Non Valuated Project stock for valuated material

Hello MM experts,
We have a valuated stock material in a plant.
We want to maintain project stock (Special stock Q) for the same material, in a dedicated storage location within the same plant as non valuated stock.
Can you please tell how this can be achieved?
Regards,
Shashi

Hi,
This is little difficult to manage a material as valuated and non valuated. To make it non valuated you have to use a material type which is managed only on quantity basis and not on value basis like non valuated stock. Then you can do a material to material transfer posting. I haven't checked this scenario. For more info on this please refer these links:
http://help.sap.com/saphelp_dimp50/helpdata/en/4c/227bb446e611d189470000e829fbbd/content.htm
http://help.sap.com/saphelp_di471/helpdata/en/4c/227bdb46e611d189470000e829fbbd/content.htm
http://help.sap.com/saphelp_di471/helpdata/en/4c/227ba746e611d189470000e829fbbd/frameset.htm
http://help.sap.com/saphelp_di471/helpdata/en/4c/227be846e611d189470000e829fbbd/frameset.htm
http://help.sap.com/saphelp_di471/helpdata/en/4c/227b8d46e611d189470000e829fbbd/frameset.htm
Regards,
Atal

Similar Messages

  • Table for Valuated Project stock

    Dear All,
    Can any one  suggest form which table I can get value of valuated project stock for whole project.
    I can get it through table QBEW (Project Stock Valuation), but it gives value for individual WBS only.
    Regards,
    Nitish

    Thanks for your reply.
    Basically I am using it in Yreport and initial input parameters are only Project definition and version.
    So accordingly how we can built programme, so as to pick value for whole project(all WBS) .
    Regards,
    Nitish

  • Actuals for stock valuated materials in a valuated project stock

    Hi friends!
    Iu2019m working with materials in the project, and we are going to do direct external procurement from the project. The material we are using are valuated stock and in the project I have valuated project stock.
    The requirements are that the vendor give us the material prices, and the material will not be consumed by the project(WBS/network). All the material will be collected to the special project stock until we decide to move the material to the unrestricted stock to be consumed by another department in the company. All the actual cost must follow-up in the project.
    This is what I do:
    From the project I create material components and I create the PO requisition I got the same price as in the project. Thatu2019s ok.
    When I convert the PO requisition to the PO I got no price but if I save I got the latest used price for the material and this could varied and it´s ok but should not work like this for this scenario.
    My doubts are when I do the goods receipt (MIGO) and the price of the material in the PO are not the same as the stock valuated price I got the difference as actuals in the project and the valuation of the material are in the project stock. If the price of the PO is the same as the valuation price I got no actuals in the project.
    When I register the invoice from the vendor (MIRO) I got no actuals either so I cannot do my project follow-up costs. When I check the cost they are in accounting (balance sheet account).
    When I do the material movement with 411Q to unrestricted stock I donu2019t get any actuals in the project either.
    Is this a normal behavior when using stock valuated materials in a valuated project stock?
    I SAP help I found this information for non valuated project stock:
    u201CAll the actual production costs appear in the project because no price variances can occur and all external procurement follow-up costs are debited to the WBS element.u201D
    But if the best practice is to use valuated project stock why follow-up costs cannot be done in the project?
    Please give me some ideas of this,
    Best regards
    Jose Marin

    If the mateiral was created using the no stock material material type then yes you can see this material in MM60.  Search using material type 'NLAG' for non stock. 
    Regards,

  • Non-Valuated Project Stock Report

    Dear Sir,
      I am assigning some valuated and non-valuated materials to the Project. So I have selected Project Stock in Project Defination. So I can see Valuated Project Stock in MBBS but I can't see non-valuated project stock . So where should I come to know these stock also ?
    Regards
    Girish Lashkar

    Hi,
    If you check your project definition control tab you can find which type of stock you are using, whether it is valuated project stock or non-valuated project stock. Since SAP is giving a radio button to select this, it means you can not maintain both valuated and non-valuated project stock.
    In your case may be some of the material code you created as non-valuated material for the particular plant, not for project. Please check it again.
    You can also refer sap help under project system > material to know better.
    Tnx.
    Abdul

  • Results Analysis for Valuated Project stock

    Hi,
    To have transfer prices we have activated material ledger and multiple valuations.
    As material ledger only works with valuated stock, we have moved the Project structure (ETO) from non valuated to valuated.
    Our client requirement was to recognised revenue based on cost. With non valuated project stock, cost is upated as soon as we received the stock for the project and we were able to acheive the RA (revenue recognisition) as per the clients requirement.
    However after changing to valuated, during goods receipt stock is upated and not cost. So we asked the client to consume the purchased material if they have to recognise the revenue.
    Then the question came that if the SFG is received back from the assembly/production order, all of a sudden we will not have cost but revenue & stock. After looking some SAP notes on statistical cost elements, we have created the stock account as a statistical cost element (category 90) and implimented the following SAP notes which helped us to reverse the stock value and update it to P&L (by reading the balance in statistical cost element linked to the Project).
    a) Note 78420 : To activate Function Module EXIT_SAPLKKAG_005 (contains include ZXKAGU05).This Function module takes into account the actual & plan costs of the assigned Production orders & Networks
    b)Note 616869 : Provides source code to be copied to  include ZXKAGU05
    c)Note 616960 : Changes to include ZXKAGU05 to read statistical cost elements in RA
    d)Note 26002 : To activate Function Module EXIT_SAPLKKAG_001 (contains include ZXKAGU01).In this include we can make the necessary modifications to RA calculations. Through this include, stock will be reversed during RA.
    e)Note 785626 : Provides source code to be copied to include ZXKAGU01
    Hower if we have purchased parts which are not consumed, still the RA (FM EXIT_SAPLKKAG_001) reads the value in statistical cost element and posts a debit to RA P&L and reverses the stock. Therefore now i have cost but no revenue (as no consumption).
    As per last paragraph of sap note 785626, if we have purchased parts and we want to exclude them from stock reversal, we have to use a filter with customer enhancement 3 (SAP note 67423). It also says that the goods receipts and issues of purchased parts has to lead to a different valuation class and assigne a different stock accout. Now can any one give some guidance on how a project specific purchased parts (receipts and issues to prod order) can be linked to a seperated valuation class.
    We have same material which is sometimes purchased and sometime produced.
    Regards
    Raghu.

    Hi
    I can say something from theory but not much from sap config. perspective. You have not mentioned actual revenue since POC is calculated from
    R(a)/R(p).How you have considered 100% poc?
    From your data,it looks to me that you have met the target revenue from actual cost which is less than planned one.Inventory indicates that you can generate revenue in next accounting period (unlike WIP).I feel that unlike plant stock,RA is not perfomed on project stock Murli, can ammend my view if it is wrong.
    You can post this problem to Fi/Co.
    Regards
    Adwait

  • Valuated and Non-valuated project stock in same SAP system

    Dear All,
      Can we operate with the system where projects are with valuated and non-valuated project stock at the same time. If yes, are there any precautions we need to take before doing this.
      Currently we are changing to 'valuated project stock' from 'non-valuated project stock' due to advantages of 'valuated project stock'. But since we are implementing this change in already stable system where projects are running with 'non-valuated project stock'. Please suggest of there are any complication with this.
      Thanks in advance !
    Regards

    Hi Muralidhar Lanka,
    Thanks for your time and efforts to share your thoughts with all of us. Hope you will not mind, did you done this kind of changes to profiles midst of the project in the past? or its your guess.
    Because, many times these kind of questions comes from business to change, but we are not sure how it will affect the existing as well new projects. In such circumstances, normally we politely propose to go with two profiles rather changing the existing one since we are not sure of how it will affect.
    It would be great help to all of us if you can share your experiences how the goods movement and value flows have taken in  system for old projects and new projects. What kind of changes you could notice after changing profile in terms of .. a few of them
    1.  Goods movement
    2. Consumption of production orders and internal order.
    3. Settlement and RA (customer projects/ investment projects)
    4. POC calcualtion of projects
    I am sorry if you find my questions are silly and not worth to answer, please disregard.
    Looking forward to hear from you at your convenient time.
    Thanks,
    PSR

  • Project stock options: valuated and non-valuated

    Hi Experts
    In some discussions, i have been told that the 'valuated project stock' option is adaptable for customer projects where as 'non-valuated project stock' option is for cost projects. is it right?
    May explain what circumstances non-valuated project stock option is chosen?
    If we choose non-valuated project stock option, the results analysis is must, is it right?
    warm regards
    ram

    Even Customer projects may be Non-Valuated. It depends on client requirement.
    Regarding result analysis it is  not must in case of valuated. Again depends on customer requirement.  Resulst anlysis can be used for both Valuated as well as Non-valuated projects.
    Venkat

  • LIS Reporting of Valuated Project Stock

    We have a scenario where we have materials that are used both as valuated project stock and plant stock.  Plant stock goes to normal orders.  For the projects, the material is manufactured and goes into valuated project stock.  So the same material can be valuated as plant stock and project stock.  An example might be:
        Item A    50 in plant stock
                      10 for project A
                        5 for project B
    Some reporting works well.  MMBE for example faihfuly reports these values.  MBBS is correct.   MB5L shows good integrity between all accounts.
    The inventory LIS reports are messed up.  MC.1 reports odd values including the project valuation class which SAP says it will not report. 
    Does SAP Inventory LIS (MC.1 etc..) handle the situation where a material has multiple valuation classes and can be used in diferent way?  Is there a fix for this problem?
    The ultimate requirement is to have stock history similar to plant stock but for project stock.

    Hi,
    Please try the below report..
    S_P00_07000140
    Thanks
    abdul.

  • Valuated project stock not allowed with customer stock.

    Hi,
    I am trying to create invoice correction request for credit with the reference of invoice
    the invoice data is not copying into sales order. I am getting the error "Valuated project stock not allowed with customer stock".
       My question is can we have any routine in copy controll to fulfill my requirement or do i develop a new routine?
    Thanks in advance.
    Regards,
    Narayana

    Hi
    Did you find any sloution for this problem?
    I am facing the similar error.
    Inputs will be helpful
    Thanks
    Regards
    DDP

  • Subcontracting with valuated project stock

    Hi All,
    We are using MM subcontracting process with project assignment.We have valuated project stock.
    When I try to execute transaction ME2O for issuing components to subcontractor I do not get the PO with project assignment. I only get the PO if there is no object assigned in the PO i.e. account assignment category is blank in PO.
    Am i missing something here or is this SAP standard?
    Regards,
    V S
    Edited by: V S on Jun 30, 2011 4:15 PM

    Hi,
    Please check the following link. This explains how you can manage Subcontracting Process with Project Stock.
    [http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/402891a3-7f89-2c10-3097-91556442b8b5]
    Hope it helps,
    Best regards
    Amit Bakshi

  • T Code for Project Stock for a particular period

    I want to check my project stock for a particular period, is there any Standard T Code, if not how to find the solution. Please revert me the solution.
                                                                                    Thank you.

    Hi
    Please check the following Report
    S_P00_07000140 - Inventory and Raw Material for Special Stock Report
    To access the report, from the SAP Easy Access menu, choose Accounting >> Financial Accounting >> General Ledger >> Reporting >> Tax Reports >> Thailand >> Inventory and Raw Material for Special Stock Report
    OR
    please try to create a Query by using the following tables..
    MSPR
    MARA
    MAKT
    Tnx.
    Abdul

  • No valuation variant found for valuation area

    Dear Experts
    When i m clearing or puting the LOt in quality through MB31 with 101 Movment for Production Order Following Error has occured
    No valuation variant found for valuation area xxxx.
    Rgds
    Pankaj Agarwal

    transaction - OPN2
    for Valuation variant 007 see the details of material val tab page
    if its defined properly
    than go to
    IMG--Production >SFC>Integration-->Define valuation of GR
    assign 007 to ur valuation area that is plant code
    hope this helsp

  • Calculation of consignment stock for a material ( ABAP/MM)

    HI,
    I need information to find out consignment stock as per requirement. I doubt the requirement is not complete enough but they dont agree. I am using following logic.Please provide me your inputs.( i was asked to follow standard program logic of 'RM07MLBD')
    1.I am retrieving material document no.s from MSEG with the movement types 631,632,633,634,701,702 and SOBKZ = 'W' for a particular reporting period for a material.
    2. I filter them by checking date BUDAT in MKPF.
    3. then i aggregate them taking SHKZG = 'S' or 'H' accordingly '+ ' or '-'.
    And finally i Aggregate them for customers belonging to same state (REGIO)
    but i am getting some negative values and incorrect entries.
    what i am not able to understand is whether my selection criterion is wrong or aggregation of materials is wrong or if i am missing any other selection criterion? Your inputs are highly appreciated.
    Thanks in Advance.
    Shrini

    Hi ,
           Follow sample program RM07MKBS OR MB54 which display consignment stock for  am material.
    Please reward if useful.

  • No valuation variant found for valuation area 4000

    Dear Experts
    When we are saving the production order we are getting the Following Error "No valuation variant found for valuation area 4000" i have check from my side the config for Valuation Varaint and Costing Variant is OK can any one please help me in this
    we are running on EHP4 right now
    Best Regards,

    got the solution

  • Table for field unrestricted stock for a material

    Hi,
    Which table holds the value of unrestricted stock for a material?
    Thanks in advance.
    Phani.

    Hi,
    Thanks for your replies...
    Does the fields suggested by you store the values of warehouse stock?
    Regards,
    Phani.

Maybe you are looking for

  • PS CS4, refuses to save one file type .psd to another file type .jpg. How to resolve? Desperate!

    I open a .psd file, make changes to eliminate layers and reduce the file size to then save as a smaller .jpg file.  However, when the drop down window pops up to select what file extension I would choose, it immediately flashes closed with out time t

  • Problem while creating queries using SQVI

    Guys, I have many diff versions of sap's. 4.6c, 4.7, 4.7uc, 5.0, 5.0uc and so on...... I have to few queries in 4.7 in SQVI, i have to make it in sync in all the othr servers. I have created all of them in all servers, but while creating in 4.6c, whe

  • Best isolation method for Web Dynpr iViews ?

    I'm going to develop some Web Dynpro iView to be integrated into the SAP EP. THese iViews should work with KM APIs. I read into the HelpOnline it's possible to chose between Embedded or the URl isolation method. As far I know te web Dynpro tecnology

  • Mail Not Remembering Window Position of Previous Session

    Mail has started forgetting how its main window was sized when previously using the application. When I open Mail, the window dimensions are like those for a small screen - not as previously sized. Is this a known problem (could not find with discuss

  • Upgrade from Mac OS X 10.6.8 VM to mountain lion failed

    I purchased Snow Leopard 10.6.3, created a .iso and installed in on VMware Workstation 9 without any issues.  I upgrade to the latest 10.6.8 since that was the required release to move up to Mountain Lion 10.8.3. I purchased the Mountain Lion via App