Note 157009 - Construction Industry Scheme (CIS) UK

Does anyone have any idea when this note is due to be released by SAP?
I am conscious of the time frame left to deliver this change....
It has already been delayed by two weeks!!!!

Hi Barry
Even I need to impelement CIS note 1003730.(Our version is 4.7)
I am new to applying SAP notes.
Can you please guide me on basic questions like
1.As an FICO consultant what exactly my job in this?
As I see there are 7 attachments to this note and I can only open two files i.e CIS validations and Config steps.Other 5 files I beleive some coding part given in SAR format.
As a functional consultant I understand some part mentioned in config file ,beyond that I did not get much as more technical part is there in that.
2.Is it like I need to do any functional config steps and majority of the work handled by ABAP resource?
3.Please guide me basic steps how you have implemented if possible .
4.Whether it is working fine now for you?
It would be great if you could help me on this new note.
Thanks in advance.
Henfi

Similar Messages

  • Construction Industry Scheme (CIS)

    Construction Industry Scheme (CIS) was part of the Oracle Public Sector Financial module. According to Oracle this is now included as part of Oracle Financials v11i. Can anyone confirm that the CIS functionality is included in 11i? Has anyone been involved in implementing CIS functionality in 11i?
    Thanks

    CIS remains a part of OPSF and will be available with the launch of 11.5.2
    There has been talk of this being absorbed
    into the core product but as far as I am
    aware this is still only talk.
    The only part, so far, of OPSF which has
    gone core in release 11i is Gross Based VAT.

  • UK Construction Industry Scheme (CIS)

    Hi All,
    I have a question regarding the changes to the UK CIS scheme that became relevant in April 2007. I have been informed that the expiry date (Exempt To) for the CIS certificate is no longer relevant as all vendors must now be checked via HMRC.
    However the date appears to still be checked in our system in relation to making the correct CIS deductions, we are on R/3 release 4.7 SP 25.
    Does note 1003730 change the behaviour of the system to prevent checking of the exmept to date?
    Regards
    Chris

    Anyone any ideas?

  • CIS (Construction Industry Scheme) UK Legislation Change

    Hello All,
    Here in the UK the Government is making changes to the way CIS tax is dealt with from April 2007.  SAP advise that the code change promised in note 157009 is now due in January, which leaves very little time for testing and making any necessary changes to business processes.
    Has anybody else had any thoughts on how they will deal with the CIS legislation changes?
    Thanks,
    Paul.

    Any thoughts anyone?  The revised code is still not released.
    Thanks,
    Paul.

  • Material master codification & inventory mgmt- construction industry

    Hi,
    I am designing the process for a client in the construction industry. The implementation will include integration with PS module. The client is working on different projects and the materials requirement for each project differ from the other.
    Example:
    Though i may have pipe at a broad level, the requirement of pipes is based on the diameter of pipes and this would ideally form multiple material codes.
    I want to know, if any of you have come across such a scenario where creation of material master to the lowest level of specification will be very tedious. And also the same material specification may not be used in more than a project.
    But at the same time, the client wants to track his inventory based on the specifications of pump received and issued / consumed.
    thanks

    hi,
    would appreciate any help on this.
    thanks

  • Constructions Industry - Use of SO BOM

    Hi,
    We are using ECC 6 and my client is a constuction company.
    The company is using SAP material no - material type DIEN and this is entered during SO creation.
    We dont keep any inventory as the nature of the business is construction/service.
    For example - we have SO - Construction of 2Storey Building  - Material No = C2S
    There is a template that constitute the activity being done for C2S ( ie: Excavation, Pilling, BackPilling etc) which has its corresponding cost equivalent.
    The sum up cost of the activity is the SO price which include some mark up.
    At the moment, this activity is manually calculate and outside of SAP.
    My client now want to incorporate the template/activity with cost  to SAP - the intention is that- when a Sales Order coming in. The template will automatically captured for that  order with the corresponding price et..
    Not sure but it seems the concept is to activate the BOM.
    Pls consider me as totally newbie on BOM, i understand its concept but i dont know how it will be done through SAP setting..
    Appreciate if i got the right approach and value all the help of how to achieve it in SAP.
    Thanks in advance.
    She

    Hi She,
    The requirement detailed by you is a typical requirement, which most of the customer wants irrespective of industry. This requirement cannot be and should not be addressed in SAP logically. The reason being that the cost of procurement will vary. In the example of Construction industry, labour price will vary from place to place withing same city, other charges like electricity consumed will also differ based on service provider, if the site is not easily approachable by regular or large teucks / containers, the cost of transportation will vary, and so on.....  This is a part of wish list a client will always have, but it is important to draw a line, beyond which even a development should not be proposed. The value will as it be required to be entered manually on most occasion, as there will be no standard price of procument.
    Even if a thought is given for Development, the impact of development on the system, volume of added master data, time to be considered to trigger the event during transaction, feasiablity and system performance also require to be considered.
    Regards,
    Rajesh Banka

  • Weather Career Change is advisable from Non IT to SAP after 10 years of experience in Construction Industry

    Hi,
    I have 10 years of experience in construction industry.My area of expertise is in project management.I before 5 years I have a strong desire to work in IT industry. But not able to get a chance.But I need a career profile change to IT industry. So I choose to do SAp ps leaning *** certification from authorised training partner.  module.please suggest
    1. whether this is advisable.
    2. Whether I need to resign from my current job.
    3. What salary I can expect from SAP job profile, as my current salary is 7 to 8 lacs.
    4. Whether I will get a job immediately after certification.
    5. Howmuch SAP PS certification Job requirement in market.
    Please advise.
    Thanks,
    Priyadarshan

    Hi Sama,
    Kindly go through below link and  all you questions will be answered.
    Career Center
    Regards
    D.Singh

  • Error Message : Condition type is not maintained in the schema RM0002

    HI Gurus,
    I have created a new purchasing procedure as follows.
    ZVATV : <b>Condition Schema</b>
    VATV  : <b>Condition Type</b>
    VA : <b>Sch.Grp Vndr</b>
    When I create the Purchase order, the above mentioned schema, ZVATV is automatically determined.
    But when I create Contract, system throws an error message saying condition type VATV is not maintained in the schema RM0002.
    I am very new to SAP, Kindly explain in very detail about this error message and ways to get rid of it.
    If u have got any <b>very detailed material</b> about pricing kindly forward it to my mail id: [email protected]
    Thanks in advance.
    ~Gokul.

    Hi,
    The new condition type you are specifing is the gross price condition (PB00). for PB00 condition type a supplementary pricing procedure is assigned as RM0002. u may have copied the PB00 and changed it to VATV, but with out changing the RM0002. copy the RM0002 and in that also change the PB00 to VATV. after this go to VATV condition type control data (M/06) and assign the new supplementary pricing procedure instead of RM0002.
    The supplementary pricing procedure is required to have the condition types for which no access seqeunce is mentioned. All the condition types in main pricing procedure with out access sequence needs to be mentioned in supplementary pricing procedure.therefore all these condition types will have the same validity periods as PB00.
    Regards,
    Ramakrishna

  • Dependency is not configured in the schema resource Error (OSB)

    Hi all,
    I am using OSB(10gR3). I am using workshop IDE. I have copied few Xsds into a project. One schema which has an import throws an error
    "dependency is not configured in the schema resource Error .Possible reason one or more import/include not set correctly."
    Kindly help me in solving this error.
    I am new to OSB,kindly share any good online resources I would be of great help for me.

    "Edit References" button will appear on sbconsole. Upload it on sbconsole and you will be able to see the button.
    If you open the XSD in the workshop (in design view), under "Directives" you will be able to see the imports. Click on any of them and in the "properties" tab below you would be able to see "Schema Location" (in General tab of properties). Click on browse button and it will ask whether you want to download it from a HTTP URL or want to refer from a existing workbench projects.
    Regards,
    Anuj

  • "Source file does not conform to XML Schema!" error at Import Server

    Dear SDN,
    When I run Import Server the import job stopped with the error "Source file does not conform to XML Schema!" in Log file. I used MDM SP05 Patch01 and HF1.
    Both of 2 Import Server have same problems. Of course it works in Import Manager.
    What do I have to check?
    Regards,
    Eric

    Hi Eric
    Just confirm this...
    One needs to load XML schema file in MDM and can be done by specifying this file in Port .
    Refer this link.
    http://help.sap.com/saphelp_mdm550/helpdata/en/fa/69b20ae0ae4b158a3f6d025b3d3847/content.htm
    Just make sure that corresponding XSD file is specified in the port
    Regards

  • SAP best Practice for Construction industry in GCC countries

    Dear Pals
    Pleas let me now the link for the SAP Best Practice document for Construction industry in GCC countries.
    Thanks & regards
    Rajaram

    Hi,
    Try the link gien below:
    http://help.sap.com/bp_bl603/BL_AE/html/index.htm
    Regards,
    Amit

  • SAP Best Practices for Building construction industry

    Hi All:
    Is there any best practices available in the building/house construction industry? Can you please guide me through that?
    Thank you.
    Regards,
    - Rohan

    Yes they do
    Look here:
    http://www.simplysap.com/sap-news/sap-articles/sap-adds-60-offerings-family-of-sap-best-practices.htm
    http://www.sap.com/industries/eng_construct/index.epx
    http://download.sap.com/download.epd?context=D6B5CC86EFFB6EF10CE24BDC2B076371A3E006D336E32EFF63C3CD11CF5450FDA274E617019330E191ABE803C04F532DCFB4A0F8A50E3F32

  • Why not we lock these schemas instead of change the password

    The documentation mentioned that the following schemas belong to individual APPS base products. By default the password is the same as the SCHEMA name. Changing the password for these schemas does not affect any configuration files.
    ABM AHL AHM AK ALR AMF AMS AMV AMW
    AP AR ASF ASG ASL ASN ASO ASP AST AX AZ
    BEN BIC BIL BIM BIS BIV BIX BNE BOM BSC
    CCT CE CLN CN CRP CS CSC CSD CSE CSF CSI
    CSL CSM CSP CSR CSS CUA CUE CUF CUG CUI
    CUN CUP CUS CZ DDD DOM EAA EAM EC ECX
    EDR EGO ENG ENI EVM FA FEM FII FLM FPA
    FPT FRM FTE FUN FV GCS GL GMA GMD GME
    GMF GMI GML GMP GMS GR HR HRI HXC HXT
    IA IBA IBC IBE IBP IBU IBY ICX IEB IEC IEM IEO
    IES IEU IEX IGC IGF IGI IGS IGW IMC IMT INV
    IPA IPD ISC ITG IZU JA JE JG JL JTF JTM JTS LNS
    ME MFG MRP MSC MSD MSO MSR MST MWA
    OE OKB OKC OKE OKI OKL OKO OKR OKS OKX
    ONT OPI OSM OTA OZF OZP OZS PA PJI PJM PMI
    PN PO POA POM PON POS PRP PSA PSB PSP PV
    QA QOT QP QRM RG RHX RLA RLM SSP VEA
    VEH WIP WMS WPS WSH WSM XDO XDP XLA
    XLE XNB XNC XNI XNMXNP XNS XTR ZFA ZPB
    ZSA ZX
    If not affect any configuration files, why not we lock these schemas instead of change the password.

    These are the Schemas Shipped with E-Business Suite.
    In oracle EBS there is lot of inter dependency present between all schemas. For dependency pls check following link;
    http://etrm.oracle.com/pls/et1211d9/etrm_search.search
    Also go through below note id
    Best Practices for Securing the E-Business Suite [ID 189367.1]
    Regards,
    Nitin J.

  • Can not validate XML against schema

    Hi all,
    I'm new to XML validation. I have this sample from net.
    this is the schema definition:
    <xs:schema targetNamespace="http://www.w3schools.com" elementFormDefault="qualified">
    <xs:element name="note" type="xs:string"/>
    </xs:schema>
    and this is the xml file:
    <?xml version="1.0"?>
    <note xmlns="http://www.w3schools.com" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.w3schools.com note.xsd">
    <to>Tove</to>
    <from>Jani</from>
    <heading>Reminder</heading>
    <body>Don't forget me this weekend!</body>
    </note>
    when i try to validate at http://schneegans.de/sv/, this is a validator i found searching
    it gives error
    The root element does not comply with the schema. (2:2)
    any ideas?
    i have created my own xml and schema.I registered the xsd on oracle 10g but i get the same error :(
    where can i validate my xml against a schema?
    thanx a lot

    Validating XML Documents Against XML Schema
    http://www.oracle.com/technology/pub/articles/vohra_xmlschema.html

  • Travel Expense: Error: Travel Exp already exist not possible to switch schema

    Dear Team,
    I am supporting Travel Management in one reputed company.
    User facing one issue where TRF raised by copying one old TRF, during that time Travel expense report also getting copied. It is not giving any error while raising TRF in this process, but when the user trying to raise TER for the same he is geeing error: 'Travel Expenses already exist not possible to switch schema' Kindly suggest how can I stop this. Attached is the ESS Screen.
    Regards,
    Adi.

    Hi Adi,
    no. Leave that as it is. I wasn't entirely sure whether the field's value influences the TER in any way. But since it is = 1 and your TER schema collides, this is completely irrelevant. Still good to have this ruled out.
    Have you checked what I wrote concerning FITVFELD_WEB? There's a checkbox in the schema "Overlapping Trips allowed" (loosely translated from German, might not be verbatim). If it's not checked, check it and retry.
    Again though: 4 years ago, as I already stated in my earlier posts, these settings had no impact on the collision of Travel Expense Claims and coexisting TERs in the same time were not possible. I assume it is still not possible, so we're clutching at straws here.
    However. If I understood your business needs correctly, you actually do not want the expense report data/indicators to be taken into account, because you just need the copy for the Travel Request, right? There might be chances for implicit enhancements and "killing" that bit information from the copied TE-Cluster entry so it doesn't stray into the copy of the Travel Request Copy anymore.
    Cheers, Lukas

Maybe you are looking for