OMS2 - quantity update vs. value update

Hello MM experts,
Could anyone please explain the difference between quantity update vs. value update - which is selected in what scenario.
We have a new material with 3050 val. class and VERP as item category group. When we created PO, it gave us error as to  'Account Assignment Mandatory'. So I selected quantity update in OMS2 for VERP material type. However, it still gave the error. So, I selected the 'value update'. Now the PO was created successfully. I did not select value initially, since it wasn't selected for any other material type/plant.
Please explain the reason.
Thank you.

Hi Munair,
from accounting perspective any material can be purchased for either  STOCK or for CONSUMPTION
- STOCK implies that material will be kept in inventory and will be managed on Qty and Value basis ( you can see stock qty and value in material master accounting view and in reports like MB52) and subsequent issue will generate an account posting
-  CONSUMPTION means that material's purchase value will be consumed at the time of purchase.
for items which we always want to be consumed at the time of purchase e.g. factory consumable or small items like stationary etc. where we don't want to track them on value basis in accounting  we need to put VALUE update as ' blank'
this will ensure that material can't be brought in to inventory and hence will always ask for account assignment because system wants to know that if its for consumption than against what it will be consumed e.g. cost centre / internal order
it will allow to progress of you use an account assignment and put a cost centre against it.
In your case some companies wants to track packaging on a value basis ( so require value update as X in OMS2)
for others if packaging is too small in terms of value than they prefer not to track this is accounting and somark value update as 'blank' in OMS2)
Hope this clears
Regards
Dheeraj

Similar Messages

  • No Quantity/ value update at Movement type

    Hello All,
    At Material type level with valuation area SAP controls check / uncheck Quantity/ Value updating (OMS2)
    In our specific business scaenraios, we use material type (HALB) with valuation area combination with / without Quanity & Value updating. Hnece, above setting will not work in our scenario.
    is it possible to have control of Quantity/ Value updating by using a custom movement (ex: copy of 101 to 1Z1)?
    Really appreciate your thoughts!
    Thanks
    Siva

    Hii shiva, lots of threads are available regarding this .
    have u gone thru.plz search sdn, u will get good reply.
    quantity and value update
    Quantity update and value update in case of account assignment category
    Material Type that updates Value but no Quantity
    Quantity and value updates for stock.
    quantity/value updation query
    hope u will get sm idea.
    Note : Do not use SMS Speak.Avoid links while answering,try to give your own suggestions.
    Edited by: Jeyakanthan A on Jul 22, 2011 10:25 AM

  • Quantity and value updation

    Hi to all,
    Kindly explain , what is the meaning of Quantity and value updation.
    1. Quantity updation means where we have to check quantity
    2. Value updation means where we have to check value
    Thanks
    Ravi

    hi buddy
    this kind of thing will come in picture when u take some order from outside with customer material I.E. u act as subcontractor
    at this time the value updation is not required so we can use unvaluated material type UNBW
    ok
    in ono quantity update can be use in scenario of returnable packaging where u dont want to make any quantity updates and also value updates when u transfer the matrial
    ok
    reply if any query
    reward if useful
    regards
    kunal

  • Value updation

    hi all
    i created a movement type and i want to change the how can i change the quantity and value updateing check boxes and value string
    my problem is when i do the GR i want only quantity updation, no values update  in FI documents
    thanks in advance

    This can be done only for matl type in OMS2 tcode
    u cant do for a mvt type
    pl reward if u feel ok
    guru

  • Material Type value update activation

    There is a requirement to convert a material type from only qty update to Value update . The transactions like procurement and consumption are happening for this material type .
    In case , Value update is also activated for this material type and accounting view is created for these materials , what will be the  implications during the cut over activities .
    The suggestions and information from the members , who have experience in the similar scenario are welcome
    Regards
    Mani

    Hi,
    It is very well possible to have materials with value updation only.
    It is useful when no inventory i.e no stock is to be maintained. Only value is the required.
    For eg: Pipeline material is directly consumed. No inventory is required to be maintained against it.
    Such materials are also called as non-stockable materials.
    These materials will always be procured against an account assigment category in PO. The value is directly posted to Consumption Account picked via Acc *** Category during GR.
    No stock/inventory account will be posted during GR.
    Regards,
    Komal

  • OMS2 setting for quantity & Value update.

    Whenever new plant is  created (after go live), we have to do the the Qty & Value update (OMS2)  for that new plant/valuation area for each individual material type.
    While doing this we have select the material type  individually for each material type & then checking the Qty & Update field which takes lot of time.
    I like to understand is there any smart way to update the quantity & value update for all material type in single screen. Currently we have to go to individually for each material type.
    This will save lot of time & Smartness in consultant work.

    Hi,
    Plant is considered as an operating area or a branch or a location within a company which concerning with production facility or branch office or large warehouse storage .
    When a new plant is created – it is always better to check OMS2, OMWD and other related assignment or copy from existing running plant. Also there are other related factors individually involved to plant only for which a new plant is required; all are needs to be attended. So instead of saving time, better check all settings (excise registration, if any) for anew plant to work business effectively.
    Regards,
    Biju K

  • Quantity/value updation query

    hi all
    PR-RFQ/Quotation-Price comparison-PO-GR-IR, when I am doing this process I want only update quantity only, I don’t want to update value updation
    Pls tell how it is possible is there any configuration required in this scenario
    Pls tell me as early as possible

    Dear Sandeep,
    You can use material type: UNBW when create a material master record, this standard from SAP that only update for Quantity.
    Regards,
    w1n

  • Quantity/value updating

    Dear expert:
    i create a PO (with account assignment) with a material belongs to a material type has not set quantity and value updating. i get a material document when i do goods receipt against this purchase order. i know there will no quantity and value update, but i wonder where the data is stored. please give me some clue.
    thanks and best regards,

    Hi David,
    When you are creating PO with qty & value updating untick, system will ask for account assignment mandatory (ex: K cost centre) while creating PO & when you do GR the qty part will go to cost centre consumption & value will be booked for that cost centre used. you can see controlling document in GR, for PO without cost cenre you see accounting entries here you see cost centre entries.
    Regards
    Rang
    Message was edited by:
            Ranganath Mysore

  • Qty and value update

    hi all sapians,
    Can any one give me a very clear idea or story behind the check boxes of quantity and value update in OMS2 and for some material there boxes are checked and for some materials boxes are not selected.
    Edited by: MANI ROOPA SD/MM on Apr 21, 2008 8:09 AM

    hi
    Quantity Updating Specifies that the material is managed on a quantity basis in the material master record for the relevant valuation area.
    Value Update: Specifies that the material is managed on a value basis in the material master record for the valuation area concerned.
    The values are updated in the respective G/L accounts at the same time.
    as you said at for some material there boxes are checked and for some materials boxes are not selected
    the Qty and Value are updated based on valuation area
    Valuation Area
    Organizational level at which the material is valuated. A valuation area can be one of the following:
    Plant: All plants belonging to a company code, in which case the valuation area is the company code
    1: Based on valuation area and as required some material types are selected and some are not
    2: Based on material Type we select Qty and Value updation: like for NORM for your valuation area (and also might be for plant valuation) all boxes are selected and for material type KMATConfigurable materials it is not selcted
    regards

  • RG1 value update on Sales

    Hi Gurus,
    After a complete Domestic Sales process, RG1 register should be updated with quantity and value for goods removal from factory . In standard after updating ,extracting and retrieving the final report it is being noticed that value is not getting updated , only quantity is getting updated. Kindly let me know if i have missed any configuration for the value updation or else let me know the correct process to get the value updated.

    Sumit Ghosh
    Please note, as the query raised by you is related to CIN, therefore, we are moving discussion from SAP ERP Sales and Distribution (SAP SD) to Internationalization and Unicode
    Use Internationalization and Unicode for CIN queries or information sharing.

  • Material Type: Value Updating Flag

    Hi
    For a material type, is there a possibility that only the 'Value Updating' flag is checked and the 'Quantity Updating' flag is unchecked? Is this a realistic scenario? Any reall-time example for such a scenario?
    In this case, is the material type considered as Inventory managed ?
    What is the implication of checking the 'Value Updating' flag?
    Does this mean that a Stock Account is associated with the material type?
    Thanks for your inputs here in advance
    Kind Regards
    ~P

    Hi,
    It is very well possible to have materials with value updation only.
    It is useful when no inventory i.e no stock is to be maintained. Only value is the required.
    For eg: Pipeline material is directly consumed. No inventory is required to be maintained against it.
    Such materials are also called as non-stockable materials.
    These materials will always be procured against an account assigment category in PO. The value is directly posted to Consumption Account picked via Acc *** Category during GR.
    No stock/inventory account will be posted during GR.
    Regards,
    Komal

  • Updating the value in frame1 if changed in frame2

    hi,
    i have two frames....frame 1 has button calculate....frame 2 has button update which can update the data on frame two.....so the scene can be like that user might or might not want to update data on form 2 but in either case will calculate.....The approach that i was thinking of is that if i update it i store it in a JtextField2 on frame2 ...read the value in frame1 and compare with the value when updated wasnt hit....if values are same the result can be the standard value else it will store the value from JtextField.....now i have a question....
    1) is this approach fine??.....How can i tell calculate that Update was hit or not?????...is there any way by which i can get that a button in frame2 was hit or not???
    private void jButtonAction2Performed(java.awt.event.ActionEvent evt) {
                table1 t1 = new table1();                    //frame 2
                String a1 = t1.jTextField1.getText();   //frame2....reads the data from textfield 1
                String a4 = jTextField1.getText();  //frame1
               double anum1, anum4;
            anum1 = Double.parseDouble(a1);
             anum4 = Double.parseDouble(a4);
              double asum = anum1*anum4 ;
          System.out.println("i am NOT UPDATED value--> "+asum );
              String tabsum = t1.jTextField2.getText();    //text field2 has the updated value of the product with which asum will be compared
          double tsum1 = Double.parseDouble(tabsum);
         System.out.println("i am UPDATED value--> "+tsum1);for some reason it is not reading the content of jTextField2 of frame2 and showing the error -------> Exception in thread "AWT-EventQueue-0" java.lang.NumberFormatException: For input string: "jTextField2"
    Thanks

    or find a workaround?
    but since am using NETBEANS making SSCCE takes me even longer thats why i was trying to do it myselfThen don't use Netbeans.
    The point is to make a simple example that you understand. Once you get the simple example working you incorporate the knowledge you learned into your main program.
    It makes no difference if a component is defined on a second frame or the same frame. As long as you have the correct reference you can update it from any frame.
    We can't help you with your currently stated question, because the problem is probably contained outside the posted code. As I told you earlier, the problem is likely that you have an incorrect reference to one of your components. Since we can't see where you declared each variable we can't help you.

  • Program updating the value with succeeding 0

    Hi
    We have got a problem.
    We have developed a program to update the value of the condition type. The upload file will have the SO, line item, condition type and value.
    In the background, the sales order change BAPI is called and the value of the condition type is updated. There is no bug in the program for this functionality with reference to the problem.
    When I upload, the value is getting uploaded correctly. But for some users, the value is updated with an additional 0 at the end. For example if 78 is the value of a condition type, the update happens as 780. The strange behaviour is that if I take that user id and password and upload in my laptop, the value is correctly uploaded without any addtional 0.
    We have checked the user profile of all the problamatic users. They are fine. The xls sheet decimal notation is checked and they are also fine. There is no bug in the program, as it is working fine for many users.
    What else should I be checking to solve this issue. An ABAPer advised to check the GUI level difference. I dont know how to do that but there should not be any such difference in the GUI versions for the users.
    Can somebody put some light on this issue.

    Hi Navaneetha,
    The Excel version is the same for you and the user?
    Can the same be debugged and rectified?
    Regards
    Saurabh

  • Open Delivery value update error in credit management

    Hi
    We have credit management active at delivery level. The value of open deliveries is not getting updated correctly for items with material substitution (material determination). For all other items, its getting updated correctly.
    E.g Let say the credit limit set in FD32 is 10000 and the credit limit used % is 98 and the credit exposure value is 9800.
    Now when I create an order with qty 10 for mat A, it creates a sub item B due to material determination and the value of the item is Rs.1200. In our system, the sub item with TAPS item category is relevant for pricing.
    Then I create a delivery in VL01N and save it.
    Now if i check in FD33, the credit limit used should be 101% and the credit exposure value should be 11000, but its not updating the open delivery value correctly. Its not considering the value of the new delivery.
    However, If I add a normal item (TAN) in the same sales order and create a delivery for that item and save it, its updating the credit exposure based on the value of the normal item in the delivery correctly.
    How to make the system update the open delivery values correctly by taking the items with material determination also into account.??
    Please advise if any specific settings need to be done.
    Regards
    Madhu

    Hi,
    the system updates open values for credit management. These are:
    Open sales order credit value (S066-OEIKW)
    Open delivery credit value (S067-OLIKW)
    Open billing document credit value (S067-OFAKW)
    The system updates the open values in standard SIS structures S066 and S067. Technically, the structures are transparent tables. You can display the contents using transaction SE16 or using table maintenance.
    The S067-OLIKW will give the open delivery credit values credit.Check in you system whether this table is updated with the delivery values for the credit account(customer number)
    RVKRED77 u2013 Reorganize SD credit data
    When updating errors occur, it enables you to reorganize the open credit, delivery and billing document values.
    If the table is not updated run this report in background.
    Regards,
    Saju.S

  • How to update Elements value inside existing xml file

    Hi Gurus,
    Am somehow new to java and working on xml with java, i have a scenario where i want to update the elements of my existing xml file, i know its possible as i have posted one code on this forum which updates the values of the arrtibutes of existing xml file. Ref :
    http://forum.java.sun.com/thread.jsp?forum=34&thread=186091&start=15&range=15&hilite=false&q=
    But am not able to use the same code to update the vlaues of the attribute.
    if i have this xml file :
    <?xml version="1.0"?>
    <RootElement>
    <Transaction>
    <Task9>
    <TaskID>Task9</TaskID>
    <Description>My Test Case</Description>
    <Time>12/12/2004</Time>
    </Task9>
    </Transaction>
    <Transaction>
    <Task2>
    <TaskID>Task2</TaskID>
    <Description>Testing my xml</Description>
    <Time>12/12/2004</Time>
    </Task2>
    </Transaction>
    </RootElemen>
    Now i want to update teh </Description> and </Time> field using the code that i have given above in the link.
    If any one can help me ill really appreciate.

    The value of an element is stored in a child node of that element. For example, let's say that "e" references the node <Description> then:
    e.getFirstChild().getNodeValue() => "My Test Case"

Maybe you are looking for

  • How to load a txt file into a table

    Hi, I have a txt file 3 sample records: 25     fff     fff     2012-03-08 13:42:31.0     2012-03-15 14:58:31.0 26     ooo     ooo     null     null 27     ooo     ooo     2012-03-22 10:39:49.0     null I have problems with the nulls: my ctl is like t

  • Videos in my iTunes are not playing back correctly.

    Every time I choose to play on of my music videos purchased from iTunes, it playsback really distorted and fuzzy sounding. I have checked all my connections ot see it it was a speaker issue, and I also checked to see if these same videos would play o

  • Ipv6 address setup in local zone

    I'm having problems with a local zone that needs a defined IPv6 address. I've had a number of issues -- now i'm down to routing. I've set up a manual address on a physical interface, and assigned it to a zone by setting it from the global zone: ifcon

  • Problems with certificate and signed jad

    Hello I have a third party jar and jad which is signed as far as I can tell. When I run the jad under the phone emulator.exe I get the text below Is there something I need to do. Perhaps to do with keystores etc. I can install the jar and the applica

  • How to call method of one View into another view?

    Hi Gurus, I am having 2 views defined in a main window say view1 & view2 i have method get_data defined in view1 & now want to call it in view2. Is this possible? Can this is also possible if the 2 views belong to a different window? Regards Rahul