No Funds Center error while creating Production Order in CO01

Hi SAP Consultants,
I am trying to save production order in transaction CO01 but I am getting error saying "No funds center entered/derived in item 00001"
Diagnosis
In company code (&2) the component Funds Management is active. This requires the entries or the derivation of a funds center.
You can use the following elements to derive the funds center: company code / account  or CO object .
Procedure
Enter a funds center or ensure that the funds center can be derived from the possible assignments by:
assigning a funds center in the commitment items- master record or maintaining the assigning of a funds center to the CO object.
My company is a public sector company and Funds management is active.
Any help would be appreciated.
Thanks in advance.

Hi,
Kindly check for item 0001 in the Material Master which Profit Center is maintained and check if a Funds center is assigned to it. This should solve your problem.

Similar Messages

  • Update error while creating production order (TCODE CO01)

    Hello,
    We have created new plant into development server for testing. We have created production Order few days back at that time we have not faced any problem. But from last two days , when we create new production Order , system gives following error:
    ORA-00947: not enough values
    DBIF_RSQL_SQL_ERROR" "CX_SY_OPEN_SQL_DB
    SAPLCOVB" or "LCOVBF10"
    HEADER_POST"
    and
    Update was terminated
    System ID....   DEV
    Client.......   500
    User.....   HPLSU
    Transaction..   CO01
    Update key...   4B6E4F48C08D027FE1008000C0A802F3
    Generated....   08.02.2010, 10:35:48
    Completed....   08.02.2010, 10:35:49
    Error Info...   00 671: ABAP/4 processor: DBIF_RSQL_SQL_ERROR
    Our work is held up.
    Please also note that If we increase the QTY in the existing Order ( already created few days back) , System accept the same and Order is saved.
    We are looking for the solution for the above.
    Early reply will be highly appreciated.
    thanks
    harish

    Hi Rishi,
    You better check with your BASIS team.
    Check this link also
    Supervisor Error ADM0015
    Regards,
    Satyajit Kumar
    Edited by: Satyajit Kumar on Feb 8, 2010 7:47 AM

  • Error while creating Production order without BOM

    Hi Guys,
    While creating production order without a BOM i am getting the following error in the error log.
    Error: BOM for material xxxxxx does not contain any valid items
    Message no. CO636
    Kindly help.
    Regards,
    Sid

    Dear customer,
    could you check in the master data screen of the order if one BOM has been selected?
    please coudl you check your customizing the following transactions:
    OPJM
    OPJI
    what do you have in 'BOM slection field' MRP4 view of the header material?
    Please check if with this info you can find the missing data to explode the BOM
    regards
    Maria

  • Cost calculation error while creating production order

    Hi, "version 0 is not defined in controlling area xxxx for the fiscal year 2008, maintain the fiscal area dependent version parameters for the version o".the above error message appears at the time of saving my production order with co01 t-code. i have tried to rectify this by okez t-code, but it gives message that "activation of the indicator is notallowed". the same message appears while releasing the order, while doing the GI . Pls suggest.

    Hi,
    Please refer the below thread.
    https://forums.sdn.sap.com/watches!add.jspa?forumID=144&threadID=484386
    Regards,
    Senthilkumar

  • Error while creating Production Order

    HI Experts,
    While creating a production order for a material with planning stratagy 82, I am getting an error saying "Error occured in number assignment for object" AUF_PLAN.
    Can you pls tell me what was the exact problem!!
    Regards
    Prasanna

    Prasanna,
    Just a basic doubt, when you are saying that the material is assigned with Planning strategy "82", what is the need to create a Production Order manually? I am not sure whether this has an effect at all...but lets try.
    Remove the strategy from Material Master MRP 3 view and then try creating the Production Order with Order type PP04, as you were trying earlier. This is just to see whether is this something related to Order type definations or Assembly Processing.
    You also try creating a sales order, when the planning strategy "82" is still exists is the material master to see whether production order is getting created automatically by system.
    Please let us know the feedback on the above
    Regards,
    Prasobh

  • Error while creating production order (capacity leveling)

    Hello Friends,
    For capacity Planning - Leveling, i am using overall profile  "SAPMPSG006 - MPS/MRP: Capacity availability check", in Production scheduling profile, which i have attached in the material master.
    In Availability check parameter, checking control for the combination of Plant,order type and business transaction 1, in capacity availability section also, i have maintained the overall profile "SAPMPSG006 - MPS/MRP: Capacity availability check'.
    Now i have created the production order for a particular period (start date 17.03.10 , finish date 20.03.10). In CM01, agaist the work center, i can see the load. Hence available capacity and required capacity is same for three days.
    Now again i have created one more production order for the same period (start date 17.03.10 , finish date 20.03.10), system is showing the window with the message work center with overload.On the same screen, when  i click on finite scheduling tab, than system showing the new latest start date and time the same as earlier date i.e 17.03.10.
    Here my question is , when i click on finite scheduling tab, than system should propose the date 21.03.10, as on and after this date capacity on this workcenter is available. But system is not proposing the dates, where capacity is available.
    When i checked the dispatching log, there i found two errors.
    continued..................

    Dear,
    That's great production order system is proposing the future date automatically.
    Few check,
    1) Factory calendar for holidays?
    2)Any other production order on that days?
    3)Your capacity profile and its setting?
    Basic dates
    Check whether scheduling should be performed with a time being specified. For this, check the scheduling data of the scheduling type in Customizing. OPU3
    Do the basic dates change?
    Check whether the alternative "Adjust basic dates" has been selected for the scheduling parameters.
    Check whether the basic dates are set correctly on account of the operation dates. So check operation dates also?
    Regards,
    R.Brahmankar

  • Error when creating Production Order

    Dear All,
    When i was trying to create Production Order using CO01, there was an error message that says "error when calculating cost, see log, log is deleted when saving"
    what is the problem from that error message? how can i solve this problem?
    best regard,
    MARUFAT

    Cost consist of material cost which are the direct cost, it is calculated from the component and the material itself for which the order is created. If the material is semifinished or finished check whether the accounting view for these material contains value. These material could be costed as per the method mentioned by our friend or you may enter value through MR21 (if the material is not costed atall since it is created). It is recommended to update cost through costing run and by CO member. Now if the material is Raw material you need to maintain PIR.
    The second part could be the activity cost. These follows from the routing/receipe. Mostly the costing error is due to the inappropriate defination of either cost center or activity types. You need to confirm whether activity price are define for the period.
    Appriciating you for taking a concern on the costing error and not overriding.

  • ABAP dump Error while creating service order in PCUI.

    Hi Experts,
                     We are getting following ABAP dump error while creating service order in PCUI which is working fine in GUI.
    Runtime Errors         RAISE_EXCEPTION
    Date and Time          02.01.2008 14:55:38
    Short text
    Exception condition "TYPE_NOT_FOUND" raised.
    What happened?
    The current ABAP/4 program encountered an unexpected
    situation.
    What can you do?
    Note down which actions and inputs caused the error.
    To process the problem further, contact you SAP system
    administrator.
    Using Transaction ST22 for ABAP Dump Analysis, you can look
    at and manage termination messages, and you can also
    keep them for a long time.
    Error analysis
    A RAISE statement in the program "CL_CRM_ELEMDESCR==============CP" raised the
    exception
    condition "TYPE_NOT_FOUND".
    Since the exception was not intercepted by a superior
    program, processing was terminated.
    Short description of exception condition:
    For detailed documentation of the exception condition, use
    Transaction SE37 (Function Library). You can take the called
    |    function module from the display of active calls.     
    We have added custom fields in the service application. these custom fields with Z-structure & data elements  are included in BSP structure CRMT_BSP_SRV_OIC_SRCHRES in development system.But the same Z structure & custom fields are exist in the production system but not included in BSP Structue CRMT_BSP_SRV_OIC_SRCHRES.
    This may be the reason resulting this ABAP dump error in PCUI while creating Service order.
    How these Z structures can be included in the BSP Structure CRMT_BSP_SRV_OIC_SRCHRES in production system?
    Helpful answers would be rewrded max points as it is high priority issue.
    Regards,
    Basavaraj Patil

    Hi Thirumala,
    Thnaks for the reply.
                I have enhanced service application using transaction EEWB to add new custom fields. these fields are there in Z structure created by the system in production system. All the transports are moved to target system. Problem is that Z structure( contains custom fields)  created while doing  EEWB is not included in BSP structure.
    I f transports are missed to move to target system, Is there any other alternative to solve this problem?
    Regards,
    Basavaraj Patil

  • Prt availability.while creating production order

    while creating production order. system checking PRT availabilty
    if PRT is not there system throws warning msg
    PRT: Item: 0010  Material TESTPRT1 plant BP01 is not available.
    Message no. CF301
    Diagnosis
    You are attempting to use a PRT. However, the current status of this PRT does not permit you to use it.
    how can change into error msg.........
    thx in advance

    Hello,
    I've checked the WUL of the message CF301 and found:
    CALL FUNCTION 'CO_FU_FHM_AVAILABILITY_CHECK'
           EXPORTING
                index_imp             = affhd_sav-indbt
                tco11_imp             = tco11_tmp
           IMPORTING
                fhm_not_available_exp = fhm_not_available_tmp.
    FHM verfügbar
      IF NOT fhm_not_available_tmp IS INITIAL.
        CASE affhd_sav-fhmar.
          WHEN material.
            MESSAGE i301 WITH affhd_sav-psnfh
                              affhd_sav-matnr
                              affhd_sav-fhwrk.
          WHEN sonstige.
            MESSAGE i302 WITH affhd_sav-psnfh
                              affhd_sav-sfhnr.
          WHEN dokument.
            MESSAGE i303 WITH affhd_sav-psnfh
                              affhd_sav-fhmnr.
          WHEN equipment.
            MESSAGE i307 WITH affhd_sav-psnfh
                              affhd_sav-fhmnr.
          WHEN OTHERS.
            MESSAGE a886
                    WITH sy-repid
                         hlp-fname.
        ENDCASE.
    I'm afraid the attribute is hardcoded to be warning.
    BR,
    Tiemin

  • Error while creating product group

    hi,
    i am getting error while creating Product group.
    Required parameters missing when calling up module
    Message no. M3749
    Please suggest me.. how to cop this
    Regards,
    amit

    Dear Brahmankar,
    I am using product groups in SOP as well as in the normal plannning scenario.In the normal planning scenario I am giving my PIR's in MD61 for the entire group.Then I am running MRP in MD02 for my product group.System is generating all the requirements normally for the entire group .
    Please suggest me , this process is correct or it will create any problem in any module .
    Thanks & Regards
    Prabhakar

  • Error while creating return order(Complaint) in IC web client

    Hi SAP Experts,
    I am getting following Error while creating return order(Complaint) in IC web client.
    Error when processing your request
    What has happened?
    The URL http://sapcrd.comfort.com:8000/sap/bc/bsp/sap/crm_ic/default_delta.do was not called due to an error.
    Note
    The following error text was processed in the system CRD : Exception condition "NON_EXISTING_HANDLE" raised.
    The error occurred on the application server sapcrd_CRD_00 and in the work process 2 .
    The termination type was: RABAX_STATE
    The ABAP call stack was:
    Function: PRC_PD_HEAD_ADD_COND of program SAPLPRC_PRICING_API
    Function: CRM_PRIDOC_UPDATE_EC of program SAPLCRM_PRIDOC_COM_EC
    Form: EXECUTE_CALLBACKS_PLANNED of program SAPLCRM_EVENT_OW
    Function: CRM_EVENT_SET_EXETIME_OW of program SAPLCRM_EVENT_OW
    Function: CRM_ORDER_COMPLETE_SINGLE_OW of program SAPLCRM_ORDER_OW
    Function: CRM_ORDER_MAINTAIN_SINGLE_OW of program SAPLCRM_ORDER_OW
    Function: CRM_ORDER_MAINTAIN_MULTI_OW of program SAPLCRM_ORDER_OW
    Function: CRM_ORDER_MAINTAIN of program SAPLCRM_ORDER_API
    Method: IF_EX_ORDER_SAVE~PREPARE of program ZCL_IM_PRICE_ADJUSTMENT=======CP
    Method: IF_EX_ORDER_SAVE~PREPARE of program CL_EX_ORDER_SAVE==============CP
    What can I do?
    If the termination type was RABAX_STATE, then you can find more information on the cause of the termination in the system CRD in transaction ST22.
    If the termination type was ABORT_MESSAGE_STATE, then you can find more information on the cause of the termination on the application server sapcrd_CRD_00 in transaction SM21.
    If the termination type was ERROR_MESSAGE_STATE, then you can search for more information in the trace file for the work process 2 in transaction ST11 on the application server sapcrd_CRD_00 . In some situations, you may also need to analyze the trace files of other work processes.
    If you do not yet have a user ID, contact your system administrator.
    Error code: ICF-IE-http -c: 330 -u: VORUSX -l: E -s: CRD -i: sapcrd_CRD_00 -w: 2 -d: 20080324 -t: 021723 -v: RABAX_STATE -e: RAISE_EXCEPTION
    HTTP 500 - Internal Server Error
    Your SAP Internet Communication Framework Team
    Maximum points will be awarded for useful information.
    Thanks,
    Rony

    Hi,
    I notice there is a Z class being called.
    Method: IF_EX_ORDER_SAVE~PREPARE of program ZCL_IM_PRICE_ADJUSTMENT=======CP
    You should check this customized class.
    Cheers,
    cady.

  • Error while creating Work Order

    Hello Experts,
    I am getting below error while creating work order via add-on named beas but the error seems to coming from SBO.
    Please advise.
    Thanks
    Deepak

    Hi,
    Plz check this thread:
    What does this error mean?

  • Error while create sales order

    Hi,
    Please help.
    I am facing error while create sales order.
    No item category available (Table T184 OR VERP  )
    Message no. V1320
    Diagnosis
    No item category could be determined for the combination OR VERP .
    System Response
    The system does not allow further processing of this item.
    Procedure
    Check the entries in table T184 by means of which item category determination is controlled.
    If you do not have the authorization to do this yourself, contact your system administrator.

    Hi,
    Check in spro whether Item categorygroup VERP is assigned to sales document type.if not assign.
    Path
    SPRO-SD-sales-sales douments-sales document item-assign item categories.

  • Resrtict -  copy from option while creating Production order

    Dear all,
    I want to know how to  Block  the "copy from" option while creating Production order(CO01).
    Regs.
    S.R

    Dear Ramesh,
    You can do this Via SHD0
    Just check the below link
    [Regarding Backflushing(MFBF) fields making display;
    Regards
    kumar

  • Error in BDC using 'N' mode while creating production order

    Hi,
    I am trying to create a production order  ( transaction CO01 ) by using a BDC. I just have to fill the header details, components , assign the component to operation , save and exit. When I am running the BDC in 'A' or 'E' mode, it works fine. The 'E' mode doesnt stop anywhere and successfully creates the production order . But when I change the mode to 'N', it throws an error "No batch input data for the screen SAPLCOKO1 0115". I am using Call transaction in BDC to create the production order. What could be the issue? Can someone throw some light?
    Thanks,
    Suganya

    Hi Suganya,
    I guess that Chandra Madapati is right. I also faced the same issue for another transaction.
    If you want to disable the batch input (sy-binpt), you can use the addition OPTIONS FROM in call transaction statement.
    It refers to the structure CTU_PARAMS in ABAP dictionary and contains the following components:
    Component
    Meaning
    DISMODE
    Processing mode for batch input processing. Values as for the MODE addition.
    UPMODE
    Processing mode for batch input processing. Values as for the UPDATE addition.
    CATTMODE
    CATT mode for batch input processing. CATT means Computer Aided Testtool. While batch input is mostly used for data transfer, CATT processes are to be viewed as more complex transactions, since they are reusable tests. Values: " " (no CATT mode), "N" (CATT without single screen control), "A" (CATT with single screen control).
    DEFSIZE
    Selection as to whether the screens of the called transaction are displayed in the standard screen size. Values "X" (standard size), " " (current size).
    RACOMMIT
    Selection as to whether the COMMIT WORK statement terminates batch input processing or not. Values: " " (COMMIT WORK terminates processing), "X" ( COMMIT WORK does not terminate processing).
    NOBINPT
    Selection for the symbol field sy-binpt. Values: " " (sy-binpt contains in the called transaction "X"), "X" (sy-binpt contains in the called transaction " ").
    NOBIEND
    Selection for the system field sy-binpt. Values: " " (sy-binpt contains "X" after the end of the batch input data in the called transsaction ) "X" (sy-binpt contains " " after the end of the batch input data in the called transaction).
    In this, if you give NOBINPT as 'X', the system field sy-binpt becomes disabled. You can also set the processing mode and update mode using DISMODE and UPMODE respectively.
    Thanks & Regards,
    T. Prasanna Kumar

Maybe you are looking for

  • ITunes imports movies; they do not show in catalog

    I have around 500 movies in my iTunes catalog. All of these have been ripped from DVD and run through MetaX to add titles,artwork, etc. Along the way there have been bumps with iTunes here and there, but I have learned what they want and have done my

  • New Superdrive, but lost Airport

    My combo drive died in my Ti Book 800, since my Applecare expired, I bought a dual layer Matshita Super Drive from OWC. The installation went well, but I lost my airport card afterwards. The icon says it's on but the system profiler says it's not. I'

  • How To Import Orcad Component Libraries into Multisim

    Ive been using LabView for a long time now, and I have just started using Multisim and Ultiboard.   A lot of companies all ready have orcad libraries for their components, such as Maxim and Microchip.  Is there anyway to import these into Multisim or

  • Sum up currency calculated column in a standard list view

    Hi How do I total up a currency format calculated column in sharepoint 2010. I am having a problem referring to the articles on the net. Nothing seems to be working. Can I use jquery or something, or can I do it with editing in in the sharepoint desi

  • What is a neat way to delete a stale amavisd pid_file on first boot after panic or power failure?

    Lion Mail Server component postfix/smtp 100% reproducible blocks inbound smtp mail delivery on first boot after a panic or power failure. Error messages from mail.log are like: postfix/smtp[45785]: connect to 127.0.0.1[127.0.0.1]:10024: Connection re