No Sampling Procedures in In-Process Quality Inspection (origin 03, insp. points 100)

Hi
I am facing a problem while attaching master inspection characteristics etc. in a master recipe (C202). I first specify inspection points as 100 in the recipe header (quality data section) and then I go to the operations section, select a phase and go into the area where I can attach MICs, methods and procedures. Now, no matter what kind of MICs I add there ( ones that require a sampling procedure, of course, as it is my need) it does not let me browse (F4) on the mandatory sampling procedure field. I have created all kinds of sampling procedures (freely defined inspection points, without inspection points, manual valuation, spc, fixed, 100% - all combinations) but the mandatory sampling procedure field does not let me browse for sampling procedures. If I directly type a name, it says that the procedure is not suitable for inspection points (100 that I defined) despite the sampling procedure being a freely defined inspection points one or any other. This is only in the case of inspection points/in-process/master recipe. otherwise normal GR usage 5 plans are working fine. Any help? It's urgent. Thank you!
Regards,
Bilal

No, I'm using 100 inspection points, freely defined (both in my master recipe header and sampling procedure)
And yes, the sampling procedure does have the radio button selected for freely defined inspection points, manual valuation and fixed sample.
Like I said above I did get half of it working by making a setting in SPRO in the section that says Inspection for manufacturing order. In the process order section, I selected something related to production order in one of the tabs. That now enables me to assign a sampling procedure to a characteristic (SP with freely defined insp points) but it still doesn't let me browse (F4) for a sampling procedure eventhough there are 3-4 suitable procedures. I directly have to type them and press enter. Cannot F4/browse procedures.

Similar Messages

  • 100% Sampling Procedure is not functioning for Prod. Order - Insp.Type:03

    Hi Experts,
    We have a number of material as  SPARE PARTS.
    We are creating Production Order for these Spare Parts.
    Inspection Type 03 is used for it.
    Customization -> Define Default Values for Inspection Type
    Sample  100 % Inspection Check Box is activated
    Skips Allowed Check Box is activated.
    Material Number : 571113211
    QM View
    Inspection Type 03 is assigned
    100 % Inspection Check box is activated (By Customization Setting)
    Skips Allowed Check Box is activated (By Customization Setting)
    Routing is created for this material .
    For the operation 10,  Two MIC are assigned.
    For Each MIC the 100% SAMPLING PROCEDURE IS ASSIGNED
    Production Order is created with Qty. : 80.
    System generates the Inspection Lot.
    The result recording screen  the u201CINSPECT FIELD  SOLLSTPUMF IS 1 ONLY.
    It must be 80.
    I am able to record only one entry.
    As 100 % SAMPLING PROCEDURE IS ASSIGNED TO THE MIC,
    THE LOT SIZE OF THE PRODUCTION ORDER MUST BE THE SAME OF SAMPLING SIZE.
    For the manual Inspection type, I just assigned the sampling procedure to the MIC in Inspection Plan.
    When I created the Inspection lot the Sampling size  with Inspection Lot qty of 80,
    I am able to enter the result for the specified MIC 80 times.
     It is working fine for manual Insp. Type  89.
    With Best Regards,
    Raghu Sharma

    Hi Rajaram,
    Thanks for your prompt reply.
    The issue is solved.
    This is the requirement of Inprocess Inspection.
    I am assigning the MIC in Routing.
    Hence I need the Inspection lot as soon as Production Order is released.
    In Material Master QM View, Inspection Type 03.
    I have deactivated the 100% Inspection Check Box.
    The issue is solved.
    With Best Regards,
    Raghu Sharma

  • In process quality inspection in operation of a process order

    Hi,
    PP-PI inprocess quality inspection at operation level
    I am creating a process order having two operation. the first is quality inspection (inprocess inspection) & last is related to consumption of some materials.
    The control key in operations are pi02,pi03(miles stone confirmation). i am using insp type 03 in material master 
    user needs  insp. happen first then consumption of material.
    my question is
    1.when operation first get triggered  quality lot generated i enter RR & do UD.but here i can not see the insp lot stock as subscreen. why? then how can i block defect qty in block stock?
    2.how can i consume material in the same quality operation? 
    With Regards,
    Kareena

    Hi Kareena,
    I think the thread is going in other direction. You were asking for some solution to mentioned the consumption.............
    That can be taken care..........
    For 03 - "In process inspection" lot as yield confirmation by activating the STD function of SAP as I have mentioned in my last post.
    For 04 - "Inspection against GR form Production" lot, by stock posting.
    For any lot you can do customization in "EXIT_SAPLQEEM_011", to post the material consumption at each MIC/Operation valuation.
    But now the entire scenario what you are asking is bit confusing.
    You wrote
    I think for process order,
    quality activity confirmation we are talking
    & for this i have not maintained inspection
    point or inspection point identification.
    i am doing RR from qe11.
    It seems you we are talking about 03 type inspection lot. that you can relate with the option I have mentioned in the beginning of this reply.
    in my inspection plan for the material
    i have maintained 5 different characterstics
    in that row i can not see the sampling
    procedure,base unit of measure,
    base quantity all these field are gray in color
    i have defined sampling procedure also
    i have not maintained inspection point identification.
    Where you have mentioned these 5MICs?
    If it is inspection plan, then it will go with 04 Type.
    If it is Master Recipe/Routing, then it will go with 03 Type.
    Now the other point you wrote the MIC Line item have the fields GREY for Sampling Procedure,&...........&.......So to activate them,
    Select the line item for MIC, click on the Control Indicator (Sampling Procedure) and then you will be able to assign the Sampling Procedure to MIC.
    The fields "Inspect" & "Inspected" are related with the "Insp. Scope" with the MIC. The scope is define at the Control indicators for the MICs (On Page2 for the Indicators). There are four Radio Buttons to define the Inspection Scope.
    Scope not Fixed
    If you set this indicator, the number of inspected units is defined by the user for results recording.
    This number does not have to agree with the precalculated number of inspected units.
    E.g. If the the sample size for that particular MIC is not fixed ever and you will supposed to enter it at the time of RR you should define this indicator and the field will open for entry in QE11.
    Fixed Scope
    If you set this indicator, the number of inspected units must correspond
    to the precalculated number of units to be inspected for results
    recording.
    The system can perform a valuation for the inspection characteristic based on the number of nonconforming units or the number of defects in the sample.
    And the field will be GREY, non - modifiable.
    Similarly the larger and smaller scopes work.
    Best Regards,
    Shyamal

  • In-Process Quality Inspection in Rep Mfg

    Hi..
    We have Rep Mfg scenario , and we want to chk the material while in-process.
    In the Mtl Mastr we have maintained Insptn type as 13 .
    In Rate Routing we have maintained a operation with  control key which requires Insptn characteristics n MIC is assigned in routing.
    We have created a Planned order .
    Now , requirement is dat system should not allow backflush activity until in-process inspetion rresult is recorded.
    Whether Inspetion Lot gets created in Rep Mfg as soon as Planned Order is created..? 
    How to make the system to accomodate in - process inspection before backflush..?
    Please guide me with soln
    With Regards,
    LN

    Hi
    Try by selecting reporting point in the rem profile.
    suppose u have 10 operations ok
    first 3 operations are production operation then 4th u want to go for inprocess inspection then for the 3rd operation select the control key as milestone key and 4th is quality control key with milestone confirmation.
    Then when ever u go for backflush(MFBF)  first u have to confirm the up to 3rd operation then 4th operation confirmation.
    by this u can do the inprocess inspection scenario for REM

  • In - Process Quality inspection process

    HI Gurs,
    I have multiple operation in the routing. 010, 0240 .0250
    0240 is the Quality operation  .
    I do the production confirmation in in co11n for operation 010 .
    I do the Quality confiramation for the operation 0240  using Qa32 first result recording QE01 then  Usage decision .
    but when go for the
    confirmaion of operation 0250 system not allowing me to do .
    Please suggest me your expert comment how should i do it.
    Sanjay Sharma
    SAP PP consultant

    Dear,
    You can do this with OPK4 setting here slect your plant and process order type go in details here change the setting to
    Results Rec. (QM) = Warnning message if no inspection result exist.
    Regards,
    R.Brahmankar

  • Usage of Sampling Procedure with Inspection Points

    Hi Experts,
    Does any one have an idea whether we can use sampling procedure with free inspection points apart from In-Process Quality Inspection (Inspection Type 03)?
    Thanks in Advance,
    Arun
    Edited by: Arun Mann on Dec 11, 2008 11:11 AM

    hi
    check the links canhelp you
    http://help.sap.com/saphelp_47x200/helpdata/en/b5/c4db38a91b11d1bd610000e829fdb3/frameset.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/2d/350c26448c11d189420000e829fbbd/frameset.htm
    -ashok

  • Reg: Sampling procedure .

    Dear friends,
    Currently we are implementing QM for process industry.
    I need your valuable inputs on Sampling procedure. what exactly meant by sampling procedure.
    How to configure for sampling procedure.
    Thanks in Advance.

    You acn get many threads & Input if you go through the sdn but I will try to explaain you & give you some input for sampling procedure for process industry............
    Sampling procedure simply means how samples are going to determine the a char & a Inspction lot.......
    sampling procedure has sampling type like "percentage ,100% ,fixed sampling or with sampling procedure......which has valuation type like manual ,attribute or variable depending upon the mic used.
    In Process industry sampling procedure can be used with Inspection point or without inspection points.
    QPV1 is t code for sampling procedure. Mianly customization related to sampling procedure is by default available in SAP QM.
    Explore SAP help &
    Also refer :
    Re: Sampling Procedure
    Assign the sampling procedure aginst each MIC & chek using some manual inspection lot in QA01 to see the effect of sampling ype & valuation type.........

  • Setting Quality Inspection to use Handling Units

    I would like to know if anyone understands the procedure for setting up quality Inspection using Handling Units.  I need to setup sampling procedures, use skip strategies, etc. 
    If someone can let me know a clear way to se this up in Native SAP, that would be a great help. 
    More specifically, how to perform Sample Calculation using Sample Management and sample-drawing procedure 
    Thanks.
    Edited by: RGSAP2008 on Apr 15, 2010 8:42 PM
    Edited by: RGSAP2008 on Apr 15, 2010 8:50 PM
    Edited by: RGSAP2008 on Apr 15, 2010 8:51 PM

    I've only worked with HU's in QM for a brief while but there isn't  a ton difference with or w/o HU's.  The sampling procedures, sample drawing, etc.. work about the same.
    The UD posting screen is different and you post by the individual handling units, not by UOM.
    For QM you basically just need to click on the HU indicator in the insepction type setup in the material master.  You'll find the "Insp. Ctrl" field doesn't work as it normally does.  Most of the selections in there don't work.  Early lot creation does work if I remember but the other ones don't.  Each GR of handling units against a production order will result in an additional inspection lot.
    FF

  • Quality Inspection - Sampling procedure, Sampling scheme & Dyn. Mod. rule

    Hi Experts,
    I am impementing QM process to our group of company. Can you please help me?
    How to link Sampling procedure, Sampling scheme & Dynamic modification rule??
    It is very helpful for me, if you give a brief on this at the earliest.
    reg,
    RPV

    Dear Velu,
    Please go through the following link..........
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/44/fb8928a95e11d2839e0000e829fdb3/frameset.htm
    Regards,
    VB

  • Sample management with in-process inspection

    i need to know why must we assign inspection points when we use sample management in an in-process inspection ?

    Hi,
    [Kindly refer the link herewith|Inspection point] wherein the importance of inspection point is mentioned.
    In simple words, inspection point determines what system should do to proceed the inspection.
    I mean if you will enter 100 (STD SAP), system will plan the inspection, UD , Quality score procedure etc etc according to the freely defined inspection points.
    Now say if you enter 200 (STD SAP) there, then system will go in the direction of Samples, means will generate Physical Sample (Numbers), Samples size, will fetch these data to UD and stock posting screen also, then calculate the Quality score, etc etc.
    If you will enter it time based inspection point then system will drive the entire inspection lot accordingly.
    Now these is the straight and written explanation to your answer.
    Means If there is inspection point as 200--->there will be need  of SDP, Sampling procedure, etc
    But in same manner it is applicable in reverse order also, i.e. If you wanna go with SDP,Sampling procedure (SAMPLE Mgmt) then,inspection point there must be maintained accordingly.
    Regards,
    Shyamal

  • Quality Inspections Using WM Without Physical Sample Managment

    I have configured the system to not use physical sample managment.  Warehouse Management is being implemented.  When the WM personnel perform a goods receipt and subsequently confirm open transport orders using LT04, a pop-up window to Process QM Inspection Lot requesting where to place the sample quantity appears.  The business wants the sample quantity to always remain with the stock.  How can I get rid of this request to specify where the sample quantity should be placed when I am not using physical sample management?

    hi allen,
    why don;t you directly put the materail in final detination after goods receipt .
    after goods receipt matl will be placed in interim storage type 902 and after confirming the transfer order the material will be placed in final destination .
    In the system (stock overview) material will be shown in under inspection but material will be lying in the same location .
    the sample should be removed from final destination and after perform the UD. after comletion of UD if material is ok then accept the material which will change the status of the material from quality inspection to unrestricted stock in the system but material will be lying the same location .
    in this case you don;t have to keep the material in quality interim storage location for the sample approval.which will definitely save your time ,space & effort.
    manish

  • Quality management( difference between sampling procedure & sample drawing)

    Hi Experts,
    I am very new to quality management module & working in united states. i am trying to find difference between sampling procedure & sample drawing procedure.
    I see that sample drawing procedure is assigned to Inspection Plan & sampling procedure is assigned to characteristics, But i don't know the difference between these two, Please help me.
    Regards,
    Seshu

    Hi,
    SAMPLING PROCEDURE :
    A procedure that contains the rules for determining the sample size for an inspection. The sampling procedure also specifies the type of valuation to use for results recording (attributive, variable, or manual).
    Use
    You assign a sampling procedure to each characteristic in an inspection plan to calculate the sample size.
    Integration
    In a sampling procedure, you must activate the function for inspection points based on a sample-drawing procedure if you assigned a sampling procedure and a sample-drawing procedure to an inspection plan at the characteristic and header levels respectively.
    SAMPLE DRAWING PROCEDURE:
    Definition
    A master data object in which you plan the drawing of physical samples. In the sample-drawing procedure, you specify:
    Which categories of physical samples must be drawn
    How many physical samples must drawn
    The size of each physical sample
    Whether the drawing of physical samples must be confirmed
    Use
    The system uses the information in the sample-drawing procedure together with the information in the inspection plan to calculate the physical sample sizes, and to create physical-sample records when an inspection lot is created.
    Structure
    A sample-drawing procedure contains the following types of information:
    Header data
    The sample drawing header contains the following information fields and control indicators:
    Key that identifies the sample-drawing procedure
    Short text description for the sample-drawing procedure
    Authorization group that limits the access to the sample-drawing procedure
    Text for matchcode searches
    Long text indicator
    Indicator for calculating the number of physical samples on the basis of number of containers in the inspection lot (as opposed to the base unit of measure)
    Confirmation indicator to activate or deactivate the confirmation requirement
    Lock indicator to prevent the sample-drawing procedure from being used
    Usage indicator that shows whether the sample-drawing procedure is currently used in an inspection plan
    Sample-drawing item(s)
    A sample-drawing item contains specific instructions for creating physical samples with respect to a specific inspection lot container type and specific partial-sample numbers in the inspection plan. In a sample-drawing item, you can also specify:
    Which categories of physical samples you want to create (primary samples, pooled samples, and reserve samples)
    The physical sample container you use to draw each category of physical sample
    A factor to increase the quantity of physical samples to be created (for example, if you need to carry out more than one inspection)
    The number of physical samples to be created (fixed number or variable number based on a sampling scheme)
    Integration
    The sample-drawing procedure interacts with the following planning objects:
    Inspection plan
    You assign a sample-drawing procedure to an inspection plan to activate the functions for sample management.
    Sampling scheme (optional)
    If you want the system to determine the number of physical samples automatically on the basis of a sampling scheme, you can reference sampling schemes in a sample-drawing procedure.
    Hope it helps...
    Regards,
    Priyanka.P
    AWARD IF HELPFULL

  • Sample  still showing in quality inspection stock after usage decision completed

    After process order completed, we have received 100 units as a quality inspection stock.  After usage decision,( QA11), I have posted 98 units to unrestricted use and 2 units to the  to sample usage
    98 units successfully move to unrestricted stock.
    However 2 units for sample still showing quality inspection stock.
    I have checked MB51, mat document number for sample is 4900000160 and movement type is 331
    Do you have any idea why sample still showing in quality inspection stock. It  should consumed and zero out the quality inspection stock in MMBE

    Hi,
    Please check you MIC's control Indicators.
    Is it tick on Destructive insp. under Sample tab ?
    Please tick it and try again with whole process.
    Destructive Insp. : You specify whether the sample is to be destroyed after inspection. This means that is no longer available. This quantity is used in the usage decision as the proposed quantity for the posting to sample.

  • How to consider sample qty of raw material's quality inspection during mrp.

    hi expert.
    i have to consider sample qty of raw material's quality inspection during mrp.
    i am wondering how to implement it.
    is this possible?
    thank you~~!!

    Hi Seung Hyun,
    I think it depends on the sample quantity, whether it is a fixed quantity or it depends to the raw material quantity or requirement from the orders. If it is not fixed, then you can use scrap percentage as suggested by Vivek.
    If it is fixed quantity, then there are several alternatives to follow:
    Include the sample quantity to your safety stock
    Create another material number to distinguish the sample from the original raw material number and include it in the BOM
    Regards,
    Julian

  • Picking of Quality Inspection Stock in Process Order

    Hey All,
    In Process Order system will pick the stock which is lying in Quality Inspection. Some one please help / guide HOW TO STOP THE PICKING STOCK in process order which is lying in quality inspection.
    With Regards
    Paramjit

    CAn you describe in more detail. In what transaction does this picking of Q-stock appear?

Maybe you are looking for

  • E17genmenu exits with symbol lookup error

    e17genmenu gives me this when used: [proteus@localhost ~]$ e17genmenu Checking For /usr/share/applications...Exists Checking For Files In /usr/share/applications Found: abiword.desktop Getting Eap Name Parsing Desktop File /usr/share/applications/abi

  • Mobile Application in share point 2013

    hi, How to Develop mobile application in share point 2013, i don't know how to do this one , could please explain step by step.

  • Extract date from date

    Hi All, I have a query. I want to name of the day from the date selected from the record. I know there is a function Extract that extracts the day from the date. But it returns the day number of the month. I want to extract the name of the day i.e. w

  • Error Msg appearing after Installation

    Hi , After installing Oracle in a certain home , I Installed Oracle 9iAS in an other home different from the one used for Oracle 8 Database. Both are share ware got from Oracle site. But after the installation I am unable to open Sql Plus as it is gi

  • I have tabs set to open a blank tab, but now each new tab has google search on it.

    I don't have google selected as a search engine - I won't use google. I have tabs set to open up a blank tab each time. I want a blank tab, without the google search bar.