No error for subcontract PO when we do GR without issuing components.

Hi experts,
The system is not giving any error message when we do a goods receipt for a subcontract PO without even issuing the components to the vendor. i have a PO which had 4 components to be issued. 1 material is of HALB material type and the rest 3 were UNBW material type. i did a GR without even issuing the components to the vendor and the system allowed me to do the GR without giving any error message which shoud not happen.
Any idea why the system is not giving the error message?
Thanks
Mahendra

When a goods receipt is done in SAP, then there was usually a truck in your plant and the material is physically placed into your goods receipt area.
You are looking for a solution to block the receiver from doing his job (to receive the material). because someone else (maybe shipping manager) has not done his job (forgot to record the goods issue to the subcontractor in SAP, physically the material was probably shipped, otherwise you could not have phyiscally received the finished material).
Do you really think that preventing to post a goods receipt is the best option?
In my opinion, you should try to control that everything what leaves your company is goods issued.

Similar Messages

  • I keep getting an error (for twelve updates), when trying to update CS5 Master Collection.  I used chat, and was told to come here.

    I keep getting an error (for twelve updates), when trying to update CS5 Master Collection.  I used chat, and was told to come here.

    update directly, http://www.adobe.com/downloads/updates/

  • MIGO Error for subcontracting scenario through PO

    Hello All,
    We have PR PO process where PR is created for subcontracting and then PO with BOM explode in PO for same material for in and out.
    User is getting error while posting MIGO for Subcontracting GR though PO.
    Though 541 stock has been transferred to vendor
    and though PR PO process we are doing subcontractor PO and MIGO 543 movement
    getting error with blank message in migo
    Message no. M7895
    Due to this not able to complete MIGO and stock transfer to plant from vendor
    Please check the attached file for error
    Thanks and regards
    Hard Vora

    I think it is still possible to place the cursor on the message and to click the icon with the question mark, this should then hopefully bring a pop-up with the message number.
    from there you can investigate further. e.g. if it is a Z or Y message, then it is a home made message, and you can get the info who created it from transaction SE91.
    In any case you should do the following in Migo:
    Open the sub-items before you press Save or before you click the Check button. Only then you can know whether the message belongs to the header or to the item.

  • Z1 Compact shows error for every file when syncing on Bridge for Mac

    No matter what file (music, picture or video) or where they are from I can't put anything onto my phone from my mac it just says error for every single file. Any solutions?
    Solved!
    Go to Solution.

    Transfer the files with Bridge
    Bridge (for Mac)
    "I'd rather be hated for who I am, than loved for who I am not." Kurt Cobain (1967-1994)

  • GR of subcontracting items without issuing  components

    Hi all
    I am facing a problem regarding subcontracting. In a PO of material X  (item category L (subcontracting)) of required quantity 10, a component Y quantity 50 to make X is to be given to the vendor. The problem I am facing is that I am able to post GR of all material X without issuing any Y to the vendor. I should not be able to do this until all the component quantity (50) has been issued to the vendor. If I issue 5 Y then I should only be able to receive 1 X at max or not even 1 X. When I issue some quantity of Y it stays in subcontracting stock as seen by transaction ME2O.
    How to settle this stock with subcontractor and what should be done to not be able to MIGO all 10 X until 50 Y has been issued to vendor or or to be able to do it proportionally ?
    Also fine tune my concepts in this regard.
    Thnx

    Yes receiving is a physical activity not a computer activity but what I want to say is that even if X is physically received, the user should not be able to MIGO it if the components issued (subcontractor stock) is not settled.  When I MIGO the received items and enter 0 quantity for the issued component the system lets it be. Instead the system should issue an error implying  that all components have not been issued to vendor, so you can not receive X until you have issued all Y.
    Try to understand my point. I know physically the vendor will send the product only when he has received all components from us but on the system, I am able to receive all X without even issuing a single Y. This is important for me because if some receiver does this without settling the subcontractor stock, it will become an odd case because the movement type 543 which does this component settling is not selectable. It is automatic for subcontracting component line item. Kindly test this scenario on your system. Make a subcontracting PO, do not issue a single component to vendor and then MIGO this PO it with 0 component quantity. I am able to post the GR which i should not be able to because the shipper has not issued a component and the receiver is able to receive on the system. I just want the system to not receive until all the components have been shipped.

  • MIGO Error for subcontracting PO

    Hi,
      This is regarding the error which I am getting when I am doing a GR using MIGO for a subcontracting PO.
      The Error message is as *'of the required quantity of material &, && quantity is open'*. This error comes for few plants.
      I am working on 46C version of SAP.
      OSS note 526850 says this is a program error in version 46c but then why this error is not comming for all plants .
    Any helpful inputs related to this issue will be rewarded with points.
    Thanks in Advance.

    I think it is still possible to place the cursor on the message and to click the icon with the question mark, this should then hopefully bring a pop-up with the message number.
    from there you can investigate further. e.g. if it is a Z or Y message, then it is a home made message, and you can get the info who created it from transaction SE91.
    In any case you should do the following in Migo:
    Open the sub-items before you press Save or before you click the Check button. Only then you can know whether the message belongs to the header or to the item.

  • When I use my dvd on my Imac I get a system error for the visualisor when switching to apple TV

    When I use my dvd on my IMac I get a visualisor system error when I activate Apple TV

    How would I check to see if the like works when I enable via the inspector pane
    If you enable hyperlinks when you click on the link link to the pdf file it will open a browser window and display the pdf file.
    I upload the pdf files to the server and link to them as if they were an external web page:
    That's been more reliable for me than linking to the file as Link To: A file and have iWeb upload the pdf file to the serve.

  • Number range error for some materials when converting into Production order

    Hi,
    Please I need some help with my error.
    When trying to convert planned orders into production orders, I receive an error message saying Internal assignment not defined for number range XX.
    The strange part is that is only happening for two materials! Material type is the same one we always use.
    The planned orders have also the same type.
    Any idea?
    Thanks,

    Hi,
    I think for these 2 materials system is selecting the order type for which external number range is marked and ingternal number range is switched off.
    Can you go to CO01 and create a production order for these materials directly w/o assigning order type on intial screen. check which order type is detrmined by system and check its number range in co86.
    please check.

  • Error on pst file When leave outlook opend without any action for a while

    Hi,
    When I leave my outlook opend without any action for a while it reports an error in the pst file and out of memory error,so i have to close outllok then open it again
    this problem is general (not just on my pc ), i tried compact for the pst file but the problem still occure.
    i use outlook 2007 and sun java System Connector 7.3
    my mail server is :
    Sun Java System Communications Express 6.3
    sun java System Connector 7.3 patch id is 139162-05

    _1-when i click on any message the error is:_
    Error on  C:\Users\Administrator\AppData\Local\Sun\Outlook Connector\SJOC_1.pst
    *2-when i click on folder such as drafts,sent items ..... the error is : out of memory please close..............*
    if i close the outlook then open it again every thing is working well
    i monitor the outlook process, it was as the following:
    at 9:01 am 17.628 K
    at 9:17 am 18.348 K
    at 9:50 am 25.972 K
    at 10:05 am 20.220K
    the messaging server version is:
    Sun Java(tm) System Messaging Server 6.3-7.04 (built Sep 26 2008; 32bit)
    libimta.so 6.3-7.04 (built 18:30:54, Sep 26 2008; 32bit)
    SunOS Cegco-Internet 5.9 Generic_122300-22 sun4u sparc SUNW,Sun-Fire-880
    the clients os is windows  vista bisuniss
    all updates are installed
    this problem is common in my company
    Edited by: Firas_Khadrawi on Dec 8, 2009 9:09 AM

  • Parse failed: Exception DBD, The supplied XML is not valid[Measures].[SAP_OBJECT_NAME] State:N/A error for hidden KFs when migrated to HANA

    Hi All
    Please help me with the following query. We are migrating SAP BW 7.4 on Oracle to HANA. We have few WEBI report's universes built on BEx queries. In one of those reports there are some hidden RKFs, these works perfectly fine in reports based on oracle. Now we migrated to HANA in development system and when i refresh the universe structure they started giving errors like "Parse failed: Exception DBD, The supplied XML is not valid[Measures].[SAP_OBJECT_NAME] State:N/A". The object giving this error is in hidden state. I tried to unhide it and run the report then it runs fine but that not the client want as there might be so many hidden KFs in other reports also. BO version is 4.1 SP 2. We are on SAPKW74006 support package on BW side. Is there any notes to correct this error. Please pass me the relevant links. Highly appreciate your help.
    Thanks
    Dwaraka

    DCA-40012: The Web Service call failed. A connection to the target Web Service could not be created.
    First of all test the web service you have created in model project. Right click the web service name and select "Test WebService". If you see any issue(s) while testing fix it first before you run the jspx page.
    Check the port number in the URL and connections.xml, it have to be same.

  • APEXExport - unexpected error for 2 Workspaces when trying to export

    Hi all,
    Have been using APEXExport for a couple of years to back up our Apps from numerous workspaces to subversion and it works great. Hoever, recently added two new workspaces and getting a really strange error:
    java oracle.apex.APEXExport -db <servername>:1521:<RAC instance>-user <schema_user> -password <password>-workspaceid <workspace ID>
    Exporting Application 100:'TESTING'
    Exception in thread "main" java.sql.SQLException: ORA-20987: APEX - Application 100 not found logged in as database user <schema_user>. - Contact your application administrator.
    ORA-06512: at "APEX_040100.WWV_FLOW_ERROR", line 752
    ORA-06512: at "APEX_040100.WWV_FLOW_ERROR", line 1064
    ORA-06512: at "APEX_040100.WWV_FLOW_UTILITIES", line 8902
    ORA-06512: at line 1
    at oracle.jdbc.dbaccess.DBError.throwSqlException(DBError.java:189)
    at oracle.jdbc.ttc7.TTIoer.processError(TTIoer.java:242)
    at oracle.jdbc.ttc7.Oall7.receive(Oall7.java:554)
    at oracle.jdbc.ttc7.TTC7Protocol.doOall7(TTC7Protocol.java:1478)
    at oracle.jdbc.ttc7.TTC7Protocol.parseExecuteFetch(TTC7Protocol.java:888)
    at oracle.jdbc.driver.OracleStatement.executeNonQuery(OracleStatement.java:2076)
    at oracle.jdbc.driver.OracleStatement.doExecuteOther(OracleStatement.java:1986)
    at oracle.jdbc.driver.OracleStatement.doExecuteWithTimeout(OracleStatement.java:2697)
    at oracle.jdbc.driver.OraclePreparedStatement.executeUpdate(OraclePreparedStatement.java:457)
    at oracle.jdbc.driver.OraclePreparedStatement.execute(OraclePreparedStatement.java:531)
    at oracle.apex.APEXExport.ExportFile(APEXExport.java:165)
    at oracle.apex.APEXExport.ExportFiles(APEXExport.java:125)
    at oracle.apex.APEXExport.main(APEXExport.java:314)
    The strange thing is that APPLICATION 100 that its objecting to does not exist in that workspace at all! All the other exports work fine.
    Anyone got any bright ideas? We are on APEX 4.1, Oracle 11.0.1.0.7.
    All help gratefully received!
    Thanks,
    Jeremy

    Try
    select owner, application_id, alias, pages, workspace_id, workspace
    from apex_applications
    where application_id=100
    order by application_id
    That should give you some insight as to whether application_id 100 exists and its association with parsing schema
    (aka owner) and workspace.
    Remove the where clause and you can see all of your applications in the database.
    Edited by: stevenewguy on May 21, 2012 8:17 AM

  • I am getting an installation error for Adobe AIR

    I am getting an installation error for Adobe AIR when I try to update Pandora and it will not allow Pandora to update to the latest version. I have gotten this same msg when I tried to updaqte a program that uses Microsoft server. The error msg says see author.

    Hi ricky,
    I would use highlight execution (light bulb on LabVIEW toolbar) to see exactly what AI Single Scan VI is causing the error. You could also use breakpoints on each wire right before the AI Single Scan VI is called so that you can turn highlight execution on to see if the call generates an error.
    Another suggestion is to create a new VI and copy and paste all the VIs from your current VI to this new VI. This might correct a problem if the VI is corrupt.
    Finally, you could use the AI Config, AI Start, AI Read VIs instead of the AI Single Scan. I doubt there is something wrong with the VI, it is morelikely a corrupt VI. Recreating the VI will morelikely fix this problem.
    Anyway, hope that helps. Have a good day.
    Ron

  • GR for Subcontracting Orders

    Hello ,
    We need to do a GR for subcontracting orders , when i read the documentation for the fm MB_CREATE_GOODS_MOVEMENT , it says that subcontracting orders are not supported .
    Searching the forum i found that we can use the fm BAPI_GOODSMVT_CREATE , but i am not sure how to use the fm , what about the components will the BAPI find it or do we need to pass the components .
    So please suggest it there is some way we can use the FM MB_CREATE_GOODS_MOVEMENT to create GR for subcontracting orders as in i think the BAPI calls the same FM and how to handle the components.
    Regards,
    Arun

    Hi,
    Internally, within BAPI_GOODSMVT_CREATE, again it calls the function module MB_CREATE_GOODS_MOVEMENT.
    for the TABLES field IMSEG, we need to pass only the parent material and its quantity.
    Internally using the function module MD_KOMPONENTENVORSCHLAG_WE, it will calculate the components from the table RESB if we are creating with respect to any purchase or else take the reference from STKO/StPO i.e. CS03 transaction ration for the bom component.

  • Delivery for subcontracting

    Hi,
         Could anyone tell me when the delivery has to be done for subcontracting and when the goods movement 541 should be used. The transaction ME20 doesnt exist when i tried to create delivery for the subcontracting PO.
    Thanks in advance
    Aparna

    hi
    the code is ME2O and not ME20
    Process Flow
    This scenario consists of the following steps on goods delivery:
    Purchase order creation based on a scheduled purchase requisition created by last MRP run
    Optional: manual purchase order creation
    Purchase order approval (if required)
    Components of the Material sent to the subcontractor through a Transfer Posting
    Creation of Subcontracting Challan
    This scenario consists of the following steps on goods receipt:
    Goods receipt for purchase order delivered by subcontractor
    Component reservations and consumption of component quantities as provision of material
    Reconciliation of Challan
    Completion of Challan
    Invoice receipt by line item
    Invoice verification and validation of tax expenses
    Outgoing payment
    Key Points
    BoM explosion triggers follow-on functions such as delivery to subcontractor
    Automatic posting of value flow
    Automatic posting of stocks into corresponding stock types
    Subcontracting info record shows added value
    regards
    kunal
    Edited by: kunal ingale on Aug 14, 2008 7:53 AM

  • Runtime error in MIGO for subcontracting order

    Hi All
    We have an issue in subcontracting process. We are trying to complete goods receipt for the multiple line items for subcontracting PO.
    These multiple line item contains serialized materials. When we are trying to complete the GR, We are getting runtime error saying u201COnly 0 serial numbers entered instead of 1u201D
    Any pointers in resolving this issue will be a great help to us.

    Mohandevegowda wrote:
    Hi All

    > We have an issue in subcontracting process. We are trying to complete goods receipt for the multiple line items for subcontracting PO.

    > These multiple line item contains serialized materials. When we are trying to complete the GR, We are getting runtime error saying u201COnly 0 serial numbers entered instead of 1u201D

    > Any pointers in resolving this issue will be a great help to us.
    Hi,
    Pls check whether you have maintained the serial no for the material in mm01 tcode. When it comes to subcontracting process you will create a BOM by listing all your materials but when you take GR from subcontractor after some action is performed on that list of materials then definitely you have to manually give the serial no in MIGO or check automatic serial no there.you might have not placed anything over there.
    Thanks

Maybe you are looking for

  • Error Page -AP: Suppliers Entry

    Hi, R12.1.1 on Win2k3. Supplier creation getting error page. AP: Suppliers > Entry Appear a web page with error message. Error Page – You have encountered an unexpected error, contact Admin-.. Same error page getting in Define Bank: AP: Setup > Payme

  • Missing Photos but Have Thumbnails in iPhoto

    I have a new MacBook Pro Retina running Yosemite (10.10.1) and iPhoto 9.6 (910.29) and I upgraded from a previous MacBook Pro running 10.9.4 and iPhoto 8.1.2 (424). After the migration I noticed that many pictures have thumbnails but I get errors vie

  • Adding one screen field for service entry sheet

    Hi every body, Generally we doing service entry in ML81N and we select cost element and cost centre and we want link one field for order on screen , it is possible , if yes then  how we can do.. Thanks in Advance, Dharmveer

  • How to enable SMIME to READ emails

    I've been getting emails from some friends, that have this SMIME.p7s attachment on them.  mail.app just won't even open, it just trys to load it and nothing happens.  when I go to my WEBMAIL, I can see the email and that there is this SMIME.p7s attac

  • Imovie 11 not compatible with 10.5.8 - Whats the alternative?

    Hi I don't have ilife installed on my mac. I wanted to buy ilife 11 but as far as I understand its not compatible with my OS. And I can't find ilife 09. Can someone please advise me on any alternative? Regards.