If the server does not wish to make this information available to the client, the status code 403 (Forbidden) can be used instead. The 410 (Gone) status code SHOULD be used if the server knows, through some internally configurable mechanism, that an old resource is permanently unavailable and has no forwarding address.

    Hi ,
    This is an indication that ECM cs.ear deployment has failed for some reason . To get the exact reason either check ucm_server1.log or start the server from command line and there the errors will be shown.
    Copy the core part and post it .
    Thanks
    srinath

  • Receiver JMS ( websphere MQ ) error  - No transition found from state:ERROR

    Hi all
    we are using JMS adapter to connect to the Queue manager . whenever the queue manager restarts , the messages is not getting thru and it is struck in the adapter engine with status " not to be delivered "
    i am getting error in receiver communication channel audit log....its showing
    *MP: Exception caught with cause com.sap.aii.af.ra.ms.api.RecoverableException: No transition found from state: ERROR, on event: process_commence for DFA: CC_JMS_XXXXXXXXX:15fa03eb9fd837849906f512610314c4*
    note : already i have gone thur many forum  and nothing helps.
    Thanks in advance
    Faheem

    If you are using the FCC then this could be because of that. What is the connection status with MQ? Are there any connection errors with MQ.
    If you are using FCC in your Receiver JMS channel then just to confirm, first remove the FCC configuration and try to send a xml file. If the xml file goes in successfully then the problem is in your FCC configuration.

  • Images and .properties(bunldes) files are not being found from my JSPs

    Hi,
    I have created .ear file by using ANT Application. And deployed into Oracle9iAS(OC4J). Here problem is that images and .properties(internationalization bundles)files are not found from JSPs.
    Here is my directory structure.
    public_html--->locale -->BusinessEntity -->businessentity_en_US.properties
    --->enterprise -->images -->knowldege.jpg
    --->BusinessEntity-->BEAdd.jsp
    in my jsp bundle(.properties)file is accessed like this:-
    <i18n:bundle baseName="/locale/-->BusinessEntity/businessentity" id="businessentity" locale="<%= locale %>" />
    in my jsp images accessed like this:-
    src="/enterprise/images/knowldege.jpg".
    In my working environment, without creating .ear file, images and .properties files are being found my JSPs. But if i create .ear file and after deploy, images and .properties files are not being found my JSPs.
    please let me know where i might did wrong
    thanks in advance
    srinivas

    Hi i am again. Here is my configuration files(server.xml and default-web-site.xml)
    server.xml :-
    <?xml version="1.0"?>
    <!DOCTYPE application-server PUBLIC "-//Evermind//DTD Orion Application-server//EN" "http://xmlns.oracle.com/ias/dtds/application-server.dtd">
    <application-server application-directory="../applications"
    deployment-directory="../application-deployments"
    >
         <library path="../tools.jar" />
         <rmi-config path="./rmi.xml" />
         <jms-config path="./jms.xml" />
         <log>
              <file path="../log/server.log" />
         </log>
         <transaction-config timeout="30000" />
         <global-application name="default" path="application.xml" />
         <application name="nalluri" path="../applications/trainiumear.ear" auto-start="true" />
         <global-web-app-config path="global-web-application.xml" />
         <web-site path="./default-web-site.xml" />
         <cluster id="-1640090707" />
    </application-server>
    default-web-site.xml:-
    <?xml version="1.0"?>
    <!DOCTYPE web-site PUBLIC "Orion Web-site" "http://xmlns.oracle.com/ias/dtds/web-site.dtd">
    <web-site port="8888" display-name="Default Oracle9iAS Containers for J2EE Web Site">
         <default-web-app application="nalluri" name="Commonwar" />
         <access-log path="../log/default-web-access.log" />
    </web-site>
    thanks in advance
    wating for reply
    srinivas

  • No transition found from state: STARTING

    Hi Experts,
    I am doing a scenario with JMS receiver communication channel, and there is an error occurring when I send the data to JMS adapter:
    Message processing failed. Cause: com.sap.aii.af.ra.ms.api.RecoverableException: No transition found from state: STARTING, on event: process_commence for DFA: CC_JMS_RECEIVER:d0058f0da62e309ba0930891dc300ee8
    Please someone gives me an idea!
    Thanks a lot,
    Thien Duong

    Hi Thien,
    Thats better , atleast with you giving a little background now i can start with my work. As you say thats it difficult for you to establish a trace it would be even more difficult from over here but still. Starting with first things first.
    1) The drivers and there version need to be correct and hope they are deployed correctly.
    2)
    Hope these links are useful to you..
    configuration of JMS  adapter Using WebSphereMQ
    connection with the JMS provider
    http://www-1.ibm.com/support/docview.wss?uid=swg21180117
    http://www-1.ibm.com/support/docview.wss?uid=swg21105655
    Regards
    joel

Maybe you are looking for