No. ranges for Internal order budget

When i am changing the budget amount in Ko22 It is asking maintain interval 04 no. ranges for budgeting and planning pls suggest what is the logic behind why it is asking 04 and where i have to configure
Regards
Eswar

Hi Babu,
this is configured in transaction OK11.
The number range 03 is provided for order planning. Number range 04 is
provided for order budgeting. Youa have to maintain both if you want to plan / budget your internal orders.
Hope that helps, points welcome
Csaba

Similar Messages

  • External Alphanumeric Number Range for Internal Orders

    Hello,
    I am trying to create external number range for Internal Order Type. I want to create internal orders which will have internal order number as alphanumeric and some will be in only numbers.
    How should be the range look like, so that I have flexibility to enter Internal Order number as whatever format I want i.e. T123, 12MP, 1234, ABCD etc.
    Any help will be appreciated.
    Thanks.

    how many do you need?
    Just one, that covers all?
    a0000000 - zzzzzzzz

  • PLM table for Internal Order budget, Actual Cost and Actual Hrs

    Dear all
    In cProjects version 4.0, we have integration with existing ECC 6.0. We create Internal Order manually and assign it to cProjects.
    One cProject  having one Internal Order.
    Resource Planning part is managed in cProjects while Actual Time keeping(CATS with reference to Internal Order), budgeting of Internal Order, Material and Service Procurement which is done against Internal Order is managed in ECC. ECC and PLM are separate systems.
    We have RFCs established to transfer actual hrs, budget and actual cost data from ECC to PLM.
    Which is the ABAP table in PLM where we get linking of cProject with Internal Order and also actual hrs, budget and actual cost data in PLM system?
    Thanks & Regards
    Ashish

    actual hrs, budget and actual cost data in PLM system?
    Its not there, actual hours can be found in DPR_Task but it needs to be transferred by running a report.
    The planned cost etc is also calculated at runtime and passed on to Costing object in ECC (Int order/PS)
    Actual hours will be in CATSDB in ECC
    needless to say actual cost will also be there in ECC and not in PLM, PLM only displays at runtime based on RFC.
    If you want to try, Break the RFC and try to check the Evaluation..
    Niranjan

  • Number range for Internal orders - KONK

    Hi all
    I am not able to create a new number range group in order number range tcode KONK.  I tried to create it in my old clients login (they have 4.6c) I was able to create a new group but I am not able to in my companys QAS or DEV box....Have anybody had this trouble before?
    I am able to save the range but its not showing the group name in the maintain number range groups screen...
    Please help if you have had the same situation...
    Thanks

    Hi Satya
    How will the screen on su53 look like because I never got any errors displayed on screen when I tried to save the number range.....
    I know that if I have authorisation issues it will show at the bottom of the screen but I never got that kind of message when I created the range....I am able to see that range in the number range overview but I am not able to see the group in the group list...
    Please help...
    Thanks

  • Release budget for internal order

    Dear SAP experts,
    In our scenario (classic scenario) from an approved SC a PO is created in the backend, with reference to a specific internal order, inserted from the requestor in the SC.
    Suppose 10 items are ordered each of value 10 (so PO total value is 100), but only 9 items are delivered. When we create confirmation in SRM, the order will always remain partially confirmed.
    My question is: how can we “release” that delta budget (100-90) from the internal order?
    Thanks,
    Ci

    Hi Ajay,
    thanks for you answer.
    I already checked that if the PO refers to a contract, the value of the PO against a specific position of the contract is correctly updated (in the example above, is set to 90 and not 100, after final invoice is checked), so I think that the behavior is similar for internal order budget.
    However, how can I check if the internal order budget has been released? Is there a list of committments related to a specific order? (I'm sorry if these are basic questions, but I am new to FI-CO issues).
    Thanks a lot,
    Ci

  • KO22 internal order budget issue

    Hello All,
    while making changes for internal order budget with transaction code KO22 the system shows a error as u201CItem order xxxxxx budget exceededu201D & for some orders u2018Item order xxxxxx budget almost exhaustedu201D & also referring to a budget for year 2006,2007,2008 . & The system doesn't accept those changes .
    Another strange thing is that  the system allows the same changes for few items  (maybe 4, 5, or six that time it will get saved that time it will not give error) ,
    but trying to do  10-15 changes , the system shows the warning message as stated above
    If anyone has encountered this strange issue please share your inputs
    Thanks & regards,
    Prashant

    Dear,
    When making changes to budget then make sure you are increasing it not decreasing....
    When you decrease the budget then system will check tolerance defined............and display warning or error....
    For e.g in tolerance you have defined that system should display warning at 95% absorption of budget and Error at 100%.
    You have set budget 10000 INR for the Internal Order. So it means at 9500 INR system will issue warning and at 10000 INR or more system will give error.
    If posted amount to order is 9000 INR so you can noway reduce budget less than 9000 INR because it is 100% and system will give error.
    Regards,
    Chintan Joshi

  • Budget removal for Internal Order

    Dear,
    I had assigned budget to an internal order for year 2007.  But now i am trying to remove that budget using Tcode K026.  While selecting time frame system is giving error and asking me to select period only between 2008 to 2014.... Why this is so?
    How to remove budget assigned for year 2007

    Hi,
    I guess, your budget profile does not allow to touch budget 2 years after the current year. You can change the budget profile in customization (IMG - Controlling - Internal Orders - Budgeting and Availability Control - Maintain Budget Profile) and then modify your budget.
    Regards,
    Eli

  • Budget control for Internal Order

    Hi
    Can any one tell me the setting for budget for internal order to avoid excess processing for procurement ?

    You have to configure your GL accounts.
    While creating GL a/c you will have to maintain Field status group as R017   Expense Accounts -Internal Order related in Control of doc creation in co code subscreen in tab Create/bank/interest.
    Hope this will help.
    Enjoy SAP,
    Parag Mahajan

  • BW Datasource for Internal Order and Budget

    Hi Gurus,
    I would like to ask what datasource I can use for FICO specifically for Internal Orders and Budget. I have looked at all the datasources under the CO node but i can't seem to find a datasource that has the details for the Internal Order and for the Budget.
    Thanks in advance
    - Kit

    Hi,
          Check these datasources once.
    0CO_OM_OPA_8-- Orders: Budget Line Items 
    0CO_OM_OPA_2 --Orders: Budget 
    Refer this link as well.
    http://help.sap.com/saphelp_nw70/helpdata/EN/43/de43fcf6e2154bbbbcecbc63cdf287/frameset.htm
    Regards
    Karthik

  • Not checking the budget for internal order at the time Travel Request creat

    Hi All,
    I have two issues.
    (1) We activated travel managment in our system for public sector germany. In that case we need to create trip directly from PR05 instead of TRIP. I created budget for internal order but its not controlling and checking budget at the time of creation of the trip. We activated fund management also but i need control at internal order level. Please guide me.
    (2) While creating trip in PR05 what ever expenses mentioned in Trip it's committing and also i am able to see in fund management commitments report. We extracted reports based on COSP table. This commitment is not updating in this table. Please guide me which table is showing link between internal order and fund management account assignment objects.
    Regards,
    sree

    thanks for your reply.
    I maintained Budget profile and Tolerance limits. I am getting error only at the time of posting in PRRW.But i need to control at the time of saving the trip. I can use user exit to control. If there is any standard functionality of checking the budget at the time of saving then it should be good.
    For me main problem is i am not able to get report both trip commitments and fund management details. Please inform me in which table internal order and trip commitments are storing.
    Regards,
    Sree

  • Internal Order Budgeting for HR and Plant maintenance

    Dear All,
    I am using internal order for budgeting control. I want to use internal order budgeting for Payroll also. How do i assign internal order for the same.
    I want to check budget through internal order for plant maintenance order also. At the time of issue of material to PM order or at the time of settlement.
    regards
    ranga

    Budget Profile:
    IMG => Internal Orders => Budgeting and Availability Control => Maintain Budget Profile
    Make sure activation type made to 1.
    Availability control settings:
    IMG => Internal Orders => Budgeting and Availability Control => Define Tolerance Limits for Availability Control
    Regards,
    Ravi

  • How to block entry through internal order budget in F-02

    Hi,
    Kindly tell me during Purchase order creation through internal order (Order related PO) whreas budget is maintained against that internal order if the PO amount is exceede than budgeted amount it gives warning / error messge that budget is exceeded. Same internal order or any other internal order which has budget against that internal order if I go to  F-02 tcode and pass entry with cost center and internal order(budget is given) both it does not give any warning message if budget value exceeded i.e, F-02 posted amount is greater than budgetd amount. It goes to next screen which should not do. Kindly tell me the reason why it is not being blocked and goes to next screen or if there is any configuration  please guide me.
    Best Regards,
    Samrat
    Edited by: Samrat Roy on Nov 2, 2010 11:43 AM

    Hi Eli,
    Now I have observed during saving the record in F-02 it gives warning message as per tolerance limit set in config area. Actually I want in F-02 screen when you put Document date, posting date, type, period, company code, currency, posting key(debit), GL account, next 2nd screen you mention amount, cost center, internal order(budget is maintained), posting key(credit) and press enter for next 3rd screen to put credit amount. While you go from 2nd screen to 3rd screen then warning / error message should give if amount is exceeded than budgeted amount which I am getting during saving. Is it possible to make any check between two screens ????
    Beside I would ask you here tolerance limit is set as 95%, 100% and 102%. During PO creation through internal order it gives error message when amount is exceeded than 102% as budget is exceeded. If the amount is between 95% to 99% it does not give warning message which should do. But from posting in F-02 screen it gives proper messge in all levels since 95 % to 99% and 101% to 102%.
    Regards,
    Samrat

  • How to Assigning the number ranges for Purchase Order using EXIT_SAPMM06E_0

    How to Assigning the number ranges for Purchase Order using EXIT_SAPMM06E_001 using Functional Module NUMBER_GET_NEXT explain me ?

    Hi,
    First go thourh the FM import export parameters list.
    Try to create an internal table of type INRI-NRRANGENR for number ranges.
    We can provide the lower and higher values for this table so that what ever PO is created will be with that range.
    Try to create the ncessary ones using this FM.
    In the Exit, EXIT_SAPMM06E_001,
    the Export parameters are-
    EKKO-EBELN- the PO ios created with in that specified range
    Range as INRI-NRRANGENR - Here try to assign the Internal table that was populated in the FM.
    Try to code this in the Include provded and keep Breakpint and check the PO number generated.
    Reply if u need more help on this.
    Reward if helpful.
    Best Wishes,
    Chandralekha

  • Internal order budget release

    hai,
    i have prepared internal order budget. how to release the budget?because system is saying that avilability control is not activated.
    govind.

    Hi,
    Use OKOB and check availability section for activation type.
    Regards,
    Murali

  • Internal Order Budget Carryfoward

    hi all,
    I need to carry out the budget carry forward for internal order.
    Please clarify my doubts.
    1. Do i run KOCO and then KOCF or KOCF and then KOCO
    2. does the availability control get deactivated after carry forward and do we have to activate again.,
    Regards,
    Sudha

    Hi Pavani,
    1.You need to run KOCF first then KOCO because you should carry forward your commitments before carrying forward the budget.
    2.I think  availability control does not gets deactivated on carry forward.
    Hope this helps you.
    Regards
    Eugene

Maybe you are looking for

  • External drive not showing up on desktop

    I have an external hard drive (2T Newertech ministack). We had a power outage the other day. Even though the drive is on it no longer appears on the desktop. I went to Disk Utility and see if it could be repaired but the drive is not even showing up

  • Data Guard configuration for RAC database disappeared from Grid control

    Primary Database Environment - Three node cluster RAC Database 10.2.0.1.0 Linux Red Hat 4.0 2.6.9-22 64bit ASM 10.2.0.1.0 Management Agent 10.2.0.2.0 Standby Database Environment - one Node database Oracle Enterprise Edition 10.2.0.1.0 Single standby

  • Animation Codec Issues - no preview in Media Encoder or Quickview..

    I have recently updated to Mavericks (10.9.5) and I have since found that I can't preview any After Effects creative I have produced with the animation codec in Media Encoder. Normally I would bring the AE file (with animation codec) in to Encoder an

  • List and details controls of JFileChooser not working

    hey pls tell me wheather there is any way of making list and details controls of JFileChooser work in jdk1.3 it perfectly work in jdk1.4 .... pls help me thanx nik

  • Third Party Modules (Library | Develop etc.)

    Besides the ability for developers to build plugin extensions (the ones with the .lrplugin extension which are widely called modules as well and reside in a module directory unfortunately), I would like to see the possibility to have third party modu