Note 403102 - Offset takes non-working time of resource into account

Hello Friends,
I have implemented the OSS notes 403102 for considering the offset value without considerding the non working time of the resource in APO system.
but as i have implemented the sample code given there(copy & Paste) the functionality seems to be not working.
the productive hours maintained in the transaction /SAPAPO/RES01 is 8.5 hrs.
previously the system was considering the productive hours as 24 and was calculating.
after implementation of the notes if I specify a 4 days offset iam getting 3.5 days offset .  for 6 days its 5 days offset.
does anyone faced this issue.
Any help will be highly appreciated.
if u any code modification u can mail to me at [email protected]
Thanx & Regards,
Mahadev Shetty.

Hi Rob,
The msg was provided by SAP, but i am unable to correlate the exact code that i have to write.
any ways thanx for the reply
Mahadev.

Similar Messages

  • 403102 - Offset takes non-working time of resource into account (OSS notes)

    Hello Friends,
    I have implemented the OSS notes 403102 for considering the offset value without considerding the non working time of the resource.
    but as i have implemented the sample code given there(copy & Paste) the functionality seems to be not working.
    the productive hours maintained in the transaction /SAPAPO/RES01 is 8.5 hrs.
    previously the system was considering the productive hours as 24 and was calculating.
    after implementation of the notes if I specify a 4 days offset iam getting 3.5 days offset .  for 6 days its 5 days offset.
    does anyone faced this issue.
    Any help will be highly appreciated.
    if u any code modification u can mail to me at [email protected]
    Thanx & Regards,
    Mahadev Shetty.

    thanx got the solution thru config change

  • Non working times report in pwa 2010

    how can I report out non working time for resources?

    See this similar
    post for a code oriented solution for resources.
    This
    post gives a similar code for project exceptions.
    Otherwise, select Reports | Assignment | Who Does What, edit the Report, and then within the Details Tab, select Calendar under the resource column.  It will list each resource's calendar and non working time. See reference
    here.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • Adobe PDF won't print non-working time colour in MS Project

    Adobe PDF won't print the colour chosen for non-working times in MS Project.  I have tried changing the colour, changing the style, moving non-working time in front of tasks and have fiddled with the printer properties, all to no avail.  It ignores whatever style I have for non-working time and makes a blank space, although it will take gridline changes . . . . please help!
    Shevaun

    Thank you for providing the suggestion and the Cleanup tools, however they did not help.
    I ran each version of the cleanup tool, and for each I had it clean up Reader and Acrobat (i.e. 4 separate cleanup operations).  I then rebooted the machine, and installed Reader 11.0.3.
    Still had the same behavior:  Reader will not print.  I tried printing to a second printer (that is attached via USB)...and it did not work either.  I also tried printing to a Cute PDF Writer print driver...and that did not work either.  In each case, no print data made it to the Windows print queue (as demonstrated by watching the queue while printing.)  No error was raised, but no print data was transmitted.
    I then uninstalled Reader 11.0.3, rebooted, and re-installed Reader 9:  printing works fine now.
    There is definitely something in Reader 10 and Reader 11 that breaks printing in some environments.    (As you alluded to...I have seen a number of postings online about printing problems in Reader.)
    More details about my environment:
    Windows 7 Professional N (Version 6.1, Build 7601: Service Pack 1)
    VMWare virtual machine
    Two virtual CPUs (each: Intel Core i7 920 @ 2.67 GHz, 2673 Mhz, 1 core, 1 Logicial Processor)
    Hardware Abstraction Layer:  6.1.7601.17514
    RAM:  3096 (allocated to virtual machine)
    Bridged networking
    VMware host:
    Windows 7 Ultimate, 64-bit 6.1.7601, Service Pack 1
    18 Gig RAM
    Intel Core i7 CPU 920 @2.67 GHz
    VMWare Workstation 9.0.2 build-1031769
    (but problem existed on older version of VMWare Workstation 7.x as well)

  • Hiding non-working time in Team Planner View

    Hello there.  The tasks in my project are typically between 2-5 hours over a week period.  In Team Planner View, I'm hoping to provide a better representation of free time between tasks by making my bottom tier hours in a 4 hour count.  However,
    decreasing the scale forces the Task names become cut off when the event itself shrinks.
    I was hoping to remove the non-working time (i.e., nights and weekends) from the Team Planner view to enable a better view.  I'm aware that the capabilities of Team Planner View seem to be limited, but is this type of formatting at all possible?
    Thanks for the help,
    Joe

    Joe --
    After I created my response and posted it, I wondered whether you wanted to completely remove the nonworking time periods.  This is not possible.  The best you can do is to remove the shading for nonworking time periods, but you cannot remove them
    entirely in any view.  Hope this helps.
    Dale A. Howard [MVP]

  • How to forward support messages to SAP in non-working time automatically?

    Hi colleagues and Happy New Year!
    I have a question: how to forward support messages to SAP at non-working time automatically?
    Details:
    when a support message is created at working time it shouldn't leave my system, but when
    a support message is created at non working time, for example, on saturday night it should be sent to SAP automatically. Where in the system I can find the options to customize it to provide these requirements?
    Edited by: Helen Rudnikovskaja on Jan 3, 2009 12:36 PM

    Hi These 2 notes wil solve your problem,
    Note 1084744 - Problems with the automatic function "Send to SAP"
    Note 1225682
    Pls assign pts.

  • Non- Working Time

    In sap when i am trying to create a/p invoice based on a grpo and the posting date and due date is 06/01/08 (which is sunday) the system throws following prompt" 06/01/08 is defined as non- working time? continue. yes,no.". The calender defined for the company in the system is of yr 2006 and weekend as saturday to sunday.
    -"Valid for one yr only" box is selected
    -"Ignore weekends for payments" is NOT selected
    Also system never threw this msg when i created a po and grpo.
    please let me know why the system has thrown this prompt.

    Hi Kapil,
    The solution to this problem lies in the fact that you must have mentioned the Payment Date in the BP master data for the vendor......this window is appearing in the Payment Terms Tab in the BP master Data below Holidays.
    Use the window to define the days each month in which your customer usually pays the open invoices, or the days each month that your company pays its vendors.
    Example
    When 10 and 20 are defined in the Payment Dates window for a certain customer, the invoice due dates are calculated as follows:
    ·        If the posting date is between the 1st and the 10th of a certain month the due date of the invoice is the 10th of that same month.
    ·        If the posting date is between the 10th and the 20th of a certain month the due date of the invoice is the 20th of that same month.
    ·        If the posting date is after the 21st of a certain month the due date of the invoice will be the 10th of the next month
    Hope this helps.....reward points if helpful
    Nagesh

  • Scheduling changeover times in non working times

    PP/DS heuristics and or the PP/DS optimiser will not automatically place changeover times in non working times, however other smaller APS systems have such functionality. Has anyone come across this or have a method to use to get APO to do this? May be it should be a new development?

    Hi Thomas,
    Thanks for your reply. Yes i am aware of this setting - this is the standard approach, however do you know of a way automatically (heuristic or optimiser) schedule the set up segment of an order into non working times whilst keeping the produce section in productive time? I know you can amend the strategy and use that in the heuristic but it will schedule all parts of the order in the non working time if it can.
    Thanks
    Fred

  • Displaying Non-Work time for all resources via a Calendar?

    I am looking for a way to display a calendar or a view of all resources that will show the planned vacation time for each resource based on the "non-work time" set in each resource calendar.

    Hi,
    As workaround solution, through P6 professional you can create a report with choosing
    "Resources" as subject Area and selecting "Time Distributed Data" option and,
    At "Time Intervals Field" you can select "Limit" to be distributed.
    This will give you a tabular report showing resource limit over selected period with selected intervals.
    Regards,
    Marcos

  • System Message "Define as non Working time"

    This System Message will Poup before Each A/P invoice,when i going to post it
    "23/05/09 is defined as non-working time. Continue?"

    Please check this thread:
    Non- Working Time
    Thanks,
    Gordon

  • Does the EBCC takes the timestamp of the files into account when the synchronisation occurs?

    We are running WL Portal 7.0 sp2.
    I had to re-deploy an older version of our portal application.
    I put back the old portal webapp and ran the EBCC to synchronize the approprate
    portalApp-project.
    In the EBCC I specified "Update all the files in the project." but after the deployment
    I received several stacktraces concerning webflows that couldn't be found.
    Does the EBCC takes the timestamp of the files into account when the synchronisation
    occurs?

    tomk wrote:
    The PKGBUILD has a depends array and a makedepends array. Anything that's required at runtime goes in the depends array, and must be installed for the application to run successfully. Anything that's only required at buildtime foes in the makedepends array, and can be removed from the system after the application has been built.
    man PKGBUILD and various wiki pages for more details.
    Anything that's only required at buildtime foes in the makedepends array, and can be removed from the system after the application has been built.
    ==================
    Who remove them ? user or the abs ??
    I think the best method is file dependence , not package dependence.....
    Software is arranged by package. but its dependence is file. When Install a package, pacman check its file dependence, and install the packages which include those files....
    If a  not explicit installed package 's file does not required by any other packages , it can be removed automatically !
    In this situation ,pacman can find packages that not needed after compilation, and remove them.
    Last edited by iamybj (2010-03-22 03:15:06)

  • Non-working time for particular resources

    I have reviewed the suggested answers and they don't seem to fit my case.   Project 2013 Pro.
    I have a particular resource who takes three days off. These days occur in the middle of an 8 day task, fixed duration, on which he is only working 20%. He has his own calendar to deliver this information and I have checked that the days off display in Resource
    Sheet/Resource Information  for that person.  The fact that he takes off three days is not shown by the bar in Gantt view. (standard time off is set to 'behind task bars'). 
    If I temporarily change his commitment to 100%, the calculated hours in the task form are 40, showing that the software is recognising his time off, since otherwise it would be 8x8=64. The gap in his work time still doesn't show.  
    Is there a way to show the gap so that I know (well, remember) he is not around for those three days?
    Cheers
    Alan 

    TeamPlanner view shows the resource's nonworking time as it is seen below: 

  • HT2534 it does not give me the "none" option to create a free account

    I dont get the 'none' option to create a free account..please help

    Did you follow the instructions on that page exactly when creating the account (the instructions won't work with existing accounts) ?
    e.g. if doing it on your computer's iTunes and yo are currently logged into an account then log out of it. Then find a free app app in the store and click on its free 'price' :
    And on the popup that you get click on 'create Apple id' :
    A few days ago I tried that process in response to another thread and I got the 'none' option on the payment details screen.

  • When i take a picture with my samsung galaxy note edge it takes a long time to focus, like 30 sec to 1 min. Is this normal or is there a problem with my phone?  It gets frustrating when trying to take a pic quickly.

    any info would be appreciated, i have tried different things to see if it is a setting that i don't have right, but i just cant get the camera to focus when i want to take a pic. it takes is a long time to focus and it is very frustrating. Babies don't wait for your camera to focus...................lolol.  

    It definitely shouldn't be that slow, are you using the stock camera?  what mode are you using it in?  what other settings do you have setup? try downloading another camera like "a better camera" or any other free one and see if it behaves the same.  If it does that tells me that either the lens is really dirty or the hardware may have an issue.  Make sure the lens is clean then try either a restart or power down and battery pull and see if that solves anything.

  • Quota overview is not being displayed in ESS Working Time

    Hi All,
        Please provide a solution for this below mentioned query.
    Quota overview(Absence Entitlements) can be seen in the R/3 for an employee but same(Quota Overview), list of all the leave entitlements cannot be seen in the ESS. There is a message being displayed "There are no customizing settings for ongoing requests for employee No:****". What customizing settings is he talking about?
    Anticipating a solution for this. Thank you.

    Hi.
    R u sure the Absence that is available in infotype 2006 is valid.Do try to create a fresh quota if you have changed the grouping in between,.
    Regards,
    Nachy

Maybe you are looking for

  • How to send a csv file by email in SSIS

    Hi, I need to create a SSIS package which creates a csv from sql table and send the same file by email. I have created the package but it thorws error saying the file does not exist in the send email task. For the first time the file will not be pres

  • Problem in Smartform convert to PDF with special character

    Hi ABAP Guru, While convert smartforms to pdf.Some special character like ( - ) convert to ( # ).In development server there is no problem but the problem arise in quality.Please help

  • MM:Release Strategy for Release Order again Approved Contract

    Hi, Release strategy for Release Order is required or not against approved contrat?? As fas as I know once the contract is approved, release order is not required to approve again. This is the standard setting from SAP or We need to do some setting f

  • Can you lock "continued on page x" so it won't flow with text?

    I have my text boxes linked and as I revise text everything moves. Is there a way to lock (continued of page X) from flowing with the text and stay in the appropriate text box? Thanks. I know I could use a separate text box but in this case, I haen't

  • Cffunction returns space

    Hi, I am using coldfusionmx6 and created function.while it calling in xml it giving space.How to delete space? <cffunction name="datereplaceformat" returntype="string">   <cfargument default="" name="datechange" required="No">    <cfargument default=