Not creating inspection lot for STO

Hi ,
I have two plants X(Supplying) and Y (Receiving).
In material master in quality 01 and 08 (inspection type) for plant Y active.
Process as folllow:
1)STO with U (acc assignment) created.
2)VL10B ,created delivery.
3)Vl02n PGI
4)Migo GR for STO did in plant Y.
but stock is not going in quality instead of this it is going in unrestricated.
Guys please throw some light ,why system is behaving like this.
Regards
Sowmya

Hi,
In your STO purchase order in Delivery tab check if  stock type is " X Quality Inspection"
Check in Material master updated inspection types 01 and 08 are checked as active
In material master quality view Post to inspection stock check box is active
Thanks
Diwakar

Similar Messages

  • In QA16 i given material doc no ,i am not getting inspection lots for UD

    iam using QA16 for quality inspection .
    Iam given material doc no in QA16,but iam not getting inspection lots for UD(usage decession).its comming empty screen in QA16.
    iam using multiple UD at a time.

    Dear check this below points.
    1. Check if Material Master Auto usage decision has been checked.
    2.All characteristics should be optional if not make all the char as "Optional " through control indicator This can be done for next lots only.
    3.All chracteristics must be calculated and status should be 5 completed and no defect recording done.
    4. Check mic indicator activated in material master and you have to do RR for this inspection lot or u can force fully complete all MICs and male IL status INSP and check again in QA16
    5.Did you selected releavant UD selected set for inspection lot in QA16.
    Cheers
    KK

  • Creating inspection lot for vendor returns

    Hi All,
    In Subcontracting, components are sent to vendor using Mov Type 541, if vendor returns the components without any value addition we recieve the goods with Mov type 542.
    Now, when we recieve the goods using 542 customer requires that the material has to be posted to quality inspection and a lot has to be created.
    I have already tried with inspection type 08 but its not working.
    Any ideas how it can be done?
    Regards
    Naveen Goveas

    Hi Naveen,
    You have come across a common problem in later releases of SAP. Ram is nearly right in the settings for control of inspection lots for goods movements. In the standard system movement type 542 has no inspection lot origin assigned, so even if you have maintained an inspection type for your material there is no "trigger" for the inspection lot creation from that movement type. Unfortunately, you cannot change the inspection lot origin settings for movement types. The only choice you have is to create (as a copy) a customer defined movement type (one which already has the appropriate inspection lot origin assigned) and use that instead. You have to also be careful about the 'Quantity' and 'Value' updating strings for your new movement type.
    Hope that helps.
    Colin

  • Create Inspection Lot for Serial Number

    Hello,
    Is it possible to create an Inspection Lot and associate it to a Serial Number right away.
    I've done a process were I've change the Material and Serial Number of my equipment, so now the old inspection lot is not usefull no more and I would need to have a new inspection lot so that the movement to place the stock on unrestricted is cone for the new inspection lot.
    Or is that any other way to do this???
    Thanks in advance.
    BMO

    Atul,
    The inspection lot is created when the mobile is delivered from client and dismantled, and my stock gets increased for the returned material - that stock remains in Quality.
    Later when the Usage Decision for the Inspection Lot is given (depending on the selection) my stock passes from quality to unrestricted, and this is the normal process without issues.
    Possible exception:
    If in the midle of the process I've to change the serial number for this mobile or to change the Material + serial number, the first Inspection Lot created is not helpfull to me because I can´t change there the Material or serial number. So the Usage Decision would be given for the old serial number, isn't it?
    Today I found a Ztransaction that is used to create Inspection Lot. In the first step the material, goes in the warehouse in Quality and in the second step, when the Usage Decision is given, the stock passes from Quality to Unrestricted.
    For the substitution Material / Serial number everything is correct, but for the first one it's not, should this obsolete stock goes to scrap?
    Thanks,
    BMO.

  • Not created inspection lot

    hi,
    please give me idea. i given inspection type oi  and activated in material master. then i done migo for external procurement against po. when i checked in mmbe stock shows in quality stock. but in qa 32 i am not getting any inspection lot. please explain and give me idea.
    bhakta

    Yes, I think that Prasobh opinion can also be valid.
    Take this into account:
    a) if the material master QM view has some error or lacking of the inspection type you are interested into or "Active" flag not checked, then the inspection lot is not created.
    b) if all the previous stuff is OK, the inspection lot is created but still we have to find a valid inspection plan to assign the characteristics and sample size. In this case, the status of the lot is different and you were not able to find it in QE51 transaction.

  • Inspection Lot for Inhouse Operation Not Creating

    Dear Friends,
          My process is Like this, in production Order Out of ten operation eight operation are subcontracting Process.I am getting inspection Lot for this eight operation by maintaining inspection type 0130.But i am not getting inspection lot for inhouse operation by maintaining inspection type 03 also.So Please tell me what setting i have to do to get inspection Lot for inhouse operations.
    Your Valuable solution is important for me...
    Regards,
    M.M.S

    Hi Mohammed,
    Check Inspection type maintained in Material master, it must be checked for "active". If it is active then system will create inspection lot as soon as you release your order.
    Regards,
    Shyamal

  • Automatic creation of inspection lot for Expired Batches

    Hi All,
    I am in one trouble and need some help in above scenario.
    I am able to create inspection lot for batches about to expire, but how to create inspection lots for batches which were already expired or which next inspection date already missed?
    Master data like '09' inspection type, inspection plan is already maintained.
    Second question, is QA07 also affect on special stocks like vendor stock or project stock etc?
    Immediate response will be appreciated.
    Thanks

    Hi
    To meet you above mentioned requirement you have to modify the program RQAAAS10 as per your logic both to create lot for Expired Material and to consider project stock or vendor stock as In standard SAP these stock are not considered.
    regards
    Manish

  • Inspection lot for external service

    Hi Gajesh/ Sujit/shyamal/ all
    we are planning to use service master for external vendor's service, i have couple of questions
    please share your experience, if anyone of you come across this kind of requirement
    1. is it possible to create an inspection lot for external service?
    2. we want to capture / validate the vendor's external service, weather it is accepted or not? sometime we need to enter quantitative value also
    3. is there any setting or config for assign /create inspection lot for service master?
    what I know is without material master we cannot create inspection lot but i don't know about service master.
    thanks
    Sami

    Gajesh,
    thanks for quick response.
    2 business req. are as follows
    1.  vendror is performing periodic service, MM side external service order (service contract/PO)created, bsaed on thatPO vendors performing service.
    service entry sheet they are capturing man hours and date of service.
    business wants quality of service to be captured in QM inspectiion lot.
    2. production order ---> routing -- operation ---> vendor & service PO number  assigned external work --> now inspetion lot will be created for that material/production order.
    how can we link service master, service entry sheet and inspection lot?
    how to map for this req.?
    again is't possible to create inspection lot for service master?(without material master)if your answer is yes, then where/how can we assign inspection type ? which inspection type?
    thanks
    Sami

  • Inspection lot for stock transfer

    Hello All,
    My requirement is that when i will do movement 301 from plant A to B then system should create inpsection lot. System should not create inspection lot instead of 301 mov type. If i assigned inpsection type 08 in material master it will create lot for each stock transfer posting. My requirement is that system should create lot for mov type 301 when i transfer from plat A to B.
    Also it should not create lot if I transfer stock from A plant to C.
    Please guide me on this issue.
    Regards,
    Mayura

    should create lot for mov type 301 when i transfer from plat A to B.
    Also it should not create lot if I transfer stock from A plant to C.
    Well If you do not maintain 08 inspection type in plant C for that material it will not create lot in plant C.whereas in plant B if you maintain it will create.
    Apart from this there is one more way
    Copy 301 in OMJJ say Z31. Now for this inactive QM in customization.Whenever you do 301 from A to B it will create lot.
    but when you do A to C with mvt type Z31 it will not create inspection lot.
    I hope this makes sense

  • MFPR - Processing Inspection Lots for Production versions issue

    Hello,
    User are not able to seeing line item to create inspection lot for a specific part number.
    I checked inspection set up in  material master, rate routing, and compared with similar part numbers.It all looks good to me.
    Any help would be greatly appreciated!!
    Regards,
    Owais

    In REM Inspection lot for Inprocess is generated for header material for which you actually define "production version".
    Line items can not be seen in MFPR.

  • Create inspection lot in sales return

    Hi Experts,
    When doing sales return (VA01) and return delivery order (VL01N), if I need to create inspection lot for QA guys, what is required to set?
    I have tried using SAP standard inspection type 06 or 10, no inspection lot is created.
    Please help!
    Regards,
    Daniel

    Hi
    Sales return inspection mainly deals with two scenarios: stock relevant and non stock relevant. 06 inspection origin/type is for non-stock relevant and the preferred one.
    The basic setting is already explained in previous post. Now few things to done are:
    1. Activate inspection type 06 for the materials
    2. Make sure tick box is not checked for movement type 651 in QCC0Q-inspection-Insp lot creation-insp for good movement--deactivate quality
    3. in Tcode VOV6, select schedule line category DN and check that movement type maintained in 651
    4. Check your inspection plan usage is correct as per your inspection type setup.
    Now your settings are completed for customer return inspection with 06 origin. Once any return delivery is done, a non-stock relevant lot will be created in SAP.

  • How to create inspection lot manually without using QA01 Transaction code?

    Hi,
    Please anybody give procedure for creating Inspection Lot Manually without using Transaction Code QA01

    Hello, Srinivas,
    If you want another T code only then you can try QA01A.
    or you can create a Physical Sample with QPR1 and then click on the button there to create inspection lot. To create inspection lot for that Physical sample (you will able to see that button only after releasing the sample) Or you can use QPR5.
    But let me know the reason why you want T code other than QA01.
    Regards,
    Shyamal

  • Creating inspection lot  in REM

    Hi
    In REM(Repetitive Manufactruing) Scenario: 
    Is their any possibility to create an inspection lot.
    1) At the first GR and no more at subsequent GR or;
      2) at each GR?
    Thanks in advance
    Saravana

    Hi kumar
    if you want to create inspection lot for REM then following are the settings
    1. inspection type 13 for inprocess check for repetative with task list selection
    2.  maintained inspection characteristics in rate routing for which you want to maintained inspection.like inspection point
    3. Inspection creation by tcode MFPR which creates inpsction lot for your production version. manually,
    Regards
    Pravin

  • Inspection lot for sale service order

    Dear all,
    Is it possible to create inspection lot for service order created in sale and distribution?
    I have a sale document type against which services are sold. I want when service order is created inspection lot trigger.
    Thanks to all.

    I believe the service order is simply a different type of maintenance order.  You should be able to create inspection lots for these in a similar fashion as used in maintenance orders.  I.e inspection types 14 are used.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/2d/352264448c11d189420000e829fbbd/frameset.htm
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/e9/92b917f6dc11d19296ab92e885eaaa/frameset.htm
    There are many places in the services help files that mention using inspection lots.  The two above are just a couple of them.
    FF

  • Creation of inspection lots for vendors

    Hello friends,
    How can we create inspection lots for all vendors at a time? I want to record results for my vendors(near about 2000 no.) by inspecting their raw matwrials in a lab.

    Hi Kiran,
    Why you are going for manual lot creation if the scenario is like above?
    1.     Assign inspection type 01 to material master
    2.     Prepare an inspection plan through QP01 with usage 5
    3.     Inspection lots will get generated with lot origin 01 whenever you do good receipt through
    migo with 101 movement type
    Conclusion: Inspection lots will get generated automatically whenever you do good receipt with vendor material combination.
    Best Regards,
    Anand Rao