No HD 508 for FOX25 Eastern Mass.

If you try HD 508 in Methuen Ma you receive the same coverage as 504?? Channel 08 works as FOX25 BUT HAS NO HD

Thanks for the reply penguin!
I tried adding it to the kernel, but it did not work. I think usb_hid is just for usb keyboards/mouses/etc.
I noticed that every time I remove and plugin my flash drive /var/log/messages.log says something slightly different for my flash drive if that helps:
Oct 30 18:10:43 myhost sda1
Oct 30 18:10:43 myhost Attached scsi removable disk sda at scsi4, channel 0, id
Oct 30 18:10:43 myhost Attached scsi generic sg0 at scsi4, channel 0, id 0, lun
Oct 30 18:11:10 myhost (jftaylor21-896): starting (version 2.12.0), pid 896 user
Oct 30 18:11:10 myhost (jftaylor21-896): Resolved address "xml:readonly:/opt/gnosition 0
Oct 30 18:11:10 myhost (jftaylor21-896): Resolved address "xml:readwrite:/home/j
Oct 30 18:11:10 myhost (jftaylor21-896): Resolved address "xml:readonly:/opt/gnoition 2
Oct 30 18:11:50 myhost usb 1-6: USB disconnect, address 3
Oct 30 18:11:55 myhost usb 1-6: new high speed USB device using ehci_hcd and add
Oct 30 18:11:55 myhost scsi5 : SCSI emulation for USB Mass Storage devices
Any other suggestions?

Similar Messages

  • Any software or tool for disable USB mass storage ?

    Hi,
    I am a trainee IT admin in a company with 300+ Mac machines.
    we have integrated all systems in a domain hosted on Windows Server for authentication.
    For disabling USB mass storage, we have manually removed .kext file from all machines. But it was quite a difficult job and need to perform every-time after  Software Update.
    Is there any alternate way or a Software/Tool which can disable USB mass storage permanently ?
    Thanks in advance.
    SP

    Sure.  This is cake.  MCX supports this.  How are the Macs configured?  Are they bound to Active Directory?  Open Directory?  JAMF?  The state of directory association/management will determine how you implement.

  • Standard field for Net explosive mass (NEM) for dg documents

    Hi,
    I have searched standard fields in the material master and dangerous goods master but i can not find a standard field for Net explosive mass (NEM). This value is needed for dangerous goods documents.
    Is there anyone that know if there is a standard field for this or do I have to create one myself?
    Best regards / Gustav

    Hello Gustav
    sometimes SAP is saying that Enh.- Apck need to be activated and if you take a "close" look this it is not the case. It is sufficient to use new SPs.
    Now based on your reseach results:
    Actually the situtation regarding Enh.. Pack is like this:
    a.) to use EHS you need to "switch" (activate) the EA-APPL component; no way back ! possible !
    b.) to use Enh. Pack EHS extensions you need to "switch" (activate) the Enh.PAck => actually: no way back possible ! (SAP has announced that they are planing to change this behaviour; I did not follow this discussion; I believe actually there is no way back and personally I believe this (to go back) does not make sense in EHS environment)
    c.)  OPS_EHS_CI_1 is the Business function in Enh. pack 3
    d.) LOG_EHS_CI_2 is the Business function in Enh. pack 5 (now available to all customers).
    Therefore to my understanding this is the SAP approach: 1.) first activate EA-Appl, then OPS_CHS_CI_1 and then if suitable/necessary LOG_EHS_CI_2
    What are the pros and cons of activation?
    a.) in principal you are dealing with a "release" change (testing required; analysing new customizing activities etc. etc.)
    b.) to our experince there are in most cases "strange" effects at other places; therefore you need take care regarding the activation (example: we lost some EHS functions (which are part of the former release) in release change to ECC 6.0; these functions (yes they still exists but..) are only ! part of EHS after ! an "activation" of Enh. Pack 3)
    c.) at the end you get all  enlargements which are part of Enh. Pack (without a choice!
    In most cases the benefit is higher compared to the "technical" risks of the activation (on long term approach).
    Details of the functionality of OPS_EHS_CI_1 and/or LOG_EHS_CI_2 (what are the changes etc.) are explained on high level in help.sap.com and on detailed level on SAP marketplace; therefore I will not enumerate them.
    On SAP Marketplace you find a number of OSS hints "how to use Enh.Pack" / "How to activate" / Master Insturctions (Set up etc.) etc.
    Personally my impression is: both Enh.PAcks (3 + 5) contain usefullnew functions which could give benefit on mid and long term in using EHS.
    Keep in mind the SAP strategy: new functions  (PS: Enh. Pack 6 will get in Ramp Up this year (to my recent knowledge) and will contains further EHS extensions) will always be part of enh. pack. Only if the function is needed because of legal change a new function is delivered as SP (no activation necessary).
    With best regards
    C.B.
    Edited by: Christoph Bergemann on Apr 9, 2011 8:31 AM
    Edited by: Christoph Bergemann on Apr 9, 2011 8:36 AM
    Edited by: Christoph Bergemann on Apr 9, 2011 8:37 AM
    Edited by: Christoph Bergemann on Apr 9, 2011 8:37 AM
    Edited by: Christoph Bergemann on Apr 9, 2011 8:39 AM

  • I need download  Adobe Photoshop CS4 Extended for Middle Eastern to install it on MAC OS X 10.5 Leop

    CAN anyone help me to get direct link to download Adobe Photoshop CS4 ME (Middle Eastern) for Macintosh ??

    Hi,
    I believe that version was put out by WinSoft, so you'll probably have to contact them.
    http://www.winsoft-intl.com/en/portfolio/adobe/

  • PREREQUISITE FOR PURCHASE ORDER MASS MAINTENENCE

    Dear Experts,
    Please explain the prerequisite points for the purchase order Mass Maintenance.
    i want to set Delivery completed indicator for the open purchase orders.
    is it prerequisite for setting the deletion flag to the purchase order items.
    if delivered quantity is more the PO order quantity, it is not allowing to set the deletion flag
    also it issues the warning message of release PO - Release already affected.
    Please explain the concept in brief.
    Thanks in Advance

    Hi,
    When you set the "delivery completed" indicator, it considers a purchase order item to be closed. This means that no more goods receipts are expected for this item. If the "delivery completed" indicator is set, the open purchase order quantity becomes zero, even if the full quantity has not been delivered. It is still possible to post goods receipts for the remaining quantities.
    When you set the "delivery completed" indicator:
    The purchase order item is considered closed, even though the total quantity may not have been delivered.
    Although a further delivery is not expected, it is still possible.
    At the time of the next goods receipt, the system suggests the item as unselected in the item selection list.
    The purchase order item can be deleted, even if the total quantity was not delivered..
    Thanks and Regards,
    Maheshwari

  • System audit trail for FBL5N and Mass Change use

    Hello,
    My client carried out the foll actions yesterday.
    Called TCode FBL5N using a range of customers
    When the line items were displayed, they selected some of them and then went into Environment - Mass Change - New Values
    Here they input a new value to the Dunning Block field.
    Then they saved it and came out.
    Later they realized that they should not have made the changes to some of the records. Unfortunately, now they dont remember either the customer range for which they had run FBL5N or the line items which they had changed.
    So, the question is: is there any way by studying the audit trail or system history, one can find out which are the documents/line items that were changed yesterday within a specific time frame using TCode FBL5N and then Mass Change?
    Please see if you can provide some input.
    Regards,
    Suvarghya Dutta

    Hello,
    It must have been kept to "All"
    From future, all your transactions will have security audit log.
    If you want to see the system log, then visit SM21.
    Regards,
    Ravi

  • Input selection for PO in Mass

    pls tell me how we block po in mass t.code?
    in which field it will ask for PO no?
    here we put objet type or variant name...
    n when we runing it then system showing msg.. variant not found
    Regards
    Rekha

    As I expected, the message has nothing to do with the mass transaction. Make the message a warning, then you can do what you want. but it is on your own risk:
    More detail from the message long text:
    If Funds Management (FM) is active, purchase order items cannot be deleted if goods receipts (GR) and/or invoice receipts (IR) exist.
    The deletion of purchase order items should not be allowed except when the follow-on documents have been reversed in both MM and FI.
    You can only delete a purchase order item when the corresponding follow-on documents (IR and/or GR) have been reversed.
    In the current case, the GR balance is  and the IR balance is (both in the transaction currency ).
    The message severity of this error message is variable. The default value is 'E' (error). This can be changed to 'W' (warning) or 'I' (information), or the message can be surpressed.
    Note that balancing problems between MM, FI, FM, the budgetary ledger, and SPL documents (if active) could occur if the deletion of purchase order items is allowed.
    When archiving object MM_EKKO, FM is not updated and the message FICUSTOM 201 is not regarded. Only the MM data is updated, so the Customizing for this message does not affect the setting of the deletion indicator using archiving program RM06EW30.
    If you want, you can implement user exit EXIT_SAOLFMOI_009 to skip the deletion of the purchase order without regarding the user ID.

  • T-Code for Sales order mass output

    Hi Friends,
    I have 150 SOs. In which I need to process the output again. Checked the MASS trx for this but could not find any option?
    Is there any otherway we can process the output at one shot?
    Regards,
    Ram

    Hi,
    Just like we have the T.Code "VF31" for billing documents,we don't have any such T.Code here for "Sales orders".But there is a procedure.
    That is:
    Goto the T.Code "SE38".
    Enter the program name as "RANAST00".
    Execute.
    Enter the application as "V1".
    Enter the output type also.
    Check the tick box "send again".
    Execute.
    Regards,
    Krishna.

  • Soft for a device mass configuration with variables support

    Hello everyone.
    Does anyone know a soft for mass configuration of Cisco network devices with variables support? I have a lot of network devices with the typical configuration. But some of parametres at this devises can be different (IP octets, IPs at ACLs, names with numbers, etc). So is there some soft where I can give it some script with variables for all devices and it puts values for each device from some DB or file? Right now I have found only one soft with name "DeviceExpert" but is there more?
    Best Regards.

    Hi,
    You would need to contact Adobe Support via online chat.
                        http://www.adobe.com/support/chat/ivrchat.html
    Regards,
    Sharad

  • Illustrator for MAC - Eastern Languages Support

    Hi
    I am looking to purchase a license for an Adobe Illustrator Version - MAC OS - that would support input for Eastern Languages (Mandarin, Arabic, ..)
    Any input that helps would be much appreciated.
    Regards,

    naj,
    If you buy a CS6, it must be a MENA version.
    If you subscribe to CC/CC2014, you may change language freely along the way.

  • How can I send out pending agreements for signature en masse on a scheduled basis?

    I'm using EchoSign's Salesforce integration, and I'm trying to create a scheduled batch that will send out a large number of agreements for signature.  EchoSign has some exposed global methods that I'd hoped will help facilitate this, namely AgreementTemplateService.load, which generates an agreement based on an agreement template ID, and EchoSignAPIService.sendDocument, which sends out an agreement that it is provided.  Also, using the background action field on Agreement, it is possible to update an Agreement to 'Send', triggering its send-out.
    I can do all this through code anonymously, or via a custom page at the click of a button, but to do it without user interaction is proving difficult.  Regardless of whether I try to do it via trigger or scheduled batch, the above-mentioned methods fail out in different ways that essentially amount to the same problem (trying to call a future method from a batch, or a callout from a trigger); I've reproduced the error messages here (these are stamped onto the agreement record and displayed when the record is viewed):
    System.CalloutException: Callout from triggers are currently not supported
    System.AsyncException: Future method cannot be called from a future
    You have uncommitted work pending. Please commit or rollback before calling out
    It seems the above methods are intended for use in a custom page, rather than in some scheduled, non-interactive use-case.  Is there any workaround for this, or support for sending out agreements at a scheduled time, rather than at the click of a button?  Thanks!

    I'm not an Adoby guy, hence you may ignore my reply, but Adobe Dynamic Link is obviously not just one way ticket and in most cases works just fine.
    You have already been explained by J-MS and tclark513 how to properly use it and which pitfalls may occur.
    So as to apply an effect onto a whole sequence or a group of clips you need to either nest them in PrPro or pre-compose them in AE. Then just apply an effect (or several ones) onto that composition.
    So, if you nest clips in PrPro, select your nested sequence in the timeline, right-click and choose 'Replace with After Effects Composition'. Done! Your dynamically linked AE composition is in the right place in your timeline and in your Project panel as well. If you can not treat it as an ordinary footage, there are obviously some mistakes in your workflow. 
    If you didn't nest your sequence or a group of clips in PrPro before replacing them with AE composition, you may easily do it within AE. Just select all the layers in AE composition and choose Layer -> Pre-compose... (Ctrl/Cmd+Shift+C) Done! Switch back to your Master comp and apply your desired effect(s) 
    You may loose some effects or/and transitions while travelling from PrPro to AE via Adobe Dynamic Link, whereas you don't while travelling back
    (If you start building your AE composition from scratch right in AE and then need to import it into PrPro, DO NOT export one as PrPro project out of AE, but rather choose Adobe Dynamic Link -> Import After Effects Composition... within PrPro)
    P.S. And yes, submit a feature-request so that Adobe will convert 'Transparent Video' into fully functional 'Adjustment Layer'.

  • Question - is JavaMail the choice for me? Mass email delivery.

    Hello. I'm thinking about using JavaMail API, and I would like your feedback if JavaMail is the right choice for me.
    I'm working on a J2EE app (running on Glassfish) that will send email out to multiple recipients. The critical parts are
    1) It must scale so that it can send up to 10,000 email multiple times a day.
    2) The servlet that sends out the email must have a descent performance (can't hang while sending out 10,000 email forcing the user to wait, but for the servlet to send out 10,000 emails....I expect a little delay)
    So I'm using postfix for delivery with support for 10,000 recipients. I am thinking of using JavaMail inside a servlet which retrieves the 10,000 email addresses and creates 100 separate emails with 100 email recipients under BCC for each email.
    I am sending out the email in bulks of 100 separate email each with 100 recipients under BCC to address performance.
    Does my solution sound logical? Anything else I should be aware of?

    I'm not speaking from personal experience since I haven't tried to build something
    of the scale you're talking about, but...
    I wouldn't expect the overhead of the JavaMail API to be a significant issue here.
    Of course, you have to use the JavaMail API in a reasonable manner to get good
    performance and scalability.
    A lot depends on the performance of your server as well.
    I would expect the most difficult part to be handling the inevitable failures (network, server, etc.)
    that will occur when working at this scale.
    100 connections to your mail server several times a day shouldn't be an issue, but your
    mail server will be busy sending out all those messages.

  • Closed Captions - Appalling support - Section 508 for video non-existent.

    Adobe premiere pro has horrific support for closed captions.  I find it quite appalling that the page on captions is severely outdated and there is no commitment to nor desire to support, provide, or even assist with captioning beyond the poorly designed and non-intuitive caption editor which takes an Adobe Scientist to use.  Adobe should be ashamed.  There is no delay adding other functions to Premiere and the other CC products, but no urgency or desire to remotely address accessibility. 
    Are there any real plans other than the same unfulfilled promise over the past 12 months to provide real functionality, or we will continue to have to use third party applications for this?
    Page reference: Adobe Premiere Pro Help | Closed Captioning

    Hi WarithNiallah,
    First of all, Premiere Pro's closed captioning feature is not intended to be a replacement for closed captioning applications. The feature's intent is to only be able to edit them. I'm sorry that your expectation is that you could do all of your closed captioning work within Premiere Pro. If that is what you really want engineering to focus on, let them know here: http://adobe.ly/feature_request
    I don't see any errors on the actual documentation per se, but if you do see any please let us know and we'll fix that.
    Thanks,
    Kevin

  • Design for Request of Mass Data

    Hi,
    i would like to hear your recommandations for a special PI design:
    I have a synchronous scenario
    3rdParty (SOAP) <-> PI <-> SAP (ABAP proxy)
    where i expect some responses of 30.000 data sets. This would take up to 30 minutes in the SAP system.
    How can such a scenario be setup by taking performance challenges into account?
    I considered to insert a request "package" parameter, to split the response into 10 parts and forward the responsibility to request the right part to the client, but i m not very happy with that.
    Do you have any other proposals?
    Regards,
    Udo

    >
    Udo Martens wrote:
    > Hi,
    >
    > i would like to hear your recommandations for a special PI design:
    >
    > I have a synchronous scenario
    > 3rdParty (SOAP) <-> PI <-> SAP (ABAP proxy)
    > where i expect some responses of 30.000 data sets. This would take up to 30 minutes in the SAP system.
    >
    > How can such a scenario be setup by taking performance challenges into account?
    >
    > I considered to insert a request "package" parameter, to split the response into 10 parts and forward the responsibility to request the right part to the client, but i m not very happy with that.
    >
    > Do you have any other proposals?
    >
    > Regards,
    > Udo
    in similar scenarios this is what we have done;
    1. Request the sending application to limit the number of messages per call. Hence each call will have a lesser number of data and your response time will be met
    2. what is the relevance of the response to the sender? Is it a mock ack to say that the receiver system has received the data or do you need data back from the receiver system to be send to the sender? If it is only a ack and the data in the response is not relevant then use a Syn to async scenario. That is create the response from PI itself and send it to the sender while you can do an async call to your ABAP proxy to push data to R3

  • Separate TCode for Mass Change of documents (For authorization purpose)

    Hi
    We have internal audit function where internal audit chief will remove the payment block of multiple vendor invoices through FBL1N --> Environment --> Mass Change.
    Now problem is that authorization for FBL1N is given to 6 more employees (related to AP Accounting). Hence all these employees can do the mass change. I want to restrict this mass change authorization only to one person i.e. internal audit chief.
    Please tell me how to bring this restriction.

    Hi:
          You should contact your basis guy to do so...In tab authorization first you will have to find this object he system will display it , there you can assign 03 in place of *. 
    Personally i will recommend you should go for creating transaction variant using SHD0 which is an easy way to do so. Please check it will solve your issue. I just did both in test sever both of them are working perfect for me. Mass button is disabled when you set 03 for F_BKPF_KOA. SHD0 meets the subject topic of your post.
    Regards

Maybe you are looking for

  • Java Socket bind() and connect() method

    Hi, I'm running a windows xp machine and have set it up (using the raspppoe protocol) to make simultaneous dial-up connections to the internet. Each of these dial-up connections then has its own IP address. When I create a new Socket, bind it to one

  • Stacked canvas with horizontal scrollbar

    Hi, In a forms module I want to show a stacked canvas with a horizontal scrollbar. I have set the generator preference POPHSB on every level to yes, but the stacked canvas is still generated without scrollbar. In the Designer help topic "Generated st

  • Pasted images in an email message are changed

    I have realized that randomically, during an email editing, if I past an image it changes without any my direct action. The new image is always the same one, a pie chart illustrating bouncing percentages on websites. No matter what image I'm insertin

  • WRT54G2 won't get an IP

    Recently my mom started complaining that she couldn't get online wirelessly. At first it was intermittent but in the last two weeks it has gone out completely. She was able to connect tot he router but no internet. When I checked it out I found the f

  • Sony hd-e1

    Hi there I need some help. I have a Sony HD-E1 hard drive and I was using it on my Sony Viao laptop (Windows based) and now when I plug it into my macbook pro it says it is not compatiable with mac. Is there a mac driver I can download for this?