ODI:How to import a version of a project into another project

Hi Everyone,
I have exported an XMl file(exported version file) of a odi scenario.how can i use this file in another project?
I have to import this version in my new project.
Thanks,
Jayant

But is there a way to import the complete list of numbers, so the pictures are listed at once ?
Or is there a script that enables bridge to read the list of numbers.
To my knowledge there is no way to add this file in one time to the find command and I have very less knowledge about scripting. If you know how to use and create theme your goal could be to create one your own but the time and effort is far more then just rate or label the wanted files.
For example, You can have bridge pointed to the folder with all the files, if you have nested subfolder select the main folder and choose select items from subfolders in the view menu, this shows you all the files of the main folder in the content panel.
Select a sort order that corresponds with your list.
Scroll through the files and the ones you need you can either add one star or a label to it. When done select one star or the chosen label and you will only see the files you need.
really a piece of cake and take you no more then 5 minutes... :-0
I´ve seen that bridge comes with a colaborationtool but i didn´t realize this before and now
i looking for a workaround or workflow to keep things easy.
Not sure what you mean with collaboration tool but think you mean the option to reach PS functions via the Tools menu and select batch or photomerge?
This has bin there from the first edition as I try to recall and is very, very useful as there are many other tools in Bridge that will provide you a fast workflow.
I would advice you to buy (and read) the book Real World Camera Raw by Jeff Schewe and Bruce Fraser. There are editions for CS2, CS3, CS4 and CS5. It is written in very understandable language and you will find almost everything there is to know about ACR and Bridge and how to create perfectly and fast workflows

Similar Messages

  • How to copy part/all of a project into another project in PE4?

    Is there a way to copy some or all of the workof one projedt ( clips, transitions and effects) into another project.  I would especially like to use the same rolling credits in all my video's.  I've tried copy/paste and Get Media from a file but I get  "file format not supported" when I try to import a .prel (project)

    There is a also a Clipboard "extender," ClipMate, that will allow one to Copy/Paste from one Project to another. I have not used it, but many have and few have any issues.
    The Export to DV-AVI method is the main one. The only thing to think about is that you will want either a perfectly tight edit, before the Export, or a very loose edit (I'd go so far as to add 02 sec. of Black Video between un-Trimmed Clips), as you will not want to, say replace a Transition, as you would have to Trim even more of your Clips to create the necessary Handles.
    Good luck,
    Hunt

  • Import whole completed projects into another project-make it 1

    Hi,
    I have a problem. I finished my I movie project recently, but because I worked on it as several ones, which I wanted to put together in the end, I don't know now, how to make them one! So it's not just single clips I want to import, but whole projects. I'm using iMovie 4 on a iBook G4 with Panther (10.3.9.).
    So if anyone knows how to sort that out, I'm happy about any good advide!
    Cheers.
    Nelson

    At first it was a larger project with about 30 Clips in .mov and .avi, a few JPG'and one audio Track. But then I created a simple project with only two .mov clips and nothing else for testing and the problem remained the same.

  • Importing a project into another project?

    Can I open an existing project and import another saved project?
    Or is there a way to merge two project together?

    Not in PrE. PrPro can do this. The closest that one can come with PrE is to Export/Share from Project 1, as a DV-AVI (for SD material), and then Import that into the other Project. If you do this, I would either edit quite loosely, so you have Handles on the Clips, when Exported, or edit very tightly, and be sure that you do NOT need to do more, as any Handles will be included in Transitions, etc.
    Good luck, and sorry for the bad news,
    Hunt
    PS - maybe by PsE 9?

  • How to import updated version of APEX app without losing saved IR's?

    Oracle XE 11.2
    Apex 4.1
    Linux Red Hat 5.4
    ============
    Does anyone have suggestions on how to import updated version of APEX app without losing saved IR's?
    Also, I want to maintain app id from update to update (from revision to revision). In fact, I think that that is required in order to keep the saved IR's.
    The only process I have found that seems to "work" (i.e. loads new revision of app over old revision of app) is the following (via SQL*Plus):
    declare
    l_workspace_id number;
    begin
    select workspace_id into l_workspace_id
    from apex_workspaces
    where workspace = 'MYWORKSPACE';
    apex_application_install.set_application_id(400);
    apex_application_install.set_workspace_id(l_workspace_id);
    apex_application_install.generate_offset;
    apex_application_install.set_schema('MYSCHEMA' );
    apex_application_install.set_application_alias( 'MYSCHEMA_ALIAS' );
    end;
    @new_version_of_app.sql;
    but I do not have any saved reports in this app. Will this process keep the saved IR's from the previous version of the app 'intact'?
    Thanks.
    Edited by: user601798 on Oct 11, 2012 7:02 AM

    Hi,
    I cope with the same issue.
    But I've several prod instances and many applications on each of these... and SIR saved by many users.
    Of course each prod application have its own ID, distinct from the dev application ID.
    Is there really not any kind of solution in my case (apart from release the dev app on the dev workspace ; export 50 apps from it and import those 50 times, maybe more in the futur) ?
    I'd be a pity if not, I think there must be a lot of us working in that configuration.
    Thanks !
    Fanny

  • How can I move an original Version from one Project to another Project?

    How can I move an original Version from one Project to another Project?

    From the Aperture User Manual:
    To move an image into a different project
    Drag the image [from the Browser] into another project in the Library inspector.

  • How to import pictures from an external memory into Iphoto?

    How to import pictures from an external memory into Iphoto. Is there a way to open all the pictures in my computer in the Iphoto?

    to import photos either use the iPhoto file menu ==> import command or drag the photos to the iPhoto icon in the dock
    LN

  • How to import photo from album in Iphone into computer?

    How to import photo from album in Iphone into computer?

    You can't. You can import from the Camera Roll only.
    Photos transferred from your computer to your iPhone via the iTunes sync/transfer process should remain on your computer. Photos transferred from your computer are optimized for viewing on your iPhone via the iTunes sync/transfer process - the original resolution of these photos is reduced, which is why transferring these photos in the opposite direction is not supported. These photos should remain on your computer and be included with your computer's backup.
    There are some 3rd party paid utilities that provide for transferring these photos in the opposite direction but such utilities are not supported by Apple and the original resolution of these photos will be lost.
    Here is one such utility.
    http://www.ecamm.com/mac/phoneview/

  • Is it possible to import slides from one Keynote presentation into another. If so how do I do it on iPad 2?

    Is it possible to import slides from one Keynote presentation into another. If so how do I do it on iPad 2?

    You do it sort of like the way you arrange your apps on the iPad and how you drag apps into groups. You do the same technic with your Keynote slides.
    Look here......http://support.apple.com/kb/PH1360

  • HT4007 I have multiple libraries. I would like to import one project into another library. How?

    I have multiple libraries. I would like to import one project into another library. How?

    Select the project in the Library Inspector and export the project as library. Then import this library into your other Aperture library.
    File > Export > Project as New Library
    File > Import > Library
    Regards
    Léonie

  • How to import one project file into another project file

    In previous versions I could take an 8 track project file and drag it into another project.  This doesn't work in version 10.  I am playing multi track stems for worship.  I create each song as it's own file then drag them together to create a set.  I don't mix down since I want to be able to add or subtract an instrument based on who may or may not be avaiable that day.  Has this feature been taken out of Version 10?  Can you do this in either Logic or Mainstage?
    Thanks

    <?xml version="1.0"?>
    <xsl:stylesheet xmlns:xsl="http://www.w3.org/1999/XSL/Transform" version="1.0">
    <xsl:output method="xml"/>
    <xsl:template match="/">
    <xsl:variable name="xml1" select="document('xml1.xml')"/>
    <xsl:variable name="xml2" select="document('xml2.xml')"/>
    <xsl:copy-of select="$xml1"/>
    <xsl:copy-of select="$xml2"/>
    </xsl:template>
    </xsl:stylesheet>

  • How to get a value from one item into another

    How can i get value from one item into another item.
    Ex: I have a report, in there i have check boxes, and when i have checked some rows, and press submitt, a prosses computates it into a item on another page, and a branche redirects to page 3. Then i'm going to use the value in the item into a PL/SQL script in an report to show the submittet items.
    How can i do this?
    Computation script, pages and all that is fixed. But i dont know which PL/SQL statement to use to get th value from the item.

    Hi Fredr1k,
    Use the V() function from pl/sql.
    e.g. V('P3_MY_ITEM')
    will return the value of that page item.
    As long as the pl/sql is called from within the Apex environment.
    Regards
    Michael

  • Import package from one project into another

    Hello everyone,
    I have some projects.
    An enterprise and war project created in netbeans.
    I would like to use some files from one project to another. when I import
    the package I get the error-
    'package x does not exist'
    I have added the package to the project but I still get the error.
    I have also added the project to import to my glasspath but still.
    E.g.
    set classpath
    .;c:\enterpriseA;
    My next idea is to create a war project into my enterprise project and copy the files
    from the war project into it in order to use it. But I'm sure there is a better way.
    THanking you in advance.
    eve
    Edited by: evepokua on Nov 22, 2009 1:44 PM

    One mistake I keep making is that I don't add the package to the
    Dependencies of the plugin I'm writing. You have to go to plugin.xml,
    and add the package you depend on to the Dependencies section. Maybe you
    didn't do this?
    Michael
    nasti wrote:
    > Hello everybody!
    > I am new user of osgi and eclipse. I tried to do some of Oscar examples
    > but I had some problems. Namely, the problem in import of package from
    > one project into another in Eclipse.
    > I add first project to the Build Path of the second one.
    > I add to the first project manifest line: Export-Package example2.service.
    > I add to the second project manifest line: Import-Package example2.service.
    > But when I tried to execute these bundles the
    > java.lang.NoClassDefFoundError was occurred. May be you will help me
    > with this problem.
    > Thanks....
    >
    >

  • How to splice 2 imovie projects into 1 project?

    How to splice 2 imovie projects into 1 project?

    Select what you want from one project.  Edit - Copy then double-click other project to load it into the time line. Select where you want to add it (default is at end)  and select Edit - Paste.
    Geoff.

  • I want to import one imovie project into another one.  In other words, I have created a short sequence in iMovie 11 on one computer, and I want to import it into a project that I am working on, on another computer.

    I want to import one imovie project into another one.  In other words, I have created a short sequence in iMovie 11 on one computer, and I want to import it into a project that I am working on, on another computer.  I copied the project files onto a hard drive, and then connected that drive to the Mac that my main project is on, but when I select "import" the files are faint gray -meaning I can't select them.  Help!  I want to transfer a sequence of shots from one iMovie 11 project on one computer, into another iMovie 11 project on another computer.

    Tell me it ain't so!
    I wish I could.  The research you've done is correct.
    Wether you copy and paste or rebuild the Project from the other computer, you're going to need to get your Evnets copied from the other computer.
    The Prjoject files only contain pointer back to the original media.
    Matt

Maybe you are looking for

  • Slow boot and overall system sluggishness.

    My Macbook Pro is booting up very slow sometimes. It will take 10-15 minutes to be usable even though there are almost no startup items. It will happen only sometimes, most of the time I will boot in about a minute like it should. Still the system wi

  • Namespace replace/rename issue in ALSB

    Hi, As part of our project we have been using ALSB3.0. In one of our outbound Proxy flows we have configured transform stage which intern executing XQuery transormation. Post transformation it publish message on BEA JMSTopic in following format. *<?x

  • Problem when saving as an .eps

    Hey guys I created a vector and I wanna save it as an EPS file. My fonts were turned to outlines ofcourse. So here what I did. File>save as>eps and the option "embed fonts for..." was checked(don't know if matters) My problem is that when I open the

  • Comparison of 9.2.0.8 text features with 10.2.0.3

    Hi! We are using oracle text (9.2.0.8) at one customer (CLOBS + BLOB CONTEXT indizes)! Which new oracle text features (which really work properly) could motivate us to migrate to 10.2.0.3? If someone has already experience with oracle text in 10gR2 p

  • Cross Docking readily in ECC 6.0

    Hi, I am in ECC 6.0. I wanted to know if the Cross docking function is in. Do I need to turn on any activation switch? Someone, I am not able to locate any reference or folder for CROSS DOCK in the IMG. I read up the SAP Help but cannot find the path