OKB9 for secondary cost element

Hello all,
Does anyone know a way to rederive cost center for secondary cost element posting? We have a need to re-derive the cost center of a production order at the time of settlement. I tried OKB9 and OKC9 and it didn't work.
Any help will be greatly appreciated.
Thanks,
Cassandra

Hi,
I am not sure if i understand your scenario. However, if you want to control the settlement to Cost Center on Cost Elements, you can use the Source Structure which will be assigned in the settlement parameters for the Production Order.
Kind Regards
Umapathi G

Similar Messages

  • Number convention for Secondary cost element

    Hi,
    Anyone can guide me how to check the number convention for secondary cost element being set up in SAP?
    thank you

    Hi,
    The best way so far i have experienced is:
    Start the numbering with two digits from your company code and then cost element category and then the numerics.  If you have too many Cost elements, better to have 10 Digit numbering system.
    Assumption: You have multiple company codes
    For Example you company code is TP01
    Activity Type Cost element:
    TP43000001 - Labour Hours
    TP43000002 - Machine hours
    and so on
    This is easy for identifying either from the consultant point of view of the end user point of view
    Best Regards
    Surya

  • Table For Secondary Cost Elements

    Dear Folks,
                  Please Help me for getting details (TABLES)  of Secondary Cost elements Actual Line items Date wise and Cost Center wise
    Thanks in advance
    Regaards
    ASHOK K

    check this might help you..
    Tables to be refered for secondary cost element.
    Regards
    Kumar

  • Posting for secondary cost element

    Hi All,
    After running KSU5 (cost centre settlement, we have small balance in secondary balance. Could you please advise how we can post entries between secondary cost element.
    Regards
    Deepak

    KSU5 is used for cost center assessments (settlements are a type of allocation for internal order/WBS elements/networks/etc). Once you define the rules for the allocation, SAP will follow those rules and post the appropriate entries. You cannot post manually/directly to secondary cost elements. SAP cannot get "out of balance" during an allocation. When you say "small blance in secondary balance", I am not sure what you mean. Are you saying there is a financial balance remaining in the Sender cost center? More info is need to properly address the issue.

  • Tables For Secondary Cost Elements

    Dear Folks,
    Please Help me for getting details (TABLES) of Secondary Cost elements Actual Line items Date wise and Cost Center wise
    Thanks in advance
    Regaards
    ASHOK K

    Hi Ashok,
    some important Costing tables
    COEP  - Line Items (by Period) 
    COEJ  - Line Items (by Fiscal year 
    COKA  - Control Data for Cost center wise
    COEJT - Line Items for Prices  
    COEPT - Line Items for Prices
    CSKA Cost Elements (Data Dependent on Chart of Accounts)
    CSKB Cost Elements (Data Dependent on Controlling Area)
    CSKS - Cost Center Master Data
    CSLA Activity Master
    COBK  - Document Header       
    COEJL - Line Items for Activity 
    COEJR - Line Items for SKF
    COEPL - Line Items for Activity
    COEPR - Line Items for SKF  
    COKL  - Control Data for Activity
    COKP  - Control Data for Primary
    COKR  - Control Data for Statics
    COKS  - Control Data for Secondary 
    AUSP - Characteristic Values       
    A132 - Price per Cost Center             
    A136 - Price per Controlling Area      
    A137 - Price per Country / Region        
    COSC - CO Objects: Assignment of Original 
    CSSK - Cost Center / Cost Element       
    CSSL - Cost Center / Activity Type      
    KAPS - CO Period Locks -  
    regards
    Gokul

  • Reports for display secondary cost element

    Dear SAP consultant
    After run settlement cycles we going to display reports for secondary
    cost elements but it is return zero balance, i know that when i am trying
    to drill down it will get the whole data. but it is not practical because
    the huge amount of data that transferred to this report. In the other
    hand it will display the data with +/- sign which is not be helpful.
    Is there any report to display the result from settlement run on the
    secondary cost elements.
    << Moderator message - Everyone's problem is important. But the answers in the forum are provided by volunteers. Please do not ask for help quickly. >>
    Edited by: Rob Burbank on Jan 12, 2011 4:12 PM

    hi
    goto S_SL0_21000007 > select as per your requirement > give Cost Element Group for Sec CE and execute
    Kkumar

  • Secondary Cost Element data in CO-PA

    Hi,
    I have a doubt in CO-PA, regarding the flow of secondary cost element costs.
    I want to report the costs flowing through the Secondary cost elements (activity costs) in Profitability Analysis.
    Can someone advise me on process to do this.
    Thanks in Advance,
    Safi

    Hi,
    Please define a group for Secondary cost elements or identify the secondary cost elements and define an Assesment cycle using KUU5 in that go to Extras-Cycles-Create and define the cycle and attach segment in cycle with appropriate sender and receivers and then execute the cycle to see the values flown into COPA
    Regards
    Balaji

  • Secondary cost element report

    Hi experts,
    i just looking for secondary cost element reports ?
    regards,
    Sanju M S

    HI,
    Go to T.code : S_SL0_21000007 and,
    Go to bellow link
    http://wiki.sdn.sap.com/wiki/display/PLM/SettlementandCostElementReports
    http://help.sap.com/saphelp_46c/helpdata/en/a9/ab76ce414111d182b10000e829fbfe/content.htm
    Thanks,
    Raviteja

  • In controlling secondary cost element cost is considerble for financial rep

    in controlling secondary cost element cost is it considerble for financial reporting requirment. In controlling for pm orders based on planning in kp26 they are booking man hours  activity price. when at time of confirm of the order planning converted to actual.
    Client is giving activity price based on primary cost, when we plan the activity price It will double booking what we incured in primary cost. let me clarify for financial report requirment can we consider secondary cost or not

    Hi,
    Secondory cost is a re allocation of Primary cost. It should not be considered if you are considering primary cost. Secondary cost is used for analysis and should not be confused with Primary cost
    Ex. Cost gets collected to cost centers, The activity is a carrier which carries cost to Process/ production order. So that doent mean that the cost is gernerated twice once you book the financial and second when you acutally allocate the cost.
    In controlling we allocate the cost in a more meaningful way to get the required analysis which will support the decision.
    So both the cost should not be considered
    This may be useful
    Regards
    Shantanu

  • For financial report requirment can we consider secondary cost element cost

    For financial reporting requirment can we consider secondary cost element cost to profit and loss a/c

    In our senario _ cost is booking cost centers and revenues booking concern profit centers .
    for Financial reporting requirment can I include secondary cost to profit and loss a/c
    what is the impact on the report
    exp: salary booking in primary cost,than Per hour man hour cost computed by costing dept for allocate to concern department
    it is cost center activity price we specify in kp26 at the time of pm order confirm it will confim the activity quandity price will from planning area only,  so for salaries in primary g/ls already captured, if we consider secondary it may double booking
    srinivasa reddy

  • Using Primay cost element instead of secondary cost element for expenses tr

    Hai  SAP Guru
    WE are developer company, so when a land is acquired we create the project under business development with nomenclature "BD/LG/01" with  corporate  profit centre linked to it (as we are not sure if the project takes of due to various issues.)
    When the project commences we create another project structure with nomenclature "BE/LG/01u201D  with new profit centre.
    So when we transfer the cost lying in u201C BD u201D  project to u201C BE u201C project by giving settlement profile, the cost get transferred using secondary cost element. when we see the statement through CJI3 report the cost would have get transferred but when we
    see the report through Finance Profit Centre report the cost would have not transferred.
    So in order to get the report in profit centre, can we use primary cost element instead of secondary cost element, if we use the primary cost element what the consequence and what care needs to be taken for settlement.
    Thanks.

    Thanks.

  • Line item report on secondary cost element (cat - 21)

    Hi Gurus,
    Secondary cost element with category 21 is used for internat settlement from order to wbs or wbs to cost center. But can we see line item report on this cost element. Or we cannot see any line item report on this cost element. it is just used for internal settlement purpose.
    Please clear this doubt. thank you

    Hi Mohit,
    I hope you can have line item report @ order and WBS element stright away...
    for orders use: KOB1 transaction code for actual line items, where you have the facility of entering CE or CE group to find the vaues related to particular cost elements in the order. If you are flexible with CEs related to 21, give there otherwise create a CE group specific to 21 category and enter the group and find the results you want.
    same way for WBS elements/projects: we have transaction code CJI3 for actual line items, here also we can enter CE or CE groups
    Not only for actual line items, we have the option of viewing plan line items, budget line items, and commitment line items @ both order and WBS level with different transaction codes other than mentioned above, like KOB2, KOB3, CJI4, CJI2 etc
    I hope it helps a lot if I understand your query right
    Regards..
    Jose

  • Secondary Cost Element Values doesn't display in Profit Center Report

    Hi everyone,
    I'm having a problem with our Profit Center plan/actual/variance reports wherein it doesn't display the postings I made to the Secondary cost element when I executed an assessment cycle (KSU5). I already set in the configuration that all postings to be done in the cost centers, should have a parallel posting to the profit center assigned to it. I can see the postings in my cost center reports, but not in my profit center report. Could I have missed out on any procedure to enable the secondary cost element parallel posting in my profit centers? Any help would be appreciated. Thanks!

    it might be the configuration of the library or some parameter in the report (record type should be 0 and 2 for actual values, where 2 stands for distributed values and 1 and 3 for planned values)
    but it also might be that the reconciliation is done between different CC and same PC
    - check your CC organisation asignment
    - if sender cost center and receiver cost center have tha same PC it is probably the reason
    - I had that problem my self and didn't solve it
    cheers
    matej

  • Display of secondary cost elements in KSB1

    Hi
    One of our customers wants to delete the view of Secondary Costs to a particular cost center in Actual View of Cost Line Items (through T Code KSB1). The costs flow to the secondary cost elements based on the activity type carried out. The system is calculating the total cost and then deducting the secondary costs again from the total cost as a result of which the overall costs are in the negative. The customer wants to display the total costs only and not the flow to the secondary cost elements, even, though the data is posted for the current fiscal year for the said cost elements.
    Some transaction data already exists for the secondary cost element. We tried to changed the settings in allocation cost settings to Allocation Type 4, Manual Entry, no allocation for a future date, but still the costs are flowing to the cost element. Pls suggest a way out.
    Would assign points if the problem is sorted.
    regards
    Sanil Bhandari

    Solved

  • Difference between type of Secondary Cost Element Category?

    Hi,
    I checked the system, and during the secondary cost element (CE) creation, I can select some of the CE category as follows:
    21 Internal settlement
    31 Order/project results analysis
    41 Overheads
    42 Assessment
    43 Internal activity allocation
    50 Project-related incoming orders: Sales
    51 Project-related incoming orders: Other
    52 Project-related incoming orders: Costs
    61 Earned value
    My question, what kind of report that I can read entries with these kind of CE?
    Reason: I want to check what has been posted to these secondary CE.
    Or
    Could anyone explain the use of above-mentioned CE category in brief?
    Thanks.

    Cost element that is used to allocate costs for internal activities.
    Most often used categories are
    21 Internal settlement
    (When ever an order is settled e.g internal order settling to cost center through this type of cost elements)
    31 Order/project results analysis
    (WIP in production orders are calculated and posted using this category)
    41 Overheads
    (Used in costing sheet to do an overhead allocation)
    42 Assessment
    (whenever cost is allocated between cost centers through allocation method - Assessment)
    43 Internal activity allocation
    (found in production orders when a routing activity is confimed the charge goes to the production order through this cost element)

Maybe you are looking for

  • Assert statement (JDK 1.4). Bug in OJC ???!!!

    It appears to be bug in the Oracle Java Compiler (OJC) of JDev 9.0.3 and JDev 9.0.2, if you have an assert statement in a method of a class that has an inner class or in a method of the inner class (any assert statement, anywhere in the code). If the

  • Newbie at Illustrator scripting needs help assigning image

    I am trying to copy a graphic stored in a vb.net picturebox.image into an activeLayer of an illustrator document. Can anyone supply me with code as to how to do it. Also is there a way to lookup a swatch by name and not have to rely on knowing it's i

  • A good RSS reader with auto torrent download capability?

    I'm creating a torrent download box using deluge.  The problem is, deluge doesn't seem to have its RSS plugin built into it anymore, but it does support auto downloading by putting torrents in a folder that deluge will watch.  I now just need an RSS

  • How do u handle the user parameters for a currency field.

    How do u handle the user parameters for a currency field.    Decimal saperator and a hundreds saperator. (depending upon the user parametes set for the user the saperators may differ)       Eg: currency field: 13.896,01 (In this case u2018,u2019 is a

  • Should I switch to iMovie HD? ...and other questions.

    I'm planning on purchasing a new camcorder that can film in HD. I want to know if it's possible to import HD footage from the camcorder into iMovie 4, or if I should upgrade to iMovie HD for better results. If I SHOULD upgrade to iMovie HD, do you th