No totalization in a report of report painter for row containing a set

Hi!
I've created a set XXXX based on the table-field  GLPCT-RACCT. One of the row of the set is a formula. The formula is the sum of the rows of the set / 2  i.e row 005 of the set XXXX is (001002003+004)/2. The set has been added as characteristic value element, as row of a report of report painter. I've take a look to the output of the report but the total of the row based on the set does not take into consideration the formula inside. why?
i.e
Report                                  period 1
row 1                                          100
row 2                                      10000
row Z based on set XXXX:          
001                                               20                                             
002                                               20
003                                               20                                              
004                                               40
005 (formula)                               50
total of row Z based on set       100  (instead of 150)
Could you help me in solving the problem?
Thanks
Giovanna

There may not be any currency attached to the value derived by the formula. That could be the reason why it is not getting summed up. The total would be expecting all the items to be summed up are of same currency,
I am not sure of how to make the total to add up the formula.
Alternatively you may check to see if all your row requirements can be fitted in within the set , i.e. including subtotals and totals.

Similar Messages

  • Report Runing Very Slow for  range even data set for that range is small

    Hello Experts,
      I have a report which runs on date selection.
    When I run the report for say 01.01.2000 -31.12.2010  whcih contains 95% of the data , the report output is coming with in a minute.
    But when I ran the report from 01.01.2011 - 31.12.2011 , or say 01.01.2011 for a single day , where the data set is hardly 3k records,the report is runing for long time 15 - 20 minutes and not showing output.
    But when i remove this variable and run the report , it is coming again with in a minute.
    One weird thing is when i ran the report from 01.01.2000 - 31.12.2011 it is also coming with in a minute, but when i ran for 01.01.2011 single day it is not coming.
    Can any one share some inputs on this one.
    Thanks
    Vamsi

    Hello Experts,
      I have a report which runs on date selection.
    When I run the report for say 01.01.2000 -31.12.2010  whcih contains 95% of the data , the report output is coming with in a minute.
    But when I ran the report from 01.01.2011 - 31.12.2011 , or say 01.01.2011 for a single day , where the data set is hardly 3k records,the report is runing for long time 15 - 20 minutes and not showing output.
    But when i remove this variable and run the report , it is coming again with in a minute.
    One weird thing is when i ran the report from 01.01.2000 - 31.12.2011 it is also coming with in a minute, but when i ran for 01.01.2011 single day it is not coming.
    Can any one share some inputs on this one.
    Thanks
    Vamsi

  • Project Report in Report Painter

    Hi,
    Need your help for one of my issue.
    Current issue in the System / reqirment:
    There is a project report in report painter-GR55 which used to provide planed / actual cost and planed / actual quantity of the project. Whenever we are trying to run the report for several years and periods there is no cumulative data displaying. E.g. if we want to execute the report for the range of 001 period/2009 fiscal year to 004 period/2010 fiscal year, system is displaying data of 2009 and 2010 for the period of 01 to 04 only and there is missing data for period from 05 till 12 in 2009
    Root cause:
    There is no field in table-CCSS for the fiscal year/ period (FISCPER field name). As per the OSS note-157720 this is standard behavior of report painter. SAP suggested to build new report group based on OSS note-157720.
    Approach:
    An an alternative we used table-RWCOOM as there is field fiscal year/period (FISCPER). The new report group is working fine except planed cost of the project as the planed cost of the service orders are added up to project planed cost. We found there is missing field name-Object indicator which will restrict planed cost of the service order flow into project for which planed cost of the service orders are added up to project cost plan. This field-object indicator is available in table-CCSS.
    Looking for now to fix the issue:
    Option-1
    We are looking for any field similar to object indicator in table-RWCOOM which will restrict planed cost of service flow into Project
    Option-2
    Build new report based on OSS Note-157720.
    Please advise for this issue.
    Thank you in advance.
    Regards,
    Rakesh

    Hi Eli,
    Thanks a lot for your suggestion. A small query i got here while building the auxilarry coloumns-2 and 3.
    As per the Note (157720), in the auxilary coloumn-2 for the period we have to define period as 0 .....from period-1. Whereas my from period will be 1 and i can't provide from period-1 here
    In same way for Auxilarry coloumn-3 period details as per the Note will be To period +1 ...17 whereas my to period will be  12 so i may not enter the details.
    System will forbid if to period value is less than from period value.
    Could you guide me on this.
    Thank you for your cooperation.
    Regards,
    Rakesh

  • Need to add Purchase Order field in Standard report in report painter

    Hi Gurus,
    I have a requirement to add an extra field in Cost center:Act/Plan/Comm CC Cur report.This is otherwise a Z report in report painter with 0% code (T-code : GR55-> Report group->Report).But,when we go to technical information of this report,it has four standard sap programs,which contains code for this selection screen.It does not even have a modification scope.
    Selection screen of this report contains following parameters:
    Selection values:
    Controlling Ar
    Fiscal Year
    From Period
    To Period
    Plan Version
    Selection Groups:
    Cost Center Group
    Or value(s)
    Cost Element Group
    Or value(s)
    My requirement is to add one more parameter : Purchase oeder in new block:
    Is there any way to achieve it.
    Note: Copying the standard progs into custom prog is not working,i already tried that.
    Please let me know your suggestions,if any one of you came across such requirement before.it is very impoertant for me.
    Thanks in advance,
    Meenakshi

    Hi Subramaniyam,
    You can find enhancement in me28 by following steps and then apply your logic in include of this enhancement.
    cmod>Give a project name>in enhancement column give the package name ME >f4>in package write ME-->ENTER>It will show you all enhancements available in me28> find which ever suits your requirement>save > click on components> from there you can make changes in include program.to add that particular field.

  • Vendor Ageing Report Through Report Painter

    Dear All
    As per my company requirement we are trying to develop vendor ageing report through report painter, by using library 8A4 (EC CPA: Drill Down Open Item), our requirement is all normal items and some special GL transactions (Not all) has to flow in this report.
    In FKI4 / FKI5 if we assign any special GL, then data flowing in to report relating to that particular special GL transactions only, normal items are not flowing in to report. If we not assign any special GL then all normal and special GL transaction are flowing in to report.
    Can anybody suggest how to restrict flow of some special GL transaction data in to report. Our requirement is all normal transaction along with some specified special GL transaction data has to flow in to report. Points will be rewarded on helpful answer.
    Thanks & Regards
    Madhava

    Hi Madhava
    You can pull all values whether Sp GL or Normal GL values. For a particular 'Column' if you assign Sp Gl Indicator you will fetch all Sp Gl Values in that column. Same way in other column, you dont assign Sp Gl Indicator, instead you calculate manually as shown below;
    In a similar fashion you can calculate all values for (00-30), (31-60) ...and so on.
    Hope this clears all your doubts?
    Regards
    Abbas

  • Report Painter for New GL

    Dear experts,
    I need to create a custom report with ReportPainter with the data you see with t.FAGLB03.
    Since there are no standard reports for New GL, to copy and modify, i created a library by copying the library 0FL (Table FAGLFLEXT) and i stopped after  :(. For example, "Lead column" must be a hierarchy of profit centers. In the "Element definition" i added "Name" - "Profit Center" and chose "Characteristic is Interpreted as Set / Hierarchy," and "Characteristic is Interpreted as variable. In the list of "Value of variable" for the "From" there is no variable that refers to the table FAGLFLEXT, PRCTR field.
    What should I do? I create all the necessary variables with T.GS11, or is there an easier way? Can I use something existing?
    Please, can you give me an explanation step-by-step what I should do. Any advice is welcome!
    Thank you in advance.

    Hi Serena,
    As stated you can create your own reports using the standard SAP library 0FL
    you do not need to create a custom library.
    One tip I have is that If you are creating reports with the  Profit Center scenario active then
    you can still use transaction code KE5B to copy your Financial Statement Version (FSV) groups to EC-PCA.
    Even though your reporting source will NOT be EC-PCA in the New G/L, this method can still be
    used as a short cut to create account groups that can be referenced as sets in Report Painter.
    I used this method in the lead column for "Account Number" to easily generate a FSV style report
    in report painter in the New G/L with the profit center scenario activated.
    - Good Luck

  • Report Painter for GL balances

    Dear Experts,
    I would like to create a report through report painter, which gives the GL balances Business Area wise under Profit centers.
    I'm using the 0FL New General Ledger Library.
    I'm able to get GL balances either Business area wise or Profit center wise.
    I'm not able to get GL Balances with Business area and Profit center.
    Requirement is like this.
    Under Profit Center, we want Business area wise - GL Balances.
    Profit center
      Business Areas
       GL balances
    Kindly help me to create such a report
    Thanks
    Om
    Edited by: Om Prakash Arjuna on Nov 7, 2011 4:39 PM

    Hi,
    It seems it is not complicated.
    Crate Report:
    Row / Column:                     PC&BA                    
    GL Accounts
    from the above ex, crate report Row with Account Number & Calumn PC&BA
    Stil you have issue plz revert with clear requirement.
    Regards
    Viswa

  • No Program generated after creation of new report via Report Painter

    Hello,
    I have created a new report after copying an existing report from report painter GRR1. The new report has also been assigned to a new Report Group relevant to the same library.
    There is no Syntax error. The only change has been to the Title of the report.
    However when I am trying to execute the report nothing happens. ABAP found that no program has been generated by SAP for this mew rpeort. We confirmed this by searching with my user ID in table TRDIR.
    However there is no trace of it.
    We have tried to execute the report from GRR3 & GR53 (report group). The report & report group is having the same attributes as the old one.
    Unless the report is in executable stage we are not able to go to the Selection screen & finally from the Technical Information to the program name.
    Please could you let me know what can be the possible cause for this & how can we resolve the same.
    Thanks & Regards
    Shreenath

    @JoeSchmoe115:  Thanks for your suggestion.  Using a web service or WCF service would still mean dealing with potential timeouts for very large reports (granted you can adjust those timeouts).    
    I think an approach using a console app could work, but rather than having the web app spawn it, an alternative would be to do the following:  (1) have the web app insert report generation requests (including all necessary report parameters) into
    a database table, and (2) have a console app, periodically invoked by Windows Task Scheduler, which reads that database table and then uses the SSRS API as you describe to generate the report, save the byte stream to a file, and finally send
    the e-mail notification to the user.  
    mkedwards
    What you've described will work but saving report generation requests in separate table may not be necessary. I don't have much experience with web services but can they just spawn C# console app with needed parameters and exit without waiting for console
    app to complete?
    The positive side of using database to store report generation requests is that you would have complete log of all requests. Your console app can then update database with completion status.

  • Creation of report using Report Painter

    Dear All,
    I have a requirement to create a report using Report Painter. I don't have any idea about this.
    Could you pls provide me some study materials or Links to study Materials, it could of great help.
    Regards
    Ranjan

    report painter
    http://help.sap.com/saphelp_47x200/helpdata/en/da/6ada3889432f48e10000000a114084/frameset.htm
    <b>reward points if helpful</b>
    Message was edited by: Rahul Kavuri
    Message was edited by: Rahul Kavuri

  • Report Painter for Creating Report in Group currency

    Dear all,
    I have created a report using report painter.  I but currently the figures are in Local currency.  May I ask how can I convert these figures into Group currency? 
    Thanks.

    Hi,
    In the characteristics you have defined if you double click you can see on top BASIC KEY FIGURE select Group Currency and the same shall happen.
    Revert for further help
    Regards,
    Rahul

  • Cash Flow report in Report Painter

    Hi,
    I am trying to make a cash flow report in Report Painter.
    Can any one help me with steps or config material so that i can prepare and tally the cash flow report being generated in Report Painter.
    Also there are report line items where by the figures are getting populated but are not tallying with the GL balance, if seen individually by going to GL line item display
    Thanking You,
    Parin

    HI
    GOOD
    I NEVER WORK ON THIS BUT HERE I AM GIVING SOME LINKS , I HOPE YOU WILL GET SOME IDEA FOR YOUR PROBLEM.
    http://www.asug.com/client_files/Calendar/Upload/BPS%20presentation%20to%20Indiana%20ASUG%202-10-06.ppt
    http://sap.ittoolbox.com/groups/technical-functional/SAP-R3-ACCT/cash-flow-report-642778
    THANKS
    MRUTYUN

  • Adding ztotals table in report painter for transaction FGI3 in report type

    Hello All,
    I have zprograms in report painter for trasaction FGI3. For my reports i have to add Ztables..In the transaction FGI3 there is report type  020. Here they maintain the Zreports.
    Can you hellp me out in adding the totals table.
    Thanks

    Hi,
    Transaction FSi2 takes you there.
    Alex-

  • Drill Down Report in screen painter

    Hi Experts,
    I have a requirement in dialog programming/screen painter to create a 2 level drill down report. for eac page of the report, it should only contain 10 entries then to view the other entries (11 and up), the button for next page should be click (there is also back button).
    First question is how will I have the drill down report (alv list type?) in screen painter?
    Second question is how should I process the logic mentioned above (next and back) in screen painter/dialog programming?
    Thanks in advance for all teh support. Points will be rewarded.
    Cheers,
    Kurtt

    Hai,
    Go thru this Threads u ll get an idea,
    Drill down report help
    Re: regarding Drill Down Reporting
    drill down capabilities for an alv grid display field using oops concept
    Regards,
    Padmam.

  • Reports through Report Painter

    Hi All,
    Can you please guide me how to use report painter and how to create custom reports through report painter.
    I want to prepare a report that will show Planned costs,Commitments,Actual Costs,Original Budget,Supplements,Current Budget in a single report.
    If any body have some manuals with screen shots,that will be very usefull.
    Waiting for your answars.
    Muzamil

    No better manual than SAP help!
    Below is the link to Report Painter
    http://help.sap.com/saphelp_erp2005/helpdata/en/5b/d22cee43c611d182b30000e829fbfe/frameset.htm
    Regards
    Sreenivas

  • Change Selection criteria for existing report in Report painter

    Hi Experts,
    We are on 4.7, using report painter for getting reports for Cost center & Profit Center. For one of the report we have selection criteria as Cost center and cost center group, but now user want us to add new selection field as Cost element and cost element Group to same report. We have tried all the options from GR32 ->Edit-> General Selection, but we don't find cost element in Key figure listed there.
    Please let us know how can we add the new field to selection criteria. We also would like to know is this is possible with existing report  to add new fields or not? Is that we need to create new report for this?
    Thanks in advance..
    Shilpa

    Shilpa-
    In my opinion the best way to troubleshoot issues like this is to go to SAP delivered standard reports and see how they are setup. For example, in your case you want to add cost element and cost element group to your report. There is one standard report from SAP - Transaction :S_ALR_87013611 which has both cost center, cost center group and cost element, cost element group in the selection criteria. You can look how this report is set up, and maintain your report in a similar fashion. Atleast this way, it will give you an idea.
    Go to transaction code GRR3 and under library look for report "1SIP-001". By double clicking on the row, you will see how it is maintained.
    Hope this helps.
    Shail

Maybe you are looking for