Object RESB within Critical Area - creating Maintenance Order

Hi All,
We are getting warning message while creating Maintenance Order. It says " Object RESB within Critical Area". After checking we found that 90% of the number range for reservation documents have been consumed and it is maintained in settings that the warning will come up when number range enters last 10%.
we have changed this setting to 5% but still the issue is not resolved. We are still facing the same warning message.
Kindly guide.
Regards
DM

DM,
  This maybe due to the buffering of the number range numbers on the application servers.once these numbers are exhausted and new  block of numbers are picked up  from the database server this should go off.  Ideally you may want to adjust to a new  number range so that this warning message doesn't irritate the end users.
Regards
Narasimhan

Similar Messages

  • Error while creating Maintenance order

    Hi,
    While creating Maintenance order with any order type (PM01,PM02 & PM03) & entering material in component Tab, the system is giving this Error 'Entry does not exist,check your entry'
    The used material is already maintained in the Material Master with all necessary information.
    Kindly suggest the best possible solution for this problem.
    Thanks in advance 
    Rohit8384

    Hi,
    The following error is coming while order processing.
    Entry    does not exist - check your entry
        Message no. 00 058
    Diagnosis
        Input values must be defined in Table MARA. The value or values '  ' are
        not specified in this table.
    Procedure
        Check whether the input is correct and correct if necessary.
    Procedure for System Administration
        If this is not an incorrect entry, check the system settings and change
        them if necessary.
        If there is a connection to the Customizing system, you can maintain the
        system settings by choosing Maintain entries (F5)
    Thanks in Advance.
    Rohit

  • Problem in creating Maintenance Order with multiple operations

    Hello all,
    I am facing problem while creating Maintenance Order with multiple operations and sub-operations. I am using BAPI : BAPI_ALM_ORDER_MAINTAIN.
    For single operation it is working fine,but i am unable to create MO with multiple operations and sub-operations.
    Please, provide me the inputs required,
    I have used methods :
    ORDER        CREATE,
    OPERATION CREATE
    and SAVE.
    Regards,
    Siddhartha

    Hi,
    The FM you are using is a perfect one. This FM is bit tricky to use. You need to perfectly pass the Reference number field. which links various input table parameters of this FM.
    Thanks & Regards,
    Navneeth K.

  • Error in commitment check when creating maintenance orders

    I'm getting an error " Error in commitment check" when creating the maintenance order for procuring the spare parts which is an non-stock item. I checked the cost for the particular Cost center/GL there is no money in that, so thatu2019s the reason for getting the error, so when we did testing in DEVL and QA, we put money into the cost center/fund/functional area and the issue has been resolved.
    Now my client said they donu2019t want that control and they want to remove the commitment check so that you can create maintenance order even though you donu2019t have money on particular cost element.
    FICO person told that there is no AVC check in place, also there is no budgeting control implemented, she also told that when they create Purch requisition directly they are not getting the error even though cost is not in that particular cost element but she wonder why it is giving error when we create the purchase requisition thru Maintenance order.
    I have referred the experts forum to figure out this issue, but everywhere they mentioned this is due to budgeting or funds management issue and ask me to contact FICO person to remove the control, but there is no such person as current FICO person is an end user trained in SAP.
    Your help is appreciated

    Hi,
    We got same error , while procuring through PM order , Please help us , what settings required .., Our version is 4.7EE .
    The note mentioned up to level of 4.6 ,
    Regards,
    Sujana

  • While creating Maintenance order using t-code iw31 mainwork center not pick

    Hi,
    while creating Maintenance order using t-code iw31 Maintenance work center not picking from drop down (already have in drop down)but giving manually accepting.
    --Ganesh

    Hi,
    My understanding is that the selected work center is not copied into the input field. This can be corrected with note [1451299|https://service.sap.com/sap/support/notes/1451299]. Check if the note is relevant for your system.
    -Paul

  • Bapi's for creating Maintenance order in IW31 with notification

    Hi All,
       Is there any bapi's for creating Maintenance order with Notification number in the transaction iw31.
      Also is there any bapi's for creating measurement document.
    Points will be awarded.
    Regards,
    vinoth

    RFC MeasDocument: Individual Processing, Create
    MEASUREM_DOCUM_RFC_SINGLE_001
    RFC MeasDocument: Individual Processing, Change/Display or Read
    MEASUREM_DOCUM_RFC_SINGLE_002

  • Need Bapi to create maintenance order

    Hi All,
    I need a BAPI to create maintenance order in PM module.
    i checked before posting the i did not get suitable BAPI .
    please help...
    Thanks,
    Santhosh

    BAPI_ALM_ORDER_MAINTAIN

  • Settlement Parameter change while creating maintenance order

    HI ,
    I am creating maintenance order PM  through transaction IW21 while saving the order based on revison the settlement profile has to change . i am using userexit IWO10009.
    Please send the replay.
    Thanks in Advance.
    Thanks
    satya

    Hi,
    Use this exit for settlement rules. IWO10027 :  User exit: Generate user-defined settlement rule
    Regards
    Ahsan

  • Create Maintenance Order for the Sub assembly and the top assembly together

    Hi
    We create repair order for an equipment when it comes for maintenance.
    We want to create repair/maintenance order for all the sub assemblies for the equipment along with the order for the top assembly at the same time.
    Appreciate your guidance.

    Dear Srini K
    Please create the order for the main equipment & create suborders for the sub assembly is one way to do it. so that main order & other orders may have link to each other.
    Another way if you want to store history that which are the assemblies are affected or you have worked on it you can enter these in all assemblies in object parts tab of the orders.
    Also you can create the notification & maintain the object parts code, Damage code & cause code for each assembly & sub assembly sothat you can keep history.
    But if you can tell me the business requiremennt it detailed i can guide you ini correct direction.
    I hope this will satify your requirement.
    Regards

  • Costing error while creating maintenance order

    Hi,
    while creating a maintenance order,when i go for precosting ,the following error is coming,please help to resolve this problem
        " No prices could be determined for object Activity type "

    Hi,
      In my activity master data I have maintained as in planning. Kindly tell me how to check whether the cost sheet is maintained as integrated planning for this year. i have check in my customised setting from the following menu path controlling -> General Controlling ->Maintain version->Maintain setting for each fiscal year (version maintained is plan/actual version). Here i have maintained integrated planning for the year.

  • Create maintenance order based upon notification in NWBC / Portal

    Dear experts,
    How to create a maintenance order based upon a notification, using the POWL for notifications ?
    I am using NWBC and would like to create a maintenance order, based upon a notification put in process.
    In R/3, this works fine using transaction IW22 / IW28 and all info from the noticiation is copied in the new order.
    How can I get the same functionality using  the role SAP_BPR_MAINTENANCE_TECH_12 ?
    Kind regards,
    Dirk

    Dirk,
       You should be able to select the Notification number from the POWL overview list and choose the "Create Order" push button on the Tollbar (along with display notification, change notification etc).
      What i have noticed is that once you are inside the notification from the Portal application, the create Order push button or functionality doesn't seem to exists. This is probably incomplete functionality taking into consideration the standard IW22 transaction /Or a  Bug  and maybe you could raise a OSS Note for the same.
    Regards
    Narasimhan

  • Plant Maintenance Schedule Calls not creating Maintenance Order

    Hi,
    I have created a maintenance plan that is schduled on a weekly basis. This worked fine initially but now calls are not being generated and therefore no orders are also being generated. The process I used is:
    1. Create Equipment
    2. Create Task List
    3. Create Maintenance Item
    4. Create Maintenance Plan
    5. Schedule Maintenance Plan
    Can you help?
    Also can you tell me which program you use to create orders for an entire maintenance planning plant, I know IP10 can be used for maintenance plans? For example you schedule your maintenance plans but I assume a periodic job must run to actually create the orders

    Hi Gary,
    I had an issue with calls not being generated and was browsing similar issues when I came across yours. I note that you also asked how you could create orders for a whole maintenance planning plant.
    This can be done by using the sort field on a maintenance plan. You need to define sort fields (config) for the maintenance plans for each of the plants required and then insert them on each plan. You can then use the sort field as a selection when scheduling.
    Hope this helps.
    John

  • Creating maintenance order from enhancement IMRC001

    Hi
    I am trying to create a maintenance order from the customer exit EXIT_SAPLIMR0_001 inside enhancement IMRC001. For order creation i have invoked the BAPIs  BAPI_ALM_ORDER_MAINTAIN and bapi_transaction_commit subsequently to write changes to the database. But once the control returns from main program I receive an express message which states
    Update was terminated
    System ID....   ECD
    Client.......   400
    User.....   SSEN
    Transaction..   CO11N
    Update key...   48DCDEE6DD6E01AFE1008000093362E1
    Generated....   15.10.2008, 09:11:42
    Completed....   15.10.2008, 09:11:43
    Error Info...   00 671: ABAP/4 processor: SAPSQL_ARRAY_INSERT_DUPREC
    Can any of you help me on this. I am doubtful on commiting from a include; but in the doc for this enhancement it is mentioned that we can create order from it. Is there any other way to do this?
    Thanks in advance
    Sudip

    udip,
    I think there's some sample code with this user-exit..
    Have a look at that, it may give some pointers...
    Also try without the BAPI_TRANSACTION_COMMIT.
    PeteA

  • Warranty Popup not coming while creating maintenance order

    Dear Experts,
                 I have created master warranty for distance covered having unit Mile.
    Created counter with same charateristic and unit (ie mile). In the equipment master data entered the master warranty no and start date.
                  Now when i am creating the maintenance order , it is not giving me any pop up. i have done necessary customising for dialog box while creating order and notification, but still the dialog box not coming.
                 If i am not using any master warranty and giving start and end date of master warranty then it is giving me the dialog box.
    Can you please see what is the problem
    Regards
    Amar

    hi
    check whether you have defined the counter in the warranty ,and cross check with measuring point for that equipment ,is the same characteristic used.
    also in the equipment warranty tab whether Green coloured check is appearing and the details
    regards
    thyagarajan

  • Error while creating maintenance order - Budget almost exhausted.

    Hi Experts,
    We have maintained budget on WBS element. As per WBS report S_ALR_87013558 still Rs. 438000 available.
    Now when we were trying to make a maintenance order with assignment of same WBS element system is showing error
    "Budget almost exhausted" Message no: BP611. Actually the order cost is only Rs 18000.
    Could anyone help me to find the root cause of this problem?
    Please do the needful.
    Best Regards,
    Praveen
    Edited by: Praveen kumar on Aug 26, 2009 1:19 PM

    Hi,
    No, here we dont have PS team. Even I am also new to PS.
    Best regards,
    Praveen.

Maybe you are looking for

  • Adding new text style

    I have a style that shows in Photoshop, but not Premiere Pro. Babylonian5 Hollow.  How do I use it in the latter?

  • Could someone help me with sql tags?

    Good morning here in Brazil, rsrs!! Well, I can�t see why it is giving me this exception, the codes are below could you give me some explanation? Thanks! my conection class and getDetalhes method: package teste; import java.sql.Connection; import jav

  • Movies for I-Pod

    Where are the best sites for downloading movies to my I-Pod? Gateway   Windows XP  

  • Data Guard Switch Over & Failure

    Dear All(s) I have configured, physical standby database for productional database. standby logs successfully shiping on standby databse. How i can check database gata guard against failure and how switch over will done. Thanks in advance.

  • TS2755 I can't sigin in iMessage with my app id

    Since i got the iPad 2 I'm using my apple id very well with app store and i tunes .. But imessage refuse to log me in I tried alot to login from settings> iMassege and I checked my password alot Even some of my friends  tried to login with there app